Determination 511320

Cyclone storm damage claim declined

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A tavern owner claimed for storm damage to her building after Cyclone Debbie, and the FSP declined the claim citing pre-existing roof corrosion and deterioration. AFCA found the exclusion applied and ordered nothing.

The FSP bore the onus of proving an exclusion was the proximate cause, and the contractor reports showed long-term corrosion and deterioration excluded under the policy.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 511320 Determination Page 1 of 8 Case number: 511320 15 August 2018 1 Overview 1.1 Dispute The applicant is the owner of a tavern in Queensland. JH represents it in this dispute. For simplicity, this determination will refer to the applicant and JH collectively as the applicant. The applicant says Cyclone Debbie damaged her building. She lodged a claim with the financial services provider (FSP). The FSP declined the claim. The FSP says the damage to the building was not caused by Cyclone Debbie, but by factors which are excluded under the policy (such as wear and tear and gradual deterioration). 1.2 Issues and key findings Is the FSP liable for the building damage? I am satisfied the damage sustained to the insured building was unforeseen and unexpected by the applicant. She did not intend for this to occur. The applicant has therefore established a valid claim under the policy. However, based on the available information, the FSP established the proximate cause of the building damage was pre-existing roofing issues (corroded roof sheets, fixings and flashings, deteriorated silicone sealant). The policy excludes damage due to wear and tear and gradual deterioration. The FSP is not liable to repair the building damage. Is the applicant entitled to compensation? Having considered the circumstances of the claim, I do not accept the applicant is entitled to an award of financial or non-financial compensation. Further the FSP is not liable to reimburse her legal costs. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to decline the claim. It is not required to take any fur ther action. Case No: 511320 Determination Page 2 of 8 2 Reasons for determination 2.1 Is the FSP liable for the building damage? Applicant established a valid claim within the terms of the policy The onus of proof rests on the applicant to establish, on the balance of probabilities, she has suffered a loss caused by an insured risk. The policy covers accidental loss or damage to the property, subject to general exclusions for damage caused by wear and tear or gradual deterioration. As ‘accidental’ is not defined in the policy, its ordinary meaning is taken. This is an event that is unforeseen and unintended by the insured. The applicant says on 28 March 2017 Cyclone Debbie damaged her building. Her staff provided statements about water entering the building during Cyclone Debbie and the subsequent storm event. There is no evidence to suggest the applicant intended this damage to occur. On this basis, I am satisfied the applicant has established a valid claim. FSP is required to establish an exclusion applies In these circumstances, the FSP bears the onus of establishing that, on the balance of probabilities, it is entitled to rely on an exclusion to deny the applicant’s claim for damage to the roof and internal areas. The FSP says the building damage was not caused by Cyclone Debbie but by pre - existing issues, wear and tear, gradual deterioration. In order to deny the applicant’s claim, the FSP must show these factors were the proximate cause of the damage (the real, effective or dominant cause). Damage caused by issues that pre-existed the storm During the claim process, the FSP appointed two contractors to inspect the property. The FSP’s builder (RZ) inspected the roof and reported it was in a poor condition. RZ found patched roof repairs, deteriorated silicone and gutters with debris. The FSP’s building consultant (CR) concluded the rainwater entered the roof through:  corroded roof cladding, fixings and flashings  extensive deterioration of sealant previously applied. CR also notes there was no storm created opening, but identified water drip marks inside the building. CR says internal water damage corresponds to fixings/roof sheets which have been coated with numerous layers of sealants and patched. The applicant disputes the findings of the FSP’s contractors regarding the cause of the damage to the roof. She says Cyclone Debbie caused all the damage to the building. Case No: 511320 Determination Page 3 of 8 The applicant says:  cyclone 4 wind speeds created a storm opening to the building  the wind caused stress to the building’s roof to crack and lift  two small puncture holes were made in the midst of the cyclone event to relieve the rain water collecting on top of the bar/kitchen’s ceiling  the drip stains and surface corrosion are not old but caused by Cyclone Debbie. She says because of the loss of electricity, she was not able to dry out the area and as a result was unable to prevent mould growth and rapid corrosion. In support of her position, the applicant provided two journal articles, a technical bulletin and a maintenance schedule. The maintenance schedule refers to declarations provided by two of the applicant’s staff. The staff state roof maintenance was done by the way of regular application of sealant (approximately three times a year) and cleaning of gutters (approximately twice a year). The staff also state they witnessed the replacement of a few sheets of roofing iron a few years ago. Whilst I accept the staff provided genuine accounts of their recollection of the building maintenance, I do not accept this challenges the FSP contractors’ findings about the pre-existing issues with the roof. RZ and CR’s reports provide a logical and rational explanation of how the damage occurred. This is consistent with the observed fac ts. CR’s report is also supported by detailed colour photographs. The articles and bulletin are general in nature about the effect of cyclone damage to buildings in Australia. It is not specific to the applicant’s property, nor does it rebut the FSP contr actors’ findings about the cause of damage to the building. There is no expert evidence to challenge RZ and CR’s reports. On the balance of information available, I am satisfied pre-existing roofing issues allowed the ingress of water into the building and caused the damage. FSP is not liable to repair the damage After careful consideration of all the information, I accept the proximate cause of the damage was wear and tear and gradual deterioration over time, rather than the one- off effects of Cyclone Debbie. Damage caused in this manner is excluded under the policy. Accordingly, the FSP is not liable for the cost to repair the roof and internal building damage. 2.2 Is the applicant entitled to compensation? FOS may award compensation for financial and non-financial losses Under the Terms of Reference, FOS may award compensation (capped at $3,300) for consequential financial loss suffered by an applicant relating to their claim. In addition, FOS may award compensation (capped at $3,000) for non-financial loss where an applicant has suffered an unusual degree or extent of physical Case No: 511320 Determination Page 4 of 8 inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. However, FOS adopts a conservative approach to the award of compensation for non-financial loss. FOS expects applicants to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Applicant not entitled to non-financial compensation The applicant is dissatisfied with the way the FSP handled her claim. Among other things, the applicant says she:  experienced interference with her expectation and peace of mind of having an Australian product bound by Australian contract law  experienced an unusual degree of physical inconvenience in having to travel from Victoria to Queensland to inspect the damage and had to leave her responsibilities unattended in Victoria  had to take time to conduct legal research and draft documents for the claim and dispute. Having carefully reviewed the information available, I am not satisfied the applicant is entitled to non-financial compensation. I acknowledge she travelled interstate to the property. However, I accept this inconvenience would have arisen as part of the claim event, not the FSP’s con duct. Whilst I accept the applicant spent time drafting and corresponding to the FSP about this claim, this would fall within normal degree of inconvenience expected when in a dispute with their insurer. For reasons discussed, I am satisfied the FSP was e ntitled to decline the claim. Therefore, the FSP has met the terms of the insurance policy it provided to the applicant. Given all this, I do not consider the circumstances support an award of compensation. Applicant not entitled to legal/professional and travel costs The applicant seeks to be reimbursed for legal/professional and travel costs she incurred. The FOS process is designed to be accessible to applicants without the need for legal/professional advice. Accordingly, FOS considers that the reimbursement of legal/professional fees is appropriate in limited circumstances (for example, where a dispute raises complex legal or technical issues). The issue in this dispute was the proximate cause of the building damage. I do not consider the issue was reasonably complex and technical to require legal advice or the assistance of a professional representative. Further, it is unclear what legal or professional advice she has sought in relation to the claim. Case No: 511320 Determination Page 5 of 8 In relation to the travel cost claimed, I note the applicant’s building and business was managed by two staff. It is unclear why she was required personally travel to Queensland as part of disputing the FSP’s position. She has also not provided information to evidence her travel cost. Given all this, I do not accept the applicant is entitled to the costs being sought. Case No: 511320 Determination Page 6 of 8 3 Supporting information 3.1 Key policy wording Section 1 Property …We will cover you up to the sum insured for accidental loss or damage to your property insured at the premises during the period of cover. … Policy section exclusions … 2. We will not cover You for loss or damage caused by: a) wear and tear, gradual deterioration, scratching, marring, developing flaws, normal upkeep or any gradual cause b) corrosion, rust, oxidation, any form of fungus, wet or dry rot, dampness of atmosphere, variation in temperature, evaporation, disease, shrinkage. 3.2 Key records Record K ey points FSP’s builder ( RZ ) Report 25 - 05 - 2017  The roof is in poor condition but this is not because of the cyclone, the repairs the insured talked about have been done previous to the event as the fixings are old and consistent with the entire roof.  There are patch repairs all over the roof by others again prior to any storm event. There are numerous AC units on the roof and some of the drains are expelling directly onto the roof causing rust. There has been a lot of mastic and silicone used over the years and this has started to deteriorat e. The gutters and the box gutter has weeds and other debris lying in the outlets preventing water from escaping.  The interior of the premises shows signs of where repairs had be en done previous to the event as they have been poorly done. Some of the split systems appear to be leaking inside the wall cavity and has caused the plasterboard to bec ome wet and then dry out and crack. All this is consistent with old damage . There is also a crack running down a wall followi ng the mortar joints, this is next to a split system.  the writer believes that this claim be looked at as the damages are old and may not be related to the event that took place in March 2017 FSP’s building consultant ( CR ) Report 15 - 06 - 2017  The claim relates to damage caused by water entry through various sections of the roof due to extensive corrosion of roof sheets and deferred maintenance relating to the roof cover which has clearly reached the end of its servic eable life.  The writer observed rusted roof fixings and roof sheets which have been sealed with silicon sealant many times over the Case No: 511320 Determination Page 7 of 8 leaking spots. The sealant has since deteriorat ed and delaminated from the substrate allowing for continues water entry each time it rains.  The above is consisten t with the corrosion of met al roof beams observed within the building and evidence of historical repairs carried out in relation to water damage in the affected areas.  We conclude that the claimed damage is not the result of TC Debbie, rather is the result of long term wear and tear and maintenance related det erioration of the roof cover. We recommend that the Ins ured attends to these issues as part of their normal maintenance schedule.  Front Bar and Entertainment Area  5.1.1 The two small punctures through the ceiling lining made to relieve the rain water collecting on the top of the ceiling board have been noted.  5.1.2 This area of ceiling corres ponds with the roof section where presumably rusted roof sheets have been previously replaced (refer to photogra ph 1 in Appendix A - Photographic Supplement )  5.1.3 The blistering paint on the northern section of the vaulted roof over the Entertainment Area has also been observed.  5.1.4 There was no evidence of recent water entry and/or staining in this area of damag e which appeared old in nature.  5.1.5 The ins pection of the roof area above the vaulted ceiling revealed a historical seal to the gap bet ween the roof sheets and the ridge capping (refer to photograph 2 in Appendix A - Photographic Supplement).  5.1.6 It appears that sealing of the gap had stopped wind driven water entry from occurring ever since.  Sports Bar  5.2.1 Water drip stains on the sides of partially exposed roof steel beams have been obs erved.  5.2.2 The above is accompanied by substantial surfac e corrosion blistering affecting all three beams attached to the RHS of the bar (refer to photograph 3 in Appendix A - Photographic Supplement).  5.2.3 This area of damage corresponds with the section of the roof where extensive deterioration of silicone seal ant used to patch up leaking spots of roof capping has been noticed (refer to phot ograph 4 in Appendix A - Photographic Supplement ).  5.3 Kitchen and Meal Order Area  5.3.1 Water stains to the ceiling lining and water drip stains on the sides of the roof ste el beams in the above areas have been observed (refer to photograph 5 in Appendix A Photographic Supplement).  5.3.2 As was the case in the Sports Bar area, the above areas displayed identical signs of damage which appeared old in nat ure with evidence of previously made repairs related Case No: 511320 Determination Page 8 of 8 to the observed water damage (refer to photograph 6 in Appendix A Photographic Supplement).  5.3.3 Typically, the roof area corres ponding to these areas of damage has been found affected by extensive corrosion to the roof she ets and roof fixings which have been coat ed in the past with numerous layers of sealants to stop the leaking (refer to photograph 7 in Appendix A - Photographic  Supplement ).  5.3.4 Furt her, the Nearmap aerial view of the lnsured's property reveals a patchin g roof sheet over the affected areas of ceiling has been installed in as early as 2014 (refer to photograph 8 in Appendix A – Photographic Supplement).  5.4 Dining Area  5.4.1 A high conc entration of mould growt h on the ceiling has also been described to me as a recurring occurrence (refer to photograph 9 in Appendix A - Photographic Supplement).  5.4.2 This, approximately 28sqm area has been fitted with two large capacity air blowers which blow the air close to the surface of slightly slopping raked ceiling ( refer to phot ograph 10 in Appendix A Photographic Supplement ).  5.4.3 The observed damage is consistent with the effects of large volume of air being blown against the surface of the ceiling and subsequent absorption of moisture contained in the mases of ai r by the ceiling plasterboard.  5.4.4 Warm and moist conditions in the vicinity of the ceiling surface creat e a perfect environment for mould/fungus growth observed in this area.  5.4.5 This damage is result ant from the inc reased moist conditions created clo se to the ceiling surface and lack of adequate ventilation.  CONCLUSIONS  6.1 From the inspection undertaken and obse rvations made at the time of CR inspection, all damages noted on site are resulting from water entry through the roof due to pre - existing con ditions i.e. corrosion to the roof cladding, roof fixings and roof flashings as well as extensive deterioration of flexible sealant previously used to stop the water ingress.  6.2 There was no storm created opening made by the TC Debbie and CR is of an opin ion that the observed damage is of a long term nature relating to the ongoing maint enance issues.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.