Text of the determination
Determination
Case No: 511043 Determination Page 1 of 8
Case number: 511043 20 July 2018
1 Overview
1.1 Dispute
The applicant held a home and contents insurance policy with the financial services
provider (FSP). He lodged a claim for damage to his insured home which occurred
on 29 December 2016, as a result of water surcharging through the pipes servicing
his pool. He says this affected the general pool area and flowed into the home.
The FSP accepted the claim and covered the damage inside the home. In relation to
the pool, the FSP obtained many expert opinions and offered to cover the applicant
for several loose tiles in the pool area only. It calculated the value of this damage at
$1,365 and offered a cash settlement for this amount.
As the FSP will not undertake or warrant the work, the applicant considers the
offered settlement unfair. His expert says any removal of the tiles will require the
entire area to be resealed, which will cost $79,171.40.
Upon further consideration and receipt of another expert report, the FSP revoked its
offer and now considers the damage is not covered at all.
1.2 Issues and key findings
Is there damage to the pool surrounds and is it covered under the policy?
On balance, the evidence suggests the applicant‟s pool was damage d by the storm
event and this loss is covered under the terms of the policy.
The FSP has the option to either repair and warrant the damage or to settle the
applicant based on the quote from his expert.
1.3 Determination
This determination is in favour of the applicant.
The panel considers the FSP must (at its discretion), either:
attend to the necessary work to repair the applicant‟s pool (including additional
issues which have developed since the loss), providing a reasonable and
industry-consistent guarantee for the work, or
pay $79,171.40 for the work, plus interest calculated at the statutory rate from 4
July 2017, until the date of settlement.
Case No: 511043 Determination Page 2 of 8
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise in this dispute.
Reference to the applicant in this determination includes reference to submissions
made by the appli cant‟s legal representative.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Is there damage to the pool surrounds and is it covered under the
policy?
Evidence of an insured event at the property
There is no dispute the applicant‟s insured home was damaged as a res ult of a storm
event, which permitted water to back up service pipes for the pool area, allowing
stormwater and debris to flow through this area and into the home.
As the policy broadly provides cover for accidental damage, the panel accepts there
is evidence of an insured event. There is also cover for storm, rain or flood and water
or other liquid damage.
The FSP accepts the event was covered and the resultant damage from the event is
covered under the policy (subject to the policy exclusions). It has covered internal
damage caused to the home as a result of this event.
Expert evidence regarding damage to the pool
Numerous experts were engaged to review and comment on the damage to the
insured home.
Builder „ BB ‟ (16 January 2017) notes the event was genuine and covered but
observed no direct damage to the pool area at that time.
Restorer „MR‟ (23 January 2017) note s the drains of the pool could not cope with the
downpour and this led to water flowing back through this area, causing damage to
the home. BB (2 March 2017) shares this view.
Loss adjuster „CR‟ ( 5 May 2017) notes the applicant was claiming for pool tiles but
BB did not consider any were damaged in the storm event.
IR (17 May 2017) sealed the pavers for the applicant in October 2016. The FSP
approached IR to provide an opinion as to the cause of the loss and the extent of
damage.
The expert notes the presence of two or three affected pavers which showed the
effects of staining from water underneath:
Case No: 511043 Determination Page 3 of 8
… for example, from tiles being laid on inadequately dry beds, where moisture then evaporates
through the grout lines, staining the outside of the tiles or moisture sitting underneath the
surface as a result of faulty draining systems.
This might be interpreted as damage not caused by the event. IR observes the
damage is slight but it is evident water corroded the pavers and there is evidence of
rusting on the metal drains. IR concludes this is due to the “suggested leaking
issues”.
Ultimately, IR considers “less than 5%” of the pool area appeared to be worse off,
since the sealing of the pavers was done seven months earlier.
Further evidence of drumming of the pavers was evident and “significant”, probably
contributing to the deterioration of the affected area.
Expert „V M ‟ (4 July 2017) supplied a report for the applicant. V M identifies there are
several issues with the pool area, including:
water staining to floor tiles
flaking/crumbling of the floor tiles, and
rusting to the strip drains.
VM attributes this to water damage from the stormwater ingress event “without any
doubt”. Noting the offer for $1,365 made by the FSP, V M suggests this was
insufficient to address the damage as the:
damage is not limited to one area
drain rusting is related to the event, noting the only drains damaged are those
exposed to “dirty water ingress”
method of repair suggested is inadequate as the removal of the floor tiles will
compromise the integrity of the waterproof membrane and no repairs could be
guaranteed.
VM details a scope of works totalling $79,171.40.
CR in a later report (20 July 2017) suggests the damage i s not caused by a “one off
wetting” event and attributes it to pool water. Noting the commentary from IR, CR
commissioned a quote for repair from BB, which was $1,365.
BB suggests in the quote it did “not want to get involved” in the repair as there was
“underlying issues” with the pool (which were not expanded upon). It proposes a
quote for cash settlement purposes only. The applicant rejected the quote, preferring
to have the work done and guaranteed by the FSP, not paid out.
BB did not agree the quote from VM should be accepted, given BB‟s views on the
cause of the damage.
Contractor „C C ‟ (2 August 2017) also suggests the damage was due to “long term
issues and not from a one off storm event”, noting the pool was a “wet area” and
should be able to cope with the water event.
VM, writing under a different letterhead (10 September 2017), notes the pool was
“storm damaged, very much unsafe and [totally] unusable”. VM says the FSP agreed
to cover the loss through BB, until it was established the total amount of the loss
Case No: 511043 Determination Page 4 of 8
might exceed $50,000. The FSP then took over and removed the authority for BB to
act on the FSP‟s behalf .
VM confirms the damage will cost $79,171.40, to repair and noted extensive work
was required, including the installation of a new waterproofing membrane to the
entire pool area.
FSP changed its view on the damage after conciliating the matter
Based on the findings of the respective experts, the FSP agreed to cover the
applicant‟s claim but refused to attend to the work. It offered to pay $1,365 , as per
the proposed scope of works prepared by BB.
The applicant wanted the work completed and a guarantee issued. The FSP would
not attend to this and the applicant did not accept the offer.
In discussions with the case manager, the applicant agreed he would accept the
quote for $1,365 on the basis the FSP arranged for a repairer to attend to the work
and guarantee it. This proposal was relayed to the FSP but it did not agree to this
resolution.
The policy is silent as to repair guarantees, although the General Insurance Code of
Practice outlines that insurers will accept responsibility for repairs authorised in
relation to claims. The panel accepts such an approach is necessary to facilitate
consumer confidence in the quality of repairs.
When considering the matter at the conciliation, the FSP was offered the opportunity
to obtain another quote to further consider the extent of damage. It chose not to do
this.
Instead, the FSP obtained a final expert report and ultimately changed its view in
relation to the loss. It now suggests none of the damage to the pool area was caused
by the event.
Final expert report submitted by FSP
Engineer „ RB ‟ (18 February 2018) supplied a report to the FSP after the conciliation
failed to resolve the dispute. RB was unsure of how much of the pool area was
covered by flood water but noted there was a fall away from the pool to the perimeter
box gutters. RB suggested it was “unlikely” that water could have spread around the
tiles to any great extent.
Referencing early comments from BB, RB suggested the drainage system for the
pool may have been inadequate.
RB observed:
the tiles for the pool area were in a raw state and devoid of protective coating
there was a significant difference between these tiles and the tiles in the family
room of the home
IR‟s suggestion it had sealed the pavers in October 2016 was questionable and
RB believed this had not been done for several years
Case No: 511043 Determination Page 5 of 8
there were a number of tiles in poor condition and/or presenting a “drummy”
sound when tapped. RB suggests this condition is not flood related and is
indicative of tiles which were poorly laid
the markings on the stainless steel drains is not rust and the markings here and
on the tiles is likely dirt washed in during the flood event and possibly staining
over years of use
other signs of water-related damage were present at the home but not
consistent with the event
this other damage is indicative of a water proofing system which was already in
failure at the time of the loss.
In addition, RB dismissed the conclusions of IR and its proposed offer for settlement,
as well as suggesting VM is conflicted and the conclusions from this report should be
disregarded.
The panel does not accept the evidence of RB
The panel does not accept the evidence of RB, which the FSP relies upon to deny
the claim.
RB raises a number of issues, including the analysis of the apparent “rust” damage to
the stainless-steel drains and similar markings apparent to some of the tiles.
In all likelihood, the panel accepts this may be some measure of staining damage
and not rust.
Nevertheless, there is no evidence of such a problem being present prior to this
event and the panel accepts it likely d eveloped as a result of the pool‟s exposure to
dirty water and flooding conditions in 2016.
The resultant staining/deposits are therefore not unreasonably considered part of the
damage to the pool, regardless of whether it presents as rust or not.
Interest ingly, RB considered VM “an agent of the insured” as the applicant
commissioned this expert to provide a report. He also attacked VM for its “partisan
stance” on the dispute.
The panel sees no difference between the approach of VM and any of the FSP‟s
selected experts, including (and especially) RB.
RB dismissed the conclusions of IR and impugned the expert‟s integrity and work by
suggesting no waterproofing of the pool area had been done. IR made it clear it had
sealed this area in October 2016, merely two months prior to the event.
Not inconsequentially, the FSP previously had relied heavily on IR‟s report as the
basis of its position. It now apparently dismisses the evidence of IR in favour of RB.
In the panel‟s view, RB‟s views are compromised by the ins istence of there being no
adequate waterproofing of the pool. No other expert made such an assertion and the
knowledge of the work undertaken by IR, just prior to the loss, affects the value of
RB‟s conclusions.
Case No: 511043 Determination Page 6 of 8
So too does the comparison of the tiles inside the home with the pavers surrounding
the pool. The respective floor coverings serve different purposes (one outside for a
pool area and one inside for a living area). It stands to reason the different products
would not exhibit similar characteristics.
RB openly challenges the assertion any loss arose from the insured event but was
unable to ascertain how much water might have affected the area.
The panel is not satisfied the evidence of RB is persuasive or that it should be
preferred to other experts who inspected the home. Particularly in view of how much
time has now passed since the event occurred.
Not satisfied the loss is excluded
The FSP has otherwise suggested the claim, or aspects of it, should be excluded
from cover.
B ased on BB‟s opinion , the FSP contends the drainage system for the pool may have
been inadequate. There is no strong evidence of this.
The panel accepts the drains were unable to cope with the level of rain from the
storm event but the available evidence says there were mitigating circumstances
(such as the extent of the rain event and the presence of a foreign object stuck in the
drain system).
There is no evidence the drainage system failed to comply with relevant standards or
was otherwise inadequate.
Attention was drawn by the FSP to “picture framing” paver damage and the
drumming of tiles but the panel accepts, on balance, these issues were a direct result
of the insured event.
There is no persuasive evidence of a construction defect or fault in the pool‟s design
or its drainage system. Nor is there evidence of any issues affecting the pool area
prior to the loss event.
Similarly, there are suggestions from the FSP that the water damage may have
occurred over time and was not a result of a one-off event. There is no persuasive
evidence of this either.
It was further suggested that the pool area, as a wet area, should have been able to
cope with the water ingress from the event. The panel does not accept this. Damage
to a pool area can occur through a storm/inundation event as easily as it can to other
areas of the home.
Noting the work conducted by IR to seal the pool in October 2016, the panel
considers if any obvious signs of long term damage were present it likely would have
been noticed then. Clearly, there is evidence of an intervening accidental damage
event (the storm) to which the policy responds and the panel is not persuaded there
is evidence of long term damage which might entitle the FSP to limit or deny the
claim.
Case No: 511043 Determination Page 7 of 8
FSP must settle the claim in the applicant’s favour
In consideration of the provided evidence, the observed damage and what is fair in
all the circumstances, the panel accepts the applicant‟s damage is covered under the
terms of the policy.
The evidence of IR is crucial to the panel‟s consideration of the loss, noting the
expert:
is truly independent, having worked for the applicant and separately for the FSP
did the original sealant work on the pool, and
on viewing the damage, gave an expert opinion which (at first) did not look
particularly favourable to the applicant as it limited the loss but likely provided
an accurate consideration of what that loss involved.
IR considered only minimal likely damage occurred to the paver area. The FSP relied
upon this as a basis for settlement but did not factor in the implications of the repairs
necessary.
As suggested by VM, any removal of surface pavers in the pool area will compromise
the waterproof membrane‟s integrity. This means, a relatively small job will likely
involve a considerable expense.
The best evidence of this is the apparent approach from BB, which was to suggest a
repair quote for $1,365, but at the same time refusing to attend to the work as it could
not guarantee it.
The panel believes such an approach indicates the work likely cannot be undertaken
for the nominated amount.
As the FSP did not opt to exercise its opportunity to obtain a further quote for
damage, the panel‟s choices in terms of a suitable resolution of the claim are limited.
In accordance with what is fair in all the circumstances, the panel considers the FSP
must either:
attend to the necessary work to repair the applicant‟s pool (including additional
issues which have developed since the loss), providing a reasonable and
industry-consistent guarantee for the work, or
pay the sum quoted by VM for the work, plus interest calculated at the statutory
rate from 4 July 2017, until the date of settlement.
Any work to be conducted must be inclusive of damage which has emerged or
worsened at the site since the loss.
For the most part, the panel accepts the extent of damage itself may be relatively
minor but the cost to rectify will likely not be. This is a consequence of the event and
covered under the terms of the policy.
Case No: 511043 Determination Page 8 of 8
3 Supporting information
3.1 FOS approach to this dispute
General information
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been read and considered. The parties have raised
numerous issues in their submissions to FOS. For the purpose of this determination,
commentary is restricted to only those issues considered relevant to the outcome.
As advised to the parties, FOS has considered it appropriate to expedite the di spute
in accordance with the Operational Guidelines to the FOS Terms of Reference. This
is because of the nature and complexity of the matter. This dispute has not been the
subject of a FOS recommendation and has proceeded directly to Determination.
This decision has been made by a Panel consisting of an Ombudsman, an insurance
industry representative appointed by the Financial Ombudsman Service Board, and a
consumer representative appointed by the Financial Ombudsman Service Board.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.