Determination 510939
Cash settlement of fire damage claim instead of repairs due to asbestos roof and prior damage
Summary
After a neighbouring property caught fire, the applicant's home claim was settled in cash rather than repaired, because repairs were impractical given an asbestos roof and prior damage. AFCA found the FSP correctly assessed its liability and did not order any further payment.
The policy allows the insurer to choose a cash settlement, and the FSP was unable to repair safely due to the asbestos roof and pre-existing damage, while the cash settlement matched the repair estimate.
Issues
- Claim amount dispute primary · not upheld
“The FSP has (on balance) correctly assessed its liability under the policy, and was entitled to indemnify the applicant by way of a cash settlement.”
- Claim denial secondary · not upheld
“The FSP is not liable for additional costs incurred as a result of the applicant's building being non-compliant with the most recent building codes, laws and regulations.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 510939 Determination Page 1 of 5
Case number: 510939 19 April 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy held with the financial
services provider (FSP) for damage sustained to his property as a result of a
neighbouring property catching fire.
The FSP accepted the claim and elected to indemnify the applicant by way of a cash
settlement.
The applicant disputes the FSP’s decision to indemnify him by way of a cash
settlement, instead requesting that the FSP undertake associated repairs. Further,
the applicant says the cash settlement amount is insufficient for him to undertake the
associated repairs himself.
1.2 Issue and key findings
Has the FSP correctly assessed its liability under the policy?
The FSP has (on balance) correctly assessed its liability under the policy because:
the policy allows the FSP the option of undertaking repairs or providing an
equivalent cash settlement
the available evidence establishes the FSP is unable to undertake repairs due
to poor prior repairs / pre-existing damage and the presence of an old asbestos
roof underneath the more recently installed metal roof
the available evidence establishes the cash settlement offered is in line with the
cost to repair the damage to which the policy responds
the FSP is not liable for additional costs incurred as a result of the applicant’s
building being non-compliant with the most recent building codes, laws and
regulations (original asbestos roof).
1.3 Determination
This determination is in favour of the FSP.
The FSP has correctly assessed its liability under the policy.
However, if the cash settlement offered by the FSP has yet to be paid, the FSP is to
arrange for payment to be made within 14 days of any acceptance of this
determination.
Case No: 510939 Determination Page 2 of 5
2 Reasons for determination
2.1 Has the FSP correctly assessed its liability under the policy?
No dispute the applicant’s property suffered fire related damage
There is no dispute between the parties that the applicant’s property has suffered fire
related damage as a result of the neighbouring property catching fire, that being:
heat damaged barge capping / cladding / wall
settlement of soot on the surface of the roof
fire damaged boundary fencing (50% liability).
The FSP’s builder (WC) estimated the cost of repairs in the amount of approximately
$5,000.
FSP says it is unable to undertake repairs due to pre-existing building issues
During WC’s site visit, a number of pre - existing issues with the applicant’s property
were identified.
With regards to the damaged barge capping, WC in part reported:
The original roof is asbestos and at some stage it has been battened over with a new metal
roof installed over the top. There are no Decktites to any of the penetrations and the
damaged barge capping cannot be fixed back due to a risk of penetrating the asbestos.
[sic]
Following a request for further information on this point, the FSP’s building consultant
confirmed:
in accordance with section 18B of the Home Building Act (the Act), a builder is
obliged to comply with the Act and any other law
regulation 457 of the Work Health and Safety Regulations requires that
asbestos that will be disturbed during the refurbishment of residential premises
should (so far as is reasonably practicable) be removed prior to the
refurbishment commencing
considering the installation of the metal roof over the asbestos roof required the
fixing of battens through (and so disturbing) the underlying asbestos roof, the
asbestos roof should have been removed prior to the installation of the metal
roof
repair of the damaged barge capping risks penetrati ng the asbestos roof.
WC also noted several areas of poor prior repairs / pre-existing damage to the
property’s cladding which were unrelated to the fire incident . The FSP says these
issues would affect associated repair warranties were it to undertake the repairs
itself.
For these reasons, the FSP says it is unable to undertake repairs to the applicant’s
property.
Case No: 510939 Determination Page 3 of 5
Applicant’s builders also unwilling to undertake repairs
The applicant says he has approached numerous builders in relation to having
repairs quoted for and/or undertaken.
However, he says with the exception of one builder who offered to replace (not
repair) the damaged cladding, all refused to quote on or undertake repairs due to the
presence of asbestos on site.
This clearly reflects the FSP’s position in relation to the repairs.
FSP not liable for additional costs relating to building non-compliance
With regards to any additional costs incurred during repairs as a result of the
presence of the original asbestos roof, the FSP refers to the following policy provision
which in part states:
Home Cover Exclusions
We will not pay for:
additional costs resulting from your buildings or any part thereof not being
compliant with the most recent building codes, laws and regulations;
Therefore, the FSP says the policy does not respond to any such additional costs
that will likely be incurred by the applicant when undertaking the repairs to which the
policy responds.
FSP entitled to cash settle the claim
I acknowledge the applicant’s frustration that he finds himself in this position through
no fault of his own, at least to the extent of the fire at the neighbouring property.
However, for the reasons discussed above, the FSP is unable to undertake repairs
on the applicant’s behalf.
Therefore, I am satisfied the FSP was entitled to indemnify the applicant for his loss
by way of a cash settlement, the relevant policy provision allowing for this set out in
Section 3 below.
No evidence to challenge repair costs quoted by WC
As outlined above, WC estimated repair costs to which the policy responds to be
approximately $5,000.
The applicant has been unable to provide any evidence to show that these specific
repairs (when considered in isolation) cannot be completed for this amount.
I am therefore satisfied the FSP was entitled to rely upon WC’s repair quote when
assessing its liability for the damage claimed.
FSP has correctly assessed its liability under the policy
For all the reasons discussed above, I am satisfied from the available evidence that
the FSP has (on balance) correctly assessed its liability under the policy.
Case No: 510939 Determination Page 4 of 5
However, if for any reason the cash settlement offered by the FSP has yet to be paid,
the FSP is to arrange for payment to be made within 14 days of any acceptance of
this determination.
Asbestos ground surface fragments (on balance) unrelated to fire event
For the sake of completeness, I note the FSP arranged for an asbestos inspection
report to be undertaken to determine whethe r the applicant’s property had been
impacted by ground surface asbestos contamination as a result of the fire event.
Whilst asbestos fragments were identified, the report confirms:
The identified [asbestos containing] fragments did not show signs of being fire impacted
and no obvious fire damaged debris was observed within the inspected area at the time of
the inspection. It is possible the fragments were pre-existing prior to the fire event.
Therefore, the available evidence suggests this asbestos surface contamination is
unrelated to the fire event and so the FSP not liable for any associated
decontamination works.
Case No: 510939 Determination Page 5 of 5
3 Supporting information
Policy provisions
What if you need to claim?
If you claim under your policy, we have the choice to settle your claim in many ways.
We can settle your building claim by:
paying for the reasonable cost of repair or rebuilding the damaged part of your
buildings;
paying you the reasonable cost of repair or rebuilding the damaged part of your
buildings;