Adequacy of 2012 flood cash settlement and unoccupied excess

FirmFinancial Firm (Unknown - Insurer)
Decided2019-05-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant disputed the cash settlement for the 2012 flood claim, the temporary accommodation and contents allowances, and the unoccupied excess on a 2015 theft claim. AFCA ordered a termite treatment payment of unstated amount and rejected the other claims.

The cash settlement was adequate on the expert evidence, the unoccupied excess applied because repairs were never started, and the insurer need not pay for contents or non-financial loss beyond what it has already paid.

Issues

Subjects and remedies

home or building damagenatural disastertheft or burglarypay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case numbers: 505272 & 510647 Page 1 of 15 Determination Case numbers: 505272 & 510647 7 February 2019 1 Determination overview 1.1 Complaint The complainant held a home building and contents insurance policy with the financial firm (the insurer) for several years. In October 2010, the complainant lodged a claim for water inundation of the home building, following a storm event. At the time, the insurer accepted the claim and authorised repairs. Before repairs for the 2010 claim were finalised, the complainant lodged a new claim in March 2012, for water inundation under similar circumstances. The insurer accepted the new claim, ultimately providing a cash settlement for the building, contents and other costs such as temporary accommodation. In July 2015, the complainant lodged a claim for the theft of a fixture (a cast iron wood fire heater). The insurer accepted the claim but applied an unoccupied excess. The complainant says the cash settlement for the 2012 claim is insufficient to carry out all required claim related repairs. She considers the insurer should rebuild the home building at a new location. She also says several contents items were stolen, lost or simply not returned by the insurer’ s contractors. The complainant says the insurer has incorrectly applied the unoccupied excess for the 2015 claim. She also seeks compensation for consequential financial loss and non- financial loss due to the insurer’s poor service during the handling of h er claims. 1.2 Issues and key findings Was the cash settlement for the 2012 claim adequate? The panel considers the insurer has provided a fair cash settlement offer, save for the issue regarding the termite treatment. The insurer is to provide an additional payment for this item, as outlined in section 2.1 below. Was the allowance for temporary accommodation adequate? Based on the available evidence, the panel considers the amount allowed for temporary accommodation costs is adequate. Determination | Case numbers: 505272 & 510647 Page 2 of 15 Is the insurer liable for any items allegedly stolen by its contractors? There is no evidence to establish on balance that the insurer’s contractors stole any items. However, it appears several items were misplaced or disposed of. The insurer attempted to settle the complainant for many of these items as part of the 2012 claim and provided a cash settlement that substantially exceeded the contents sum insured. Therefore, the contents settlement is considered adequate. The insurer is not required to make further payments for this aspect of the claim. Has the insurer correctly applied the unoccupied excess for the 2015 claim? The property was not occupied due to its state of disrepair. However, this occurred because the complainant never finalised repairs, following the cash settlement of the 2012 claim. While the complainant is of the view the cash settlement of the 2012 claim was insufficient, there is no evidence to establish this. In this circumstance, the panel considers the unoccupied excess has been correctly applied. Is the insurer liable for any other costs? Whilst the Service may award non-financial loss compensation (to a limit of $3,000) in certain circumstances, the panel is of the view that given the amount the insurer paid for contents items, non-financial loss compensation is not appropriate in the circumstances of this complaint. There is no evidence to substantiate that any costs were incurred by the complainant as a consequence of the insurer’s conduct. Accordingly, the panel considers compensation for consequential financial loss is not warranted. 1.3 Determination This determination is substantially in favour of the insurer.  The insurer is required to pay the complainant an additional amount for termiticide treatment as outlined in section 2.1 below.  The insurer is not required to pay any additional amount for temporary accommodation or contents.  The insurer correctly applied the unoccupied excess for the 2015 claim.  The insurer is not required to pay the complainant compensation for non-financial loss, or for consequential loss. Determination | Case numbers: 505272 & 510647 Page 3 of 15 2 Reasons for determination 2.1 Was the cash settlement for the 2012 claim adequate? Complainant is dissatisfied with settlement for 2012 claim The complainant says the cash settlement offered by the insurer is insufficient to carry out the repairs for the 2012 claim, to completion. In particular, she is concerned the extent of damage to the subfloor piers has never been fully assessed. The complainant has also said that the repairs carried out by one of the insurer’s builders for the 2010 claim were not up to standard. The insurer accepted this and decided to include the repairs required for the 2010 claim, as part of the scope of works (SOW) for the 2012 claim. Insurer has carried out numerous assessments As outlined in section 3.3 below, ther e have been several inspections by the insurer’s experts in order to address the numerous queries the complainant has had and ensure the SOW for the repairs, including the pier support system, is adequate. The insurer’s engineer MP was unable to closely in spect all piers. This was due to the lack of access in certain areas of the subfloor space. As a result, some piers were only visually inspected. Following a lengthy follow up inspection carried out in 2015, MP determined that 13 stumps required replacement. The complainant had further concerns and the insurer asked MP (as of 2017, known as IE) to provide a further report on the methodology of the assessment. The complainant remains dissatisfied with IE’s report as she considers flooring could be removed to enable access to the piers that have been only visually inspected. No evidence that home building requires full rebuild The panel notes that MP/IE has issued three expert reports and there is no expert evidence that contradicts its findings. While the complainant remains concerned, this in itself is not sufficient to conclude the entire building should be rebuilt. The insurer’s assessors and engineer are satisfied the building is repairable and does not require a full rebuild. There is no expert evidence to show the structure of the home building is damaged beyond repair or that it would not be economical to repair. The panel notes the complainant wishes the insurer to rebuild her property in a different location. However, this appears to be due to the area having been classified in 2014 by the local government as a high-risk area for inundation and not due to the claimed damage. In the absence of evidence to the contrary, the panel is satisfied the home building does not require a full rebuild as a result of the insured events in 2010 and 2012. Determination | Case numbers: 505272 & 510647 Page 4 of 15 In principle the insurer should repair the property, given the issues arising from the 2010 claim related repairs. However, the panel is satisfied in the circumstances (the complainant wishing to relocate the property due to reasons outside the policy cover) it is appropriate for the insurer to cash settle the 2012 claim. Insurer to include termiticide treatment in settlement amount In the assessment report dated 30 August 2016, the insurer’s loss assessor AS mentions termiticide treatment (chemical treatment) is not covered under the policy. AS also says ant caps or similar would not have been affected by the event. However, MP’s report dated 12 April 2012 says, “s ignificant quantities of soil and organic debris had been retained on the underside of many of the joists and bearers and on the termite caps on the underfloor support stumps ”. In this report and in the one issued in 2015, MP recommends termite treatment to be applied. There appears to be no indication in the relevant policy of an exclusion or term that excludes cover for this item. Accordingly, the insurer is to obtain a quote for termite treatment as part of the building repairs and settle the complainant for this additional amount no later than 30 days from the date of acceptance of this determination. 2.2 Was the allowance for temporary accommodation adequate? Complainant has been living in rental properties since 2012 It is not in dispute the complainant was entitled to temporary accommodation under the policy and received a settlement of $12,750. The insurer says this was an allowance of 15 weeks at a rate of $850 per week. This included a payment for unforeseen delays. The relevant policy provides cover for “the reasonable cost incurred by you for comparable accommodation for up to 12 months while your building is being rebuilt or repaired”. The insurer considers its settlement for temporary accommodation adequately covers the timeframe that would have been required to finalise repairs. The complainant says she has had to pay accommodation at her own expense since 2012. She considers she should receive some compensation for this situation, including the cost for relocating between rental properties. Temporary accommodation settlement was adequate The complainant has raised several concerns about the scope of works, following cash settlement of the 2012 claim related repairs. However, this has only led to a small increase of the settlement figure for items that are not essential. As per section 2.1 above, there is no evidence the settlement for repairs was inadequate. Further, the complainant has confirmed she used the funds paid by the insurer for the repair of the property, to pay the balance of her home loan. Determination | Case numbers: 505272 & 510647 Page 5 of 15 It is not fair for the insurer to be held responsibl e for the complainant’s decision not to start repairs in 2012 and make the building inhabitable again. Accordingly, the panel is satisfied the insurer is not required to pay a further amount for temporary accommodation, given there is no evidence the repairs would have taken a longer time or the start of the building repairs were delayed by the insurer. 2.3 Is the insurer liable for any items allegedly stolen by its contractors? Complainant advises numerous items were not returned The complainant has provided a spreadsheet containing a list of numerous items that have allegedly gone missing. Other than a few photographs of a clock and glasses, she has not provided any other evidence to substantiate her loss of contents. The panel appreciates proof of ownership may have been lost during the insured events or would have been no longer available after several years of ownership. However, without further evidence it is challenging to validate the loss of contents. Insurer exhausted contents sum insured in settling contents claim The claim notes for the 2012 claim indicate the complainant had raised the issue regarding the theft of contents by the insurer’s contractors several times. The insurer has attempted to settle her for these items as part of the original claim. In a report of 30 September 2013, the insurer’s loss assessor DM identified that the sum insured for contents ($115,350) had been exceeded. This report says the insurer had paid approximately $160,000. The notice of response indicates that a total of $190,626.80 was paid for contents. It appears the fact that the amount settled for contents was well over the sum insured is not disputed. No evidence insurer’s contractors are responsible for loss of items The insurer has rejected the allegation of theft by its contractors in its final decision letter dated 25 November 2016 and the notice of response. The panel agrees there is no evidence to establish on balance this occurred. If this were established, there could be a potential argument for the payment of contents beyond the sum insured, as the insurer would be responsible for the alleged loss of items by its contractors. However, as this has not been established and the insurer has made payments for several thousand dollars above the contents sum insured, the panel is satisfied the insurer is not required to provide any further payments for loss of contents. Determination | Case numbers: 505272 & 510647 Page 6 of 15 2.4 Has the insurer correctly applied the unoccupied excess for the 2015 claim? Insurer applied unoccupied excess to theft claim The complainant lodged a claim in 2015 for the theft of a fixture (a wood fire heater) while the house has been unoccupied. The insurer accepted the claim. Given the heater was installed several decades earlier, an exact replacement could not be sourced. After numerous enquiries, the insurer offered a cash settlement based on the price of what it considered a suitable replacement. When calculating the payment, the insurer applied an unoccupied excess on top of the basic excess. The unoccupied excess is $1,000. The complainant is dissatisfied about this excess being applied, as she holds the insurer responsible for the home building not being repaired and thus being unoccupied. Further, she believes it was the insurer’s contractors who stole the item. No evidence insurer’s contractors s tole wood fire heater The complainant is convinced the only people who could have stolen the heater are the insurer’s contractors given it is not an easily removable item and would require knowledge of its existence within the home building. Without any evidence to establish this was the case, the panel is not prepared to accept on balance the complainant’s argument. This is because the property remained unoccupied for a prolonged period and any person may have had plenty of time to scout the property and locate the wood fire heater before the theft. Unoccupied excess was correctly applied The relevant product disclosure statement (PDS) says the unoccupied excess will apply to an incident covered by the policy if at the time of the incident the building has been unoccupied for more than 60 continuous days. The relevant PDS says “unoccupied” means:  the building is not furnished enough to be lived in; or  no-one is eating, sleeping and living at the building; or  the building is not connected to utilities. The complainant does not dispute the building has been unoccupied for a period longer than 60 continuous days. However, she says the theft occurred while the property was being worked on by contractors in relation to the 2012 claim. The theft was reported as h aving occurred on or around 16 July 2015. The parties’ material indicates there was a loss assessment on 19 June 2015 and engineer MP attended the site on 20 July 2015. However, it appears there was no constant attendance by contractors. Determination | Case numbers: 505272 & 510647 Page 7 of 15 As mentioned above, the complainant was cash settled for the main part of the claim in 2012. While she had several concerns, it remained her responsibility to organise and proceed with the repairs. This did not take place. Based on the available evidence, the panel is of the view the building was unoccupied in 2015 because repairs were not started back in 2012. Accordingly, the panel is persuaded the insurer has applied correctly the unoccupancy excess to the 2015 claim for theft of the wood fire heater. 2.5 Is the insurer liable for any other costs? Terms of Reference allow for compensation in limited circumstances This determination is made under the FOS Terms of Reference (TOR). Under the TOR, compensation may be awarded where a complainant has suffered consequential financial loss in connection with his or her claim, as a result of the insurer’s conduct. This is capped at $3,300. Under the TOR, compensation may also be awarded (capped at $3,000) for non-financial loss, where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Consequential financial loss is not warranted The complainant seeks payment of compensation on the basis she had to re nt a property at her own expense. She also claims for the cost of relocating between rental properties ($5,000) and loss of plants in the property’s garden. She also seeks compensation for theft and damage caused by contractors. The panel is of the view the cost of rental properties following the settlement of the claim in 2012 was in part covered by the temporary accommodation payment. Any rental cost beyond what was settled by the insurer is considered to have been due to the repairs not having been finalised at the property by the complainant. The panel is not satisfied additional rental costs are a consequence of the insurer’s actions. While there is a possibility the garden plants may have been damaged while the insurer’s contractors were at the premise s, no evidence has been provided to show the extent of this damage or the cost of replacement of plants. The panel is unable to make a finding on this aspect. The panel is satisfied the insurer adequately addressed the complainant’s concerns regarding loss of items and additional damage through the cash settlement of her building and contents claims. Determination | Case numbers: 505272 & 510647 Page 8 of 15 Non-financial loss Throughout the three claims, the complainant has constantly raised concerns about the handling of the claims. She notes one of her concerns is due to the work of the first building contractor (for the 2010 claim). She seeks compensation for grief, time and inconvenience as a result of the drawn-out claims. The panel has thoroughly reviewed the details of each of the three claims. There is no dispute the repairs of the 2010 claim took more than a year to be carried out and they had not been finalised when the 2012 event occurred. During the assessment of the 2012 claim, it was confirmed by the insurer’s assessors that there were issues with the 2010 claim related repairs. The insurer decided to include these issues within the 2012 claim as further damage had occurred in the same areas. Whilst the panel acknowledges that there ha ve been delays, the panel also notes that the insurer has paid the complainant an amount significantly greater than it was required to, in respect of contents. In the circumstances of this complaint, the panel is not satisfied that the insurer should be required to pay a further amount for non-financial loss. 2.6 Other matters Insurer correctly followed process for renewal of 2017-2018 policy period The complainant is adamant she lost her policy for the renewal period October 2017 – October 2018 due to the insurer reportedly changing the policy cover. She is concerned ab out the insurer having made “manual reviews” of her policy and now not willing to provide cover. As a result, the complainant ended up not renewing the policy for this period. The insurer may decide to review the level of cover and whether it is prepared to offer renewal of a policy. This is in accordance with the Insurance Contracts Act 1984 (the Act). There is no indication the insurer mishandled the renewal process or took any course of action that is not compliant with the Act. Further, there is no obligation for an insurer to inform an insured of its policy reviews, other than at the time of renewal if required. It appears the complainant was concerned there would be no cover. However, there is no indication of this having occurred either. The parties’ material suggests there may have been a concern from the insurer regarding extending cover for a building that was not well maintained and in good condition. Determination | Case numbers: 505272 & 510647 Page 9 of 15 However, this is a policy condition that is part of the standard wording of the PDS. It is not a condition or term being applied solely for the complainant’s circumstances. The insurer could have explained its concerns better. However, the panel is satisfied there was no unilateral variation of the contract by the insurer and the review process carried out by the insurer was consistent with the Act. Determination | Case numbers: 505272 & 510647 Page 10 of 15 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority (AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach Due to the nature of this complaint, it has been referred to a panel for determination. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this case based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.3 Key points on relevant expert material Record Key points Insurer’s engineer ( XK )  This dwelling was affected by a signific ant storm event on or about 15 October 2010. During this event, flow of water occurred to a depth of about Determination | Case numbers: 505272 & 510647 Page 11 of 15 Record Key points Report 13 May 2011 50mm above floor level.  Repairs have been underway for a considerable period.  The piers have been affected by the significant water inundation. Water has saturated previous trenc hing, allowing piers to sett le towards the trenches.  Eight piers appear to have been affected by this cause. XK recommends demolishing them to ground level and rebuilding them. The floor has been releveled. Insurer’s a sse ssor (MS) Report 10 March 2012  The house is a single storey house wit h Colorbond roof on brick piers.  Water has entered approximately 400mm high through the entire house.  Insured believes the house was uns afe and a health hazard due to potential mould.  Insured has a previous claim for s imilar water damage that was nearing completion.  The house appears to have been locked up since the floor and carpets were still soaking wet. All contents have been left in the property.  A restoration company is required to attend to remove all carpets and decontaminat e the structure.  A builder will need to attend and strip out the wall linings and create a detailed SOW and quote. Insurer’s engineer (MP) Report 12 April 2012  The building was inundated on 1 March and 4 March 2012.  The building had also been inundated about 12 - 18 months earlier, during which time a similar event of lesser depth occurred.  There is evidence of rectification work involving the insertion of packers at the top of some of the brick piers. This was presumab ly undertaken under instructions from [ the insurer] following the earlier flooding.  Water has entered the site from bot h the front and rear of the house. The flood level reached a height of about 150mm above the internal floor level of the timber framed, t imber floored building.  The internal water level was slightly below the level at which the internal plasterboard sheets have been cut out to allow drying out of the structure.  A considerable quantity of organic material has washed beneath the house and bee n caught up in the horizontal spaces bet ween the external wall linings and the horizont al planks across the external deck and around the base of the building’s perimeter.  Significant quantities of soil and organic debris had been retained on the underside of many of the joists and bearers and on the termite caps on the underfloor support stumps.  The soil surface beneath the underfloor space is undulating and covered with gravel, together wit h sandy and silty material and accumulat ed organic debris, all of w hich was washed in by the inundating waterflow.  Several of the floor support piers have tilted. S ome of the tilted piers had FRC sheet packers inserted between them and the supported bearers.  In some parts the pier footings had been undermined slightly by the waterflow beneath the building. The stumps at the nort hern end were generally shorter than those at the southern end of the house.  The stumps that have rotated and tilted most obviously are predominantly beneath the southern end of the house. Determination | Case numbers: 505272 & 510647 Page 12 of 15 Record Key points  The passa ge of recent flooding has deposited bot h soil and organic material across the underfloor space beneat h the house. This has reduced the underfloor clearance.  Once the underfloor space is cleared out, detailed ins pections of all the support piers can be made to determine which piers require replacement.  Any piers that are vertical and which cannot be moved manually may be left in place if they firmly support the joist/bearer above them.  Any bearers that are not in intimat e contact with the supporting, but sti ll vertical masonry piers should be jacked slightly, enough to insert sheet packers.  Any piers that have rotated and which are not in direct or indirect contact with the bearer that they support should be rec onstructed.  Piers which have tilted but are stil l in contact with the underside of the supported bearer with the aid of FRC sheet or packers should be rebuilt plumb and where necessary, with sheet packers.  The earlier inundation of the site about 15 months ago may well have caused some of the settlement s and rotations that are evident in the underfloor stumps.  Even if the damage to the stumps was not the result of the March 2012 events, [there is a] likelihood the damage may have been sustained … following the earlier inundation.  It is necessary that stu mps are kept in an essentially plumb condition and those which do not confirm to this requirement, should be rebuilt.  Particleboard flooring would have been first wet on 1 March and 4 Marc h 2012. Water receded from the site in bet ween these two events.  Bui lder SB remove d the carpets on or about 12 March 2012.  The underside of the flooring has had several short term inundations and the top of the particleboard would have been kept in a moist condition for a period of approximately two weeks.  While the surfac e of the particleboard flooring is slightly textured, there is no indication of sever e opening at the junction bet ween adjacent sheets or of obvious swelling or splitting o f the outer fibres of the sheets along the length of the butt joints between adjacen t sheets.  Particleboard is regarded as being able to withstand three months exposure to the elements during constructions. T he particleboard flooring has not been affected in a manner which would have significantly reduced its structural capability or inte grity.  Light sanding of the internal surface of the particleboard is all that would be required.  Underfloor spac es and other areas should be retreated [against termites]. Insurer’s a sse ssor (DH) Report 10 May 2012  The property has been stripped out for dec ontamination works.  The client is concerned about the process required to replace and pack piers when limited ground clearanc e is available.  The client is concerned about the integrity of the sheet flooring.  Some of the client’s concerns require rectifi cation under the old claim. The assessor has added these works to the scope of this claim.  Other items of concern about previous repairs will be absorbed during the current works associated with this claim and therefore can be discounted. Determination | Case numbers: 505272 & 510647 Page 13 of 15 Record Key points  Clients have deci ded to relocate the home to another property less susceptible to flooding issues. Clients were told it is pointless to carry out any repairs as per the scope, as the relocation would destroy the repairs.  Building repairs are to be cash settled.  Scope alter ations are required to make the scope accurate for the cash settlement.  Projected repair times by builder to be obtained for any temporary accommodation settlements. Insurer’s a sse ssor (DH) Report 23 July 2012  Details regarding the scope inclusive of any additional works need to be obtained. The scope should be detailed more thoroughly or there will be continuous enquiries by the client on what has been allowed for.  All concerns raised over the previous claim were raised during reassessment.  The pressing i ssues about the previous claim were addressed in the previous assessment and the required outcomes are noted in that report. Insurer’s a sse ssor (DM) Report 30 September 2013  DM attended the site to supervise delivery of glass and mirrors.  Cash settlement for clothing and s hoes not successfully restored was negotiated at $150 for shoes and $500 for several clothing items.  A leadlight door had a crack across a pane of leadlight.  A stack of leadlight panels was opened and some of the lead seemed to have a white coating on it. The insured said the lead was corroded.  A quick calculation revealed the general contents sum insured of $11 5 ,350 had been exhausted. The payments to date total approximately $160, 000, which is inclusive of restoration costs.  A settlem ent of $3,000 would be offered to the insured in full and final settlement of the contents claim. This was considered a good will gesture in order to draw a conclusion to the claim.  DM agreed to allow the insured to keep the glass and mirrors, which were r eturned. The settlement was accepted.  [Insurer] is to arrange a cash settlement of $3, 650 in full and final settlement of the claim. Insurer’s a sse ssor (AS) Report 22 June 2015  Insured is not accepting that the subfloor and other as pects of the repairs ha ve been included in the settlement from 2012.  Insured advised the SOW for the subfloor repairs is not enough. She believes the SOW and report need to be more specific. She has not obtained any information to substantiat e this.  Insured would have liked to r elocate the home to higher ground or lift the home above the flood level but believes the settlement offered is not enough to do this.  AS advised the SOW and settlement is for the repairs of the home to what it was before the 2012 flood, the insurer will n ot pay extra to upgrade the home.  During reinspection, AS noted the home has not been repaired since the flood. The walls have been stripped out and left. The customer has not lived in the home since 2012.  The home is not habitable. There is a broken window at the rear. Determination | Case numbers: 505272 & 510647 Page 14 of 15 Record Key points  AS recommends a builder be appointed to provide a quote for what it would cost to repair and replac e some subfloor piers and pack/level off the floor to its pre - existing levels.  The attending builder should carry out a subfloor inspecti on using a diagram/sketch of the subfloor piers. The builder should provide a quote based on what is required for each pier as per MP ’s report. Insurer’s engineer (MP) Report 11 August 2015  The insurer had requested MP inspect the floor support stumps be neath the dwelling and determine which of them require replacement as a result of the inundation that occurred on two separate occasions in March 2012.  The underfloor investigation took place over an approximately 3.5 hour period.  The [suggested] procedure for reconstruction of individual floor support stumps is to be applied to 13 stumps indicated in the report’s sketch.  The overall level of the floor diaphragm would be measured after the underfloor stumps have been rebuilt and if adjustments are needed, t hey should be undertaken as per the procedures set out in the report.  The toleranc e on floor level that would be appropriate and accept able would be +/ - 10mm. A maximum of 20mm out of level over the whole diaphragm.  Once the underfloor stump reconstruction and adjustment of the planarity of the timber floor diaphragm has been finalised, final clearance and sanitising of the underfloor space can be undertaken.  If retreatment of previously existing termiticide application is included under the policy, the und erfloor spaces and any other areas necessary should be retreated.  No repairs to existing termite attack on any part of the building superstructure or improvements at the site will be included in the specified flood related repair work to be undertak en at t he site. Insurer’s a sse ssor (AS) Report 16 October 2015  The quote supplied by builder JC includes the work outlined in MP’s report dated 11 August 2015. JC quoted $13,543.  The customer has been settled based on builder RC’s quote, which included $15,600 plus margin and GST for the cost of repairing the subfloor. The customer says the $15,600 allowance was not enough.  The customer has been settled for more than the quot ed amo unt and now has a full understanding of what the allowances are for.  AS recommends closing the claim as all items have been addressed.  Discuss ion with [the complainant] onsite on 20 July 2015 indicated the subfloor issue was the only item remaining with th e SOW. Insurer’s a sse ssor (AS) Report 30 August 201 6  The complainant has said settlement for contents is fine.  The insurer has settled more than the quoted amount. If the customer is still disputing the subfloor work and the soil issues, she will need to supply her own report to substantiate her claim.  The insurer will not cover the cost to move the home to another location or to raise it out of the flood levels.  An additional $760 to be paid for a bifold door. Insurer’s engineer (IE – formerly  The out of plumb of the underfloor brick stumps was measured using the Tajima Slant 100 level. Assessment of the out of plumb can be visually Determination | Case numbers: 505272 & 510647 Page 15 of 15 Record Key points known as M P ) Report 8 November 2017 interpreted within 0.5 degrees.  The practical limitations on measuring the out of plumb were created by the nature of the brickwork from which the brick stumps were built.  As seen in photographs taken on 20 July 2015, the faces and corners of the piers are not completely true and plumb.  This was partly due to variations in the sizes of indivi dual bricks (due to having us ed second grade bricks of variable size and quality) and partly due to the quality of the bricklaying, which is of a lesser standard than would be required for external face brickwork. Nevertheless, this is acceptable for stump construction.  Because of these variations, the actual verticality of the stumps (and its change) could not be determined with great certainty.  However, the measurements obtained were enough to allow a distinction between stumps that were not significantly out of plumb and those that were out of plumb to a greater degree.  The maximum out of plumb recorded was in the range of 2° - 3°, which was regarded as not structurally critical put possibly indicating the stumps that sustained that degree of rotation may h ave sustained an element of rotational movement (which IE regarded as damage).  Therefore, the stumps having an out of level less than 2° could be retained. The stumps having an out of level equal to or greater than 2° had sustained damage and were to be re placed. This was the basis of the stump replacement recommendation in the 11 August 2015 report.  The vertical distance between the underfloor soil surface and the underside of the floor bearers varies over the plan area of the building.  Therefore, because the stumps below the nort heast quadrant of the building were shorter, direct access beneath that part was not physically possible. Accordingly, assessments were made visually.  Notwithstanding this, the shorter stumps showed no signs of visually obvious or structurally significant rotation or other movement .