Text of the determination
Determination | Case numbers: 505272 & 510647 Page 1 of 15
Determination
Case numbers: 505272 & 510647 7 February 2019
1 Determination overview
1.1 Complaint
The complainant held a home building and contents insurance policy with the financial
firm (the insurer) for several years. In October 2010, the complainant lodged a claim
for water inundation of the home building, following a storm event. At the time, the
insurer accepted the claim and authorised repairs.
Before repairs for the 2010 claim were finalised, the complainant lodged a new claim
in March 2012, for water inundation under similar circumstances. The insurer
accepted the new claim, ultimately providing a cash settlement for the building,
contents and other costs such as temporary accommodation.
In July 2015, the complainant lodged a claim for the theft of a fixture (a cast iron wood
fire heater). The insurer accepted the claim but applied an unoccupied excess.
The complainant says the cash settlement for the 2012 claim is insufficient to carry
out all required claim related repairs. She considers the insurer should rebuild the
home building at a new location. She also says several contents items were stolen,
lost or simply not returned by the insurer’ s contractors.
The complainant says the insurer has incorrectly applied the unoccupied excess for
the 2015 claim. She also seeks compensation for consequential financial loss and
non- financial loss due to the insurer’s poor service during the handling of h er claims.
1.2 Issues and key findings
Was the cash settlement for the 2012 claim adequate?
The panel considers the insurer has provided a fair cash settlement offer, save for the
issue regarding the termite treatment. The insurer is to provide an additional payment
for this item, as outlined in section 2.1 below.
Was the allowance for temporary accommodation adequate?
Based on the available evidence, the panel considers the amount allowed for
temporary accommodation costs is adequate.
Determination | Case numbers: 505272 & 510647 Page 2 of 15
Is the insurer liable for any items allegedly stolen by its contractors?
There is no evidence to establish on balance that the insurer’s contractors stole any
items. However, it appears several items were misplaced or disposed of. The insurer
attempted to settle the complainant for many of these items as part of the 2012 claim
and provided a cash settlement that substantially exceeded the contents sum insured.
Therefore, the contents settlement is considered adequate. The insurer is not
required to make further payments for this aspect of the claim.
Has the insurer correctly applied the unoccupied excess for the 2015 claim?
The property was not occupied due to its state of disrepair. However, this occurred
because the complainant never finalised repairs, following the cash settlement of the
2012 claim.
While the complainant is of the view the cash settlement of the 2012 claim was
insufficient, there is no evidence to establish this. In this circumstance, the panel
considers the unoccupied excess has been correctly applied.
Is the insurer liable for any other costs?
Whilst the Service may award non-financial loss compensation (to a limit of $3,000) in
certain circumstances, the panel is of the view that given the amount the insurer paid
for contents items, non-financial loss compensation is not appropriate in the
circumstances of this complaint.
There is no evidence to substantiate that any costs were incurred by the complainant
as a consequence of the insurer’s conduct. Accordingly, the panel considers
compensation for consequential financial loss is not warranted.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is required to pay the complainant an additional amount for termiticide
treatment as outlined in section 2.1 below.
The insurer is not required to pay any additional amount for temporary
accommodation or contents.
The insurer correctly applied the unoccupied excess for the 2015 claim.
The insurer is not required to pay the complainant compensation for non-financial
loss, or for consequential loss.
Determination | Case numbers: 505272 & 510647 Page 3 of 15
2 Reasons for determination
2.1 Was the cash settlement for the 2012 claim adequate?
Complainant is dissatisfied with settlement for 2012 claim
The complainant says the cash settlement offered by the insurer is insufficient to carry
out the repairs for the 2012 claim, to completion. In particular, she is concerned the
extent of damage to the subfloor piers has never been fully assessed.
The complainant has also said that the repairs carried out by one of the insurer’s
builders for the 2010 claim were not up to standard. The insurer accepted this and
decided to include the repairs required for the 2010 claim, as part of the scope of
works (SOW) for the 2012 claim.
Insurer has carried out numerous assessments
As outlined in section 3.3 below, ther e have been several inspections by the insurer’s
experts in order to address the numerous queries the complainant has had and
ensure the SOW for the repairs, including the pier support system, is adequate.
The insurer’s engineer MP was unable to closely in spect all piers. This was due to the
lack of access in certain areas of the subfloor space. As a result, some piers were
only visually inspected. Following a lengthy follow up inspection carried out in 2015,
MP determined that 13 stumps required replacement.
The complainant had further concerns and the insurer asked MP (as of 2017, known
as IE) to provide a further report on the methodology of the assessment. The
complainant remains dissatisfied with IE’s report as she considers flooring could be
removed to enable access to the piers that have been only visually inspected.
No evidence that home building requires full rebuild
The panel notes that MP/IE has issued three expert reports and there is no expert
evidence that contradicts its findings. While the complainant remains concerned, this
in itself is not sufficient to conclude the entire building should be rebuilt.
The insurer’s assessors and engineer are satisfied the building is repairable and does
not require a full rebuild. There is no expert evidence to show the structure of the
home building is damaged beyond repair or that it would not be economical to repair.
The panel notes the complainant wishes the insurer to rebuild her property in a
different location. However, this appears to be due to the area having been classified
in 2014 by the local government as a high-risk area for inundation and not due to the
claimed damage.
In the absence of evidence to the contrary, the panel is satisfied the home building
does not require a full rebuild as a result of the insured events in 2010 and 2012.
Determination | Case numbers: 505272 & 510647 Page 4 of 15
In principle the insurer should repair the property, given the issues arising from the
2010 claim related repairs. However, the panel is satisfied in the circumstances (the
complainant wishing to relocate the property due to reasons outside the policy cover)
it is appropriate for the insurer to cash settle the 2012 claim.
Insurer to include termiticide treatment in settlement amount
In the assessment report dated 30 August 2016, the insurer’s loss assessor AS
mentions termiticide treatment (chemical treatment) is not covered under the policy.
AS also says ant caps or similar would not have been affected by the event.
However, MP’s report dated 12 April 2012 says, “s ignificant quantities of soil and
organic debris had been retained on the underside of many of the joists and bearers
and on the termite caps on the underfloor support stumps ”. In this report and in the
one issued in 2015, MP recommends termite treatment to be applied.
There appears to be no indication in the relevant policy of an exclusion or term that
excludes cover for this item. Accordingly, the insurer is to obtain a quote for termite
treatment as part of the building repairs and settle the complainant for this additional
amount no later than 30 days from the date of acceptance of this determination.
2.2 Was the allowance for temporary accommodation adequate?
Complainant has been living in rental properties since 2012
It is not in dispute the complainant was entitled to temporary accommodation under
the policy and received a settlement of $12,750. The insurer says this was an
allowance of 15 weeks at a rate of $850 per week. This included a payment for
unforeseen delays.
The relevant policy provides cover for “the reasonable cost incurred by you for
comparable accommodation for up to 12 months while your building is being rebuilt or
repaired”. The insurer considers its settlement for temporary accommodation
adequately covers the timeframe that would have been required to finalise repairs.
The complainant says she has had to pay accommodation at her own expense since
2012. She considers she should receive some compensation for this situation,
including the cost for relocating between rental properties.
Temporary accommodation settlement was adequate
The complainant has raised several concerns about the scope of works, following
cash settlement of the 2012 claim related repairs. However, this has only led to a
small increase of the settlement figure for items that are not essential.
As per section 2.1 above, there is no evidence the settlement for repairs was
inadequate. Further, the complainant has confirmed she used the funds paid by the
insurer for the repair of the property, to pay the balance of her home loan.
Determination | Case numbers: 505272 & 510647 Page 5 of 15
It is not fair for the insurer to be held responsibl e for the complainant’s decision not to
start repairs in 2012 and make the building inhabitable again.
Accordingly, the panel is satisfied the insurer is not required to pay a further amount
for temporary accommodation, given there is no evidence the repairs would have
taken a longer time or the start of the building repairs were delayed by the insurer.
2.3 Is the insurer liable for any items allegedly stolen by its contractors?
Complainant advises numerous items were not returned
The complainant has provided a spreadsheet containing a list of numerous items that
have allegedly gone missing. Other than a few photographs of a clock and glasses,
she has not provided any other evidence to substantiate her loss of contents.
The panel appreciates proof of ownership may have been lost during the insured
events or would have been no longer available after several years of ownership.
However, without further evidence it is challenging to validate the loss of contents.
Insurer exhausted contents sum insured in settling contents claim
The claim notes for the 2012 claim indicate the complainant had raised the issue
regarding the theft of contents by the insurer’s contractors several times. The insurer
has attempted to settle her for these items as part of the original claim.
In a report of 30 September 2013, the insurer’s loss assessor DM identified that the
sum insured for contents ($115,350) had been exceeded. This report says the insurer
had paid approximately $160,000. The notice of response indicates that a total of
$190,626.80 was paid for contents.
It appears the fact that the amount settled for contents was well over the sum insured
is not disputed.
No evidence insurer’s contractors are responsible for loss of items
The insurer has rejected the allegation of theft by its contractors in its final decision
letter dated 25 November 2016 and the notice of response. The panel agrees there is
no evidence to establish on balance this occurred.
If this were established, there could be a potential argument for the payment of
contents beyond the sum insured, as the insurer would be responsible for the alleged
loss of items by its contractors.
However, as this has not been established and the insurer has made payments for
several thousand dollars above the contents sum insured, the panel is satisfied the
insurer is not required to provide any further payments for loss of contents.
Determination | Case numbers: 505272 & 510647 Page 6 of 15
2.4 Has the insurer correctly applied the unoccupied excess for the 2015
claim?
Insurer applied unoccupied excess to theft claim
The complainant lodged a claim in 2015 for the theft of a fixture (a wood fire heater)
while the house has been unoccupied. The insurer accepted the claim.
Given the heater was installed several decades earlier, an exact replacement could
not be sourced. After numerous enquiries, the insurer offered a cash settlement
based on the price of what it considered a suitable replacement. When calculating the
payment, the insurer applied an unoccupied excess on top of the basic excess.
The unoccupied excess is $1,000. The complainant is dissatisfied about this excess
being applied, as she holds the insurer responsible for the home building not being
repaired and thus being unoccupied. Further, she believes it was the insurer’s
contractors who stole the item.
No evidence insurer’s contractors s tole wood fire heater
The complainant is convinced the only people who could have stolen the heater are
the insurer’s contractors given it is not an easily removable item and would require
knowledge of its existence within the home building.
Without any evidence to establish this was the case, the panel is not prepared to
accept on balance the complainant’s argument. This is because the property
remained unoccupied for a prolonged period and any person may have had plenty of
time to scout the property and locate the wood fire heater before the theft.
Unoccupied excess was correctly applied
The relevant product disclosure statement (PDS) says the unoccupied excess will
apply to an incident covered by the policy if at the time of the incident the building has
been unoccupied for more than 60 continuous days.
The relevant PDS says “unoccupied” means:
the building is not furnished enough to be lived in; or
no-one is eating, sleeping and living at the building; or
the building is not connected to utilities.
The complainant does not dispute the building has been unoccupied for a period
longer than 60 continuous days. However, she says the theft occurred while the
property was being worked on by contractors in relation to the 2012 claim.
The theft was reported as h aving occurred on or around 16 July 2015. The parties’
material indicates there was a loss assessment on 19 June 2015 and engineer MP
attended the site on 20 July 2015. However, it appears there was no constant
attendance by contractors.
Determination | Case numbers: 505272 & 510647 Page 7 of 15
As mentioned above, the complainant was cash settled for the main part of the claim
in 2012. While she had several concerns, it remained her responsibility to organise
and proceed with the repairs. This did not take place.
Based on the available evidence, the panel is of the view the building was unoccupied
in 2015 because repairs were not started back in 2012. Accordingly, the panel is
persuaded the insurer has applied correctly the unoccupancy excess to the 2015
claim for theft of the wood fire heater.
2.5 Is the insurer liable for any other costs?
Terms of Reference allow for compensation in limited circumstances
This determination is made under the FOS Terms of Reference (TOR). Under the
TOR, compensation may be awarded where a complainant has suffered
consequential financial loss in connection with his or her claim, as a result of the
insurer’s conduct. This is capped at $3,300.
Under the TOR, compensation may also be awarded (capped at $3,000) for
non-financial loss, where a complainant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
Consequential financial loss is not warranted
The complainant seeks payment of compensation on the basis she had to re nt a
property at her own expense. She also claims for the cost of relocating between rental
properties ($5,000) and loss of plants in the property’s garden. She also seeks
compensation for theft and damage caused by contractors.
The panel is of the view the cost of rental properties following the settlement of the
claim in 2012 was in part covered by the temporary accommodation payment.
Any rental cost beyond what was settled by the insurer is considered to have been
due to the repairs not having been finalised at the property by the complainant. The
panel is not satisfied additional rental costs are a consequence of the insurer’s
actions.
While there is a possibility the garden plants may have been damaged while the
insurer’s contractors were at the premise s, no evidence has been provided to show
the extent of this damage or the cost of replacement of plants. The panel is unable to
make a finding on this aspect.
The panel is satisfied the insurer adequately addressed the complainant’s concerns
regarding loss of items and additional damage through the cash settlement of her
building and contents claims.
Determination | Case numbers: 505272 & 510647 Page 8 of 15
Non-financial loss
Throughout the three claims, the complainant has constantly raised concerns about
the handling of the claims. She notes one of her concerns is due to the work of the
first building contractor (for the 2010 claim). She seeks compensation for grief, time
and inconvenience as a result of the drawn-out claims.
The panel has thoroughly reviewed the details of each of the three claims. There is no
dispute the repairs of the 2010 claim took more than a year to be carried out and they
had not been finalised when the 2012 event occurred.
During the assessment of the 2012 claim, it was confirmed by the insurer’s assessors
that there were issues with the 2010 claim related repairs. The insurer decided to
include these issues within the 2012 claim as further damage had occurred in the
same areas.
Whilst the panel acknowledges that there ha ve been delays, the panel also notes that
the insurer has paid the complainant an amount significantly greater than it was
required to, in respect of contents.
In the circumstances of this complaint, the panel is not satisfied that the insurer
should be required to pay a further amount for non-financial loss.
2.6 Other matters
Insurer correctly followed process for renewal of 2017-2018 policy period
The complainant is adamant she lost her policy for the renewal period October 2017 –
October 2018 due to the insurer reportedly changing the policy cover. She is
concerned ab out the insurer having made “manual reviews” of her policy and now not
willing to provide cover.
As a result, the complainant ended up not renewing the policy for this period.
The insurer may decide to review the level of cover and whether it is prepared to offer
renewal of a policy. This is in accordance with the Insurance Contracts Act 1984 (the
Act).
There is no indication the insurer mishandled the renewal process or took any course
of action that is not compliant with the Act. Further, there is no obligation for an
insurer to inform an insured of its policy reviews, other than at the time of renewal if
required.
It appears the complainant was concerned there would be no cover. However, there
is no indication of this having occurred either. The parties’ material suggests there
may have been a concern from the insurer regarding extending cover for a building
that was not well maintained and in good condition.
Determination | Case numbers: 505272 & 510647 Page 9 of 15
However, this is a policy condition that is part of the standard wording of the PDS. It is
not a condition or term being applied solely for the complainant’s circumstances.
The insurer could have explained its concerns better. However, the panel is satisfied
there was no unilateral variation of the contract by the insurer and the review process
carried out by the insurer was consistent with the Act.
Determination | Case numbers: 505272 & 510647 Page 10 of 15
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority (AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach
Due to the nature of this complaint, it has been referred to a panel for determination.
The panel consists of an Ombudsman and two representatives with consumer and
insurance experience.
The panel has decided this case based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.3 Key points on relevant expert material
Record Key points
Insurer’s engineer
( XK )
This dwelling was affected by a signific ant storm event on or about 15
October 2010. During this event, flow of water occurred to a depth of about
Determination | Case numbers: 505272 & 510647 Page 11 of 15
Record Key points
Report
13 May 2011
50mm above floor level.
Repairs have been underway for a considerable period.
The piers have been affected by the significant water inundation. Water has
saturated previous trenc hing, allowing piers to sett le towards the trenches.
Eight piers appear to have been affected by this cause. XK recommends
demolishing them to ground level and rebuilding them. The floor has been
releveled.
Insurer’s a sse ssor
(MS)
Report
10 March 2012
The house is a single storey house wit h Colorbond roof on brick piers.
Water has entered approximately 400mm high through the entire house.
Insured believes the house was uns afe and a health hazard due to potential
mould.
Insured has a previous claim for s imilar water damage that was nearing
completion.
The house appears to have been locked up since the floor and carpets were
still soaking wet. All contents have been left in the property.
A restoration company is required to attend to remove all carpets and
decontaminat e the structure.
A builder will need to attend and strip out the wall linings and create a
detailed SOW and quote.
Insurer’s engineer
(MP)
Report
12 April 2012
The building was inundated on 1 March and 4 March 2012.
The building had also been inundated about 12 - 18 months earlier, during
which time a similar event of lesser depth occurred.
There is evidence of rectification work involving the insertion of packers at
the top of some of the brick piers. This was presumab ly undertaken under
instructions from [ the insurer] following the earlier flooding.
Water has entered the site from bot h the front and rear of the house. The
flood level reached a height of about 150mm above the internal floor level of
the timber framed, t imber floored building.
The internal water level was slightly below the level at which the internal
plasterboard sheets have been cut out to allow drying out of the structure.
A considerable quantity of organic material has washed beneath the house
and bee n caught up in the horizontal spaces bet ween the external wall
linings and the horizont al planks across the external deck and around the
base of the building’s perimeter.
Significant quantities of soil and organic debris had been retained on the
underside of many of the joists and bearers and on the termite caps on the
underfloor support stumps.
The soil surface beneath the underfloor space is undulating and covered
with gravel, together wit h sandy and silty material and accumulat ed organic
debris, all of w hich was washed in by the inundating waterflow.
Several of the floor support piers have tilted. S ome of the tilted piers had
FRC sheet packers inserted between them and the supported bearers.
In some parts the pier footings had been undermined slightly by the
waterflow beneath the building. The stumps at the nort hern end were
generally shorter than those at the southern end of the house.
The stumps that have rotated and tilted most obviously are predominantly
beneath the southern end of the house.
Determination | Case numbers: 505272 & 510647 Page 12 of 15
Record Key points
The passa ge of recent flooding has deposited bot h soil and organic material
across the underfloor space beneat h the house. This has reduced the
underfloor clearance.
Once the underfloor space is cleared out, detailed ins pections of all the
support piers can be made to determine which piers require replacement.
Any piers that are vertical and which cannot be moved manually may be left
in place if they firmly support the joist/bearer above them.
Any bearers that are not in intimat e contact with the supporting, but sti ll
vertical masonry piers should be jacked slightly, enough to insert sheet
packers.
Any piers that have rotated and which are not in direct or indirect contact
with the bearer that they support should be rec onstructed.
Piers which have tilted but are stil l in contact with the underside of the
supported bearer with the aid of FRC sheet or packers should be rebuilt
plumb and where necessary, with sheet packers.
The earlier inundation of the site about 15 months ago may well have
caused some of the settlement s and rotations that are evident in the
underfloor stumps.
Even if the damage to the stumps was not the result of the March 2012
events, [there is a] likelihood the damage may have been sustained …
following the earlier inundation.
It is necessary that stu mps are kept in an essentially plumb condition and
those which do not confirm to this requirement, should be rebuilt.
Particleboard flooring would have been first wet on 1 March and 4 Marc h
2012. Water receded from the site in bet ween these two events.
Bui lder SB remove d the carpets on or about 12 March 2012.
The underside of the flooring has had several short term inundations and the
top of the particleboard would have been kept in a moist condition for a
period of approximately two weeks.
While the surfac e of the particleboard flooring is slightly textured, there is no
indication of sever e opening at the junction bet ween adjacent sheets or of
obvious swelling or splitting o f the outer fibres of the sheets along the length
of the butt joints between adjacen t sheets.
Particleboard is regarded as being able to withstand three months exposure
to the elements during constructions. T he particleboard flooring has not
been affected in a manner which would have significantly reduced its
structural capability or inte grity.
Light sanding of the internal surface of the particleboard is all that would be
required.
Underfloor spac es and other areas should be retreated [against termites].
Insurer’s a sse ssor
(DH)
Report
10 May 2012
The property has been stripped out for dec ontamination works.
The client is concerned about the process required to replace and pack
piers when limited ground clearanc e is available.
The client is concerned about the integrity of the sheet flooring.
Some of the client’s concerns require rectifi cation under the old claim. The
assessor has added these works to the scope of this claim.
Other items of concern about previous repairs will be absorbed during the
current works associated with this claim and therefore can be discounted.
Determination | Case numbers: 505272 & 510647 Page 13 of 15
Record Key points
Clients have deci ded to relocate the home to another property less
susceptible to flooding issues. Clients were told it is pointless to carry out
any repairs as per the scope, as the relocation would destroy the repairs.
Building repairs are to be cash settled.
Scope alter ations are required to make the scope accurate for the cash
settlement.
Projected repair times by builder to be obtained for any temporary
accommodation settlements.
Insurer’s a sse ssor
(DH)
Report
23 July 2012
Details regarding the scope inclusive of any additional works need to be
obtained. The scope should be detailed more thoroughly or there will be
continuous enquiries by the client on what has been allowed for.
All concerns raised over the previous claim were raised during
reassessment.
The pressing i ssues about the previous claim were addressed in the
previous assessment and the required outcomes are noted in that report.
Insurer’s a sse ssor
(DM)
Report
30 September 2013
DM attended the site to supervise delivery of glass and mirrors.
Cash settlement for clothing and s hoes not successfully restored was
negotiated at $150 for shoes and $500 for several clothing items.
A leadlight door had a crack across a pane of leadlight.
A stack of leadlight panels was opened and some of the lead seemed to
have a white coating on it. The insured said the lead was corroded.
A quick calculation revealed the general contents sum insured of $11 5 ,350
had been exhausted. The payments to date total approximately $160, 000,
which is inclusive of restoration costs.
A settlem ent of $3,000 would be offered to the insured in full and final
settlement of the contents claim. This was considered a good will gesture in
order to draw a conclusion to the claim.
DM agreed to allow the insured to keep the glass and mirrors, which were
r eturned. The settlement was accepted.
[Insurer] is to arrange a cash settlement of $3, 650 in full and final settlement
of the claim.
Insurer’s a sse ssor
(AS)
Report
22 June 2015
Insured is not accepting that the subfloor and other as pects of the repairs
ha ve been included in the settlement from 2012.
Insured advised the SOW for the subfloor repairs is not enough. She
believes the SOW and report need to be more specific. She has not
obtained any information to substantiat e this.
Insured would have liked to r elocate the home to higher ground or lift the
home above the flood level but believes the settlement offered is not enough
to do this.
AS advised the SOW and settlement is for the repairs of the home to what it
was before the 2012 flood, the insurer will n ot pay extra to upgrade the
home.
During reinspection, AS noted the home has not been repaired since the
flood. The walls have been stripped out and left. The customer has not lived
in the home since 2012.
The home is not habitable. There is a broken window at the rear.
Determination | Case numbers: 505272 & 510647 Page 14 of 15
Record Key points
AS recommends a builder be appointed to provide a quote for what it would
cost to repair and replac e some subfloor piers and pack/level off the floor to
its pre - existing levels.
The attending builder should carry out a subfloor inspecti on using a
diagram/sketch of the subfloor piers. The builder should provide a quote
based on what is required for each pier as per MP ’s report.
Insurer’s engineer
(MP)
Report
11 August 2015
The insurer had requested MP inspect the floor support stumps be neath the
dwelling and determine which of them require replacement as a result of the
inundation that occurred on two separate occasions in March 2012.
The underfloor investigation took place over an approximately 3.5 hour
period.
The [suggested] procedure for reconstruction of individual floor support
stumps is to be applied to 13 stumps indicated in the report’s sketch.
The overall level of the floor diaphragm would be measured after the
underfloor stumps have been rebuilt and if adjustments are needed, t hey
should be undertaken as per the procedures set out in the report.
The toleranc e on floor level that would be appropriate and accept able would
be +/ - 10mm. A maximum of 20mm out of level over the whole diaphragm.
Once the underfloor stump reconstruction and adjustment of the planarity of
the timber floor diaphragm has been finalised, final clearance and sanitising
of the underfloor space can be undertaken.
If retreatment of previously existing termiticide application is included under
the policy, the und erfloor spaces and any other areas necessary should be
retreated.
No repairs to existing termite attack on any part of the building
superstructure or improvements at the site will be included in the specified
flood related repair work to be undertak en at t he site.
Insurer’s a sse ssor
(AS)
Report
16 October 2015
The quote supplied by builder JC includes the work outlined in MP’s report
dated 11 August 2015. JC quoted $13,543.
The customer has been settled based on builder RC’s quote, which included
$15,600 plus margin and GST for the cost of repairing the subfloor. The
customer says the $15,600 allowance was not enough.
The customer has been settled for more than the quot ed amo unt and now
has a full understanding of what the allowances are for.
AS recommends closing the claim as all items have been addressed.
Discuss ion with [the complainant] onsite on 20 July 2015 indicated the
subfloor issue was the only item remaining with th e SOW.
Insurer’s a sse ssor
(AS)
Report
30 August 201 6
The complainant has said settlement for contents is fine.
The insurer has settled more than the quoted amount. If the customer is still
disputing the subfloor work and the soil issues, she will need to supply her
own report to substantiate her claim.
The insurer will not cover the cost to move the home to another location or
to raise it out of the flood levels.
An additional $760 to be paid for a bifold door.
Insurer’s engineer
(IE – formerly
The out of plumb of the underfloor brick stumps was measured using the
Tajima Slant 100 level. Assessment of the out of plumb can be visually
Determination | Case numbers: 505272 & 510647 Page 15 of 15
Record Key points
known as M P )
Report
8 November 2017
interpreted within 0.5 degrees.
The practical limitations on measuring the out of plumb were created by the
nature of the brickwork from which the brick stumps were built.
As seen in photographs taken on 20 July 2015, the faces and corners of the
piers are not completely true and plumb.
This was partly due to variations in the sizes of indivi dual bricks (due to
having us ed second grade bricks of variable size and quality) and partly due
to the quality of the bricklaying, which is of a lesser standard than would be
required for external face brickwork. Nevertheless, this is acceptable for
stump construction.
Because of these variations, the actual verticality of the stumps (and its
change) could not be determined with great certainty.
However, the measurements obtained were enough to allow a distinction
between stumps that were not significantly out of plumb and those that were
out of plumb to a greater degree.
The maximum out of plumb recorded was in the range of 2° - 3°, which was
regarded as not structurally critical put possibly indicating the stumps that
sustained that degree of rotation may h ave sustained an element of
rotational movement (which IE regarded as damage).
Therefore, the stumps having an out of level less than 2° could be retained.
The stumps having an out of level equal to or greater than 2° had sustained
damage and were to be re placed. This was the basis of the stump
replacement recommendation in the 11 August 2015 report.
The vertical distance between the underfloor soil surface and the underside
of the floor bearers varies over the plan area of the building.
Therefore, because the stumps below the nort heast quadrant of the building
were shorter, direct access beneath that part was not physically possible.
Accordingly, assessments were made visually.
Notwithstanding this, the shorter stumps showed no signs of visually
obvious or structurally significant rotation or other movement .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.