Determination
Case No: 510546 Determination Page 1 of 8
Case number: 510546 2 August 2018
1 Overview
1.1 Dispute
A unit of holder of a strata property (JF) and the strata property‟s broker (AB) jointly
lodged this dispute. For the sake of simplicity, I will refer to them jointly as the
applicants in this determination.
Cyclone Debbie caused damage to the strata property. The applicants lodged a claim
with the FSP.
The FSP accepted the claim but declined to pay for the road, culverts, table drains
and concrete apron repairs.
1.2 Issues and key findings
Is the FSP entitled to decline part of the claim?
Based on the information provided, the FSP has established faulty workmanship was
a proximate cause of the road, culverts, table drains and concrete apron damage. As
faulty workmanship is excluded, the FSP is entitled to refuse payment o f that aspect
of the claim.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to rely upon the terms and conditions of the policy to refuse
payment of part of the appl icants‟ claim.
Case No: 510546 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the FSP entitled to decline part of the claim?
Policy provides cover for accidental damage
In order to claim under the policy, the applicants have the onus to establish the loss
was caused by an event listed under the terms of the policy.
The policy:
provides cover for any damage not excluded under the policy
defines „damage‟ as any accidental physical loss or destruction
defines „accidental‟ as something not intended or expected by you and would
not be expected from the standpoint of a reasonable person in your position.
Key extracts of the policy terms (PDS), are set out in section 3.1 of this
determination.
Circumstances of the loss and claim
The applicants originally lodged a claim on 4 April 2017, with the assistance of their
broker (RI).
The FSP‟s loss assessor (EX) , inspected the property on 27 March 2017. EX accepts
the effect of Cyclone Debbie has caused some dama ge to the applicants‟ property.
Based on EX‟s report, the FSP accepted and paid for the repair of the electrical
switchboard, entry gate and road signage.
The issue now is whether the road repairs claimed by the applicant should be
covered by the policy.
There are two main roads on the applicant‟s property:
a 950m internal road from the entrance gate to the cul de sac adjacent the
property. This road was built during the first stage of the estate‟s development.
This road‟s primary material is bitumen.
another internal road was built during the second stage of the estate‟s
development. This road‟s primary material is concrete.
The applicants have provided quotations for the repairs. They amount to $87,057.93.
FSP says the policy excludes the loss
The FSP says the following exclusions apply to exclude the roadway damage:
gradual deterioration
faulty design and workmanship.
In order to be entitled to deny the claim, the FSP must show the proximate cause of
the damage is one or more of the excluded factors referred to above.
Case No: 510546 Determination Page 3 of 8
It is well established insurance law that the proximate cause of a loss is not
necessarily the first (or the last) or the sole cause of the loss. It is the effective,
dominant or operative cause.
The identification of the proximate cause is a question of fact that depends on the
circumstances of each particular case.
Where two concurrent proximate causes operate interdependently to cause a loss
and one of the proximate causes is excluded (while the other is insured), the insurer
is entitled to rely on the excluded cause to deny liability. This is known as the Wayne
Tank principle.
On balance, faulty workmanship contributed to the damage
Photographs provided by MCS show:
soil erosion washout to roadway verges near the entrance of the estate
the retaining consist of loosely laid large rocks
random minor washouts, soil dispersion and erosion of roadway verges further
into the estate
some part of the roadway shows no evidence of soil erosion or deterioration.
T he FSP‟s consultant (MCS) and the applicants‟ engineer (TS), agree stormwater
has contributed to the soil erosion and subsequent undermining of the road surface.
However, they disagree on whether the road‟s design and construction also
contributed to the damage.
MCS identified the following issues with the road‟s design and construction:
the sprayed concrete sides of the culverts do not have control, movement and
expansion joints
sprayed concrete was also used on table drains and the concrete apron to
retain foundation and soil. MCS says the use of sprayed concrete is not
appropriate construction to retain all forms of wash out. MCS says a concrete
spoon drain should have been installed at the side of road and headwalls
should have been installed beneath the road edges. This would have prevented
washout to many of the road surfaces as well as the undermining or retained
ground surfaces of the table drains
the Australian Standards required for the construction of all structures for the
roadways including culverts and crossovers were in place at the time of design.
These Standards are required as the works referred to are commercial graded
structures and cannot simply be constructed without the use of the relevant
Standards - being Australian Standard AS 3600 - 2001 Concrete Structures and
Australian Standard AS 4678- 2002 Earth-retaining structures.
The applicant‟s engineer (TG) challenges MCS‟ findings. TG says the road was
constructed with council‟s approved design and specification and maintained to a
reasonable standard. TG provided some of the council planning documents in
support.
Whilst the planning documents were helpful in confirming the road‟s design, they do
not confirm the road was actually built to design.
Case No: 510546 Determination Page 4 of 8
The extensive use of sprayed concrete in the culverts, table drains and concrete
aprons was not documented in the planning document provided.
TG provided only limited comment about the use of sprayed concrete to the above
areas. TG questioned the Australian Standard referred to by MCS and cited other
codes/development manuals as the relevant standard. TG did not provide a copy of
these codes/development manuals.
I am satisfied that the report from MCS is thorough, logical, its conclusions are
compelling and supported by numerous helpful photographs.
Having carefully reviewed the available information, I am satisfied the road‟s faulty
construction contributed to the damage. I accept the use of sprayed concrete in the
road‟s construction of the culverts, table drains and concrete apron to retain soil and
foundation allowed the erosion of soil and washouts. This in turn caused the
undermining of the road surface.
As outlined above, the applicant‟s policy excludes lia bility for claims caused by faulty
workmanship.
Given the road was damaged by the effect of the storm and faulty workmanship, the
FSP is entitled to rely on the policy exclusion to deny the claim.
Given my findings, it is not necessary for me to also determine whether the claim is
also excluded under the unsealed road surfaces, retaining walls, bridges and/or
landscaping provision.
Case No: 510546 Determination Page 5 of 8
3 Supporting information
3.1 Key policy wording
WHAT YOU ARE COVERED FOR
This section is an Accidental, physical Loss or destruction contract of insurance between
You and Us.
We will cover Your Insured Property for any Damage occurring during the Period of
Insurance not excluded by this section.
…
EXCLUSIONS
We will not pay any claims for Damage to Insured Property arising directly or indirectly from
or in connection with:
...
c. wear and tear, fading, marring, gradual deterioration, developing flaws, normal up-
keeping or making good, rust, gradual corrosion, oxidization, concrete or brick cancer, wet
or dry rot. However this exclusion does not apply to subsequent Damage to Insured
Property not otherwise excluded by the Policy;
…
m. defect in any item, structural defect, faulty design, faulty workmanship, error or omission
that You were aware of or should have reasonably been aware of.
3.2 Key Certificate of Insurance term
2. Common Property Only
All cover under Sections 1-3 of this policy relate to the common property only. Cover under
Section 4 is provided for common area/s only. Section 12 of this policy is deleted.
3. Unsealed road surfaces, retaining walls, bridges and/or landscaping
We will not pay for any claims arising from or connected to storm, tempest, rainwater or
wind to any unsealed road surfaces, retaining walls, bridges and/or landscaping.
3.3 Key records
Record Key points
FSP’s building
consultant ( MCS )
Report
04 - 09 - 2017
Proximate Cause and Eff ect
In my opinion the roadways, culverts, table drains and spoon
drains, and the conc rete edging around the pond are all poorly
constructed structures. These are designed to be temporary
retentions of foundations and soils, rather than being substantial
st ructures which are required to achieve strength, serviceability,
and durability, throughout all forms of storm events, including those
with excessive rainfall. I consider that the storm events following
TC Debbie, which included those on 27th, 28t h, 29th a nd 30t h
March 2017, will have exacerbated all forms of foundation or soil
erosion and deterioration of all existing structures. And, as none of
these structures are suitable for their applications, all have
sustained damage because of aging and deteriorati on, and
Case No: 510546 Determination Page 6 of 8
damage has been exacerbat ed during the TC Debbie event and
the following days of poor weat her.
Pre - existing I ssue s
There were many issues with all existing structures which are
temporary structures and are not durable, serviceable and
structurally adequate for their design requirements which,
combined with the excessive rainfall experienced during the TC
Debbie event, has further exacerbat ed damage, particularly
undermining and soil erosion. None of the structures were in
accordance with Australian Standard AS 3600 - 2001 Concret e
Structures and Australian Standard AS 4678 - 2002 Earth - retaining
structures.
FSP’s building
consultant ( MCS )
Report
31 - 10 - 2017
The particular construction of all structures is considered to be
inadequate for their durabilit y, serviceability and structural
adequacy. Therefore wit h such a severe event as TC Debbie and
the extremely heavy rainfalls experienced over the four days
following [27 – 30 March], the structures that have sustained
damage due to a combination of their i nadequate design and
construction. Without correct design and construction any storm
/heavy rainfall would have continued to det eriorate all inadequate
structures.
FSP’s building
consultant ( MCS )
Report
02 - 11 - 2017
The areas to be discussed concern the bit umen edges to
roadways, sprayed concrete of the pond and the culverts and the
r ock spoon drains at the (B) drive roadway and (R) road.
1. The bitumen sprayed surfaces of the roadways are sealed
surfaces.
2. The pond edges concrete sprayed surfaces are se aled surfaces.
3. The culverts concrete sprayed surfaces are sealed surfaces.
4. The spoon drains and roadwa y side edges along the (B) drive
and (R) idge Road are unsealed surfaces and have damage
requiring repair and upgrades.
FSP’s building
consultant ( MCS )
Report
16 - 02 - 2018
The particular construction of all structures is considered to be
inadequate for their durability, serviceability and structural
adequacy in accordance with the Australian Standard AS 3600 -
2001 Concret e Structures. Therefore, wit h such a severe event as
TC Debbie and the extremely heavy rainfalls experienced over the
four days following [27 – 30 March], the structures have sustained
damage due to a combination of their inadequate design and poor
construction. Without correct desig n and construction any storm
/heavy rainfall would have continued to det eriorate the inadequate
structures
Neither of these requirements have been met and these structures
are not adequate to withstand the particular storm event
experienced, let alone con tinual rainfall events that are
experienced within the Whitsunday Region.
The sprayed concrete edging to the pond is in my opinion not
designed for strength, durability and serviceability and is purely
used as a means of retaining the pond walls in place. The method
used was what could only be considered a temporary method of
Case No: 510546 Determination Page 7 of 8
retaining the foundation or the particular soil type at the top edges
of the pond.
In my opinion the sprayed concrete sides of the culverts were not
designed for strength, durability and serviceability; they did not
contain the upstream edges and downstream edges of the
culverts. There were no control, movement and expansion joints
and t ypically what could only be described and considered to be
temporary retentions of the foundations and party soil surfaces of
the culverts on approach and the downside of the roadway
culverts.
The end of all spray ed concrete surfaces of the culverts, both the
upstream and the downstream sides, should have what is best
described as concret e headwalls, which will allow for the
prevention of undermining and washout of sprayed concrete
surfaces.
The sprayed concrete table drains, in my opinion, were not
design ed for strength, durability and serviceability and are used as
retaining foundations for the particular soil type during storm
events with rainfall. They are used as temporary retentions of the
walls, and are not appropriately constructed to ret ain all for ms of
wash out, they should be designed to prevent cracking of the
sprayed concrete finishes.
The sprayed concrete aprons, in my opinion, were not designed for
strength, durability and serviceability. They are used as temporary
retentions of the walls and are not appropriately constructed to
retain all forms of wash out and prevent cracking of the sprayed
concrete finishes.
Continual washout of the table drains, particularly on the uphill side
of the steep hillside has, in my opinion, simply been caused b y a
washout of the table drain foundations or particular soil type and
undermining of the concrete roadway surface. The table drains at
either side of the roadway were not designed for strength,
durability and serviceability. The serviceability requirement would
have nec essitated a concret e spoon drain or similar at the side of
the road and headwalls beneath the road edges to prevent
washout to the road‟s surfaces and undermining and also retain
the ground surfaces of the table drains without damage.
As pe r MCS Report 81912 the Australian Standards required for
the construction of all structures for the roadways including culverts
and crossovers were in place at the time of design. These
Standards are required as the works referred to are commercial
graded structures and cannot simply be constructed without the
use of the relevant Standards - being Australian Standard AS 3600
- 2001 Concrete Structures and Australian Standard AS 4678 -
2002 Earth - retaining structures.
Additionally, all these structures will have required to be structurally
designed, inspected and certified by a structural engineer, despit e
this being a private estate.
Applicant’s building
consultant ( TG )
Based on my knowledge and inspection of the site, the edges of
the roa d (shoulders) which have been “bitumen sealed” (BD
Case No: 510546 Determination Page 8 of 8
Report
06 - 03 - 2018
Stage1 ) is a sealed pavement, and therefore should be covered by
insurance. The road has been constructed in accordance with
Council approved design and specification, and has been
maintained to a reasonable standard. The damage to the sealed
shoulder has been caused by stormwat er in excess of normal
swale drain flow (>Q5 ARI) which have resulted in erosion,
saturation, and undermining of the road pavement gravel.
Similar ly, the concrete road (TR St age 2) the damage to the road
should be covered by insurance as it is sealed road, and has been
constructed in accordance with Council approved design and
specification. In my opinion, the damage (displacement of the
construction joints) has been caused by stormwat er in excess of
normal swale drain flow (>Q5 ARI) which have resulted in water
flow under the concrete slab (lifting it through hydrostatic pressure)
thus displacing the joint.