Determination 510546

Partial claim decline for road, culvert, drain and apron repairs (faulty workmanship exclusion)

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-02
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$87,058
SourceAFCA PDF

Summary

The strata unit holder and broker claimed road, culvert, table drain and concrete apron repairs after Cyclone Debbie, which the FSP declined. AFCA found faulty workmanship was a proximate cause of that damage, so the policy exclusion applied and no payment was ordered.

The proximate cause of the loss was faulty workmanship, which the policy excludes, and where an excluded cause is concurrent with an insured cause the insurer may rely on the exclusion.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 510546 Determination Page 1 of 8 Case number: 510546 2 August 2018 1 Overview 1.1 Dispute A unit of holder of a strata property (JF) and the strata property‟s broker (AB) jointly lodged this dispute. For the sake of simplicity, I will refer to them jointly as the applicants in this determination. Cyclone Debbie caused damage to the strata property. The applicants lodged a claim with the FSP. The FSP accepted the claim but declined to pay for the road, culverts, table drains and concrete apron repairs. 1.2 Issues and key findings Is the FSP entitled to decline part of the claim? Based on the information provided, the FSP has established faulty workmanship was a proximate cause of the road, culverts, table drains and concrete apron damage. As faulty workmanship is excluded, the FSP is entitled to refuse payment o f that aspect of the claim. 1.3 Determination This determination is in favour of the FSP. The FSP is entitled to rely upon the terms and conditions of the policy to refuse payment of part of the appl icants‟ claim. Case No: 510546 Determination Page 2 of 8 2 Reasons for determination 2.1 Is the FSP entitled to decline part of the claim? Policy provides cover for accidental damage In order to claim under the policy, the applicants have the onus to establish the loss was caused by an event listed under the terms of the policy. The policy:  provides cover for any damage not excluded under the policy  defines „damage‟ as any accidental physical loss or destruction  defines „accidental‟ as something not intended or expected by you and would not be expected from the standpoint of a reasonable person in your position. Key extracts of the policy terms (PDS), are set out in section 3.1 of this determination. Circumstances of the loss and claim The applicants originally lodged a claim on 4 April 2017, with the assistance of their broker (RI). The FSP‟s loss assessor (EX) , inspected the property on 27 March 2017. EX accepts the effect of Cyclone Debbie has caused some dama ge to the applicants‟ property. Based on EX‟s report, the FSP accepted and paid for the repair of the electrical switchboard, entry gate and road signage. The issue now is whether the road repairs claimed by the applicant should be covered by the policy. There are two main roads on the applicant‟s property:  a 950m internal road from the entrance gate to the cul de sac adjacent the property. This road was built during the first stage of the estate‟s development. This road‟s primary material is bitumen.  another internal road was built during the second stage of the estate‟s development. This road‟s primary material is concrete. The applicants have provided quotations for the repairs. They amount to $87,057.93. FSP says the policy excludes the loss The FSP says the following exclusions apply to exclude the roadway damage:  gradual deterioration  faulty design and workmanship. In order to be entitled to deny the claim, the FSP must show the proximate cause of the damage is one or more of the excluded factors referred to above. Case No: 510546 Determination Page 3 of 8 It is well established insurance law that the proximate cause of a loss is not necessarily the first (or the last) or the sole cause of the loss. It is the effective, dominant or operative cause. The identification of the proximate cause is a question of fact that depends on the circumstances of each particular case. Where two concurrent proximate causes operate interdependently to cause a loss and one of the proximate causes is excluded (while the other is insured), the insurer is entitled to rely on the excluded cause to deny liability. This is known as the Wayne Tank principle. On balance, faulty workmanship contributed to the damage Photographs provided by MCS show:  soil erosion washout to roadway verges near the entrance of the estate  the retaining consist of loosely laid large rocks  random minor washouts, soil dispersion and erosion of roadway verges further into the estate  some part of the roadway shows no evidence of soil erosion or deterioration. T he FSP‟s consultant (MCS) and the applicants‟ engineer (TS), agree stormwater has contributed to the soil erosion and subsequent undermining of the road surface. However, they disagree on whether the road‟s design and construction also contributed to the damage. MCS identified the following issues with the road‟s design and construction:  the sprayed concrete sides of the culverts do not have control, movement and expansion joints  sprayed concrete was also used on table drains and the concrete apron to retain foundation and soil. MCS says the use of sprayed concrete is not appropriate construction to retain all forms of wash out. MCS says a concrete spoon drain should have been installed at the side of road and headwalls should have been installed beneath the road edges. This would have prevented washout to many of the road surfaces as well as the undermining or retained ground surfaces of the table drains  the Australian Standards required for the construction of all structures for the roadways including culverts and crossovers were in place at the time of design. These Standards are required as the works referred to are commercial graded structures and cannot simply be constructed without the use of the relevant Standards - being Australian Standard AS 3600 - 2001 Concrete Structures and Australian Standard AS 4678- 2002 Earth-retaining structures. The applicant‟s engineer (TG) challenges MCS‟ findings. TG says the road was constructed with council‟s approved design and specification and maintained to a reasonable standard. TG provided some of the council planning documents in support. Whilst the planning documents were helpful in confirming the road‟s design, they do not confirm the road was actually built to design. Case No: 510546 Determination Page 4 of 8 The extensive use of sprayed concrete in the culverts, table drains and concrete aprons was not documented in the planning document provided. TG provided only limited comment about the use of sprayed concrete to the above areas. TG questioned the Australian Standard referred to by MCS and cited other codes/development manuals as the relevant standard. TG did not provide a copy of these codes/development manuals. I am satisfied that the report from MCS is thorough, logical, its conclusions are compelling and supported by numerous helpful photographs. Having carefully reviewed the available information, I am satisfied the road‟s faulty construction contributed to the damage. I accept the use of sprayed concrete in the road‟s construction of the culverts, table drains and concrete apron to retain soil and foundation allowed the erosion of soil and washouts. This in turn caused the undermining of the road surface. As outlined above, the applicant‟s policy excludes lia bility for claims caused by faulty workmanship. Given the road was damaged by the effect of the storm and faulty workmanship, the FSP is entitled to rely on the policy exclusion to deny the claim. Given my findings, it is not necessary for me to also determine whether the claim is also excluded under the unsealed road surfaces, retaining walls, bridges and/or landscaping provision. Case No: 510546 Determination Page 5 of 8 3 Supporting information 3.1 Key policy wording WHAT YOU ARE COVERED FOR This section is an Accidental, physical Loss or destruction contract of insurance between You and Us. We will cover Your Insured Property for any Damage occurring during the Period of Insurance not excluded by this section. … EXCLUSIONS We will not pay any claims for Damage to Insured Property arising directly or indirectly from or in connection with: ... c. wear and tear, fading, marring, gradual deterioration, developing flaws, normal up- keeping or making good, rust, gradual corrosion, oxidization, concrete or brick cancer, wet or dry rot. However this exclusion does not apply to subsequent Damage to Insured Property not otherwise excluded by the Policy; … m. defect in any item, structural defect, faulty design, faulty workmanship, error or omission that You were aware of or should have reasonably been aware of. 3.2 Key Certificate of Insurance term 2. Common Property Only All cover under Sections 1-3 of this policy relate to the common property only. Cover under Section 4 is provided for common area/s only. Section 12 of this policy is deleted. 3. Unsealed road surfaces, retaining walls, bridges and/or landscaping We will not pay for any claims arising from or connected to storm, tempest, rainwater or wind to any unsealed road surfaces, retaining walls, bridges and/or landscaping. 3.3 Key records Record Key points FSP’s building consultant ( MCS ) Report 04 - 09 - 2017  Proximate Cause and Eff ect  In my opinion the roadways, culverts, table drains and spoon drains, and the conc rete edging around the pond are all poorly constructed structures. These are designed to be temporary retentions of foundations and soils, rather than being substantial st ructures which are required to achieve strength, serviceability, and durability, throughout all forms of storm events, including those with excessive rainfall. I consider that the storm events following TC Debbie, which included those on 27th, 28t h, 29th a nd 30t h March 2017, will have exacerbated all forms of foundation or soil erosion and deterioration of all existing structures. And, as none of these structures are suitable for their applications, all have sustained damage because of aging and deteriorati on, and Case No: 510546 Determination Page 6 of 8 damage has been exacerbat ed during the TC Debbie event and the following days of poor weat her.  Pre - existing I ssue s  There were many issues with all existing structures which are temporary structures and are not durable, serviceable and structurally adequate for their design requirements which, combined with the excessive rainfall experienced during the TC Debbie event, has further exacerbat ed damage, particularly undermining and soil erosion. None of the structures were in accordance with Australian Standard AS 3600 - 2001 Concret e Structures and Australian Standard AS 4678 - 2002 Earth - retaining structures. FSP’s building consultant ( MCS ) Report 31 - 10 - 2017  The particular construction of all structures is considered to be inadequate for their durabilit y, serviceability and structural adequacy. Therefore wit h such a severe event as TC Debbie and the extremely heavy rainfalls experienced over the four days following [27 – 30 March], the structures that have sustained damage due to a combination of their i nadequate design and construction. Without correct design and construction any storm /heavy rainfall would have continued to det eriorate all inadequate structures. FSP’s building consultant ( MCS ) Report 02 - 11 - 2017  The areas to be discussed concern the bit umen edges to roadways, sprayed concrete of the pond and the culverts and the r ock spoon drains at the (B) drive roadway and (R) road.  1. The bitumen sprayed surfaces of the roadways are sealed surfaces.  2. The pond edges concrete sprayed surfaces are se aled surfaces.  3. The culverts concrete sprayed surfaces are sealed surfaces.  4. The spoon drains and roadwa y side edges along the (B) drive and (R) idge Road are unsealed surfaces and have damage requiring repair and upgrades. FSP’s building consultant ( MCS ) Report 16 - 02 - 2018  The particular construction of all structures is considered to be inadequate for their durability, serviceability and structural adequacy in accordance with the Australian Standard AS 3600 - 2001 Concret e Structures. Therefore, wit h such a severe event as TC Debbie and the extremely heavy rainfalls experienced over the four days following [27 – 30 March], the structures have sustained damage due to a combination of their inadequate design and poor construction. Without correct desig n and construction any storm /heavy rainfall would have continued to det eriorate the inadequate structures  Neither of these requirements have been met and these structures are not adequate to withstand the particular storm event experienced, let alone con tinual rainfall events that are experienced within the Whitsunday Region.  The sprayed concrete edging to the pond is in my opinion not designed for strength, durability and serviceability and is purely used as a means of retaining the pond walls in place. The method used was what could only be considered a temporary method of Case No: 510546 Determination Page 7 of 8 retaining the foundation or the particular soil type at the top edges of the pond.  In my opinion the sprayed concrete sides of the culverts were not designed for strength, durability and serviceability; they did not contain the upstream edges and downstream edges of the culverts. There were no control, movement and expansion joints and t ypically what could only be described and considered to be temporary retentions of the foundations and party soil surfaces of the culverts on approach and the downside of the roadway culverts.  The end of all spray ed concrete surfaces of the culverts, both the upstream and the downstream sides, should have what is best described as concret e headwalls, which will allow for the prevention of undermining and washout of sprayed concrete surfaces.  The sprayed concrete table drains, in my opinion, were not design ed for strength, durability and serviceability and are used as retaining foundations for the particular soil type during storm events with rainfall. They are used as temporary retentions of the walls, and are not appropriately constructed to ret ain all for ms of wash out, they should be designed to prevent cracking of the sprayed concrete finishes.  The sprayed concrete aprons, in my opinion, were not designed for strength, durability and serviceability. They are used as temporary retentions of the walls and are not appropriately constructed to retain all forms of wash out and prevent cracking of the sprayed concrete finishes.  Continual washout of the table drains, particularly on the uphill side of the steep hillside has, in my opinion, simply been caused b y a washout of the table drain foundations or particular soil type and undermining of the concrete roadway surface. The table drains at either side of the roadway were not designed for strength, durability and serviceability. The serviceability requirement would have nec essitated a concret e spoon drain or similar at the side of the road and headwalls beneath the road edges to prevent washout to the road‟s surfaces and undermining and also retain the ground surfaces of the table drains without damage.  As pe r MCS Report 81912 the Australian Standards required for the construction of all structures for the roadways including culverts and crossovers were in place at the time of design. These Standards are required as the works referred to are commercial graded structures and cannot simply be constructed without the use of the relevant Standards - being Australian Standard AS 3600 - 2001 Concrete Structures and Australian Standard AS 4678 - 2002 Earth - retaining structures.  Additionally, all these structures will have required to be structurally designed, inspected and certified by a structural engineer, despit e this being a private estate. Applicant’s building consultant ( TG )  Based on my knowledge and inspection of the site, the edges of the roa d (shoulders) which have been “bitumen sealed” (BD Case No: 510546 Determination Page 8 of 8 Report 06 - 03 - 2018 Stage1 ) is a sealed pavement, and therefore should be covered by insurance. The road has been constructed in accordance with Council approved design and specification, and has been maintained to a reasonable standard. The damage to the sealed shoulder has been caused by stormwat er in excess of normal swale drain flow (>Q5 ARI) which have resulted in erosion, saturation, and undermining of the road pavement gravel.  Similar ly, the concrete road (TR St age 2) the damage to the road should be covered by insurance as it is sealed road, and has been constructed in accordance with Council approved design and specification. In my opinion, the damage (displacement of the construction joints) has been caused by stormwat er in excess of normal swale drain flow (>Q5 ARI) which have resulted in water flow under the concrete slab (lifting it through hydrostatic pressure) thus displacing the joint.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.