Landlord insurer declined claim for wall and ceiling cracking
Summary
A landlord's claim for wall and ceiling cracking was declined after the insurer's engineer found the cracks were not caused by a listed event. AFCA found the decline justified and rejected compensation for a three-week delay in the decision.
The applicant did not establish loss caused by a listed event under the policy, so the insurer was entitled to decline the claim.
Issues
- Claim denial primary · not upheld“I am not satisfied that the applicant has established loss or damage which was caused by a listed event detailed within the policy documentation.”
- Delay secondary · not upheld“I accept that the three week period is not ideal, but I do not accept that compensation is appropriate.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 510099 Determination Page 1 of 4
Case number: 510099 20 August 2018
1 Overview
1.1 Dispute
This matter involves a claim by the applicant under her Landlord Insurance Policy,
held with the financial services provider (FSP), as a result of damage at the rental
property.
The FSP denied the claim on the basis that no insured event could be established.
1.2 Issues and key findings
Has the applicant established a claim under the terms of the policy?
The applicant has not established a claim under the terms of the policy and in those
circumstances the FSP is entitled to deny the applicant’s claim.
Is the applicant entitled to compensation?
The applicant is not entitled to compensation, given the circumstances of this claim.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to decline the claim.
Case No: 510099 Determination Page 2 of 4
2 Reasons for determination
This dispute has been the subject of a recommendation issued by the Service on 27
June 2018.
It was the case analyst’s recommendation that the FSP was entitled to deny the
claim on the basis the damage was caused by wear and tear, maintenance and
structural defects and that no single event occurred which has resulted in the
damage.
The case analyst also recommended that the FSP had met its obligations in a timely
fashion.
The applicant has disputed the recommendation.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Is the FSP entitled to deny the applicant’s claim ?
Coverage of the policy
The coverage provided by the applicant’s Landlord Insurance Policy is in relation to
loss or damage caused by an event listed within the policy documentation.
This means that not all loss and damage is automatically covered, but rather only
loss and damage caused by a listed event detailed within the policy documentation,
is covered.
When lodging the claim the applicant advised of a huge crack on the wall and the
ceiling.
There was uncertainty as to the cause of the crack but the only renovations
completed by the tenants were painting and carpet replacement.
The FSP engaged an engineer (IC) to investigate the cause of the cracking.
IC inspected the premises on 27 July 2017 and provided a report dated 1 August
2017.
Within that report IC concluded that the cracking observed did not appear to be event
related.
The crease lines in the ceiling over the living area near the front of the residence was
regarded as typical of ceiling sagging, which can be caused by glue or adhesive
pulling away, or by the ceiling sheets not being back -blocked, as observed at this
dwelling.
Case No: 510099 Determination Page 3 of 4
The ceiling cracking near the front entry, is likely due to the rotation and long term
deterioration of the structural supporting beam over, which warrants replacement.
IC was of the view that the ceiling crack in the main living area is due to the poor and
non-compliant construction of the steel beams spanning over the room.
IC made recommendations to repair the various defects.
Having reviewed all of the exchanged material I am satisfied that the report from IC is
thorough and logical and its conclusions compelling and supported by helpful
photographs.
On the basis of the report from IC I am not satisfied that the applicant has
established loss or damage which was caused by a listed event detailed within the
policy documentation.
On this basis, the FSP is entitled to deny the applicant’s claim.
Compensation
The terms of reference provide that the Service may award compensation in
circumstances where there has been an unusual degree or extent of physical
inconvenience, time take to resolve the situation or interference with the applicant’s
expectation of enjoyment or peace of mind.
The exchanged material confirms that on 3 July 2017 the applicant contacted the
FSP to lodge a claim.
IC inspected the property on 27 July 2017 and provided a report dated 1 August
2017.
The FSP formally declined the ap plicant’s claim by letter sent to the applicant dated
21 August 2017.
The applicant suggests that the time taken for the FSP to resolve this matter is
excessive and has provided details of an unrelated claim which was resolved within a
period of four weeks.
The exchanged material confirms that the original builder who attended the property
was uncertain as to the cause of the cracking and as a result the applicant appointed
the engineer IC.
The steps taken by the FSP were appropriate.
Noting that IC’s report was dated 1 August 2017 but the letter to the applicant
denying the claim was not sent until 21 August 2017, I accept that the three week
period is not ideal.
However, in the circumstances of this claim and this dispute I am not sa tisfied that
compensation is appropriate notwithstanding that the applicant may have expected a
response from the FSP at an earlier date.
The guidelines to the terms of reference provide that the Service takes a
conservative approach to compensation for non-financial loss and the Service
Case No: 510099 Determination Page 4 of 4
expects an applicant to be moderately robust and bear the normal degree of
inconvenience experience during the course of the claims process.
Whilst I accept that the three week period between the date of the report from IC and
the denial letter from the FSP is less than ideal, I do not accept that in the
circumstances of this claim and this dispute that compensation is appropriate.
The FSP is entitled to deny the applicant’s claim and is not required to pay
compensation.