Insurer refused to rectify defective repairs to boat it had selected and authorised the repairer for
Text of the determination
Determination | Case number: 509376 Page 1 of 18
Determination
Case number: 509376 19 November 2018
1 Determination overview
1.1 Complaint
The complainants held a boat insurance policy with the financial firm ( „the insurer ‟ ).
The complainants lodged a claim after their boat was damaged in the Bahamas. The
complainants sailed from the Bahamas to a shipyard in Florida, where the boat was
repaired. The insurer accepted the complainant s‟ claim and paid the r epairer.
The complainants say the repairs are defective and incomplete, and the insurer is
liable for the cost of rectification. The insurer says it did not select or authorise the
repairer, so it is not liable for any defective repairs.
The complainants also say the insurer is liable for consequential losses caused by the
defective repairs and the mishandling of the claim. The insurer denies that it
mishandled the claim.
1.2 Issues and key findings
Are the repairs defective?
The preferred evidence of the experts who examined the boat establishes that the
repairs are defective and incomplete.
Is the insurer liable for the defective repairs?
The available material establishes the insurer selected and directly authorised the
repairer. Therefore, the insurer is liable for the cost of rectification, estimated at
$114,512.67. In addition, the available material establishes that this outcome is fair in
all the circumstances.
Is the insurer liable for the complainant s’ consequential loss?
The defective repairs caused the complainants to incur costs for accommodation and
car hire. It is fair in all the circumstances that the insurer pay $2,500 for consequential
financial loss. If not paid already, the insurer is also to pay to the complainants the
maximum amount allowable under the policy for accommodation in the sum of
$1,000.
Determination | Case number: 509376 Page 2 of 18
Is the insurer liable for non-financial loss?
The insurer ‟s refusal to rectify the defective repairs caused interference with the
complainant s‟ peace of mind. It is fa ir in all the circumstances that the insurer pay the
complainants $2,000 for non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainants.
Should the complainants accept this determination, then within 14 days of acceptance
the insurer is to make the following payments to the complainants.
$114,512.67 plus interest at the rate determined under section 57 of the Insurance
Contracts Act 1984 (Cth) from 16 January 2018 until the settlement date
$1,000 for accommodation (if not paid already)
$2,500 for consequential financial loss
$2,000 for non-financial loss.
Once those payments are made, the insurer is not required to take any further action
in relation to the claim or the complaint.
Determination | Case number: 509376 Page 3 of 18
2 Reasons for determination
2.1 Are the repairs defective?
Complainants say repairs are defective and incomplete
The complainants‟ boat was damaged on 15 July 2017 when it struck a submerged
object in the Bahamas. On 17 July 2017, they sailed towards a shipyard in Florida,
arriving there on 28 July 2017.
At the shipyard, the boat was inspected by „JMSC‟, marine surveyor. JMSC ‟s first
report, dated 10 August 2017, says he inspected the boat at the request of the
complainants and the insurer. The report notes several areas of damage.
Further details of the various expert reports provided by the parties are set out in
section 3.3 of this determination.
The boat was repaired at the shipyard by „MTM‟. The complainants say t he repairs
are defective and incomplete. The insurer says it neither agrees nor disagrees.
Evidence indicates repairs are defective and incomplete
After the boat was repaired by MTM, it was inspected by „FNS‟, marine surveyors. A
report by FNS dated 13 October 2017 concludes the inspected areas are sound.
However, a second report by FNS, dated 26 October 2017, says MTM‟s work is faulty
and the boat needs further repairs.
MTM appointed another marine surveyor, „AMG‟, who produced a report dated 8
November 20 17. The report says MTM‟s repairs are generally satisfactory. AMG says
the boat may have imperfections, but this is because it‟s a model whose “build
standards were not particularly high”, and it likely had many imperfections from the
time it was built.
The complainants have provided a pre-purchase survey report dated 18 March 2017
which is inconsistent with AMG‟s conclusion. Although the report identifies several
minor defects, it does not identify the problems identified in post-repair surveys. The
panel accepts this indicates the issues in dispute were probably not present when the
complainants bought the boat.
JMSC inspected the boat in water, and later in a dry dock. JMSC‟s subsequent
reports, dated 15 November 2017 and 20 December 2017, identify severa l signs of
defective and inadequate repairs. Furthermore, JMSC says several areas identified
as damaged in his first report have not been repaired.
JMSC‟s reports are far more detailed than the other surveyo rs‟ reports. Further, at the
request of both parties, JMSC has the advantage of inspecting the vessel both before
and after repairs. JMSC‟s reports include photographs of the damaged areas and
Determination | Case number: 509376 Page 4 of 18
clear explanations of what the photographs show. The other surveyors‟ reports are
not supported by photographs. To the extent the surveyors‟ evidence is in conflict, the
panel prefers the evidence provided by JMSC.
Having considered all available evidence, the panel is satisfied that the repairs
performed by MTM were, on the balance of probabilities, defective and/or incomplete.
2.2 Is the insurer liable for defective repairs?
Code of Practice guarantees repairs authorised by insurer
The FSP relies on a policy term which says the policy excludes cover for the cost of
rectifying faulty repairs. The policy does not say the insurer will guarantee repairs to
damage covered under the policy.
The General Insurance Code of Practice (to which the insurer subscribes) requires an
insurer to accept responsibility for the quality of workmanship and materials if it
“selected and directly authorised a repairer”.
The complainants say the insurer selected and authorised MTM to repair the boat.
The insurer says it did not select or authorise the repairer, and it is not liable under
the Code for any defective repairs. The insurer says the complainants selected the
repairer and it approve d the repairer‟s estimate . The insurer submits this is different
from directly authorising the repairer as it did not communicate with the repairer to
directly authorise the repairs.
Policy says complainants cannot act without insurer ’s authority
The panel has reviewed the Code of Practice, the product disclosure statement
(PDS), and a document relied on by the insurer titled “ Claims Process – What to
Expect ” . Extracts from the documents are set out in section 3.4 of this determination.
The complainants rely on provisions in the PDS to the effect that:
the complainants may not repair the boat without the insurer‟s agreement
if the complainants enter a contract to replace or reinstate damage the ins urer has
agreed to pay for, they do so as the insurer‟s agent.
The document titled “ Claims Process – What to Expect ” says that after receiving full
details of a claim, the insurer will “give you authority to proceed with agreed repairs”.
Further, the docum ent sets out that the boat remains the insured‟s responsibility at all
times. This is reiterated in correspondence between the parties.
Insurer authorised the repairer’s quote
The complainants emailed the insurer on 18 July 2018 saying they planned to sail to a
shipyard in Florida and have the boat assessed by MTM. MTM subsequently provided
a quote for 34,196 USD. The insurer asked for a quote from another repairer.
Determination | Case number: 509376 Page 5 of 18
The complainants emailed the insurer on 3 August 2018 saying „FYS‟ had offered to
inspect th e boat and provide a repair quote, for a fee. The email said: “My preference
is [FYS] as they seem more willing to get in and work while [MTM] needed a lot of
chasing to even get a quote.” The complainants did not obtain a repair quote from
FYS because the y did not receive the insurer‟s authorisation to do so.
On 16 August 2018, the complainants provided a quote from „APB‟, as requested by
the insurer. The quote was for 47,000 USD. Later that day, the insurer emailed the
complainants stating:
I have overnight received the approval from the underwriters to go ahead with the initial
estimate provided by [MTM].
…
Please note that we can process payments directly to the repairers to minimise
exchange rate differences.
The complainants interpreted this to mean the insurer had selected and authorised
MTM to repair the boat. The complainants say they accepted the insurer‟s choice of
repairer “on the reasonable assumption that [the insurer] had properly vetted the
credentials of all potential repairers”.
The insurer says its email did not mean it had authorised MTM to repair the boat. The
insurer says it settled the claim by paying the complainants the sum of MTM‟s quote,
and the complainants then selected and authorised MTM to repair the boat.
The insurer paid the cost of repairs directly to MTM, not to the complainants. The
insurer says it did this because it was easier for the complainants if it paid MTM on
their behalf.
The insurer has not provided the complainants with receipts for its payments to MTM,
and says it has no obligation to do so. However, the available material shows two
payments were made to MTM as follows:
17,098 USD on 22 August 2017
19,404.16 USD on 19 October 2017.
There are inconsistencies in the insurer’s conduct
The insurer says it settled the claim by paying the cost of repairs to the complainants,
who then independently authorised repairs by their choice of repairer.
The panel considers the insurer‟s position is inconsistent with:
the terms of the policy, which do not allow the complainants to repair the boat
without the insurer‟s authority
correspondence between the parties which shows , despite the insurer‟s contention
the vessel was the complainants‟ responsibility, significant input by the insurer into
choice of the surveyor, choice of the repairer, and the repair process
Determination | Case number: 509376 Page 6 of 18
the correspondence which shows the complainants followed the insurer‟s
instructions and would not act without the insurer‟s authority
the insurer‟s payment o f the cost of repairs directly to the repairer
no provision of a formal release.
I nsurer’s position is not fair in the circumstances
The panel also considers the insurer‟s position is not fair in the circumstances. This is
because:
the insurer was very active in directing the repair process, including agreeing with
the selection of the surveyor but then ignoring his recommendations regarding
further inspection, mast removal at inspection, thermal imaging, and re-evaluation
of the vessel when repairs were completed
the complainants did not have the vessel repaired by their choice of repairer but by
the repairer, chosen by the insurer, who provided the cheapest quotation
in deciding on the cheapest quotation, the insurer made no allowance for
contingencies or variations during repair
the two quotations were not strictly comparable as the second repairer only
reviewed the surveyor‟s report and was not allowed the opportunity to inspect the
hauled-out vessel
the claims process document was provided after the contract commenced
the insurer did not put anything in writing to formally release it.
For the purposes of the protection on the Code, the panel is satisfied the insurer
selected and directly authorised the repairer. The panel does not accept the insurer
must directly communicate with the repairer for the Code to operate in the
circumstances of this complaint.
Therefore, pursuant to the Code, and because it is fair in the circumstances, the panel
is satisfied the insurer is required to accept responsibility for the quality of the
workmanship and materials.
Complainants have provided quotes for cost of rectification
The complainants have requested the insurer cash settle the claim by paying them for
necessary items so they can arrange repairs through the repairers of their choice.
FNS said the mast step and compression post needed further repairs. JMSC agrees,
and describes in detail the defects in repairs and lack of repairs. Further details of the
expert reports are set out in the summary in section 3.3 of this determination.
In summary, JMSC recommended proper laminate repairs, further inspections,
rigging, and thermal imaging. He also recommended the vessel be re -evaluated in a
dry dock and afloat when additional repairs are completed.
Determination | Case number: 509376 Page 7 of 18
The available material shows the mast step and compression post were repaired and
replaced from 22 December 2017 to 24 January 2018. Work to the hull and keel does
not appear to have been undertaken.
The complainants have provided invoices and quotes for the costs of rectifying MTM‟s
defective repairs, including repairs/rectification of repairs, assessing, rigging, yard
fees during rectification (30 days), and a post-repair sea trial and survey. These costs
total 83,203.47 USD.
Details of the rectification costs claimed and substantiated by the complainants are
set out in section 3.5 of this determination.
Having considered all available information, the panel is satisfied that this work is
necessary for rectification, and the costs quoted are reasonable.
Rectification estimate should make allowance for contingencies
If the insurer settles the claim by paying the complainants the estimated costs of
rectification, there is a risk that the costs will be higher than estimated. This may be
the case if work is delayed, or if further damage is discovered after repairs begin.
The quote by APB (for 49,000 USD) does not include tax, and says further damage
may become apparent after the keel is removed and inspected.
The panel considers it fair and reasonable that the estimated cost of rectification be
in creased by 10% to allow for contingencies. Adding 10% to the complainants‟
substantiated rectification costs results in a repair estimate of 91,523.81 USD.
Insurer must cash-settle rectification costs
The panel considers it fair in all the circumstances that the insurer settles the claim by
paying the complainants the substantiated cost of rectification.
The panel estimates the cost of rectification to be 91,523.81 USD.
Insurer must pay statutory interest
Section 57 of the Insurance Contracts Act 1984 (Cth) provides that the insurer must
pay interest from the time when it was unreasonable for the insurer to have withheld
payment.
In the circumstances, the panel considers this date to be 16 January 2018. This is the
date the insurer wrote to the complainants saying its internal dispute resolution review
was complete and it maintained its denial of responsibility for rectification.
Insurer must pay settlement in Australian dollars
As the complainants are now based in Australia, the insurer‟s settlement p ayment
should be paid in Australian dollars.
Determination | Case number: 509376 Page 8 of 18
On 16 January 2018, the value of 91,523.81 USD was 114,512.67 AUD.
The available material shows the policy deductible has been paid.
If this determination is accepted by the complainants, the insurer must settle the claim
by paying 114,512.67 AUD, plus interest at the rate determined under section 57 of
the Insurance Contracts Act 1984 (Cth) from 16 January 2018 (the date of its final
decision) until the settlement date.
2.3 Is the insurer liable for the complainant s’ consequential loss ?
We may award compensation for consequential financial loss
Under paragraph 9.3 a) of the FOS Terms of Reference , we can award compensation
for consequential financial loss. Paragraph 20.1 defines consequential financial loss
as “indirect financial loss or damage”.
The onus is on the complainants to establish that they suffered a financial loss
because of the insurer mishandling of the claim.
The maximum amount that we can award for consequential financial loss is $3,300
per claim.
Complainants claim consequential loss
The complainants say that because of the defective repairs by MTM, and the insurer‟s
refusal to rectify the repairs, they had to end their holiday and return to Australia.
The male complainant took 12 months‟ unpaid leave from February 2017. The
complainants say they planned to sell the boat and return to Australia about a year
later. Instead, they returned to Australia earlier in January 2018. The male
complainant returned to work, and (in that employment) is not able to take further
leave until January 2019.
The complainants say they will be incurring shipyard storage fees at least until
January 2019, because that is the earliest they will both be able to travel to Florida to
attend to the boat.
The complainants have asked the insurer to pay for:
flights and the cost of changing flights
accommodation costs
car rental costs
income lost by the complainants being on unpaid leave
Florida sales taxes incurred due to the boat remaining in Florida
shipyard fees to January 2019.
Determination | Case number: 509376 Page 9 of 18
The total of these costs, as calculated by the complainants, is set out in section 3.6 of
this determination.
Complainants could have mitigated loss
The panel does not accept that the consequential losses claimed by the complainants
are costs necessarily incurred because of the defective repairs and the insurer‟s
conduct.
The complainants‟ chosen course of action was not the only one available to them.
The complainants could have taken other actions to mitigate their losses, including:
paying for the rectification work themselves
selling the boat in its damaged condition
arranging for the boat to be repaired and/or sold in their absence.
The complainants claim they cannot afford to pay for the rectification work
themselves. Considering the complainants‟ general position, their ability to finance the
vessel, and their capacity to take a year off work, the panel is not persuaded by this
contention. Further, the complainants have not provided any evidence of t heir
financial situation or resultant financial stress to support the contention that they could
not have mitigated their loss. Moreover, it appears some of the rectification work in
relation to the mast and compression post was completed in January 2018.
The available material does not establish the complainants could not have sold the
boat in its damaged condition, or that the best course was to repair the boat before
selling it.
Insurer liable for some consequential loss
The exchanged material indicates the complainants were living on the boat, but the
boat became unliveable during repairs. While the boat was being repaired, the
complainants paid for accommodation and rental cars they otherwise would not have
paid for.
The policy provides for a maximum of $1,000 emergency accommodation. If this has
not been paid already, the FSP is to make this payment to the complainants.
Had the complainants authorised rectification as soon as the need for rectification
was confirmed, they would have incurred accommodation and hire car expenses for
the duration of the work.
The exchanged material indicates that while the boat was being repaired, the
complainants paid about $250 per week for accommodation and about $270 per week
for rental cars. The material provided by the complainants indicates rectification work
would take about 30 days.
Determination | Case number: 509376 Page 10 of 18
Taking the above information into account, the panel considers it fair in all the
circumstances that the insurer pays the complainants $2,500 compensation for
consequential financial loss.
2.4 Is the insurer liable for non-financial loss?
We may award compensation for non-financial loss
Under paragraph 9.3 b) of the FOS Terms of Reference , we can award compensation
for non-financial loss where there has been an unusual amount of physical
inconvenience, time taken to resolve a situation, or interference with a complainant‟s
expectation of enjoyment or peace of mind.
We expect complainants to be moderately robust and tolerate a normal degree of
inconvenience when making a claim. We take a conservative approach to assessing
compensation for non-financial loss. The maximum amount we can award for non-
financial loss is $3,000 per claim.
Complainants entitled to $1,000 each for non-financial loss
The complainants seek compensation (of undetermined value) for the loss of use and
enjoyment of the boat. The complainants say they have also suffered undue stress
due to the insurer‟s handling of the claim.
The panel considers that the initial damage to the boat, together with the ordinary
process of repairing the damage and making a claim, is responsible for the bulk of the
complainants‟ loss of enjoyment, inconvenience, and stress. However, the insurer‟s
refusal to rectify the defective repairs has caused additional interference with the
complainants‟ peace of mind.
The panel considers it fair in all the circumstances that the insurer pays the
complainants compensation for non-financial loss in the sum of $2,000 ($1,000 each).
Determination | Case number: 509376 Page 11 of 18
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under the FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedules 1, 2, and 3 of the FOS Terms of Reference.
FOS term AFCA term
applicant c omplainant
f inancial services provider financial firm
dispute complaint
3.2 Our approach
The determination is made by a panel consisting of the ombudsman together with a
consumer representative who has extensive experience in consumer claims and a n
industry representative who has had extensive experience in the insurance industry.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This complaint has been decided on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish, on the balance of probabilities, that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove , on the balance of probabilities, the
application of any exclusion it relies upon to limit its liability for the loss.
Determination | Case number: 509376 Page 12 of 18
3.3 Summary of relevant expert findings
Record Key points
Survey report (GMS)
18 March 201 7
Survey report and photographs of vessel
Vess el in overall average condition
Topsides above average
Deck drains average
Decks and superstructure above aver age
Rigging sailing above average
Mast support, step solid: compression post stainless fittings
securely attached: deck solid: chain plates significantly attached
without signif icant corrosion or other damage .
S urveyor (JMSC)
Damage inspection
10 August 2017
Visual and sound ins pection of th e vessel (inspected at the request of
the complainants and the insurer) showed the following damage:
Fore deck: stress cracks, damaged laminates, and visible moisture
ingress found in laminates around mast. Movement at the forward
part of the mast is causing the laminates to sag/indent this area.
Further inspection, the mast removal, and more invasive testing of
the areas should be consi dered by a qualified technician
Port shroud: makes distinctive noise and movement when
underway or at mooring – may b e associated with keel damage
Mast compre ssion post: has moved to port by 0.5cm; headliner
for upper part of post does not fit as designed
Bilge areas: stress cracks, laminate uplifts, delaminated areas
Keel and hull bottom: corrosion with wee page on the p ort side;
this indicates keel has moved slightly to port side
Bottom of keel fin: iron keel has impacted an unknown
submerged object or structure; visible damage to anti - fowling
coatings; areas of corrosion where iron was exposed to the
elements.
“Please refer to the written quot e provided by [MTM] regarding the
cost of the damage noted in this inspection. [MTM] proposed verbally
an estimated cost of $45,000.00 USD with $4,864.50 USD of that
being quoted for yard fees, haul, block, launch, crane services a nd
miscellaneous yard fees for 30 days. As the vessel would not be
habitable while the repair process is underway, lodging expenses
and meal per - diem may need to be added to the estimated cost of
repair.”
Given the results of this inspection, JMSC rec ommen ds further
inspections, including thermal imaging, and a re - evaluat ion of the
vessel when repairs have been completed. Also recommended the
original laminate schedule be obtained.
S urveyor (FNS)
Mast step and
Mast step and compression post v isually inspected after repairs.
Recommended laminat e at forward end to prevent water poo ling at
fore part of mast step
Determination | Case number: 509376 Page 13 of 18
Record Key points
compression post report
13 October 2017
Base of compression post was securely fixed to mounting block at
keel and very slight compression notice d at forward end of
mounti ng plat e
Inspected areas found to be sound.
S urveyor (FNS)
Mast step &
compression post
inspection
26 October 2017
“While the initial inspection found structural soundness in related
components, with the proper tension now on the rigging, the step
and compression post are in need of further repairs.”
The mast is improperly stepped. This error is the fault of MTM
Further repairs are required to properly align the mast step with the
compression post. The mast and compression post should be
removed to facilit ate repairs
The awkward alignment of mast and compression post has creat ed
a depression at the base of the post in the structural fibreglass.
When post removed, recommend inspection of the lower fibreglass
liner too.
Only when the items have been remedied to good marine
standards and further inspected by the surveyor can the vessel be
considered a good marine safety risk.
MTM’s surveyor (AMG)
Vessel inspection report
08 November 2017
Reviewed the reports from FNS
Co nc erns of the owner and FNS are unfounded and unsupported
by evidence
The base of the compression was never listed as damaged and
was not intended to or agreed by MTM to be repaired
The compression post is in the same position that it was in when
the boat was built
“Generally speaking, the repairs completed by [MTM] are considered
satisfactory.”
“The Beneteau 42 was a full production boat and candidly, the build
standards were not particularly high. A careful inspection of the
vessel will yield hundreds if not thousands of little imperfections that
are the result of an "imperfect" manufacturing proc ess. The vessel
was built with cost in mind and there are some irregularities in its
construction such as in the fibreglass base for the compression post.”
“Furt h ermore, the repairs are completed by hand and subsequently
have an "imperfect" finish. ”
S urveyor (JMSC)
Damage inspection
15 November 2017
Inspection of vessel in water showed the following defects:
Fore deck: gelcoat poorly applied and excessively thick in areas;
laminates inconsistent in thickness from excessive fibreglass
removal; drain (forward of the mast step) clogged with gelcoat
and/or debris. Moisture ingress and standing water is noted in
Determination | Case number: 509376 Page 14 of 18
Record Key points
circumferenc e of mast step.
Port shroud: no report ed repairs; rust weepage visible on deck
surfaces of shroud
Mast compre ssion post: no reported repairs; post has moved an
additional 0.1cm out of alignment. Compressed laminates noted at
the base of the compression post. Mast assembly should not have
been installed without a completed repair and inspection of the
compression post.
Bilge areas: no reported repairs; excessive mounting sealant on
keel mounting bolts
JMSC recommends proper laminat e repairs, further inspections,
rigging, thermal imaging , and r e - evaluat ion of the vessel in dry dock
and afloat when additional repairs completed.
JMSC concludes: “This claim should remain open until the above
inspections and a proper sea trial can be conducted.”
S urveyor (JMSC)
Damage inspection
20 December 2017
Inspection of vessel wit h complainants and new repairer (APB) in dry
dock 19 Dec embe r 2017 and earlier photographs showed the
following defects:
Fore deck: delamination not repaired and shows movement to the
keel.
Keel and hull bottom: slight movement of keel to port side not
repaired; delamination of port side of hull not repaired; corrosion on
port side of aft keel not adequately repaired before application of
anti - fowling coatings, which are now peeling.
JMSC recommends furt her ins pe ctions, including thermal imaging
and that the vessel is re - evaluated in dry dock and afloat when
additional repairs have been completed.
Summary of repairs
performed
22 December 2017 – 24
January 2018
Removed the mast step from the deck which had sunk down into
the fairing
Ground off gel coat from mast base and fix ed G 10 compression
material under mas t step
G round laminat e and gl ued quarter inch square of G10
Removed compression post and noted a 2mm low spot in the cabin
sole. G10 pad added to cabin so le - necessary to bring the top of
the cabin sole back to level
O riginal compression post showed signs of stress cracks
F abricat ed a new compression post per the exact dimensions of
the original and installed it with the mast step as one.
Thermographic testing
report ( OMI )
Vessel inspected 6 and 7 July 2018 after haul out by JMSC
Thermal images indicate voids and laminate delamination in t he
areas analysed in the report
Visual image of hull shows vessel in serviceable condition,
Determination | Case number: 509376 Page 15 of 18
Record Key points
9 July 2018 delamination detected in some areas and evidence of movement of
the keel
Thermal report of hull shows areas that were susp ect for
delamination and voids
Recommended to reimage and evaluate the vessel when the
repairs have been complet ed .
3.4 Extracts from relevant policy and other documents
The relevant e xtracts are referred to in the parties‟ submissions . The documents and
the submissions have been exchanged with the complainants.
Record Key points
Claims Proce ss – What
to Expect
If a surveyor is a ppoint ed, remember that he is appointed on behalf
of your insurers …
…
You will need to arrange to get estimates for the repair or
replacement of any items for which you are claiming.
…
Once we have received full details of your claim, including the
report of the surveyor, if appointed, we will:
inform you whet her the incident and damage as described by you
are covered by the contract of insurance
give you authority to proceed with agreed repairs
assess the estimates you provide for repair or replacement an d
advic e you of the proposed settlement under the terms and
condition of your policy.
Whilst the surveyor and the claims team will do their utmost to
assi st you and to ensure that your claim is handled efficiently
and speedily, your boat remains your re spo nsibility at all
times.
…
We are able to arrange deposits and stage payments directly to the
repairers – with, of course, your agreement…
Product di sclosure
statement
Hull and property insurance provides cover for physical loss or
damage to your vessel…
Determination | Case number: 509376 Page 16 of 18
Record Key points
3. Partial loss
Claims for partial loss of or damage to the vessel shall be settled on
the basis of reasonable repair and or replacement costs necessary
to reinstate the vessel nearly as is reasonably possible to its pre -
incident condition…
4. Exclusions – hull and property insurance
The insuranc e does not cover:
3. The cost of rectifying, repairing or replacing defective
workmanship or mat erials relating to any repair, alteration or
maintenance work carried out on the vessel ;
8. Insured’ s duties in the event of an incident which might be
covered under this insurance:
In the event of an occurrence which may give rise to a claim under
this insurance, it is a condition precedent to the liability of the
insurer under this insurance that the insured complies fully with the
following obligations:
8.3 Inspections & Retained Parts/Evidence:
8.3.1 Allow inspections, as many times as necessary, of the
damaged vessel or equipment by the insurer‟s representative(s).
8.3.2 Await the agreement of the insurer before eff ecting any
repairs or replacements.
8.3.3 Ret ain for inspection all parts which may be regarded as
evidence of loss or of cause of damage or liability.
15. OUR OBLIGATIONS TO YOU
15.4 Making a claim
[The insurer ] will provide you with a claim form which i ncludes
guidelines and instructions on how to complet e the form.
Once [the insurer ] receives your claim form with a description of the
incident and any loss or damage, [the insurer] will :
check whether the incident and damage are cov ered by your
policy; and
check that your premiums were paid at the time of the incident.
15.5 How GST applies to any Payments under Your policy:
If, after we have assessed your claim, you are required to ent er into
a contract with a third party to replace or reinstate lost or damaged
items that we have agreed to pay under your policy, you will enter
into that agreement with the third party as our agent unless advised
otherwise.
15.7 Code of Practice:
This policy is compliant with the insurance Council of Australia
Determination | Case number: 509376 Page 17 of 18
Record Key points
General Insu rance Code of Practice apart from any claims adjusted
outside Australia. Underwrit ers at [ the insurer] proudly support the
General Insurance Code of Practice. The purpose of the Code is to
raise standards of practice and service in the general insurance
in dustry.
General Insurance
Code of Practice
Repair Workmanship and Materials
7.20 Where we have selected and directly authorised a repairer,
we will:
accept responsibility for the quality of the workmanship and
materials; and
handle any Complaint about the quality or timeliness of the work
or conduct of the repairer under our Complaints process.
3.5 Rectification costs claimed by complainants.
Complainants’ quote/invoice Cost (USD)
Repairs ( mast and compression post ) by
„LUM‟ including Florida State tax
$ 18,730.73
Survey (Keel and hull) by JSMC $ 350
Thermal imaging (recommended by JMSC) $ 900
Mast step inspection by FNS $ 300
Repairs (Keel and hull) by APB including
Florida State tax
$51,940
Yard fees during rectific ation (30 days) $ 5,208.14
Rigging $ 3,280
Post - repair sea trial and survey $ 2,494.40
TOTAL $83,203.47
3.6 Consequential losses claimed by complainants
Claimants’ claim Cost (USD)
Flight change fees $ 1,541.86
Flights $3,409.09
Accommodation $ 1,803.99
Determination | Case number: 509376 Page 18 of 18
Claimants’ claim Cost (USD)
Accommodation 23 August 2017 - 22
February 2018
$2,322.60
Car rent al costs $2,845.56
Income lost by being on unpaid leave $ 108,895.74
Florida sales tax $ 12,600
Shipyard fees to July 2018 $ 20,101.97
Shipyard fees to January 2019 (5 months) $ 11,419.38
TOTAL $164,940.19
3.7 Other relevant material considered and relied on
Parties‟ submissions, emails , invoices, estimates, reports, photographs and all
attachments to all submissions.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.