Summary
The landlord's claims for further malicious damage and consequential loss of rent were declined. AFCA found the insurer delayed deciding the pool liner claim and ordered $500 for non-financial loss.
The applicant had not shown the damage was maliciously caused, and the insurer's delay did not cause the loss of rent, though it warranted modest non-financial loss compensation.
Issues
- Claim denial primary · not upheld“As there is insufficient information to conclude the outstanding claimed damage was maliciously caused by the previous tenants, the FSP is entitled to deny the applicant's claim.”
- Delay secondary · upheld“I consider that it should have done so by mid-December 2017 ... I consider that it is appropriate to award the applicant $500 for non-financial loss.”
Subjects and remedies
pay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 508926 Determination Page 1 of 4
Case number: 508926 12 April 2018
1 Overview
1.1 Dispute
The applicant (and his co-insured) held a landlord insurance policy with the financial
services provider (FSP) to cover his investment property from certain insured events,
including malicious damage by tenants.
The previous tenants vacated the property on 10 May 2017 before anticipated
eviction proceedings. The applicant lodged a claim for loss of rent and damage to
certain items (such as a cooktop oven, pool liner, fridge, power lines, and solar hot
water system) which he says were maliciously damaged by the previous tenants.
The new tenants leased the property from 2 October 2017, but vacated on
18 December 2017 because of the condition of the pool, which was yet to be fixed.
The FSP ultimately accepted the claim for loss of rent unpaid by the previous
tenants, malicious damage to the cooktop oven, pool and its liner. The applicant
seeks further compensation for:
damage to fridge, solar panels, bore pump, electricity lines and other items
loss of rent arising from the new tenants ’ departure
delay in investigating and processing the claim.
1.2 Issues and key findings
Is the FSP obliged to pay the outstanding claims?
The FSP is not obliged to pay the outstanding claims because:
the applicant has not provided information about the alleged damage to
conclude it was maliciously caused by the previous tenants
there has been no rent default arising from the new tenants’ departure and the
FSP’s conduct does not warrant compensation for loss.
Is the applicant entitled to compensation for delay?
The applicant is entitled to $500 compensation for non-financial loss.
1.3 Determination
This determination is substantially in favour of the FSP.
Within 14 days of the applicant accepting this determination, the FSP must pay $500
compensation to the applicant.
Case No: 508926 Determination Page 2 of 4
2 Reasons for determination
2.1 Is the FSP obliged to pay the outstanding claims?
The alleged damage was not maliciously caused by the previous tenants
The applicant has the onus of proving on the balance of probabilities the insured
event occurred and that the event caused the loss or damage claimed.
While malicious damage is an insured event under the policy, it does not include loss
or damage as a result of poor property maintenance, neglect of the tenant or poor
housekeeping, wear and tear or damage caused by an accident.
The applicant has identified a multitude of issues with the property, such as:
professional painters to re-paint the walls
professional cleaners steamed cleaned the bedroom carpets
damage to roller window shutters
welded a broken fence
damage to fridge
solar hot water system was leaking and not repairable
disconnected bore pump
disconnected power supplies; rear shed lost power
I have not recorded all of the applicant ’ s concerns in the above list. Some issues
have been extracted from the applicant ’s narrative as a passing comment without
supporting documents. Other issues are presumed to be a concern from invoices
supplied without explanation.
The applicant says that the previous tenants ‘ left tremendous amounts of rubbish ’
which required him to hire skip bins, remove rubbish himself, and engage
professional cleaners to clean inside the whole premises. There is no information to
suggest that the state of the property left by the previous tenants was caused with
malice. The applicant has not provided any information about amounts retained from
the previous tenant’s bond.
No property inspection or condition reports have been provided before, during, or
after the occupation by the previous or new tenants. No real estate agent reports
have been provided to support the applicant’s position. The applicant concedes that
while he ‘ could ea sily have taken some photographs’ of the damaged solar hot water
system and disconnected electricity, he did not do so because it was ‘ professional-
like ’ damage. The invoices provided merely confirm that certain items were broken,
but do not express any view as to what or who caused them to become broken.
As stated above, the onus is on the applicant to show that the loss or damage was
caused by malicious acts. The policy defines a malicious act as a deliberate act
intended to harm another person’s prope rty through an unlawful or wrongful act
without justification or excuse. The applicant has not provided information that the
alleged damage was deliberate, intentional, unlawful of wrongful.
Case No: 508926 Determination Page 3 of 4
As there is insufficient information to conclude the outstanding claimed damage was
maliciously caused by the previous tenants , the FSP is entitled to deny the
applicant’s claim.
There has been no rent default arising from the new tenants’ departure
The new tenants vacated on 18 December 2017 only a couple of months into their
lease because of the condition of the pool water, which was green and encouraged
mosquitoes and flies in the backyard. The vinyl pool liner installed over the concrete
pool was damaged allowing water to seep through.
Rent default is an insured event covered by the policy, which covers loss of rent
occurring during the period of insurance, if the tenant is evicted or leaves before the
end of the lease without giving the required notice. The new tenants gave notice of
their intention to terminate the lease, and paid their rent, and so this insured event is
not satisfied.
Although the applicant says the property posed a health risk to the new tenants and
was unliveable, the applicant did not take up an additional feature of the FSP’s policy
which might have covered such an insured event.
The FSP’s conduct does not give rise to a claim for loss of rent
The new tenants say that the applicant was in breach of the lease contract because
he failed to attend to the condition of the pool. The applicant says that the FSP failed
to attend to the condition of the pool, and the malicious damage caused by the
previous tenants. As landlord, the applicant bears the primary responsibility for
ensuring that the property was suitable for tenancy. The pool water was green when
the new tenants commenced their lease, and the applicant has provided no
information to show that he had taken steps to mitigate his loss by attending to the
pool or water.
The applicant says he filled the pool once between July and September 2017. A tax
invoice dated 2 June 2017 from a swimming pool leak detection and repair company
engaged by the applicant says that ‘~6 leakages’ were detected and sealed in the
pool liner. However, it is not clear to me when the applicant provided this invoice to
the FSP.
The available information shows that the applicant first raised the pool liner with the
FSP on 2 November 2017. Before this date, the applicant was focused on other
matters such as the rent default and cooktop oven. By email dated 2 November
2017, the applicant said he was unable to determine the cause of the pool liner
damage and asked the FSP to appoint an expert to inspect and report. The FSP’s
building consultant inspected the pool liner on 9 November 2017 and prepared a
report by 23 November 2017. By letter dated 28 November 2017, the FSP had
declined the claim. It was not until 7 February 2018 that the FSP accepted the claim.
That is, it took three months for the FSP to accept liability for the pool liner repairs.
The applicant says that if the FSP had agreed to pay for the repairs earlier, his real
estate agent might have been able to persuade the new tenants to stay as they
would have had a firm date for repairs.
Case No: 508926 Determination Page 4 of 4
The applicant says the loss of rent following the termination of lease by the new
tenants was completely caused by the FSP’s mishandling of the claim. I do not
accept this to be the case. The applicant was aware of the pool liner leaking from
mid-2017, and certainly before he engaged a leak repair company on 2 June 2017.
The new tenants occupied the property from 2 October 2017, but it was not until 2
November 2017 that the applicant raised the issue with the FSP. That is, it took over
five months for the applicant to lodge a claim about the damaged pool liner.
If the applicant had pursued a claim about the pool liner in mid-2017 and the FSP
took three months to accept the claim, then the issue would have been resolved by
the time the new tenants commenced their lease. Given this, I am not satisfied that
the FSP’s conduct has caused loss of rent arising from the new tenants’ departure.
2.2 Is the applicant entitled to compensation for delay?
$500 compensation for non-financial loss is warranted
The applicant seeks compensation for time taking to pursue his claim, stress,
inconvenience, and delay caused by the claims process.
While FOS has the power to award compensation for non-financial loss, it is only in
limited circumstances that compensation is considered for non-financial loss and
awards are unlikely to be substantial. FOS expects applicants to be moderately
robust in the way in which they deal with a problem and to bear the ordinary and
normal degree of inconvenience associated with an insurance claim.
The FSP ultimately accepted the claim for:
$5,700 loss of rent unpaid by the previous tenants being the maximum benefit
of ten weeks up to 10 May 2017 (which was paid by the FSP on 9 August 2017)
$1,287.03 malicious damage to the oven, including report fee and $27.68
interest (which was paid by the FSP on 20 February 2018)
$8,761.20 malicious damage to the pool and its liner, including $86.20 interest
(which was paid by the FSP on 20 February 2018)
The FSP waited for information about the lease, rental ledger, and bond before
paying the loss of rent unpaid by the previous tenants.
The applicant first complained about the cooktop oven on 12 July 2017, and on 24
July 2017, the FSP asked for photographs to confirm if the damage sustained to the
oven was maliciously intended. The FSP arranged for its own report on the oven. By
email dated 27 September 2017, the applicant provided a quote for replacement for
the oven. By letter dated 28 November 2017, the FSP accepted liability for the oven
damage, and has paid $27.68 interest on the cost of replacement.
The applicant first complained about the pool liner on 2 November 2017. The FSP
had all the necessary information to decide the claim by late November 2017, and I
consider that it should have done so by mid-December 2017. It was not until 7
February 2018 that the FSP accepted the claim. Given the delay, I accept that the
applicant suffered an unusal degree of stress and inconvenience. Taking into
account the circumstances of the claim, I consider that it is appropriate to award the
applicant $500 for non-financial loss.