Home / Financial Firm (Unknown - Credit) / Determination 508332

Determination 508332

Withdrawal of approved home loan

FirmFinancial Firm (Unknown - Credit)
Decided2018-08-23
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded$39,989
Non-financial loss$3,000
Amount claimed$89,911
SourceAFCA PDF

Summary

The FSP withdrew its approval of a home loan in November 2017 without a contractual basis. AFCA declined reinstatement, as the applicant had refinanced elsewhere, and ordered compensation for financial loss and non-financial loss.

The FSP could not rely on the fact sheet or loan terms clauses 5.4 and HL3.3 to withdraw an approved loan, so it breached the loan contract and must compensate the resulting loss.

Issues

Subjects and remedies

pay compensationpay non financial loss

Related

All Financial Firm (Unknown - Credit) determinations · Find similar determinations

Text of the determination

Determination Case No: 508332 Determination Page 1 of 10 Case number: 508332 20 August 2018 1 Overview 1.1 Dispute On 31 July 2017, the FSP issued to the applicant offers for two home loans totalling $1,660.000 (together the loan). The purpose of the loan was to refinance an existing loan of $1.246 million which the applicant held with the FSP and finance construction of a new dwelling on L Avenue (the property). The applicant accepted the loan offers and entered into contracts for the loan on around 9 August 2017, when the signed loan offers were returned to the FSP. The FSP‟s credit assessment notes show that the loan was ready for funding on 25 September 2017. On 22 November 2017 the FSP informed the applicant that it had decided not to proceed with the loan and that a new loan application would need to be submitted. The applicant disputes the FSP‟s decision not to proceed with the loan. The Case Manager provided the parties with a Recommendation on the issues in dispute. The recommendation was in favour of the applicant. The applicant did not reject the finding that the FSP had not acted in accordance with the loan contract, but seeks compensation for other losses which had not been considered in the Recommendation. The FSP rejected the recommendation. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination with the exception of the recommended outcome. Further submissions provided after the recommendation have been considered. Do the FSP’s submissions change the outcome? The FSP‟s submissions do not change the conclusion in the recommendation that the FSP did not act in accordance with the loan contract when it decided not to provide the loan. This is because:  The Building/Construction Home Loan Fact Sheet did not form part of the loan contract; and  The FSP cannot rely on clauses 5.4 or HL3.3 of its Usual Terms and Conditions for Consumer Mortgage Lending (loan terms) in the circumstances. Case No: 508332 Determination Page 2 of 10 Is the applicant entitled to further compensation? As the applicant has obtained finance from another lender to construct a new dwelling at the property, reinstatement of the loan is not appropriate. The FSP should pay the applicant total compensation of $39,989.09 [excludes increase in building costs] for her financial loss and $3,000 to compensate her for stress and inconvenience. Do the applicant’s submissions about ‘other issues’ change the outcome? The Case Manager considered a number of issues within section 3.1 of the recommendation. The applicant has objected to the findings. The Case Manager‟s assessment of the other issues was correct, and is adopted within this determination. 1.3 Determination This determination is substantially in favour of the applicant. If the applicant accepts the Determination, then within 14 days of the applicant‟s acceptance the FSP must pay the applicant a total of $42,989.09 for financial and non-financial loss to an account she nominates. Case No: 508332 Determination Page 3 of 10 2 Reasons for determination 2.1 Were the findings in the recommendation correct? The recommendation was accurate I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the Case M anager‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 Do the FSP’s submissions change the outcome? The FSP rejected the recommendation The FSP rejected the recommendation, saying it now wished to rely upon the following to support its decision to withdraw its approval of the loan:  certain clauses within its Building/Construction Home Loan Fact Sheet  clauses 5.4 and HL3.3 of the usual terms and conditions for consumer mortgages (loan terms), and  an email it sent to the applicant on 24 September 2017 which it says put the applicant on notice exactly how much equity she was required to contribute to the construction. The Building/Construction Home Loan Fact Sheet is not part of the contract The FSP says the Building/Construction Home Loan Fact Sheet (fact sheet) is part of the loan documentation pack issued to the applicant, and says the following clauses are relevant: Please note, you are required to use all of your equity contribution before we release any loan funds. …. If there are any variations to the Building Contract or council approved plans, let us know immediately, as they may impact your loan arrangements. The loan offers of 31 J uly 2017 state that the applicant‟s contract is made up of the loan offers and the usual terms and the loan terms. The loan offers do not refer to the fact sheet. This means that the fact sheet is not part of the loan contract with the applicant and, therefore, the fact sheet does not form a proper basis for terminating a written loan contract. Case No: 508332 Determination Page 4 of 10 Clause 5.4 of the loan terms does not assist the FSP The FSP has again changed its position with respect to the clauses it wishes to rely upon to support its decision not to proceed to provide the loan. The FSP is now seeking to rely upon clause 5.4 of the loan terms, which says: 5.4 Progressive Loan drawings If the Loan is to be funded by progressive Loan drawings, you must also satisfy our reasonable requirements for the funding of each Loan drawing, including paying your own funds towards the costs of the Building Works before we advance our funds and only requesting payments at specific stages of the Building Works in accordance with the building contract. Clause 5.4 only applies to loans that are funded by progressive loan drawings. If a loan is not to be funded by progressive loan drawings, it does not apply. Clause 5.1 of the loan terms says: 5.1 How we make your Loan available We will make the full amount of the Loan available to you by a single Loan drawing unless the Contract provides otherwise or we agree to your request to fund the Loan by progressive Loan drawings. Clause 5.1 clearly states that the loan will be made available to the applicant by a single drawing, unless the contract says otherwise, or the FSP agrees to a request to fund the loan by progressive loan drawings. I also note that item M of the loan offers stated: We pay the amount of credit stated at item B(i) at your written direction. Seventy-five per cent of the loan funds ($1.246 million) were for the purpose of refinancing an existing loan which the applicant held with the FSP. The remaining twenty-five per cent of the loan funds ($414,000) were for the purpose of financing the construction of a new dwelling at the property. It appears from the FSP‟s loan assessment notes that part of the loan was intended to be a construction loan and that the FSP expected the applicant would contribute equity of $520,000 towards construction before it would release any loan funds to pay the builder‟s invoices. However, the FSP‟s loan contracts were not drafted clearly enough to reflect this intention and the FSP‟s expectation about the applicant‟s equity contribution. On 20 September 2017, KC (of the FSP) emailed the applicant, saying:  the file had been sent to the funding team who would prepare the loan for funding  funding of the loan would be triggered by the request for the first progress payment, and  asked the applicant if she wished to add her equity contribution up front to the existing loan as a bulk reduction. The applicant replied on 21 September 2017 seeking clarification of the options. KC responded on 25 September 2017 (refer to section 3.1 for the full email), saying:  One option for funding was that the applicant could use her funds first to pay the builder and then the FSP could step in and complete by advancing the loan once the applicant had contributed her funds. Case No: 508332 Determination Page 5 of 10  Another option was that the applicant could make her equity contribution to her existing loan as a bulk reduction. The FSP would then start the progress payments for her and fund the loan sooner. The FSP explained that the advantage of this option was that it would trigger the loan restructure sooner and she would also have a lower interest rate come into place.  The applicant‟s further equity contribution appeared to be $472,928.55 based on KC‟ s calculation. The FSP says the applicant acknowledged by return email that they understood the requirement to contribute the amount of equity in dollar terms as set out in the email dated 25 September 2017. FOS has requested that the FSP provide copies of all emails exchanged between it and the applicant. The FSP has not included any email from the applicant which responded to KC‟s email of 25 September 2017. The FSP has not provided any information to FOS to show that:  the contract stated the loan would be paid other than by a single loan drawing, or  the applicant requested that the FSP to fund the loan by progressive loan drawings. Based upon the contract, the applicant was entitled to request the FSP to make the whole amount available to her and allow her to draw it to make each progress payment herself. In the absence of any information to the contrary, I am not persuaded by the FSP‟s position that the applicant accepted KC‟s email of 25 September 2017, or requested that the FSP make the loan available by progressive loan drawings . Accordingly, clause 5.4 does not apply because there is no information to show that the applicant requested that the loan, or any part of it, be drawn by progressive loan drawings. The FSP cannot rely upon clause HL3.3 of the loan terms Clause HL3.3 of the loan terms says: HL3.3 Not paying We reserve the right not to pay any Loan drawing if you have not provided us with the documentation for the Buildings Works which we told you in writing we needed or if the Building Works (if any) are not to our reasonable satisfaction or we reasonably consider there is not enough money in the un-funded component of the Loan to pay to complete the Building Works. The extensive emails between the applicant and KC, and the credit assessment notes show that the loan was originally approved on the basis that there were not enough funds in the un-funded component of the loan to pay to complete the building works. This means that, at the time of approval, the total cost to complete the building works (i.e. the total of the building contract costs and any out of contract costs) exceeded the amount of funds which were available from the un-funded component of the loan and the applicant‟s own funds. In the circumstances, it is not reasonable for the FSP to accept (at the time of approval) that there would be insufficient funds to complete the building works and Case No: 508332 Determination Page 6 of 10 then change its position after there were variations to the contract, unless the loan terms allowed it to do so. I am not persuaded that the FSP can rely upon clause HL3.3 of the loan terms to support its decision not to provide the loan, because:  As outlined in the previous section, I am not satisfied that the applicant asked that the loan be drawn down progressively. HL 3.3 applies only to loans that are drawn progressively.  Even I were satisfied that the applicant asked for the loan to be drawn down progressively, the FSP decided not to provide the loan due to the variations of the building contract and the funds deficit (i.e. the difference between the unfunded portion of the loan, the applicant‟s equity and the costs to complete the building works).  HL3.3 is clear that the FSP must reasonably consider there is not enough money in the un-funded component of the loan to pay to complete the building works. HL3.3 does not allow the FSP to decide not to draw down the loan because there are variations to a building contract.  The FSP initially accepted that there would be insufficient funds in the un- funded component of the loan to fund the building works, and approved the applicant‟s loan application on this basis, i.e. the FSP was on notice of a deficit from the date the loan was initially approved. For the reasons set out above, the FSP submissions do not change the finding in the recommendation that the FSP did not act in accordance with the loan contract when it decided not to provide the loan. 2.3 What is a reasonable remedy in this dispute? Reinstatement of the loan is no longer appropriate The recommendation stated that the FSP must reinstate the loan and confirm the funds were available to the applicant‟s builder on the condition that the applicant made no further varia tions to the building contract without the FSP‟s express prior written approval. On 22 May 2018, the applicant informed FOS that she had obtained finance from another FSP to refinance her FSP loan and fund construction of a new dwelling at the property. The new loan was settled on 15 May 2018. As the applicant has obtained finance with another lender to construct a dwelling at the property and have refinanced the FSP loan, it is no longer appropriate for FOS to require the FSP to provide the loan. The applicant has claimed a number of losses The applicant says that she has incurred further losses as a result of the delay caused by the FSP‟s decision to withdraw approval of the loan. She has claimed:  extra interest only loan repayments of $27,989.76  extra rental payments of $20,825.08 Case No: 508332 Determination Page 7 of 10  extra land tax of $4,055.20  extra council rates of $753.32  extra water service charges of $407  extra travel expenses of $880.88, and  predicted increase in construction and material costs of $35,000. I will deal with each of these below. The FSP is to refund extra interest only loan repayments I accept that by not proceeding with the loan on 22 November 2017, the FSP has caused a delay to the construction of the new dwelling. But for the FSP‟s error, the construction of the new dwelling would already be underway (and perhaps, approaching completion). This means that the FSP has caused the applicant a loss in extra interest only loan repayments which she has paid from 22 November 2017 to the date that she obtained a construction loan from another lender. The total amount of extra interest over this period is $36,689.09 (see section 3.2 for my calculation of this amount). The FSP should refund the amount of $36,689.09. The FSP should pay the applicant $3,300 for rent paid by her company The applicant has been paying rent of $1,970 per fortnight from her company‟s account. I accept that by not proceeding with the loan on 22 November 2017, the FSP has caused a delay to the construction of the new dwelling which has resulted in the applicant‟s company paying additional rent which it would not have had to pay if the loan was provided. As the FSP provided the loan offers to the applicant and not the company, the company‟s loss would be regarded as a consequential loss . Consequential loss is loss that is indirectly caused by an FSP‟s conduct. Claims for consequential loss are capped under FOS‟s Terms of Reference at $3,300 per claim. Therefore, the FSP should pay the applicant $3,300 to compensate her for the loss caused to her company as a result of paying rent from 22 November 2017 to 15 May 2018. The FSP is not required to pay the applicant’s land tax The applicant has not paid the land tax shown in the statement provided to FOS dated 11 January 2018 and has applied for an exemption from having to pay it. Given the property is intended to be the applicant‟s principal place of residence once the construction of a new dwelling is completed, the applicant may qualify for an exemption from having to pay the land tax. There are a number of requirements which needs to be satisfied in order to be eligible for this exemption. On the face of it, it does appear likely that the applicant will be eligible for the exemption, however, ultimately this is a decision for the Chief Commissioner of State Revenue in NSW. Case No: 508332 Determination Page 8 of 10 Given the applicant may qualify for an exemption from the land tax, I do not consider that the FSP should be required to pay compensation to the applicant to cover this land tax bill. The FSP is not required to pay the council rates or water service charges The applicant would have had to pay council and water service charges on the property even if the loan was provided and construction of a new dwelling was not delayed. Therefore, the FSP is not required to compensate the applicant for these charges. The FSP is not required to pay the applicant’s travel expenses The applicant did not provide any information to explain this part of her claim or to support that she incurred travel expenses. Therefore, the FSP is not req uired to compensate the applicant for this loss. The applicant has not provided information to substantiate she lost a deposit FOS asked the applicant whether the applicant was successful in getting her deposit back from the builder. The applicant said she was still working on a financial settlement with her builder and would provide FOS with details when this was finalised. FOS has not received any further update on the deposit. As the applicant has not provided information to show she has lost her deposit, the FSP is not required to compensate her for this item. The applicant has not substantiated the increased cost of construction On 18 April 2018, FOS asked the applicant for information to substantiate this item. The applicant replied on the same date saying: In regards to the prediction of construction cost increase is based on the industry reports and current cost of construction for the exact same house approved by [FSP] on July 27, 2018, if you are disputing this figure you can use the percentage you believe is right for home construction in NSW based on the contract cost of $854,166.91 back in 2017. On 30 April 2018, FOS asked the applicant if she had entered into a new building contract (given she had previously informed FOS that she had cancelled the existing building contract). On 1 May 2018, the applicant replied saying she was trying to obtain new finance to build her new home but she did not answer the question abo ut the building contract. On 22 May 2018, the applicant informed FOS that she had refinanced her FSP loan and obtained finance from another FSP to construct a new dwelling at the property. The applicant did not mention in this email whether she had entered into a new building contract. As it is unclear whether the applicant has entered into a new building contract and , if so, what the price is under this contract to build the new dwelling, I am unable to determine if there has been an increased cost to co nstruct a dwelling on the property. Case No: 508332 Determination Page 9 of 10 Therefore, I do not consider it is appropriate to ask the FSP to compensate her for this claimed item because the applicant has not established this part of her claimed loss. 2.4 Do the applicant’s submissions about ‘other issues’ change the outcome? I have reviewed the applicant‟s submissions about the other issues in section 3.1 of the Recommendation and they do not change the views expressed in point 3.1 of the Recommendation. Case No: 508332 Determination Page 10 of 10 3 Supporting information 3.1 Interest charged on loan ending 1084 Date Interest 2/12/17 $5,673.57 2/1/18 $5,862.69 2/2/18 $5,862.69 2/3/18 $5,295.33 2/4/18 $5,862.69 2/5/18 $5,673.57 15/5/18 $2,458.55 TOTAL $36,689.09 Recommendation Case No: 508332 Recommendation Page 1 of 11 Case number: 508332 19 March 2018 4 Overview 4.1 Dispute The applicant obtained approval for two home loans totalling $1,660.000 (together the loan) from her financial services provider (FSP) on 31 July 2017. The purpose of the loan was to refinance an existing loan the applicant held with the FSP and finance construction of a new dwelling on L Street (property). The applicant and FSP entered into contracts for the loan on 9 August 2017, when the signed loan offers were returned to the FSP. The FSP‟s credit assessment notes show that the loan was ready for fundi ng on 25 September 2017. On 22 November 2017 the FSP informed the applicant that it had decided not to proceed with the loan and that a new loan application would need to be submitted. The applicant disputes the FSP‟s decision not to proceed with the loan. 4.2 Issues and key findings Was the FSP entitled not to proceed with the loan? The FSP says it decided not to proceed with the loan because the applicant had made multiple variations to the underlying building contract. The FSP seeks to rely upon clause 5.3(d) of the loan terms to support its decision not to proceed with the loan. Clause 5.3(d) says the FSP may stop funding in circumstances where it has a reasonable belief that the applicant will be unable to repay the loan. The FSP has not provided informatio n to show how or when it formed a reasonable belief that the applicant would be unable to repay the loan due to a change in her financial position since the date she applied for the loan. Accordingly, I am not satisfied it has acted within the terms and co nditions of the loan contract it had with the applicant. As the FSP has made an error it must put the applicant back in the position she would have been, had the FSP not made the error. In the circumstances, the only fair way to do this is to require the FSP to reinstate the loan. 4.3 Recommendation This recommendation is in favour of the applicant. If both parties accept this recommendation, then within seven days the FSP must: Case No: 508332 Recommendation Page 2 of 11  reinstate the loan and confirm the funding available to the applicant‟s builder on the condition that the applicant makes no further variations to the building contract without the FSP‟s express prior written approval, and  pay the applicant $3,000 in non-financial loss to an account she nominates. Case No: 508332 Recommendation Page 3 of 11 5 Reasons for recommendation 5.1 Was the FSP entitled to withdraw its approval of the loan? The applicant and the FSP had a contract The FSP provided two loan offers dated 31 July 2017, one for $1,600,000 and another for $60,000 (together, the loan) which were signed for and on behalf of the FSP. The offers clearly set out that to accept the offers the applicant had to: 1. Read the [Name of Loan Offer] carefully so that [the applicant] know exactly what your legal responsibilities are and what you must do. 2. Fill in or cross out any blank spaces. 3. Sign the Acknowledgement and Acceptance below only when [the applicant] feel sure that you understand what is in this Contract. The applicant signed the loan offers, and the FSP confirmed it received the signed loan offers on 9 August 2017. On the available information, I am satisfied that both the FSP and the applicant entered into a contract for the loan on the terms and conditions set out in:  the two loan offers dated 31 July 2017, and  the usual terms and conditions for consumer mortgages (loan terms). The ap plicant met the FSP’s pre -conditions Both the applicant and the FSP appear to agree that there were some pre-conditions for the loan. I note that the FSP has not provided any information to show how these pre-conditions were documented in its contract with the applicant. The pre-conditions appear to be as follows: 1. Demolish the existing dwelling situated on the property 2. Pay a five percent deposit to the builder 3. Payout and closure of a car lease held with another financial services provider 4. Payout and closure of the FSP personal and business overdrafts 5. Payout and closure of the FSP personal and business credit cards 6. Pay council construction certificate costs None of these pre-conditions are documented in the loan offers, or loan terms that were provided by the FSP to the applicant. Nevertheless, the FSP accepts the applicant complied with some of these conditions, as noted in its credit assessment notes which show:  on 25 September 2017 the FSP‟s Lending Operations Department sent „ Commencement Letters ‟ to both the applicant and the builder  on 25 September 2017 the FSP‟s Lending Operations department marked the loan as „ Formally Approved – Formally Approve Application – Progress Payments – Funding Required ‟  that $520,000 of the applicant‟s equity had to be contri buted. On balance, and the available information I am satisfied that the:  applicant fulfilled the pre-conditions set out above, and Case No: 508332 Recommendation Page 4 of 11  FSP was aware that the applicant had fulfilled the pre -conditions. It appears that as at 25 September 2017 the loan was ready for funding, and the only steps left were for the applicant to contribute her equity and submit the first progress payment request from the builder. The FSP has not provided FOS with any information to show it put the applicant on notice that she was required to pay $520,000 of equity to the loan. The FSP says the loan was approved with ‘strict conditions’ The FSP says the loan was approved with strict conditions, as detailed below: 1) The Builders Plans are the final plans, as the agreement is made on this basis - no other variations can be made without the application being revised. 2) In order to provide a valid Approval, a valuation is issued based on these plans - therefore after the Valuation is completed, no other variations can be made without revisiting the application 3) In order to provide certainty to all parties involved i.e. Client, Bank and Builder - all funds must be made available at the point of commencement (Your savings and Loan Proceeds) and remain available throughout the process to be used for only what is listed in the agreement 4) All parties must be notified of any variations made to the plans or any major expenses not listed that will impact the available funds to complete - so that the application can be revisited and ensure the approval in still valid and within the agreed contract terms Despite repeated requests from FOS, the FSP has not provided any information to show where the above conditions are documented in its agreement with the applicant. The loan offers and terms do not document the pre-conditions As noted above, the FSP has not provided any information to show how the above pre- conditions and the other „strict conditions‟ (additional terms) were documented within the loan offers or the loan terms. As the FSP has not demonstrated where the additional terms are documented in its agreement with the applicant (despite repeated requests from FOS), I am not satisfied that the applicant was reasonably aware or ought to have been reasonably aware of the exact nature of the additional terms at the time of entering into the contract. Accordingly, the applicant is not bound by the additional terms. The FSP withdrew its approval of the loan on 22 November 2017 An email dated 22 November 2017 from KC , the FSP‟s Home Lending Sp ecialist, to the applicant says: You will need to manage your builder[„]s expectations in terms of time line and confirmation from [FSP] to be able to proceed with finance, as the variations and deficit now causes the prior approval to have to now be withdrawn .[Emphasis mine] I am satisfied that based upon the wording of the above email, the FSP purported to withdraw its approval of the loan on 22 November 2017. Case No: 508332 Recommendation Page 5 of 11 The applicant has made multiple submissions to FOS outlining her position on the dispute. Notably, she denies making any variations to the building contract. I do not accept this because:  An email from the applicant to KC, dated 22 November 2017 says “…the variation 0.4.7.1.”  A document entitled „Variation to Contract‟ which was prepared on 22 Augu st 2017, signed by the applicant on 6 September 2017, and a representative of the builder on 7 September 2017.  A document entitled „Variation to Contract‟ which was prepared on 13 November 2017 by an employee of the builder, confirms a number of changes have been made to the original building contract. This document was signed by the applicant on 14 November 2017, and a representative of the builder on 15 November 2017. Accordingly, I accept that there were variations to the building contract the applicant originally signed. The FSP has changed the condition it wishes to rely upon to withdraw approval When FOS originally asked the FSP what term within the loan offers or loan terms it was relying upon to withdraw its approval of the loan, it referred FOS to the following conditions: 5.3 Stopping funding We will not fund the Loan if any of the following conditions (a)-(e) apply: … (b) Conditions not met: You fail to satisfy to our reasonable satisfaction our conditions for the provision of credit set out in clauses 2 or 3; … 11.1 We can chose how and when we exercise our rights We may exercise any right or remedy in any way we choose. If we do not exercise a right or remedy fully or at a given time, we can still exercise it later. FOS wrote to the FSP requesting it clarify which condition it believed the applicant had not satisfied (in relation to 5.3(b)). On 14 February 2018 the FSP clarified that it was in fact only relying upon the following condition: 5.3 Stopping funding We will not fund the Loan if any of the following conditions (a)-(e) apply: … (d) Inability to pay: We reasonably believe you may not be able to repay the Loan due to a change in your financial position since the date you applied for the Loan; … The FSP has not demonstrated its ‘reasonable belief’ The FSP says it formed a reasonable belief that the applicant would be unable to repay the loan on the following basis: The [applicant] made significant variations to the underlying building contract. The previously approved facilities do not account for the out of contract costs which are estimated to be approximately $100,000. The [FSP] cannot increase the [previous] approval by $100,000 as the [applicant] cannot afford the repayments. The [FSP] has considered the [applicant‟s] complaint and is unable to approve additional funding of $100,000.00 as the Home Loan will fail servicing. Case No: 508332 Recommendation Page 6 of 11 The FSP has not provided any information to show what assessment it undertook after the loan was approved, but prior to 22 November 2017 (when it withdrew its approval of the loan) to establish that the applicant would be unable to repay the loan. Instead the FSP makes reference to the fact that:  the applicant made variations to the building contract which increased the out of contract works by $100,000  the applicant decided to install a swimming pool at a cost of approximately $60,000, and  the applicant‟s position had changed so that she was not able to repay the loan. The wording of the clause 5.3(d) is clear, in that the FSP must reasonably believe the applicant cannot repay the loan. The FSP has not provided any contemporaneous file notes, serviceability assessments or other information to show what steps it took to assess the applicant‟s ability to repay the loan, and thus form its‟ „reasonable belief‟ prior to 22 November 2017, when it withdrew its approval of the loan. In the absence of this information, I do not accept that the FSP formed a reasonable belief that the applicant could not repay the loan. The FSP has not acted in accordance with the loan terms We expect both parties (i.e. the financial services provider and the applicant) to comply with the terms and conditions of a contract they have with each other. More information about our approach to a financial services provider‟s contractual duty is in section 3.2. I do not consider that the FSP has acted in accordance with the loan offers and loan terms because:  it has changed its position on which clause (within the loan offers and loan terms) it wishes to rely upon to justify its purported withdrawal of the loan approval, and  it has not provided any information to show what steps it took to form the reasonable belief the applicant would be unable to repay the loan, in accordance with 5.3(d) of the loan terms at the time it decided not to proceed with the loan. Accordingly, the FSP made an error in this regard. The FSP must reinstate the loan When awarding a remedy FOS will do what is fair and reasonable in the circumstances. Under paragraph 9.1 e) of our Terms of Reference (TOR) FOS has the power to direct an FSP to reinstate a contract. In the circumstances, I consider that the only fair and reasonable remedy, to put the applicant back in the position she would have been but for the error, is to require the FSP to reinstate the loan it had previously approved for the applicant. The loan the FSP reinstates must be on the same terms and for the same amount as previously agreed. As part of this remedy, the applicant must agree to make no Case No: 508332 Recommendation Page 7 of 11 further variations or changes to the building contract without the FSP‟ s express prior written approval. If the applicant makes further variations to the building contract without the FSP‟s express prior written approval, the FSP may stop funding the loan. The FSP must compensate the applicant $3,000 for her non-financial loss In circumstances where an FSP has made an error, FOS can award non-financial loss. More information about FOS‟s approach to awarding non -financial loss is in section 3.2. I appreciate that the FSP‟s error would have caused the applicant an extreme amount of stress and inconvenience. This is because:  the applicant had previously expended a significant sum of monies in complying with the FSP‟s pre -conditions  the FSP‟s actions would have caused the applicant embarrassment with her builder, and  trying to resolve this issue would have been highly stressful. Given the significant effect on the applicant I consider it appropriate to award the maximum amount of non-financial loss available. The FSP should pay the applicant $3,000 to an account she nominates. Case No: 508332 Recommendation Page 8 of 11 6 Supporting information 6.1 Other issues The FSP appropriately escalated the applicant’s concerns The applicant has expressed dissatisfaction with the FSP lodging a complaint on her behalf in December 2017. The applicant says this complaint was done without her consent or approval. Under the Code of Banking Practice‟s (CBP) clause 37, and the Australian Securities and Investment Commission‟s (ASIC‟s) Regulatory Guide (RG) 165, a financial services provider is required to have robust complaint handling procedures. The effect of RG165 is that a financial services provider should treat an „expression of dissatisfaction‟ as a complaint, triggering a financial services provider‟s Internal Dispute Resolution processes. In emails dated 5 and 6 December 2017, the applicant clearly and unambiguously expressed her dissatisfaction with the FSP‟s decision not to provide the loan, and subsequently not approve a new application. It was appropriate for the FSP to treat this as a complaint, and refer it to its specialised complaint handling department. On 8 December 2017, an employee within the FSP‟s complaint handling department responded to the applicant saying that the FSP would not reverse its decision. The email also appropriately provided FOS‟s contact details and informed the applicant she had two years from the date of the email to lodge a complaint with FOS. The available information establishes that the FSP appropriately responded to the applicant‟s multiple expressions of dissatisfaction, and complied with its obligati ons under the CBP and ASIC‟s RG165. The FSP has not made an error by lodging a complaint on the applicant‟s behalf. The FSP did not mislead the applicant during a telephone call The applicant says the FSP attempted to mislead her during a telephone call on 19 December 2017. More information about our approach to misleading conduct is set out in section 3.2, however, broadly to succeed in a claim for misleading or deceptive conduct relating to a financial product or service, the applicant must be able to show that:  the financial services provider made a statement or engaged in conduct that was false or misleading (misrepresentation), and  the applicant relied on the misrepresentation to his or her detriment. The FSP has provided FOS with a copy of the audio recording of the subject telephone call. From listening to the recording I note the following:  an employee of the FSP (AG) informed the applicant that FOS would be conducting an „investigation‟ to see if it could look at the complaint  the FSP was unsure if the complaint was something that FOS could review  the applicant believed the FSP was trying to dismiss her complaint Case No: 508332 Recommendation Page 9 of 11  the FSP had submitted information detailing its position to FOS on 18 December 2017 and was waiting for FOS to complete its jurisdictional review. I am satisfied that the FSP did not make a misrepresentation during this phone call. There is nothing that the FSP said within the phone conversation which was factually incorrect or could reasonably be construed as misleading. A financial services provider is entitled to request FOS to review its jurisdiction to consider a dispute at any time during the dispute process. As the applicant had already lodged the dispute with FOS (on 14 December 2017) it was not possible for the FSP to dismiss the applicant‟s complaint. On balance, and the available information I am satisfied that the FSP did not engage in misleading conduct in relation to the phone call of 19 December 2017. The FSP did not breach the applicant’s privacy The applicant says the FSP incorrectly disclosed, or provided emails between her and KC from 2015. Some of these emails refer to issues around the timing of loan payments and the applicant‟s financial difficulty at the time. The applicant says that by doing this the FSP has breached her privacy. For a privacy breach to occur, it must be established that a financial services provider disclosed personal information about its customer to an unauthorised third party. When the applicant lodged her dispute with FOS she acknowledged the fo llowing: The information submitted may be provided to the FSP nominated in this dispute form, or another FSP identified by the Financial Ombudsman Service (FOS) as the correct organisation against whom the dispute should be lodged, before it is reviewed by FOS. The Applicant(s) authorise:  FOS, the FSP(s), any representative appointed by the Applicant(s) and any organisation named in association with that representative, to exchange information about the Applicant(s), including any reasonably necessary sensitive information, for the purpose of dealing with the dispute.  FOS to exchange relevant information between different FSPs if the Applicant(s) lodge multiple disputes against those FSPs.  FOS to refer the dispute to another dispute resolution service or FSP if FOS determines it appropriate. For general information on how we deal with information provided to us and the Applicant's privacy rights, see our privacy policy. Our dispute handling process is governed by our Terms of Reference In the course of investigating the dispute we requested the FSP provide copies of all emails exchanged between the applicant and KC. As the applicant consented to the FSP exchanging information with FOS (when she lodged the dispute) it cannot be established that a privacy breach occurred. In any event, any financial difficulty the applicant previously experienced is not relevant and has no bearing on the context of this dispute. Case No: 508332 Recommendation Page 10 of 11 6.2 Information about FOS’s approach We expect financial services providers to act in accordance with their contract A financial services provider is obliged to abide by the contractual terms and conditions of the financial service it is providing to its customer. It must also exercise reasonable care and skill in carrying out the contracted financial service. The standard of care required of a financial services p rovider is that of “the reasonable competent banker acting in accordance with accepted current practice.” Non-financial loss Non-financial loss includes claims for stress or inconvenience caused by an error of the Financial Services Provider (FSP). The maximum amount we can award for non- financial loss is $3,000 for each claim. We will only award compensation for non-financial loss if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that an Applicant may incur as a result of pursuing a dispute or rectifying an FSP‟s error. When assessing whether the circumstances are of an unusual nature we will review:  the degree or extent of physical inco nvenience suffered  the general time taken to resolve the dispute, and  the extent to which the FSP‟s actions interfered with the Applicant‟s expectation of enjoyment or peace of mind. We will assess any claims for non-financial loss in accordance with the FOS Terms of Reference. If we do award compensation, it is unlikely to be substantial. Misleading conduct FOS can investigate a claim that a financial services provider misled an applicant and caused them to suffer loss. If we find that the applicant was misled, we will assess how much worse off they are as a result of relying on the misrepresentation. The remedy for misleading conduct is not to make the misrepresentation come true. 6.3 Complaint handling procedures Code of Banking Practice 37. Internal dispute resolution 37.1. We will have an internal process for handling disputes with you which is free and accessible. 37.2. If you are: (a) an individual, and not a small business; or, (b) a small business to which any relevant internal complaints handling standard or guideline which ASIC publishes for application to Australian financ ial services and credit licensees (“Approved Standard”) applies, our internal process will meet the standards set out in the Approved Standard (for example, as at the date of the publication of this Code, Regulatory Guide 165). Case No: 508332 Recommendation Page 11 of 11 ASIC Regulatory Guide 165 RG 165.57 Under the dispute resolution provisions : (a) financial service providers subject to the dispute resolution requirements must have IDR procedures that comply with our requirements. These requirements are made by us in accordance with the Corporations Regulations and are set out in this regulatory guide: see RG 165.1 – RG 165.5, RG 165.32 – RG 165.33 and Section B; (b) credit providers (i.e. lenders, lessors and those who take credit contracts on assignment) and credit service providers (i.e. non-lenders such as brokers and other intermediaries) must have IDR procedures that comply with our requirements and cover disputes relating to the credit activities engaged in by the credit licensee or its credit representatives. These requirements are made by us in accordance with the National Credit Regulations and are set out in this regulatory guide: see RG 165.11 – RG 165.14, RG 165.23 – RG 165.31, RG 165.34 – RG 165.35 and Section B; and … RG 165.78 As part of our IDR requirements, you will be required to adopt the following definition of „complaint‟ in AS ISO 10002–2006 when handling „complaints‟ under the Corporations Act or „disputes‟ under the Transitional Act and Natio nal Credit Act: An expression of dissatisfaction made to an organisation, related to its products or services, or the complaints handling process itself, where a response or resolution is explicitly or implicitly expected.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.