Cyclone storm damage building and contents claim: scope of repairs and amount payable
Text of the determination
Determination | Case number: 508325 Page 1 of 16
Case number: 508325 23 November 2018
1 Determination overview
1.1 Dispute
The complainants lodged a claim on their home building insurance policy held with
the financial firm (insurer) for damage to their home caused by winds during Tropical
Cyclone Debbie (the cyclone) in March 2017.
The insurer accepted the claim and paid the complainants $79,615.65 (including
$24,564.00 for the shed) towards the building repairs and $21,564 towards the
damaged contents. The complainants disagreed with the scope of works (SOW) and
obtained their own scope of works from CFT and quotes from various trades.
The complainants seek settlement of the claim on the following basis:
the building repairs based upon bu ilder AB’s quote of $ 183,716
$47,758 for the contents as listed in their schedule
their representatives’ SMC fees estimated at $2,000
$1,300 in costs for reports from their experts.
1.2 Issues and key findings
What is the extent of the insurer’s liability for the building claim?
The panel determines the insurer is to pay the complainants $161,509.40 towards the
complainants’ building claim as set out under section 2.1 of this determination. The
insurer is entitled to deduct $54,865.56 being the amount already paid for building
repairs less the amount paid for the shed from the settlement sum. Interest is payable
pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) from
14 December 2017 to date of payment of the claim.
What is the extent of the i nsurer’s liability for the complainants ’ contents
claim?
The insurer is liable to settle the complainants’ contents claim for the total sum of
$47,758 as set out under section 2.2 of this determination. The insurer is to pay
interest in under section 57 of the Act from 11 April 2018 to date of payment of the
claim.
Determination | Case number: 508325 Page 2 of 16
Is the insurer liable to contribute to the complainants’ costs?
The insurer is liable to contribute up to $3,000 to the professional costs incurred by
the complainants in appointing SMC as their representative, subject to the
complainants providing appropriate invoices.
Further, the insurer is to meet the complainants’ professional costs incurred in
obtaining a report from WB dated 23 May 2018 and a report from WCQ dated 15
August 2017 subject to the complainants providing relevant invoices.
1.3 Determination
This determination is in favour of the complainants.
The insurer is to pay the complainants the sum of $154,401.84 being the balance
outstanding for the contents and building repairs. Interest is to be paid under section
57 of the Act as set out under section 2.1 and 2.2 of this determination.
The insurer is to contribute up to $3,000 towards payment of the complainants’
professional costs incurred in appointing SMC subject to the complainants providing
relevant invoices.
The insurer is to pay the complainants professional costs incurred in obtaining reports
from Dr WB dated 23 May 2018 and WCQ dated 15 August 2017 subject to the
complainants providing relevant invoices and receipts.
Determination | Case number: 508325 Page 3 of 16
Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise in this complaint.
Due to the complexities involved in this complaint, the matter has been referred to a
panel for determination.
The panel has had access to all relevant information and has based this
determination on what is fair in all the circumstances, having regard to the relevant
legal principles, terms of the policy, good industry practice including codes of practice
and prior determinations where applicable.
The complainants in this dispute have been represented by SMC. Reference to
submissions made by SMC on behalf of the complainants will be referred to the
complainants in this determination.
2.1 What is the extent of the insurer’s liability for the complainants ’ building
claim?
Policy covers damage caused by storm
The complainants hold a building and contents insurance policy with the insurer called
a ‘residential home package’. The policy covers the complainants’ building and
contents for loss or damage caused by storm.
The parties do not dispute that the complainants ’ prop erty suffered damage because
of a storm. That is, Tropical Cyclone Debbie (the cyclone) in March 2017. Therefore,
the panel accepts a prima facie claim exists.
The insurer cash settled the complainants’ claim.
The insurer has partially settled the claim for building damage
Initially, the insurer considered it had met its liability to indemnify the complainants for
building repairs. By 14 December 2017, the insurer settled the complainants
$79,615.65 towards building repairs. It says this is above the amount of two builder’s
quotes (from JL and QAT) more than the value of the SOW from its second engineer
(PW).
As at 14 February 2018, the complainants sought a total sum of $161,509.40 to
complete build ing repairs, based upon their builder’s scopes of work (CFT), along with
quotes for roof and electrical wiring replacement.
The insurer was also not prepared to appoint any further expert to assess the damage
at the time.
Determination | Case number: 508325 Page 4 of 16
After obtaining advice about mould and moisture issues from their expert (Dr WB), the
complainants provided a new SOW and quote of $183,716 from their builder (AB) on
31 May 2018. AB’s quote covered works to rectify mould and roof repairs.
Experts differ as to scope of works
The insurer arranged for two engineers to report on the cause of damage. The
complainants say the insurer did not accept the opinion of its own engineer (AM). The
complainants disagree with the findings of the insurer’s second engineer (PW) and
consider AM’s report should be preferred over that of PW’s.
The insurer appointed PW because of the difference between the complainants ’ quote
($115,340) from SC, compared to its quote and variation ($74,226.86) from JL.
PW provided a SOW which reduced the extent of repairs considered to be a result of
the cyclone. PW concluded some of the distress and damage to the dwelling was the
result of original poor workmanship, a lack of maintenance or normal wear and tear.
PW did not consider the cyclone caused any ‘rotation or twisting’ d amage to require
any bracing, post or stump repairs on the lower floor.
Of note, PW did not consider any further internal walls or ceiling sheeting needed to
be removed as he did not consider the property had an unacceptable or above normal
level of mould.
Although PW noted there was mould on timber framing in the roof cavity, he stated
‘the habitable space will be isolated from any mould on the wall and roof framing,
once walls and ceiling are relined’. In terms of any mould remediation work, he only
later recommended the air conditioning unit be serviced.
The panel has considered the information provided by both parties. The panel prefers
the scope of works prepared by the insurer ’s first engineer AM and the complainants ’
builder CFT. The panel considers the scope of works to be thorough and more
consistent with the damage sustained to the property. The panel accepts that as a
result of the storm, the twisting of the dwelling has resulted in cracking to the ceramic
floor tiles, plasterboard wall and ceiling linings. The panel accepts that this has
resulted in damage to the fibre cement sheet weatherboards and aluminium frame
windows as well as causing damage to the eaves and roof.
The insurer is responsible for current mould and moisture issues
The insurer ’s restorer (RS) completed its remediation works at the end of June 2017.
The complainants reported mould reoccurring on the roof trusses of the main
bedroom ceiling to the insurer as early as 25 August 2017.
Based upon its second engineer’s opinion, the insurer did not make any further offers
to remediate. This was the insurer ’s decision. The panel does not accept PW’s
position on the property not requiring any further removal of sheeting given mould will
Determination | Case number: 508325 Page 5 of 16
be ‘isolated’ from habitable space based upon the evidence contained in the
complainants’ report from Dr WB.
As PW did not consider there was any mould treatment required, the complainants
arranged for and obtained their own expert to report on appropriate mould
remediation work.
Dr WB confirmed the complainants ’ property was mouldy and damp in January 2018
after he conducted testing and his visual observations. Dr WB concluded the current
significant mould and moisture ingress problems were consistent with the cyclone
damage and insufficient remediation.
The p anel accepts Dr WB’s opinion as fair and reasonable given the other available
evidence. Contained in Dr WB’s reports, are his qualifications, affiliations with relevant
institutions and experience, which the insurer has not disputed. The panel considers
Dr WB has the appropriate knowledge and expertise to make conclusions about the
most appropriate remediation methods for the complainants’ property.
As the insurer decided not to complete any further assessments or arrange further
testing despite the complainants’ concerns about the mould, which are substantiated
by Dr WB’s evidence, it has not suffered any prejudiced.
Conclusions
The panel is satisfied that the insurer is liable for the damage sustained as assessed
under the scope of works of AM and CFT. The panel is satisfied that the scope of
works provides a fair method of assessing the extent of the damage.
The panel does not consider the quotes provided by the insurer based on PW’s SOW
to be sufficient.
The panel has considered the quotes provided by the complainants. The latest quote
of $183,716 to repair the building damage whilst detailed has not been accompanied
by any further explanation. The panel notes that the complainants were unable to
obtain a statement from AB as to the method of assessment of the necessary building
repairs.
The panel prefers in this instance the quotation provided by SC based on the SOW
from CFT. SC quoted $115,340 for the building repairs. The quote did not include the
cost for the electrical repairs quoted at $14,389.10 or the quote for the roofing repairs
of $31,780.30. The panel has assessed total cost of building repairs including
electrical and roofing repairs at $161,509.40. The quotes obtained by the
complainants do not include the cost of replacing the shed.
The insurer has paid the complainants $79,615.56 towards the cost of the building
repairs. The panel notes that this amount includes $24,750 for the cost of replacing
Determination | Case number: 508325 Page 6 of 16
the shed with respect to this. The balance of the building repairs paid by the Insurer
including 10% for the transfer of risk is $54,865.56.
This is the figure that should be deducted from the complainants’ quote resulting in a
net difference of $106,643.84.
Accordingly, the panel determines the insurer pay the complainants the balance being
$106,643.84. Interest is payable on this amount from 14 December 2017 (the date of
the insurer’s final decision) to date of payment of the claim.
The complainants have advised that they have a mortgage with the Commonwealth
Bank and has been advised that any lump sum will need to be paid to the bank. The
policy provides the insurer with a discretion where there is a mortgage. The panel
considers that any such discretion be exercised fairly and reasonably and consistent
with utmost good faith. As the complainants are continuing to reside in the property
and will necessarily incur the cost of the repairs then the panel determines that the
insurer exercise it discretion and pay the settlement monies directly to the
complainants to allow them to complete the repairs to the building and replace the
contents.
2.2 What is the extent of the insurer’s liability for the complainants ’
contents claim?
The insurer accepted liability for the complainants’ claim for damage to contents and
settled the claim on 30 May 2017 for the sum of $21,564.
The complainants have since sought the balance of the contents sum insured
($75,749) on the basis that the insurer had failed to remove items from the mould
contaminated site.
The complainants have provided a detailed inventory of the additional contents the y
claimed totalling $47,758. The insurer whilst acknowledging the inventory advised that
it required proof of ownership and appropriate substantiation of the items being either
restorable or non-restorable before proceeding further with this aspect of the claim.
The insurer says it has been prejudiced by the complainants’ refusal to allow it access
to the additional contents claimed and by the complainants’ refusal to allow it to
attend their property to assess the additional damage as identified by the
complainants ’ mould specialist Dr WB.
Dr WB confirmed that the cost of substantiating whether items are restorable or not,
would most likely exceed the cost claimed for the items.
Given the catastrophic event which has occurred, it is likely any proof of ownership of
such items may have been lost or disposed of, given the length of time that has
passed.
Determination | Case number: 508325 Page 7 of 16
The panel considers it is fair in the circumstances for the insurer to assess its liability
for paying such costs, without the requirement of proof of ownership. The panel
accepts the amount claimed and identified in the inventory is fair in the
circumstances.
As such, the insurer must pay the complainants $47,758 being the balance of the
contents claimed. Interest is payable on this amount from the date the insurer
requested further evidence (11 April 2018) to date of payment of the claim, pursuant
upon section 57 of the Act.
The insurer is not liable for temporary accommodation
The policy states the insurer will pay up to a maximum of 52 weeks for reasonable
alternative accommodation costs, from the time the property becomes unliveable until
it is repaired or liveable.
There is no dispute the complainants have been unable to live at their property.
The information shows the insurer had paid beyond 52 weeks, from 25 May 2017 to
27 May 2018.
The complainants have advised that they returned to the property on or about 11 April
2018 and have been working on completing repairs to the property over that time. The
complainants acknowledged that they do not now require temporary accommodation.
Accordingly, no further allowance is payable for temporary accommodation.
2.3 Is the insurer liable to contribute to the complainants ’ costs?
In accordance with paragraph 9.4 of the FOS Terms of Reference, the panel may
decide that the insurer contribute to the legal or other professional costs incurred by
complainants in the course of the complaint.
The panel is satisfied that the roof report from WCQ was reasonably obtained and
note that on 11 April 2018, the insurer agreed to cover the cost of the report. The
panel considers it fair that the insurer reimburses the complainants the cost of this
report subject to the complainants providing the relevant invoice and evidence of
payment.
The complainants have also provided an invoice of $900 for a supplementary report
from Dr WB in his response to the insurer ’s submission of 11 April 2018. The panel is
satisfied that the report was reasonably obtained in response to the insurer’s
arguments and has been relied upon in reaching this determination. The panel
considers it fair that the insurer contributes $900 towards the cost of the further report.
The complainants have also been assisted throughout this dispute by SCM. The
insurer has declined to cover the fees which SCM estimated to be approximately
$2,000 in full. The panel is satisfied that it was fair for the complainants to seek
Determination | Case number: 508325 Page 8 of 16
assistance in presenting information and in pursuing the claim. The panel is satisfied
that the costs were reasonably incurred in the pursuit of the complaint. In the
circumstances, the panel is satisfied the insurer should contribute up to $3,000 to the
costs incurred by the complainants through SCM’s representation.
Determination | Case number: 508325 Page 9 of 16
Supporting information
3.1 Insurer has cash settled various aspects of claim
The parties do not dispute that the preferred method of settling the claim, is by the
insurer paying the complainants a cash settlement.
Based upon the information exchanged, the insurer has at least paid the
complainants the following settlements, to date:
Date Description Amount
24 - 05 - 2017 temporary accommodation emergency payment
( complainants started living in temporary
accommodation on 25 - 05 - 2017)
$2,000
30 - 05 - 2017 temporary accommodation (to 30 - 06 - 2017)
shed (less $1,000 excess)
damaged contents
repair fences
$5,580
$24,750
$21,564
$3,522.50
29 - 06 - 2017 temporary accommodation (to 09 - 07 - 2017)
Pet boarding costs
$918
$1,232
05 - 07 - 2017 temporary accommodation (to 16 - 07 - 2017) $3,668
31 - 07 - 2017 contents: baby furnit ure, rug & doona
temporary accommodation (to 05 - 08 - 2017)
$1,659
$1,664.10
16 - 08 - 2017 reimbursed CFT builder’s costs $1,155
25 - 08 - 2017 reimbursed remaining CFT costs $550
13 - 09 - 2017 temporary accommodation (to 13 - 10 - 2017) $3,000
12 - 10 - 2017 temporary accommodation (to 08 - 12 - 2017) $6,000
16 - 10 - 2017 building repairs $47,627.86
14 - 12 - 2017 transfer of risk (10% of building repairs)
temporary accommodation (to 11 - 02 - 2018)
$7,237
$6,000
11 - 04 - 2018 temporary accommodation (to 27 - 05 - 2018) $11,250
Determination | Case number: 508325 Page 10 of 16
3.2 Reports
Record Key points
Insurer ’s builder
(JL)
Report, SOW &
q uote 10 - 04 - 2017
$54,132.16 for building repairs (including shed repairs ).
Inspected property on 2 April 2017.
Noted
Makesafe completed: none
Roof damage: yes, 2%
Habit ability: habitable now and during repairs
Building or design faults (contributing to damage): no
JL’ s opinion on cause
Damages sustained to the residenc e are a direct result of TC Debbie.
Damage to the fence line has occurred from falling debris from surround
trees.
The shed has suffered structural damage to walls and roller doors and will
need to be replac ed.
On the front elevation of the house the windows have been sucked out and
will need to be pulled out and refix to the jambs, the plasterboard sheeting
still had a high water content, some of the front and rear balustrade slats
have been blown off and the ba ck gutter was knocked off from a fallen
tree.
JL engaged a roofer to inspect and we have included their report.
Note furt her damages may be found as cleaning up and drying.
Attached SOW .
Insurer’s
restorer (RS)
Non - Restorable
Inventory List
02 - 05 - 2017
20 contents items listed and all noted as non - restorable due to water
damage and mould growth.
Attaching photographs showing all items.
Complainants ’
builder (BSC)
Quote
06 - 05 - 2017
$25,750 for removal and replacement of cyclone damage d shed .
Insurer’s
restorer (RS)
Report and quote
undated (but
insurer received on
20 - 05 - 2017)
Damage description
Caus e: w ater ingress through windows and ceilings .
Resulting: w ater damage to contents , m ould growth on walls and ceilings.
Affected Areas : wardrobe bedroom 1; bedroom 1, 2 & 3; and laundry.
Mould: Yes
Temporary accommodation: Yes
Quote
Quoted $8,453.50 for further recommended works.
Insured will need temporary accommodation while works are completed .
Attached photographs of property.
Determination | Case number: 508325 Page 11 of 16
Record Key points
Insurer’s
engineer (AM)
Inspection r eport
04 - 06 - 2017
Observations
The house has flexed and appears to have twisted. The flexing has
caused cracking to the upper level . The bracing rods became loose during
the event .
A roof inspection was not carried out .
Recommendat ions
The support posts have corroded at the base and will need to be stiffened .
The corroded bases do not form part of the cyclone damage but is a
maintenance issue. Drawings for the structure are attached together with
sketches for the repair of the corroded columns.
A surveyor will need to be engaged to carry out the required survey to
assess the sway/twist in the steel support columns.
The cracks that are repaired are likely to re - occur with future wind events
and will require re - patching. Limited f lexing of the structure to the point that
th e loads are accept ed by the shea r 1 walls and bracing is normal for light
framed construction .
Insurer’s
restorer (RS)
Final site report
undated (but sent
to insurer 30 - 06 -
2017)
Further works from 26 to 28 June 2017
Technician re - attended site to commence works.
Delivered a 6m skip bin to site for disposal.
Electrician disconnected the ceiling light in the laundry.
Installed 4 HEPA units into the property for the duration of works.
Mould growth has formed on ceil ing inside wardrobe in bedroom 1.
Removed and disposed of this section of the ceiling from the property.
Laundry ceiling has mould growth so removed and disposed of.
Mould growth on walls backing onto the front of the house in bedroom 2 &
3. Insured cleane d and painted thes e walls as her children have asthma.
Gyprock ceiling stripped and removed to allow treatment of the timber
framing behind to prevent further mould growth from re - occurring.
Dry agitat ed and treated timberframe in affected areas to remove mould.
HEPA vacuuming of all surfaces to remove any dust & debris possibly
blown around by the drying equipment throughout the process.
Got the complainants to sign off on works complet ed.
No further action required of RS. RS file is now closed.
Various un labelled photographs attached.
Insurer’s
engineer (AM)
Advice
25 - 07 - 2017
The columns under the house are reas onably vertical. They have been
constructed out of line in plan.
The bracing has been loosened by the cyclone res ulting in cracking to the
walls of the house. The bracing will need to be stiffened prior to any
internal work on the finishes being undertaken or the cracking will
reappear with less than cyclonic winds.
Complainants ’
builder (CFT)
Inspection report &
SOW
Conducted inspection on 25 July 2017.
Instructed by complainants to provide a SOW for the repair of the resultant
damage from the storm event .
The Owners acknowledged that repair of the corrosion to the bottom of
1 Shear is one of several stresses, w ith bending, tension, and compression being the other main ones .
Determination | Case number: 508325 Page 12 of 16
Record Key points
08 - 08 - 2017 (also
an identical copy of
the report dated
31 - 0 7 - 2017 )
metal posts (with the us e of stiffener brackets or the like) is their
responsibility; so not included in CFT’s SOW.
concur with AM’s findings about the twisting of the dwelling during the
noted storm event (Cyclone Debbie) when strong winds were ex perienced .
T wi sting has resulted in cracking to the ceramic floor tiles and the
plasterboard wall and ceiling linings.
This has resulted in damage to the fibrous cement sheet weat herboards
and the aluminium framed windows .
W ater entered the dwelling via the dislodged ea ves lining and the wi n dows
during and after the storm event, resulting in the noted int ernal damage.
Complainants ’
roofer ( WCQ )
Report
15 - 08 - 2017
The dwelling appeared to have racked 2 due to the cross bracing being
under compression where they should be under tension.
The iron roof sheeting had physical signs of metal fatigue/mechanical
damage & lap life/stretched laps due to the duration and high speed of the
wind. This has compromise d the water proofing capabilities of the roof.
This has reduced the servic e life of the roof, leaving it vulnerable to
capillary action drawing wat er into the ceiling cavity. This could result in
damage to internal gyprock ceilings, walls, flooring, cabine try & contents.
The gutter to the dwelling has suffered impact leaving it sagged and the
attached downpipe deformed.
Many floor tiles have cracked or popped, due to the cyclonic winds and
racking of the house. Wet area tiles and water proofing membrane may
also be compromised.
Complainants ’
builder (SC)
Quote
08 - 09 - 2017
$115,340 quote based on SOW supplied by CFT and report by AM.
SC anticipate the project duration cont ract time will be 11 weeks for
temporary accommodation of $750 a week, to a total of $82 50 (not included
in this quote).
Complainants ’
m ould expert (J)
Report /SOW/quote
undated
( complainants sent
to insurer on 20 - 09 -
2017)
It was evident that this property had been heavily affected by water ingress
due to Cyclone Debbie, which appears to have impacted the ceilings and
outer walls to the property.
Mould is generally found on plasterboard walls, which provides the perfect
food source for mould growth. As some sections of the plaster board (and
ceiling) were removed at the time of inspection, it was difficult for J to
confirm the level of contamination at the time.
There was very little evidence of mould contamination to the bottom plat e
and wall studs.
Mould als o produces spores which can easily spread throughout the
property during the demolitio n and removal phase.
Quote
$2,775 to carry out cleaning and remediation & additional bio - tape testing.
Insurer’s 2nd
engineer ( PW )
Report & SOW
Attended property on 28 October 2017 to inspect distress and damage in the
dwelling and determining what damage is cyclone related.
1. PW reviewed both the SOW from JL ( insurer’s builder) and the CFT
2 Racking: lateral forces brought on by w ind, storms, and earthquakes
Determination | Case number: 508325 Page 13 of 16
Record Key points
10 - 11 - 2017 ( complainants ’ builder).
2. Based on PW’s investigation, some items in both SOWs were considered
unnecessary as the distress & damage was not relat ed to the storm.
3. Some of the distress and damage to the dwelling was the result of
original poor workmanship, a lack of maint enance or normal wear & tear.
4. PW compiled a SOW setting out the minimum work he considered was
required to reinstate the dwelling following t he cyclone.
Insurer ’s builder
(JL)
SOW
15 - 11 - 2017
Quoted $32,548 for SOW per PW’s report.
See below for updated quot e and SOW.
Insurer ’s builder
(QAT)
SOW
15 - 11 - 2017
Quoted $39,015.90 for SOW per PW’s report.
Insurer ’s
engineer ( PW )
Report
07 - 12 - 2017
When PW addressed the issue of lower floor framing and bracing in
Section 3.1 of his earlier report , he referred to the QBCC Standards and
Tolerances Guide as to the level of distortion in the stumps . PW held to the
opinion on the stumps expressed in his e arlier report.
The AM post survey results showed some displacement of the tops of
some posts relative to their bases but no ‘consistent’ deformation of the
posts as would be expected if the building had twisted or rotat ed.
PW is satisfied the complainants ’ house has met the performance
requirements of the BCA.
PW agreed the prima facie evidence would point to a rod, beneath the
back left hand corner of the house, being bowed from the cyclone event.
He found no evidence the opposing rod was tight to the ext ent necessary
to match the bow in the loos e rod or the taught bracing rod had deformed
the bottom angle cleat connecting it to the post. He concluded the bracing
set was not properly constructed in the first instance & it was not tensioned
at the time of i nstallation to make it appear straight .
PW held to the opinion he expressed earlier about the floor & wall tiles .
There was almost no evidence to indicate that the windows or doors
moved relative to the wall framework, either outwards or inwards, except
fo r a window in the main bedroom where an archit rave has been
dislodged. He found no evidence of any inwards/outwards movement of
any window frames relative to the wall framing. PW held to all the opinions
expressed in Section 3.5 of his earlier report on th e windows & doors.
Regarding mould, PW made a statement of fact – he saw no evidence of
mould on any of the walls or ceiling of the dwelling. There was no musty
smell in the dwelling typically associated with mould growth.
PW stated there are no regulatory requirements setting
acceptable/unacceptable levels of mould in houses. The State
Government advice regarding the management of mould following
cyclones did not extend to removal of wall cladding/elaborate treatments.
Determination | Case number: 508325 Page 14 of 16
Record Key points
Timber frames often get wet during co nstruction & mould grows on the
framework. There is no requirement for a contractor, during an initial build,
to clean mould from framework prior to sheeting.
Mould growing on timber framework following a cyclone event is in PW’s
opinion was no different. Mould that might have resulted from the
framework getting wet does not have to be removed from the framework.
The timber frame is enclosed by the cladding, as with new construction.
PW conceded two issues he overlooked in his SOW:
1. SOW should allow a recommendation to service all air conditioning units.
2. He incorrectly report ed the quantity of roof that required removal and
replacement in his SOW. The actual roof area is 170m 2 .
Insurer’s builder
(JL)
Statement
08 - 12 - 2017
JL advised the insurer :
the s cope of works will require five weeks to complete
the complainants required temporary accommodation for 3 of those 5
weeks.
Insurer ’s
engineer (PW)
Correction
10 - 12 - 2017
PW sent insurer report of 7 December 2017 and tax invoice & pointed out :
1. Section 9.11 – Mould – the SOW should include an allowanc e of
servicing the AC units.
2. Section 10.4 – Roof – the SOW has an incorrect area of roof that
requires replacement. The area is 170 m 2 , not 20 m 2 previously indicated .
Insurer ’s builder
(QAT)
Revised SOW
12 - 12 - 2017
Quoted $56,109.90 for SOW per PW’s report. Additional costs reflect 170m 2
of roof replacement and allowance of $700 excl GST for attendance and
service of 2 air - conditioning units.
Insurer ’s builder
(JL)
Q uote & SOW
12 - 12 - 2017
Revis ed estimate of $46,359.60 for the works based upon PW’s report.
Complainants ’
electrician (JW)
Quote
19 - 01 - 2018
$14,389.10 to r emove, dispose, supply & install new recessed LED
downlight, smoke alarm, basic ceiling fan, exhaust fan light , double GPO ,
light switch , TV outlet , fluorescent light , high mount flood light ; capture gas
and safely dispose AC unit , and supply & install 3 AC reverse cycle units.
Complainants ’
plumber (BP)
Quote
21 - 01 - 2018
$31,780.30 to remove and replace 197m 2 roofing iron & 1 97 m 2 air cell
insulation; replac e all flashings fascia and gutters; downpipes; and
scaffolding hire/ edge protection.
Complainants ’
expert ( Dr W B)
Environment
assessment r eport
Mould: dangerous numbers of airborne viable moulds wit hin li ving room,
increased numbers near skip bin cf down the hill at roadside, dangerous
numbers surface viable and surface total in skip bin, and elevat ed
numbers by surface viable in bedroom 2.
Determination | Case number: 508325 Page 15 of 16
Record Key points
& SOW
02 - 02 - 2018
Moisture: dampness in flooring under tiles; elsewhere dry.
Signs o f moisture: water staining on underside of front of house, visible
staining in various locations inside.
Cont ents: Condition 2 (s ettled spores) or higher.
Temperat ure & humidity: significantly more humid indoors, 33.2 °C inside,
31.5 °C outside.
No ventilation.
Odour: mouldy; significant.
Thermography: possible dampness in pockets in anticon - blanket
(insulation) over master bedroom (bedroom 1).
Significant untreated damage.
Significant insect activity.
Significant mould detected in house.
Significant residual moisture in house.
Significant number of contents items not sealed against mouldy
environment and so have been cont aminat ed (including A/C unit
louvers/core).
Some mould det ected in bedroom 2.
Strange remediation practises evident (no containment and done against
the ANSI/ IICRC s500 and s520 standards).
Significant lag between cyclone event and remediation.
Inconsistent remediation practises.
Water penetration from above into walls, cavities and under tiles.
Proximate cause consistent with the cyc lone.
Female complainant’s claimed asthma attack(s) and child’s respiratory
condition, consistent with mould dust exposure.
Dr WB provided a suggested SOW to assist safe remediation.
Attached tables of re sults showing:
hazardous and/or severe viable fungal counts by culture in ent ry/living
room (airborne) and skip bin (surface); and elevat ed levels in kid’s
bedroom 2 cavity (surface).
elevated total fungal counts by direct microscopy in kitchen (airborne) and
AC living room (surface); and extremely high levels in skip bin (surface).
Complainants’
expert ( Dr W B)
Further report
2 3 - 0 5 - 2018
Complainants asked Dr WB to respond to insurer ’s questions suggesting
his report was essentially incorrect or similar.
Dr WB refute d the allegation s. He considered the concerns expressed
we re unfounded and confused. His report was thorough and generally
compliant wit h current known good - practice and international standards
including relevant ASTM test methods and ANSI/ IICRC mould/moist ure
remediation standards s500 and s520.
The suggested actions would likely achieve successful post - remediation
verification (PRV) ‘clearance’ in a timely and cost - effective manner.
The relevanc e of 24 P Street was unclear, referred to in insurer ’s
comment s.
Dr WB’s did not present a SOW , but suggested a strategy for remediation.
Dr WB did not understand why a specific SOW for the property was not
developed over a year ago & required him to verify that it was still mouldy,
Determination | Case number: 508325 Page 16 of 16
Record Key points
damp and not fit for human habita tion, especially by the complainants who
claim to have a variety of significant health problems such as asthma.
It is usually possible to remediate a variety of contents items such as
cutlery, crockery, solid timber furnit ure, plastic or metal items by was hing
or wiping them using the correct techniques, cleaning solutions and taking
adequate precautions to limit the exposure of personnel to mould -
contaminated dusts by use of PPE such as HEPA - rated respirators,
gloves, over - coats or similar, etc.
Some item s such as clothing, bedclothes, curtains, soft toys, upholstery,
cushions might be remediable by washing, laundering or dry - cleaning.
Ideally all such items would be tested at PRV stage before returning it.
However, the cost of performing all these works often exceeds the value of
the items themselves.
Complainants ’
builder (AB)
Quote
31 - 05 - 2018
$183,716 in total for repairs , including:
$16,250 for roof repairs
$28,000 for scaffolding
$10,450 for kitchen cabinet ry.