Home / Financial Firm (Unknown - Insurer) / Determination 508038
Determination 508038
Claim denial for pool damage under rust or corrosion exclusion
Summary
The applicant's pool damage claim was denied under the policy's rust or corrosion exclusion. AFCA found the FSP entitled to deny the claim and awarded no compensation.
The policy excludes damage caused by rust or corrosion, and expert evidence showed the pool already required replacement because of rusted structural posts.
Issues
- Claim denial primary · not upheld“The FSP is entitled to deny the claim as the available information establishes the pool already required replacement because of the corroded structural posts.”
- Poor communication secondary · not upheld“The FSP communicated with the applicant's broker in a timely fashion, which is usual industry practice.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 508038 Determination Page 1 of 7
Case number: 508038 18 September 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for pool
damage which occurred on 16 July 2017. The FSP denied the claim because it says
the damage was caused by corrosion which is excluded from cover under the policy.
The applicant disagrees with the claims decision and requires the FSP to accept her
claim.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim as the available information establishes, on the
balance of probabilities, the pool already required replacement because of the
corroded structural posts which cause is excluded under the policy.
Is the applicant entitled to compensation?
The available material does not establish an award of compensation is warranted.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to take any further action in relation to the claim or the
dispute.
Case No: 508038 Determination Page 2 of 7
2 Reasons for determination
2.1 Is the FSP entitled to deny the claim?
Applicant has established a valid claim
The applicant is required to establish on the balance of probabilities she suffered a
loss caused by a risk insured against under the policy. This is known as a valid or
prima facie claim.
The applicant‟s policy is an insured events policy. This means the policy will only
cover the claimed property damage if it was caused by one of the insured events.
At various stages, the applicant identified various causes of the damage. Ultimately,
she said in correspondence with FOS that the claimed insured event was accidental
damage to the pool wall caused by the applicant‟s customers on 16 July 2017.
Accidental damage is not defined in the policy. When the policy term is not defined,
FOS will construe the term according to its plain and ordinary meaning. In this case,
„accidental‟ is accepted as being something unexpected and unforeseen.
Insofar as the applicant did not intend or expect the pool to sustain damage, I accept
the applicant has established a valid claim.
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the loss.
Available information suggests pool already damaged by corrosion
The claim circumstances are outlined in supporting section 3.3.
The applicant says she first noticed the damage during a training course in the pool
on 16 July 2017. She says she noticed a slight buckle to the pool side and so she
contacted the manufacturer who sent an expert (PSP) to investigate the next day.
The applicant later amplified her claim. She describes the teacher training session on
16 July 2017 when “one group of two men used the wall to push off in rugged and
forceful fashion.”
She said this specific event directly caused the damage to the pool. She says it was
then she noticed the liner rippling and the buckle in the pool wall.
The material provided establishes on 17 July 2017, PSP inspected the damage.
PSP‟s report is outlined in supporting section 3.4.
Photographs provided show significant rusting of supports.
The FSP says:
b ased on what it‟s adjuster was told at the inspection on 11 August 2017, which
included material from the applicant‟ s expert, it was entitled to deny the claim
because the claimed damage was caused by corrosion.
the applicant acknowledges damage was caused by corrosion.
Case No: 508038 Determination Page 3 of 7
the applicant only clarified how the claim arose during the FOS dispute process
and did not describe this cause of damage to its loss adjuster, CL.
as a result, it has been prejudiced as the applicant has replaced the pool.
The FSP is entitled to deny the claim
I carefully considered the material provided particularly the material from PSP.
I accept PSP saw the liner was significantly creased and stretched and there was
movement to the structural wall panel in this area. However, PSP does not describe
how the damage occurred. Moreover, PSP also removed the pool deck in this area to
examine the outside of the pool walls and uprights. He said two of the structural
posts were significantly rusted at the base. This is not in dispute.
PSP says:
in the area of the claimed damage to the lining and wall panel, the structural
posts had significantly rusted at the base and the pool wall significantly buckled
which caused excessive stress to the structural posts
taking this into account, and the level of rusting observed on the posts, there
was a high risk of the pool wall collapsing soon.
There is no information from a qualified expert to establish the cause of the claimed
damage to the pool liner and wall including if it was consistent with the described
impact to the pool wall by the applicant‟s customers. Further, the applicant‟s expert
report indicates the strong and imminent likelihood of the pool failing because of the
rusted structural posts.
Therefore, even if it was established the applicant was entitled to the cost of repairs
to the pool liner and damaged panel section because of the customers‟ actions, the
available evidence establishes the pool already required replacement because of the
rusted structural posts. That is, even if the pool was further damaged by being
kicked, the pool already required replacement.
While the applic ant‟s policy covers accidental loss or damage, the wording contains a
specific exclusion for damage caused by rust or corrosion.
Based on the information provided, and for the reasons stated, I am satisfied the FSP
is entitled to deny the claim.
2.2 Is the applicant entitled to compensation?
Circumstances do not warrant an award of compensation
The applicant complains about the FSP‟s claims management. Specifically, she
claimed she was not advised of the FSP‟s position in relation to her claim.
FOS‟s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situ ation, or interference with the applicant‟s expectation of
enjoyment or peace of mind.
Case No: 508038 Determination Page 4 of 7
The FSP says it corresponded with the broker and any issue of delay should be
taken up with the applicant‟s broker.
The available information shows the claim was made b y the applicant‟s broker on 8
August 2017. The FSP‟s adjuster was appointed and inspected the premises on 11
August 2017. On 17 August 2017, the broker was provided with a copy of the
adjuster‟s report and advised of the denial of the claim. On several occ asions
thereafter, the FSP followed up the applicant‟s broker. The broker did not reply save
to advise on 13 October 2017 it was considering the claim. The claim was formally
denied by the FSP on 15 December 2017.
Whilst I accept the applicant was not directly advised by the FSP about its attitude to
the claim, the claim was made by the applicant‟s broker. In these circumstances, it is
usual industry practice for an insurer to communicate with an insured‟s broker.
The available material shows the FSP comm unicated with the applicant‟s broker in a
timely fashion.
I am satisfied the available material establishes a claim for compensation is not
warranted.
Case No: 508038 Determination Page 5 of 7
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the correspondence between the
parties and in the FSP‟s Notice of Response dated 14 February 2018. Both the policy
document and the Notice have been exchanged with the applicant.
3.3 Claim circumstances
Date Event
16 - 07 - 2017 The applicant (later) claimed she noticed the pool wall liner crease and the pool wall
buckle following two customers using the wall to forcefully push against.
17 - 07 - 2017 The applicant contacted the pool manufacturer who engaged pool technician, PSP,
to investigat e the issues related to the applicant‟s pool.
17 - 07 - 2017 PSP inspected the pool.
29 - 07 - 2017 In earlier statements, the applicant said custom ers noticed the pool appeared to be
subsiding on this date.
30 - 07 - 2017 PSP‟s invoice to remove and install a new pool at a cost of $35,000.
04 - 08 - 2017 The applicant arranged PSP to drain and dismantle the pool.
Case No: 508038 Determination Page 6 of 7
08 - 08 - 2017 The applicant lodged a claim with the FSP for pool damage via her broker.
The FSP appoint ed loss adjuster, CL to investigate the cause of damage to the
applicant‟s pool.
11 - 08 - 2017 FSP‟s adjuster inspected and phot ographed the pool whic h had been dismantled.
15 - 08 - 2017 CL reported on the caus e of damage to the applicant‟s pool. Relying on the
applicant‟s version to him and the applicant‟s expert, the adjuster concluded the
proximat e cause of the loss was corrosion.
17 - 08 - 2017 The FSP emailed the applicant‟s broker to a dvise it will deny the claim based on
CL‟s report which was provided to the brok er.
In subsequent correspondence, the FSP asked the applicant‟s broker whether the
broker wanted a formal decline letter but there was no reply.
1 8 - 08 - 2017 Invoice showing poo l water was delivered.
15 - 12 - 2017 The FSP declined the claim as it says cause of the pool damage was corrosion
which is excluded from cover under the policy.
17 - 04 - 2018 PSP provided a report on its observations and recommendation about the damage
to the applicant‟s pool.
3.4 Expert reports
Record Key points
FSP’s loss adjuster (CL)
Report
15 - 08 - 2017
FSP‟s adjuster attended and photographed pool on 11
August 2017.
Photographs show pool had already been removed but not
the decking.
Adjuster met with the insured‟s repres entative to discuss
the loss and was advised on 29 July 2017 pat rons of the
pool noticed the pool appeared to be subsiding in several
areas so the pool was closed and engineers engaged.
Adjuster not es engineers said m etal bracing which
supported the northern aspect of the pool had failed as
they were corroded and a temporary repair was
undertaken to brace the failed structure.
4 August 2017 the pool was closed, drained and
dismantled.
Adjuster‟s opinion based on visu al inspection and
disclosures provided by the applicant and her engineer.
Loss arose because of corrosion because pool is
surrounded by timber walkway which is void of ventilation
creating high humidity causing the rust.
Adjuster refers to a similar earli er failure.
Accepts the pool must be reinstated. No particulars of loss
supplied and adjuster estimated costs $40,000.
FSP’s loss adjuster (CL)
Email
Pool lining was replaced in 2015, the actual sub - structure
(framing) which is the cause of the failure was not.
Case No: 508038 Determination Page 7 of 7
10 - 04 - 2018 Received no disclosure pertaining to the Insured's closure
between 16/07 and 29/07, but was advised that the failure
occurred on 29/07.
Relied upon our visual inspection and the Insured's own
report.
As damage has long been remedied, s pecialist
engagement would not provide anything definitive.
Applicant’ s pool specialist (PSP)
Report
17 - 04 - 2018
Inspected pool 17 July 2017 because told pool damaged
on the southern pool wall the day before.
Observed liner significantly creased/stretched and critical
movement of structural wall panel.
Removed the pool deck side to examine pool walls and
uprights outside. Observed two structural posts
significantly rusted at base and significant buckling to the
pool wall.
Buckling causes excessive stress o n post and with level of
rusting observed on thes e posts, there was a high risk of
pool wall collapsing.
Immediately installed temporary bracing to prevent further
movement and reduce further wall/liner damage.
To repair pool liner and damaged panel sectio n, pool
needed to be completely drained and liner removed.
Due to the amount of rust observed after draining the pool,
it was not practical to replace the single panel section and
he recommended replacement of the pool.
Also, where rust was already prese nt it would continue to
spread to new metal surfac es meaning the rust would
spread to any new section installed. This would give a very
short lifes pan to any repair.
3.5 Other relevant material considered and relied on
FSP‟s submissions claim notes and repor ts and photographs.
Applicant‟s submissions, photographs, reports, and invoices.
Policy schedule.
Product disclosure statement.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.