Home / Financial Firm (Unknown - Insurer) / Determination 507504
Determination 507504
Storm-caused retaining wall collapse claim declined as defective building work excluded
Summary
The applicant claimed under his home policy after a storm caused a self-built retaining wall to collapse. AFCA found the proximate cause was defective building work that did not comply with the applicable standards, so the policy exclusion applied and the FSP could decline the claim.
Under the proximate cause test, the dominant cause of the collapse was defective construction, which the policy excludes.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to decline the claim and is not required to take any further action on the claim.”
- Product terms interpretation secondary · not upheld
“The FSP can rely upon the exclusion for any damage as a result of a defect in an item, structural defects, faulty or poor workmanship or design.”
Subjects and remedies
no remedy
Text of the determination
Determination
Case No: 507504 Determination Page 1 of 4
Case number: 507504 26 March 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) after a storm
caused a retaining wall to collapse at his property.
The FSP declined the claim, saying the damage was due to defective building work
and therefore excluded under the policy.
1.2 Issues and key findings
Was the FSP entitled to decline the claim?
From the information provided I am satisfied the proximate cause of the collapse of
the retaining wall was defective building work, which did not comply with building
regulations applicable at the time of construction.
The FSP can therefore rely upon the exclusion for any damage as a result of a defect
in an item, structural defects, faulty or poor workmanship or design.
1.3 Determination
This determination is in favour of the FSP.
The FSP was entitled to decline the claim and is not required to take any further
action.
2 Reasons for determination
2.1 Was the FSP entitled to decline the claim?
Applicant has initial onus to establish prima facie claim
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
Case No: 507504 Determination Page 2 of 4
The applicant holds a home insurance policy providing cover for a number of listed
events, including storm.
The applicant lodged a claim on 3 May 2017 for storm damage occurring on 4 April
2017. The applicant says the storm caused a retaining wall to collapse.
The applicant constructed the retaining wall himself and says the retaining wall was
less than one metre high so it did not require engineering specification.
FSP says retaining wall was defective
The FSP provided a report from a builder (HB), which stated the damages were
caused by poor design and the wall was under-engineered for purpose. HB stated
the three factors that contributed to the wall failure were:
little to no drainage materials behind retaining walls
galvanised posts installed too shallow
exposed soil on all sides allowing the soil to turn to mud in rain events.
The FSP then provided a report from an engineer (CBC), which stated the primary
cause of damage to the retaining wall system was defective building work, which did
not comply with the Australian Standards (AS) and industry recommendations
relevant at the time of construction.
CBC stated:
had the retaining wall been built in accordance with the relevant AS, damage is
unlikely to have occurred during the rainfall event
the damage occurred from the build-up of hydrostatic pressure, in the absence
of drainage infrastructure, during the rainfall event
the build-up of hydrostatic pressure has exceeded the retaining capacity of the
poorly constructed retaining wall.
CBC stated AS 4678:2002 ‘ Earth-retaining structures ’ outlines a number of design
requirements for these structures, including the requirement for effective drainage
behind the wall to maintain its integrity.
CBC also states the Queensland Building Regulation 2006 provides that self-
assessable building work and building work exempt from ‘building approval’ includes
construction of retaining walls that are less than one metre in height. However, it
must also be no closer than 1.5 metres from a building or another retaining wall. CBC
says both dwellings on either side of the retaining wall are within 1.5 metres of the
retaining wall system. This means the retaining wall requires ‘building approval’ and
certification.
The applicant says no engineering design was required because the wall was
constructed at a height less than one metre. However CBC says this should not
absolve the applicant from building in accordance with the relevant AS,
manufacturer’s recommendations and general indu stry recommendations to ensure
the long term integrity of the retaining wall.
The applicant provided a report from an engineer (BE), which states:
Case No: 507504 Determination Page 3 of 4
the retaining wall was constructed in August 2016 and no drainage provisions
were installed at this stage because the neighbouring property owner proposed
to do this
in December 2016, the neighbouring property owner constructed an additional
timber sleeper retaining wall above and behind the existing retaining wall , with
additional fill material added
in April 2017, the concrete sleeper retaining wall collapsed after a rain event.
BE stated other retaining walls around the property appear to have been constructed
using the same details as the failed wall, however drainage provisions were evident
behind those walls. It said the collapsed retaining wall had no apparent drainage
visible.
BE believed the retaining wall failed due to the following:
the additional loads imposed on the wall due to additional wall and fill material
placed above and behind the wall
hydrostatic pressure due to groundwater runoff and lack of drainage provisions.
The FSP says the wall had not been built to AS and was defective, therefore the
damage is excluded under the policy. It refers to the following exclusion in the
product disclosure statement (PDS), which excludes any loss or damage caused
directly or indirectly by:
a defect in an item, structural defects, faulty or poor workmanship or design
FSP’s liability depends on proximate cause of damage
In order to dete rmine the FSP’s liability for the claimed damage, it is necessary to
determine the proximate cause of the loss. What is the proximate cause of the loss is
a question of fact depending upon the circumstances of each case.
It is well established that a proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
FSP entitled to decline claim
Having considered the available information, I consider the proximate cause of the
collapse of the retaining wall was defective building work, which did not comply with
AS applicable at the time of construction.
I am satisfied, on balance, the retaining wall required building approval and should
have been constructed in accordance with the above AS, requiring effective drainage
behind the wall to maintain its integrity.
Case No: 507504 Determination Page 4 of 4
BE confirms other retaining walls in the vicinity which did have drainage provisions
did not collapse following the rainfall event. This supports the view that the wall would
not have collapsed if constructed according to the applicable AS.
As I am satisfied the proximate cause of the collapse of the wall was defective
building work, the FSP can rely upon the exclusion for any damage as a result of a
defect in an item, structural defects, faulty or poor workmanship or design.
The FSP was entitled to decline the claim and is not required to take any further
action on the claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.