Determination 507423

Cash settlement amount for water main leak and mould damage

FirmFinancial Firm (Unknown - Insurer)
Decided2018-10-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$225,000
Non-financial loss$1,000
Amount claimed$288,396
SourceAFCA PDF

Summary

The applicant's home was damaged by water from a burst council water main and mould spread during restoration. AFCA increased the FSP's cash settlement to $225,000, ordered $1,000 non-financial loss compensation and interest, and declined some exterior, flooring and property expense claims.

A cash settlement must be reasonable and allow sufficient funds to complete the repairs, and policy exclusions apply to undamaged items and consequential losses.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 507423 Determination Page 1 of 15 Case number: 507423 16 October 2018 1 Overview 1.1 Dispute The applicant holds a home and contents policy with the Financial Services Provider (FSP). Water leaking from a water main caused extensive damage to his house and contents. He lodged a claim with the FSP on 6 April 2017. The FSP accepted the claim. However, a dispute has arisen over the scope of works required to repair the damage and the appropriate cash settlement amount. 1.2 Issues and key findings Is the FSP required to increase the cash settlement amount? The information available shows the FSP’s cash settlement amount was generally adequate. However, given the claim is to be cash settled, the Panel considers the FSP’s cash settlem ent be increased in round terms to $225,000 to allow for management fees and any unforeseen costs incurred in the process of carrying out repairs. Is the applicant entitled to non-financial compensation? The applicant’s property has remained unrepaired f or a long period of time. The Panel accepts part of the delay was due to the FSP’s contractors not taking adequate action to prevent further mould cross-contamination in the house. The Panel is satisfied the applicant is entitled to an award of compensation for non-financial loss of $1,000. 1.3 Determination This determination is substantially in favour of the applicant. The FSP is required to:  increase the cash settlement for the building and contents claim to $225,000, together with interest on $194,790.58 in accordance with the Insurance Contracts Act 1984 (as amended) (the Act), from the date of lodgement of the dispute with the Service to date of payment  pay the applicant $1,000 non-financial compensation. Case No: 507423 Determination Page 2 of 15 2 Reasons for determination 2.1 Is the FSP required to increase the cash settlement amount? Policy provides covers for escape of liquid It is accepted insurance law that the applicant, as the insured, carries the initial onus to establish that he has suffered loss and damage which is covered by the terms and conditions of the policy. The applicant’s obligation to establish the claim is covered by the policy extends to establishing the extent of the loss and that the loss and damage occurred in circumstances consistent with the other known and confirmed evidence. The applicant’s policy commenced on 1 February 2017 and provides cover for the applicant’s home for a sum insured of $1,095,000 and contents $153,000. Cover was subject to a basic excess of $500. Circumstances of loss There is no dispute that on 12 February 2017 the applicant noticed water entering the house. An email from the council confirmed it repaired a water main leak near the applicant’s property on 8 March 2017. The applicant lodged a claim with the FSP on 6 April 2017. The FSP engaged a building consultant (CC) to manage the claim. CC inspected the house on 11 April 2017. CC found the house sustained water damage and mould growth. CC prepared a building scope of works, which included repairs to:  bathroom 1 & 2 and ensuite  bedroom 1, 4 and 5  laundry  middle level foyer  stairwell from top level to middle level  open plan living area. CC quoted the above works to cost $26,698.38 (including GST). CC also engaged restorer SR to restore the house. On 15 May 2017 SR attended the house. SR found mould in bedroom 2 and 3. It removed the carpet to these rooms and applied an anti-microbial chemical to the rooms. It did not install any equipment to mitigate further mould cross-contamination. SR re-attended the house on 22 June 2017 to prepare a scope of works for the mould remediation to bedroom 2 and 3. SR recommended for:  the installation of containment to the affected bedroom areas from the unaffected areas of the house  remove mould affected building material that cannot be remediated  install drying equipment. SR’s mould remediation quotation totalled $8,558.44 (excluding GST). Case No: 507423 Determination Page 3 of 15 SR noted in its quotation that its mould remediation works was primarily for the bedrooms and bathroom of the lower level. It was aware there was mould in other areas of the house, but was unsure whether the mould in these other areas was also due to the water main leak event. As a result SR did not include the cost to remediate the mould growth in these other areas of the house. Instead, it recommended for another assessment of the house so a clear scope of works can be obtained. It is unclear from the information exchanged whether another assessment took place. CC did, however, revise its building repair quotation to $31,321.13. CC made further allowance for electrical works and floor sanding/polishing. The information available shows CC and SR commenced building repairs and restoration work on 6 September 2017. SR’s report noted:  before SR arrived, the builder already cut out and removed mould affected wall lining from the house  the builder had no containment or equipment in place to stabilize the work environment to prevent cross contamination within the property. Some attempts have been made to cover the contents with plastic drop sheets. However, SR found a large amount of dust and cross contamination of plaster dust on contents and surfaces throughout the ground floor and middle floor levels  the bedroom doors, where there are contents stored adjacent to areas and rooms where mould affected building materials have been removed, have been left open with no containment in place. Now that plaster has been removed from the exterior wall linings in bedroom 3, there is evidence of a long-term water ingress issue because of the leaking windows, which is evident by heavy mould and timber rot affecting timber stud work and bottom plates, still showing high moisture trapped within the timber framing, most notably directly underneath the exterior doorway of upstairs landing area. Within this area, there are signs of heavy visible mould growth. After this time, it is unclear what further works were competed. SR re-inspected the house on 21 December 2017. SR raised concerns about the visible mould growth throughout the house. SR says the mould growth could have been caused by:  the lack of containment during the removal of mould affected building material in September 2017  the elevated levels of humidity and moisture due to the house’s geographical proximate location to the coastline. There is increased exposure to coastal breezes and fluctuations in temperature  a possible second water entry into the house. SR noted a stairwell void that runs from level one to level three of the house, and on each level a ventilation door gives access to this internal wall stairwell void cavity where mould can be seen on the timber framing material. SR prepared a comprehensive mould remediation quotation. This included:  relocation of salvage contents items to an offsite location for cleaning  removal and disposal of non-salvageable contents  mould remediation to all exposed surfaces inside the house. Case No: 507423 Determination Page 4 of 15 SR’s mould remediation quotation totalled $84,107.87 (dated 17 January 2018). SR recommended for the appointment of an engineer to determine whether there was a second source of water entry. CC appointed engineer IC to inspect the house. IC inspected the house on 25 January 2018. IC says:  the house was water damaged from the water main leak event and other water sources  water damage to the timber framing in the corner of bedroom 5 was likely due to a long-term issue. IC says it was possible water was leaking through the flashing around highlight window, but this was not observed  water damage to the lower ground toilet/vanity’s highlight windows was likely due to runoff from the timber deck above and over the retaining wall  the whole house should be remediated in accordance with SR’s mould remediation scope of works. The applicant obtained his own builder quotation for the building repairs. In relation to the building and contents claim, the applicant wants the FSP to pay $227,490.50 for:  $104,132.60 as per his builder BG’s quotation  $84,107.87 as per the restorer SR’s mould remediation quotation  $25,000 for non-restorable contents  $12,749.99 for carpet  $1,500 for 3 heated towel rails. FSP offered to cash settle for $153,468.29 In an email to FOS dated 22 June 2018, the FSP offered the applicant $153,468.29 based on:  $48,432.00 as per engineer IC’s assessment of BG’s quotation  $67,286.30 as per restorer SR’s mould remediation quotation without the 20% management fee  $25,000 for non-restorable contents  $12,749.99 for carpet. Given the FSP accepts to pay for the contents and carpet, the Panel will not discuss these items further. The policy provides the FSP with a discretion as to the method of settlement of the claim, however, such discretion must be issued reasonably and consistent with the principles of utmost good faith. If an FSP is to seek to cash settle a claim based on quotations that do not cover all possibilities, then the FSP should make suitable allowance to allow the insured sufficient funds to complete the required purpose. The Panel accepts, given the time that has elapsed and the breakdown of the relationship between the applicant and the FSP, it is now appropriate to cash settle the dispute. The P anel, however, is not satisfied the FSP’s offer to settle the claim adequately covers the likely cost to repair the property. Case No: 507423 Determination Page 5 of 15 Flooring It is not in dispute the sanding and polishing of the middle floor’s timber floor is required. The FSP has agreed to pay for this cost. However, the applicant also wants the FSP to pay for:  the cost to sand and polish the top and lower floor’s timber floo rs. BG quoted this to cost $4,950 (excluding GST)  the cost to remove, store, refit glass balustrade to carry out floor sanding. BG quoted this to cost $800 (excluding GST). There is no information on file to suggest the top and lower floor’s timber floors or the stairway connecting these floors were damaged. Instead, it appears the applicant wants this work done to maintain a consistent appearance with the middle floor’s timber floor (which the FSP agrees was damaged and requires repairs). The policy excludes cover for the cost to replace undamaged parts of the building to create an uniform appearance. In the circumstances, the FSP is entitled to rely on the policy terms and decline to cover the cost to sand and polish the top and lower floor’s timber floo rs and the cost to remove/refit the glass balustrade. Exterior cleaning, painting and scaffold The applicant wants the FSP to pay for:  pressure clean the exterior of the house, including the concrete driveway and pathways. BG quoted this to cost $2,500 (excluding GST)  the painting of the entire exterior of the house. BG quoted this to cost $28,400 (excluding GST). The applicant says the exterior requires cleaning and re -painting as the exterior and paint have deteriorated because of the leak from the broken water main. The FSP only allowed $800 for the pressure clean of the driveway and rear concrete surfaces. The FSP’s engineer IC accepts there is green mould to the southern exterior walls. However, it says the mould location and type observed suggests it was not due to the water leak event. It says had it been from the water leak event, the mould would occur at a lower level and be of a similar species to the internal mould species observed. IC says it is more the mould due to lack of sun exposure and long term maintenance issues. Based on the information available, the Panel is not satisfied the applicant established that all exterior walls were damaged by the broken water main event. Whilst the Panel acknowledges the applicant’s position that the mou ld has been more pronounced since the water leak event, the Panel does not agree this supports his position that the leak caused all the exterior damage and deterioration. Case No: 507423 Determination Page 6 of 15 Interior cleaning and painting The FSP has made allowance for painting in the bedrooms (1, 4 & 5), laundry, middle foyer wall, bathroom and staircase. Its builder CC estimated this to cost $3,421 (excluding GST). The applicant wants the FSP to pay for:  a complete clean of the interior of the house of mould and protect all surfaces. BG quoted this to cost $5,000 (excluding GST)  a complete repaint of the entire interior of the house. BG estimated this to cost $30,500 (excluding GST). The FSP’s engineer IC agrees additional mould treatment to the house as necessary. However, it only allowed $2,000 for this mould treatment and clean. It says SR can complete this work at this cost. The information available shows there is likely mould throughout the property. SR’s inspection on 21 December 2017 confirms visible mould growth throughout the house. The FSP’s engineer IC suggests the mould growth was due to moisture ingress from the chamber below the laundry and from the lower ground retaining walls. Whilst IC has provided photographs showing a wet wall in the chamber, he has not provided any further explanation on how this wet wall could have caused the mould damage. Furthermore, SR confirmed the mould could have spread because of the lack of containment when the mould affected building material was removed from the house. On the balance of the information exchanged, the Panel is satisfied the FSP is liable for the further cost for cleaning, mould treatment and repainting for the house. Whilst the FSP made allowance to clean certain areas of the house, given the time and nature of the mould damage, it is now prudent to make further allowance for the cleaning and re-painting of the interior surfaces. Bedroom 5 carpentry The applicant wants the FSP to pay for the following carpentry work to bedroom 5:  replacement of the yellow tongue flooring  repair damaged studwork  replace damaged skirting. BG quoted this to cost $400 (excluding GST). The FSP says the damage to this bedroom was not due to the water leak event. It says, based on IC’s report, the damage is due to long term deterioration from ongoing water ingress. IC says there is a damaged exterior joint that coincides with where the wet rot is located. In support, IC provided photographs showing wet rot to timber stud walls inside bedroom 5 and a deteriorated joint on the exterior wall. The applicant accepts there is a possibility the sealant joint may have failed. Case No: 507423 Determination Page 7 of 15 On the balance of the information, the Panel is satisfied the bedroom 5 damage was not caused by the water main leak event, but likely due to a deteriorated exterior joint. In coming to this view, the Panel had regard to:  the damage to bedroom 5 was approximately 2 metres above the ground level  the damage coincides with the deteriorated exterior joint. Given the proximate cause of the bedroom damage is from a deteriorated exterior joint, the applicant has not established the damage is covered by the policy. The Panel is satisfied the FSP is entitled to decline this damage. In the circumstances, the FSP has made a goodwill payment of $300 towards this cost. Furniture removal cost The applicant wants the FSP to pay for the moving and shuffling of furniture and contents. BG quoted this to cost $4,000 (excluding GST). The FSP’s builder CC already included this cost in its quotation. In the absence of further information, the FSP is not required to pay for further furniture removal cost. Heated towel rails The applicant wants the FSP to pay for three new towel rails. The FSP accepts these were damaged by the water leak event. The FSP’s builder CC already included this cost in its quotation. In the absence of further information, the FSP is not required to pay for further towel rails replacement cost. Mould remediation claim management fee The FSP agreed to pay for SR’s mould remediation quotation, less the 20% claim management fee margin listed on the quotation. The FSP says the fee was charged by SR to facilitate the administration of the claim repairs on behalf of the FSP. The applicant says the FSP should include this fee in the cash settlement. The Panel accepts the applicant is entitled to the claim management fee. In normal claim circumstances, the management of the claim and repair process would fall to the FSP. Given the applicant will be provided a cash settlement, the applicant would be managing the repair. Therefore, it is fair in the circumstances for the applicant to also receive the cash settlement for the claim management fee. FSP not liable for other property related expenses The applicant says the FSP has unnecessarily dragged out the claim to minimise its payout, therefore he would like the following items be paid as compensation:  mortgage payment for 12 months ($55,368)  Foxtel management fee for 12 months ($1,824) Case No: 507423 Determination Page 8 of 15  council rates ($2,691.49)  electricity charges ($1,021.59). The FSP has accepted to pay for the electricity usage for the operation of the drying equipment. It, however, says it needs to validate this cost. The applicant, in response, has provided copy of the electricity bills. This information has been exchanged with the FSP, and it has not responded to it. In the absence of further information, the Panel is satisfied it is reasonable for the FSP to cover this cost, given the applicant has not lived in the property for 12 months, and the only electricity usage would have been for the equipment used by the FSP’s contractors. In relation to the other expenses claimed, the Panel is not satisfied the FSP is liable for these costs. Whilst the Panel acknowledges the applicant could not live in the house, it does not directly follow the FSP is liable for the mortgage payment, Foxtel fees and council fees for this period. Moreover, the applicant’s policy specifically excludes payment for consequential losses. Cash settlement amount should be increased to $225,000 Having regard to all of the above, the FSP is required to pay the applicant all following figures (include GST):  $31,321.13 as per CC’s building repair quotation  $330 for the glass balustrade to facilitate the mi ddle floor’s sanding  $39,050 for the interior cleaning and painting  $880 for the pressure clean of the driveway and rear concrete surfaces  $330 for bedroom 5’s carpentry  $84,107.87 as per the restorer SR’s mould remediation quotation  $25,000 for non-restorable contents  $12,749.99 for carpet  $1,021.59 for electricity charges. Given the claim should be cash settled, the Panel considers it appropriate for the FSP’s cash settlement to be increased to allow for the management costs of $20,000 and transference of risk plus an allowance of a further $10,000 as a contingency for any unforeseen costs incurred in the process of carrying out the repairs. On this basis, and taking into account all quotations exchanged, the Panel considers it fair in all the circumstances for the FSP to increase the cash settlement amount for the building and contents repair to $225,000. Interest is to be paid on $194,790.58 from the date of lodgement of the dispute with the Service until the date of payment. 2.2 Is the applicant entitled to non-financial compensation? Applicant entitled to $1,000 non-financial compensation Under FOS’s Terms of Reference, FOS can award up to $3,000 for non -financial loss if the applicant suffered an unusual degree or extent of:  physical inconvenience  time taken to resolve the situation  interference with the applicant’s expectation of enjoyment or peace of mind. Case No: 507423 Determination Page 9 of 15 Such an award can be provided if the FSP’s handling of the claim satisfies the above criteria. FOS takes a conservative approach in awarding this. Further, FOS expects applicants to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs. The Panel is satisfied the applicant co-operated with the FSP and its contractors to the best of his ability. The Panel also accepts the FSP did make some genuine efforts to address the applicant’s concerns. However, the applicant’s extensive submission to this Service highlights some of the failings of the FSP and its authorised contractors in dealing with his claim. In particular, the Panel notes:  the delay in installing any equipment to mitigate further mould cross- contamination  the failure to install containment before building repairs started, allowing mould to spread throughout the house. The Panel accepts these issues caused further delay and fall short of the expectation of a reasonable insurer in the circumstance. In the circumstances, the Panel is satisfied that the applicant is entitled to an award of compensation for non-financial loss of $1,000. Case No: 507423 Determination Page 10 of 15 3 Supporting information 3.1 FOS approach There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise in this dispute. This decision has been made by a Panel consisting of an ombudsman, an insurance industry representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financial Ombudsman Service Board. This determination follows consideration of all of the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. The parties have raised numerous issues in their submissions to FOS. For the purpose of this determination, commentary is restricted to only those issues considered relevant to the outcome. 3.2 Key records Record Key points FSP’s building consultant (CC) Report 11 - 04 - 2017  CAUSE OF DAMAGE  A full and detailed inspection of the damage was conducted and we have confirmed that the listed items have been damaged as a result of burst and / or leaking pipes.  The resultant damage has been caused by burst water main on the street has caused the water to travel from the street and runoff along the left and right sides of the property. The burst water main on street was reported to council on 12/2/2017 and council repaired the pipe work on 6/3/2017.  The external walls and pavement on the property is showing dampness however we deem this is not related to the event and it is related to insured’s house being close to the marine environment and exposed to wind driven moisture from sea.  The water main on the council’s land has been leaking for more than 24 days. This has caused subfloor area on the property to be wet and dampness to rise cause mould growth on downstairs level bathroom 1, bedroom 4, bedroom 6, open plan living area and middle level laundry, bedroom 1 and foyer.  Following our site inspection we engaged a plu mber to attend and conduct leak detection testing. Details are as follows:  - Conducted pressure test of shower plumbing in bathroom 1 on downstairs and bathroom 2 on middle level – PASSED confirming no leaking pipework related failure exists.  - Conducted flood test of shower base in bathroom 1 on downstairs and bathroom 2 on middle level – PASSED confirming no waterproofing related failure exists. Case No: 507423 Determination Page 11 of 15  The findings of our plumbing investigation has confirmed that the damages that exist are due to high amount of moisture in the ground and air caused from the burst council main. FSP’s restorer (SR) Report 22 - 06 - 2017  Technicians have been informed that the source of the water ingress was a leaking water main underground at the front property saturating sub - soils;  The property is on the side of the hill with a ground floor level and 2 lower levels;  The water and mould damage that is on the lower 2 level, maybe but not limited to, the migrating water through the sub - soils and ground water run off possibly down the si de of property;  Within the bedroom 3, where approximately 1m² of carpet has been removed and cont ainment implemented over visible mould growth predominately within exterior corner of room, may be but not limited to damaged as a result of a leaking hot wate r servic e located on other side of exterior wall that is still currently leaking water;  In the bathroom on the lower 2 level there is visible signs of mould growth wit hin the top left hand corner, the area affecting is approximately 1 ft.². There are curre ntly no elevated levels of moisture within this area ad the damage to this area could possibly be as a result of the migrating ground water;  Within bedroom 2, lower level 2 opposite side of the property, there is visible signs of mould growth within the ex terior corner, however this may be an on - going issue with a leaking window, as there is evidenc e of heavy rust on the metal plaster external, bottom window reveal;  There is signs of surface mould growth throughout the lower 2 level, is predominantly on the plaster wall linings, skirting boards, architraves, door jambs and window reveals and some what the same on the lower 1 level, however a lot less. This mould growth could be pre - existing as a result of the properties close proximity to the ocean FSP’s restorer (SR) Report 17 - 01 - 2018  SR attended the loss situation in the presence of the insured, Mould Specialist AG and Hy gienist AO on the 21.12.2017.  Visible mould growth now appears to be affecting a large majority of the building contents and internal b uilding surfaces throughout most notably and more than previously inspected at time of our first scope and quote.  This maybe but not limited to lack of containment during the removal of mould affected building mat erials and the time that has now elapsed a pproximately 3 months without anyone being in the property.  The property also expos ed to elevat ed levels humidity and moisture because of its location geographically to the coastline and exposure to coastal breezes and fluctuations in temperature of which may be but not limited to the Case No: 507423 Determination Page 12 of 15 amplification of the somewhat pre - existing and current mould activity within the property.  An engineer may be required to det ermine secondary damage around window frames and possible source entry  Within the property there i s a stairwell void that runs from each level of the property from the level one how to level three.  On each level a ventilation door that gives access to this internal wall stairwell void cavity where visible mould growth can be observed on timber framing materials.  Within the current scope of works provided by the appointed Hygienist there is comment made within it that there are areas that appear to be unaffected by the current mould growth within the property however we believe mould growth is affectin g all building surfaces and contents throughout the property as per our photographs and would consider that condition affects the entire property 2 and condition 3 mould growth  We would consider that the property is completely affected throughout therefor e no containment will be implemented or required.  All sources of water ingress will need to be addressed and rectified prior the works commencing. FSP’s engineer (IC) Report 9 - 02 - 2018  We have carried out an inspection at the above address on Thurs day 25th January 2018 at approximately 11:00 hrs. The Insured, SR, and FRA were present at the time of the inspection, and during that inspection photographic evidence and site measurements were recorded. …  CONCLUSIONS  As a result of our inspection and subsequ ent inquiries, we provide the following conclusions:  9.1. EVENT RELATED  All reported damage has a possibility of being event relat ed. It is likely that there are other sources of moisture entry that have contributed and will be ongoing. These are noted und er 9.3 Building Defects.  9.3. BUILDING DEFECTS  Flashing to the highlight windows may be defective.  Poorly designed or operating air conditioning system resulting in excessive internal humidity relative to the outside air.  10. RECOMMENDATIONS (SUBJECT TO TE RMS AND CONDITIONS OF POLICY)  10.1. EVENT RELATED  The whole house should be remediated in accordance with the Scope of Work prepared by SR. This generally involves Condition 2 cleaning of salvageable elements and replacement of thos e not salvageable.  10.2. BUILDING DEFECTS  The highlight windows flashing should be tested with a water Case No: 507423 Determination Page 13 of 15 test while the plasterboard has been locally removed from around the framing. Monitor the moisture condition of the wall alongside the stairway to see that the waterproofing is not failing during normal design events.  Monitor the wat er level on the Lower Ground level deck during normal design storm events to see that it does not rise above the internal building floor level.  Remedial works such as cutting openings in the edge reta ining wall kerb may be required if this does occur.  Specialists are to check the efficiency of the air conditioning system design and operation. FSP’s engineer (IC) Report 18 - 06 - 2018  We can confirm we attended a joint site inspection on the 6 June 2018 for the purpose of assisting CC wit h the disput e resolution process relating to the scope of repair of the moisture damaged dwelling at the aforementioned site following a burst storm water main.  We provide the following summary of our site discussions wit h specific reference to the scope items in dispute outlined in the BG quotation, dat ed 19 November 2017:  i. FLOOR SANDING  a) Item identified as sand/polish bottom (lower ground) and top (first floor) timber floors of circa 82m 2 , for a cost of $4,950, exclu ding GST. We understand this item has been added to the BG quotation due to concern by the Insured of potential matching issues following the sand/polish of the middle level only, in comparison to the other levels.  b) We note that sanding / polishing of th e middle (ground floor) floorboards has been accepted in the CC scope of works despit e no apparent damage observed during our site inspection. The Insured advised of swollen / scratched floorboards however, no damage was noted during our site inspection – refer to photos 1 - 6. It is likely the floorboards have ret urned to their original moisture condition following drying works performed by SR.  c) We understand the Insurance policy does not have a matching provision, i.e. whereby repairs are performed damage d areas up to the nearest architectural break, with no coverage extend beyond to ens ure a consistent finish throughout.  d) As such, we have excluded the costs of floor sanding to the bottom / top floorboards from our cost estimate in part 4 of our report.  ii. EXTERIOR PAINTING & SCAFFOLD  a) Allowance for the painting of the exterior of the house for a total cost of $23,400 (exc gst) and associated scaffolding of $5,000 (exc gst) to facilitate access to perform the works.  b) The Insured directed us to the re ar sout hern elevation of the dwelling showing us the green mould to the localised exterior, refer to photos 7 – 9. The green mould, which appeared to be of a different species to the internal mould, in Case No: 507423 Determination Page 14 of 15  particular to the portion of the elevation shielded by to the west by the neighbouring dwelling and shielded to the east by an archit ectural return of the subject dwelling. No other elevation of the dwelling was experiencing similar mould patterns.  c) The pattern, type and location of the mould is not consist ent with the claimed leaking water main whereby the worst mould would typically occur at lower, rather than at high levels.  d) We consider the mould to be the result of the deteriorat ed painting system, long term exposure and lack of sun exposure due to sh ading from neighbouring structures.  e) We have excluded the exterior painting and scaffold as they are not considered to be result damage, but rather long term maintenance items.  iii. INTERIOR PAINTING  a) Allowance for painting of the interior of the house throughout the entire dwelling for $27,079 exc GST, this is in addition to the $3,421 exc gst allowance for the localised painting of walls outlined in the CC scope.  b) During our inspection faint mould spores were not ed to the stairway area of the lower ground Rumpus and ground floor foyer area – refer to photo 10. We note that the re - occurrence of mould is likely the result of ongoing subfloor moisture issues, rather than the subject event. Refer to photos 11 – 12 which show the moisture ingress to the c hamber below the laundry and around the lower ground retaining walls.  c) Although there has been an allowance to paint these localised walls in the CC scope of works, given the risk to other surfaces on the same levels we consider there to be merit in perf orming treatment / painting of the entire lower ground and ground floor areas internally.  d) Accordingly, we have made an allowance for the painting of the int ernal linings of the lower ground and ground floor levels only in our quantum assessment in part 4 of this report, less the circa $3,421 exc gst allowance included in the CC scope.  iv. PRESSURE CLEANING  a) Allowance of $2,500 exc gst for the pressure cleaning of the driveway and rear conc rete areas.  b) Although the observed mould and silt appeared to be consistent with long – term issues, it is foreseeable that overland flow / seepage from a damaged water main would result in similar damage.  c) We note however, that the cost claimed to performed the works are considered to be excessive and have been ad justed in part 4 of our quantum assessment.  v. INTERNAL CLEANING  a) Allowance of $5000 exc gst for the cleaning of mould affected wall finishes to the lower ground and ground floor affected areas. We consider the additional mould treatment to Case No: 507423 Determination Page 15 of 15 be necessary, and have included the costs into our quantum assessment, albeit with an adjustment following discussions with SR on the costs to perform the works.  vi. REMOVAL/ REINSTATEMENT OF FURNITURE THOUGHOUT DWELLING  a) Allowance of $4000 excl GST for the shuffle of all furniture to facilitate sanding of the flooring to the first and lower ground floors.  b) We have omitted these costs from our quantum assessment for the reasoning outlined in part 3 (i) of this report.  c) We note that there has already been an allowan ce for the shuffle of furniture in the CC Scope.  vii. GLASS BALUSTRADE  a) Allowance of $800 excl GST for the remove/ store and refit glass balustrade to facilitate sanding to all stair treads/ levels.  b) We consider this claim to have partial merit, given that the CC scope has accepted the sanding / sealing of the middle level only.  Accordingly, the cost has been included in our quantum assessment, albeit with an adjustment to exclude the balustrades of the lower ground and first floors.  viii. BEDROOM 5 (LO WER GROUND) CARPENTRY  a) Allowance of $400 excl GST for the repair of long - term water damage to timber studs, yellow tounge flooring and skirtings.  b) We note that this damage has arisen from long - term deterioration of the external coating / joints, and on going water ingress from storm events, refer to phot os 13 - 15. Wet rot was identified to the timber stud from approx. 2.0 m above finish ground level, coinciding with the damaged exterior joint.  c) We have included this repair cost as resultant damage, alb eit with damage arising from a separate event, i.e. storm. Instructing claims handlers would no doubt consider the damage as a separate claim, with an additional associated deductible.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.