Text of the determination
Determination
Case No: 507393 Determination Page 1 of 4
Case number: 507393 1 7 September 2018
1 Overview
1.1 Dispute
The applicant holds a farm insurance policy with the financial services provider (FSP)
covering a hobby farm. The applicant suffered a loss in December 2014 when a
storm caused damage to the home building and a storage shed.
The FSP accepted there had been damage to the roof, ceilings in the bedrooms,
windows and some contents items due to storm. The FSP also accepted the storm
damaged fencing and a shed.
The applicant disagrees with the settlement amount and did not cash the cheque.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Did the FSP correctly settle the claim?
The FSP correctly settled the claim, although it is required to reassess the settlement
amount for the spa bath, as it has offered to do and make a further payment as
reasonable.
Is the applicant entitled to compensation for non-financial loss?
The applicant has not established an entitlement to compensation.
1.3 Determination
This determination is in favour of the FSP. I agree with the case analyst ’s reasons for
the recommendation and the recommended outcome. If the applicant has not yet
banked the settlement cheque for $26,064.60, and it is now out of date, the FSP
should promptly reissue that payment. It is also required to reassess the settlement
amount for the spa bath and, if assessed as reasonably appropriate, add the
difference between the later quote and previously offered amount.
Case No: 507393 Determination Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case analyst ’s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Did the FSP correctly settle the claim?
Applicant established a valid claim
The applicant established a valid or prima facie claim for damage resulting from
storms in December 2014. The policy covers loss or damage due to a storm event.
FSP assessed the damage
The FSP’s loss adjuster , C, (in the report dated 9 December 2014) accepted the
applicant had suffered a loss due to storm. C said there was minor damage to the
h ome’s roof, a septic pipe, guttering on an outhouse building, ceiling in a bedroom
and television antenna. C said there was also damage to the outdoor spa and solar
lights. C asked a builder to carry out a ‘make - safe’ at the property.
C also noted the storage shed had lost its roof and this would likely mean the
replacement cost would exceed the sum insured ($10,000).
C asked a builder (RBC) to inspect the property after the applicant said she had
discovered additional damage to the property, which she believed was storm-related.
RBC made numerous comments (report dated 6 February 2015), including that the
existing stumps supporting the house were indicative of an aging sub-floor structure,
and that the on-site drainage system was inadequate to disperse stormwater during
heavy rainfall. RBC also referred to numerous cracks in the conite exterior.
RBC considered the lack of maintenance and termites had exposed the external
walls and internal linings to the elements. RBC noted the roof and stormwater system
needed maintenance, with the roof showing signs of rust at the front and rear.
FSP accepted part of the damage was storm-related
The FSP accepted part of the damage was storm-related, however it considered the
balance was maintenance-related. The FSP cash settled the claim, paying
$26,064.60 to the applicant, although she has not banked the cheque because she
believes the amount should be greater. The case analyst’s recommendation fully
Case No: 507393 Determination Page 3 of 4
outlines (in section 2.1) the items this amount covers and the basis of settlement.
The FSP also paid the sum insured ($10,000) for the storage shed.
Applicant disputes settlement amount
The applicant has said she is still disputi ng the payment relating to: storage shed;
spa bath (hot tub); house’s roof; and asbestos (not being removed from property).
The FSP has paid the ‘ sum insured ’ for the storage shed and so, although the repair
costs exceed this amount, the FSP is not required to increase it. The applicant bears
the onus of ensuring she has adequate cover and, in this instance, it appears she
had underinsured the shed.
The FSP also paid the amount quoted by the applicant’s builder (MH) with respect to
storm- related damage to the house’s roof.
The FSP settled the damage to the spa bath based on an earlier quote the applicant
provided. She subsequently provided an updated quote, which the recommendation
said the FSP should consider and respond to. The FSP is still required to consider
this updated quote, and pay the balance of the updated amount if that amount is
reasonable in the circumstances.
FSP correctly settled the claim
T he applicant has failed to provide any proof (such as a builder’s report or similar)
that challenges the FSP’s position in relation to the roof. This also applies to the
issue of clearing loose asbestos from the property. The applicant has provided no
proof the FSP’s contractor failed to remove all loose asbestos when attending the
property for the ‘make - safe’ process.
So I am satisfied, on the available information, that the FSP correctly settled the
applicant’s claim for storm-related damage (subject only to the review of the updated
spa quote).
Further submissions do not change outcome
The applicant rejected the recomm endation that was in the FSP’s favour and
provided further submissions. These submissions comprised various photographs
that are said to show the presence of asbestos on the ground at certain locations on
the property. Other photographs show property damage resulting from the storm on 3
December 2014.
The applicant also provided a letter she sent to the FSP (dated 25 February 2015) to
illustrate her attempt at resolving the various issues. She has also provided a brief
report (16 August 2018) from a plumber/roofer (O), who said:
‘ Material appearing to be asbestos was located on the property around the structure
referred to as the ‘picker’s hut’ . ’
O’s comment is not helpful, since it conveys uncertainty as to whether it is asbestos .
He also provided a quote (dated 17 August 2018) of $30,305 for repairing this hut.
The FSP accepted the hut was damaged during the storm and it paid the full sum
Case No: 507393 Determination Page 4 of 4
insured of $10,000. The FSP is not required to pay any additional amount with
respect to the damaged hut.
As well, even if it is accepted there is asbestos lying about the property, the applicant
has provided no proof the FSP’s contractor had failed to clear the property of loose
asbestos during the ‘make - safe’ process , nearly four years previously. The applicant
is obliged to mitigate her loss which means she needs to ensure she clears any
subsequent debris from the site.
The applicant’s further submissions do not warrant a change in the outcome.
2.3 Is the applicant entitled to compensation for non-financial loss?
Applicant has not established an entitlement to compensation
The applicant expressed dissatisfaction about the level of service from the FSP and
its contractors. She also said the timelines were unacceptable. The recommendation
fully outlines FOS’s approach to awarding compensation for non-financial loss.
The applicant’s situation was not straight -forward. Her former partner (IG) was
named on the property title and was a co -insured when the damage occurred. The
applicant and IG liaised through respective solicitors to resolve differences on how
the claim should be settled.
The FSP was obliged to involve IG in the process because he was on the title and a
co-insured. The FSP also needed to assess which damage was storm-related and
which had occurred over time. The applicant had failed to provide information the
FSP requested to assist in processing the claim.
The information shows the FSP processed the claim within a reasonable timeframe,
given the factors which impacted on it. I appreciate this cannot have been easy for
the applicant, having regard to her circumstances and the break-down in her
relationship with the co-insured. However, I do not consider the FSP can reasonably
be held responsible for any additional upset or delay this might have caused. That
means I am not satisfied the applicant is entitled to compensation for non-financial
loss.
Recommendation
Case No: 507393 Recommendation Page 1 of 9
Case number: 507393 19 July 2018
3 Overview
3.1 Dispute
On 4 December 2014, the applicant lodged a claim with the financial services
provider (FSP) after a storm damaged her property.
The FSP assessed the claim and accepted the storm damaged the house, some
contents, a shed and fence. It cash settled the applicant for these items in line with
quotes provided by the applicant. However, the FSP says the cause of the majority of
claimed damage was factors the policy specifically excludes.
The applicant disagrees with the FSP ’s decision and seeks her claim be reassessed.
She also raised services issues about delays and the management of the claim.
3.2 Issues and key findings
Did the FSP correctly settle the claim?
The information provided by the parties shows the FSP correctly settled the
applicant ’s roof damage claim and correctly settled the shed as a total loss.
The FSP is to reassess the settlement sum the applicant received for the damaged
spa bath as set out in this recommendation.
Is the applicant entitled to non-financial loss compensation?
I am satisfied the FSP handled the claim in a reasonable manner and without any
undue delay.
The applicant has not established an entitlement to compensation for non-financial
loss.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is not required to make any further payment to the applicant for the roof or
shed. Within 14 days of both parties’ acceptance of this recommendation, the FSP is
to reassess the spa bath in line with the quote recently provided by the applicant and
inform her of its decision.
If the applicant provides the FSP with further information with what she says is
remaining asbestos at the property, the FSP is to reassess this and inform the
applicant of its decision.
Case No: 507393 Recommendation Page 2 of 9
4 Reasons for recommendation
4.1 Did the FSP correctly settle the claim?
Applicant established a valid storm claim
The applicant is required to show, on the balance of probabilities, she suffered a loss
caused by a risk insured against the policy. This is known as a valid or prima facie
claim.
If the applicant establishes a valid claim, the onus shifts to the FSP to show, on the
balance of probabilities, the loss falls within a policy exclusion or it is otherwise able
to deny or limit the extent of its liability.
The applicant’s policy provides cover for loss o r damage caused by storm. As there
is no dispute the first storm occurred on 3 December 2014 (the first storm) and the
second storm occurred on 8 December 2014 (the second storm), I am satisfied the
applicant established a valid claim for storm under the policy.
The onus now shifts to the FSP to establish it is entitled to limit or decline all or part
of the claim in line with the policy terms.
FSP cash settled applicant $26,064.60 for accepted parts of claim
The FSP assessed the claim, accepted and settled some parts of it as being storm
damaged. On 10 September 2015, it cash settled the applicant $26,064.60
($26,464.60 net $400 excess) for the accepted storm damage, as detailed below:
Item Payable Basi s of settlement
Roof repairs $3,465 Applicant’s quot e from MH
Ceiling repairs - bedrooms 1, 2 and passage $7,463.50 Applicant’s quot e from MH
Louvre window replacement $35 unknown
Septic tank pipe replacement $495 Applicant’s quot e from MH
Pet cage $350 unknown
(Spa bath) Hot tub repairs $1,423.90 Applicant’s quot e from CPS
Christmas lights $100 unknown
Fence $3,132.20 Applicant’s quot e from MH
Brick and iron storage shed $10,000 Claim limited to policy sum insured
Applicant says the FSP has not settled her for all storm related damage
The applicant initially disputed the settlement amount she received for the damaged
fence ($3,132.20). She has since confirmed she accepts this amount is correct. As
Case No: 507393 Recommendation Page 3 of 9
this is the case, it is not necessary to consider the damaged fence settlement in this
recommendation.
During the dispute, the applicant confirmed the items she is currently disputing are
the settlement amounts she received for the house roof, shed and spa bath. Further,
the applicant also raised a new issue, being asbestos she says was left at the
property during the clean-up.
This recommendation will only consider the items currently in dispute.
Applicant says FSP’s scope of works and cash settlement sum is insufficient
The applicant says she has not banked the settlement cheque she received from the
FSP in September 2015, as she disputes the accepted scope of works and amount
she received.
The FSP says during the claim process it requested the applicant clarify her
concerns or provide any supporting evidence the further damage she claimed was
storm related, but did not receive any specific information from her. It also says the
applicant did not contact it after it issued the settlement.
FSP correctly settled the applicant’s roof damage claim
The applicant provided the FSP with two quotes in support of the home building
damage, being from a carpenter (RF) and a builder (MH). RF’s quote was $42,187
for the house damage and $39,320 for the damaged shed. MH’s quote was
$51,251.20 for house, shed and fence damage.
The FSP says:
it disregarded RF’s qu ote as RF is not a registered builder
it mainly settled the home building part of the claim based on the quote the
applicant obtained from MH.
The FSP did not obtain a quote from its expert builder (JL), on the house damage.
The applicant says the settlement amount she received for the roof ($3,465) is
insufficient. The FSP settled the roof damage in accordance with MH’s quote.
The FSP says the remaining claimed damage is not storm related, but is
maintenance related and pre-existed the storm. It provided a report from its expert
building consultant (RBC) in support of its position. RBC says the damage not
accepted has been caused by many factors including general property maintenance,
soil movement, white ant damage, poor drainage and general deterioration, all of
which the policy specifically excludes.
RBC says both the roof and the stormwater system needed maintenance, with the
roof clearly showing signs of rust at the front and rear of the dwelling.
The applicant did not provide any evidence to support her claim the settlement
amount she received for the roof was inadequate. Nor did she provide any
information challenging RBC’s findings.
Case No: 507393 Recommendation Page 4 of 9
Although the applicant says the second storm caused further damage to the house
roof, any further damage from the second storm was included in all assessment
reports and quotes.
Given the applicant was settled for all roof damage included in MH’s quote, it is
unclear why the applicant says the amount she received is insufficient.
I carefully considered both parties’ infor mation submitted about the roof. As the
applicant’s policy specifically excludes loss or damage caused by or arising from lack
of maintenance, wear and tear or neglect, and the FSP settled the applicant for the
roof damage in accordance with her quote, I consider the FSP correctly settled the
applicant’s roof claim.
FSP correctly settled the shed as a total loss
The FSP assessed and accepted the shed as being storm damaged. The parties
agree the shed was extensively damaged in the storm. The applicant obtai ned a
quote from ML for $28,587.90 and the FSP obtained a quote from its expert builder
JL for $20,155.85.
The FSP settled the claim for the damaged shed as a total loss of $10,000, being its
sum insured under the policy. It says the shed was under insured and it has met its
obligation under the policy.
The applicant disagrees with the FSP’s position and seeks a further payment of
$40,000 for the damaged shed. The applicant understands the FSP has met the
policy limit of $10,000. However, she feels the FSP owes her a duty of care, as the
clean- up of her property was not done properly and the FSP’s tradesperson brought
in to do the make safe of the property (KG) knew her ex-partner (IG) with whom she
was in the midst of an acrimonious separation.
In relation to the lack of clean up, the applicant says the FSP failed to clean up all
asbestos from her property, which is unsafe as she has young children and lots of
animals. The applicant’s concerns about the asbestos are addressed in section 2.2 of
this recommendation.
As the applicant was settled for the damaged shed as a total loss, I am satisfied the
FSP has met its obligation under the policy. The applicant is not entitled to any
further amount
FSP to reassess the applicant’s spa bath
The FSP accepted the applicant’s claim for damaged contents, being spa bath
repairs, Christmas lights allowance and a pet cage.
The applicant disputes the settlement amount she received for the spa bath
($1,423.90), even though it was based on a quote she provided to the FSP from her
expert (CPS). The settlement amount excluded pre -existing cracks to the spa bath
which the applicant made RBC aware of.
In support of her position, the applicant submitted a quote dated 4 May 2018 she
received from her expert (BF) for $1,980 for repairs to the spa bath.
Case No: 507393 Recommendation Page 5 of 9
The FSP agrees to reassess this item when it receives the applicant’s quote. As this
Service has provided the quote to the FSP, the FSP should (within 14 days of both
parties’ acceptance of this recommendation) advise the applicant of its decision on
the reassessment.
FSP will reassess asbestos clean-up upon receipt of further information
The applicant told this Service she would obtain and provide a report about the
asbestos, but she was unable to do so. Although the applicant says the clean-up and
make safe were not done properly, which caused further loss, she did not provide
any expert information in support of this.
If the applicant provides the FSP with further information with what she says is
remaining asbestos at the property, the FSP is to reassess this and inform the
applicant of its decision.
4.2 Is the applicant entitled to non-financial loss compensation?
FOS can award non-financial loss and consequential loss compensation
FOS can award compensation for non-financial loss (capped at $3,000 per claim of
compensation) where there has been:
an unusual degree or extent of physical inconvenience
time taken to resolve the situation
interference with an applicant’s expectation of enjoyment or peace of mind.
However, FOS takes a conservative approach to compensation for non-financial loss.
FOS expects an applicant to be moderately robust and bear the normal degree of
inconvenience experienced when a problem occurs and take reasonable steps to
reduce inconvenience.
Applicant seeks compensation for delays and how FSP managed claim
The applicant raises several issues about the way in which her claim was managed
and the time taken for the FSP to settle the claim.
Specifically, the applicant says:
the time taken to settle the claim is unreasonable, being nine months between
lodging the claim and receiving the cash settlement
the FSP’s delays in assessing the claim caused further damage to the buildings,
thereby increasing her loss
the FSP or its assessors did not assist her despite her many requests for help
to take the necessary arrangement and precautions, particularly KG (who did
the initial urgent make safe at the property) failed to ensure all the asbestos was
cleared, with some remaining at the property after the clean-up
she told the FSP’s assessor (CC) of her concerns about the remaining asbestos
on site, but it ‘seemed to lay on deaf ears’
the FSP failed in its duty of care to assist her, her children and pets under
hardship, as she was living well below poverty standards
Case No: 507393 Recommendation Page 6 of 9
there was a conflict of interest for local tradesmen who knew IG to provide
quotes on the damage
the FSP brought irrelevant people into the dispute, even when apprehended
violence orders and undertakings were in force
her mental state became disheveled during the claim process. Due to the stress
she experienced, she was unable to pursue further action at the time.
In response, the FSP says:
given the arrangements between the applicant and the co-insured (IG) at the
time, it had a legal obligation to obtain written confirmation from IG before
issuing the cash settlement to the applicant
delays in settlement of the claim stemmed from the issues between the
applicant and IG, with both parties disagreeing on the settlement method and
engaging lawyers to negotiate a settlement agreement between the parties. The FSP
issued the settlement to the applicant after it received notification abo ut this from IG’s
lawyer
it was ready to issue final settlement shortly after it received a complaint from
the applicant about delay on 24 February 2015
any further damage from the second storm was included in all assessment
reports and quotes
KG declined to provide a quote because of a conflict of interest when he
became aware of IG’s involvement in the claim as he was aware of IG from a
past association
the applicant did not raise concerns about the asbestos at the time, and the
FSP assessor says he would have taken immediate action if she had
its records show the asbestos was all cleaned up during the make safe
it appointed external investigators (AA) to investigate the claim after the
applicant and IG provided it with conflicting information during the claim
the applicant did not contact it since it issued settlement in September 2015.
Applicant has not established an entitlement to compensation
I carefully considered the information provided by the parties about the service issues
raised by the applicant.
On balance, I am satisfied the FSP handled the claim in a reasonable manner and
without any undue delay. In relation to the applicant’s concerns about the way her
claim was handled, I am not satisfied the make safe undertaken on behalf of the FSP
was inadequate.
A chronology of events is provided in section 3 of this recommendation. This shows
the FSP dealt with the claim in a timely manner and without any unreasonable delay.
The FSP met timeframes as required by the General Insurance Code of Practice,
which requires it to provide regular updates to the applicant.
The FSP was able to issue final settlement in March 2015, but did not do so until
September 2015 as it required notification from the co- insureds’ lawyers about the
distribution of the settlement proceeds.
Case No: 507393 Recommendation Page 7 of 9
The applicant is critical of the FSP involving IG in the claim, given her extremely
difficult circumstances at the time. Whilst I acknowledge and empathise with the
applicant’s difficult circumstances, I consider it reasonable for the FSP to do so,
given IG was a co-insured and the legal title to the property was held in his sole
name at the date of loss (it later being transferred to the applicant in mid-2015).
The FSP is entitled to further investigate the circumstances of a claim. I accept this
can sometimes take some time, especially when it chooses to engage various
experts to inspect and report on the damage cause.
Having considered all the information, I am satisfied the FSP handled the claim
reasonably overall. As such, the applicant has established an entitlement to non-
financial compensation.
Case No: 507393 Recommendation Page 8 of 9
5 Supporting information
5.1 Policy terms
We will not pay for loss or damage:
…….
g) caused by water seeping, percolating or otherwise
penetrating into the buildings as a result of:
…
(iv) Your failure to adequately maintain the buildings;
When we will not pay a claim under part A – buildings and/or contents’
This Policy does not cover loss, liability, injury or damage:
…..
6. to external paint work or other exterior coatings
of Your Building(s) caused by Rainwater or gradual
deterioration;
…….
9. caused by or arising from lack of maintenance, wear
and tear or neglect;
…
or
d) Your failure to adequately maintain the Buildings;
…
5.2 Expert reports
Record Key findings
FSP’s expert building
consultant (RBC )
Report
06 - 02 - 2015
The house is approximately 50 - 60 years and is badly in need of
general maintenance to external and general elements of the
building, particularly the windows, laundry and rear verandah.
T he damage not covered on the policy has been caused by a
number of factors including general property maintenance, soil
movement, wh ite ant damage, poor drainage and general
deterioration all of which are excluded under the policy.
The roof covering and stormwater system were both noted to be in
need of maintenance with the roof clearly showing signs of rust at
the front and rear of th e dwelling.
There is a certain responsibility upon the owner to maintain the
overall condition of the dwelling. Therefore… this could be
considered more of a maintenance related issue, rather than a
Case No: 507393 Recommendation Page 9 of 9
direct result of the December 2014 storm.
5.3 Chronology of events
Date Action
03 - 12 - 2014 First storm.
04 - 12 - 2014 Applicant lodges claim.
08 - 12 - 2014 Second storm.
09 - 12 - 2014 FSP assessor (CC first report ).
27 - 01 - 2015 FSP assessor (CC second report).
06 - 02 - 2015 FSP building consultant attended (RBC).
18 - 02 - 2015 FSP assessor (CC third report).
20 - 03 - 2015 FSP assessor (CC) provides updat e on claim to FSP on investigation of
co - insured’s.
24 - 03 - 2015 FSP assessor (CC fourth report).
07 - 04 - 2015 FSP investigator report (AA).
06 - 05 - 2015 FSP assessor (CC f ifth report ).
27 - 05 - 2015 FSP assessor (CC) provides updat e on claim to FSP. Awaiting update
from co - insured’s about settlement figures.
29 - 06 - 2015 FSP assessor (CC sixth report ).
09 - 09 - 2015 FSP assessor (CC seventh report).
02 - 06 - 2015 FSP assessor (CC) provides updat e on claim to FSP. Awaiting details
from applicant’s lawyer about settlement.
27 - 07 - 2015 FSP assessor (CC) provides updat e on claim to FSP. Awaiting agreement
between co - insureds regarding settlement proceeds from claim.
24 - 08 - 2015 FSP ass essor (CC) provides updat e on claim to FSP. Seeking updat e
from co - insured’s lawyers on progress of settlement negotiations for claim.
01 - 09 - 2015 Letter from co - insured (IG) lawyer (MAL) to CC, attaching copy of its letter
to app lawyer (AL) dated 12 - 06 - 2015 notifying applicant to receive the
total settlement of insurance claim from FSP
10 - 09 - 2015 FSP cash settles applicant $26,064.60 ($26,464.60 net $400 excess) for
the accepted storm damage.
23 - 01 - 2018 FSP IDR final decision letter.