Text of the determination
Determination
Case No: 505704 Determination Page 1 of 7
Case number: 505704 5 September 2018
1 Overview
1.1 Dispute
The applicant held an Industrial Special Risks Insurance Policy with the financial
services provider (FSP).
On or about 12 January 2017 a claim was lodged for building damage due to a
broken sewer pipe. The applicant says the building began to drop and, as such,
requires underpinning.
The FSP declined the claim as it says the damage was as result of an event which
had occurred over a prolonged period of time. The FSP further says the cracking to
the building was pre-existing and occurred prior to policy inception.
1.2 Issues and key findings
Can the FSP deny the claim?
The FSP can deny the claim because:
the FSP only began insuring the property since 25 November 2014
the evidence does not show the sewer pipe was broken after this
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to deny the claim and is not required to take any further action.
Case No: 505704 Determination Page 2 of 7
2 Reasons for determination
2.1 Can the FSP deny the claim?
Applicant has an initial onus to establish claim
In order to claim under a policy, the initial onus is on the insured to show the damage
was caused by an event covered under the policy. This is known as a prima facie
claim.
If the insured can establish a prima facie claim, the onus then shifts to the FSP to
show the damage claimed is excluded under the policy, or that it is otherwise entitled
to deny the claim.
The applicant‟s policy insures them in the following manner:
WHEREAS the Insured named in the Schedule has paid or agreed to pay to the Insurer(s)
specified below the Premium shown on the Schedule, now the Insurer(s) agree(s), subject
to the Terms, Conditions, Exclusions, Memoranda, Warranties, limitations and other
provisions contained herein or endorsed hereon, to indemnify the Insured as specifi ed
herein against loss arising from any insured events which occur during the Period of
Insurance stated in the Schedule or any renewal thereof. [Panel‟s emphasis]
The parties do not dispute that the FSP only began insuring the property on 25
November 2014.
Therefore, to establish a prima facie claim, the evidence must show the damage was
caused by an insured event (the broken pipe) that occurred after the FSP began
insuring the property from 25 November 2014.
Expert opinions differ on when and how damage occurred
Both parties have provided opinions from engineers. However, even if the panel
prefers the applicant‟s engineer (RK) about the cause of damage, this does not assist
the applicant for the following reasons.
The applicant engaged engineer JK to inspect the building and provide a report. The
inspection was done on 18 March 2013. In JK‟s report, he identified substantial and
severe cracking to the western wall as well as subsidence.
The broken sewer pipe was along this wall and it is the cracking and movement on
this wall that is being claimed. This shows the leak could have occurred prior to 25
November 2014.
The following evidence also supports this possibility.
The plumber who repaired the broken sewer pipe provided an email dated 11
January 2017 that said:
It was quite evident that the sewer bend had been broken for a long period of time and had
been leaking water and effluent in under the foundations
The builder who discovered the broken pipe said in a letter dated 24 February 2017:
Nobody can actually say how long the pipe had been leaking, but again, my experience
suggests it was a decade, minimum
Case No: 505704 Determination Page 3 of 7
RK acknowledged the leak could be a “reasonably long term issue”.
The applicant has provided evidence to show the sewer system was inspected on 18
and 25 October 2008 with no leaks found. However, this does not refute the realistic
possibility that the leak occurred after this and before 25 November 2014.
In particular, JK‟s report supports the fact the leak likely occurred prior to 25
November 2014 given the extensive damage identified to the western wall.
Therefore, the panel does not accept the evidence shows the sewer pipe was broken
after 25 November 2014. Accordingly, as the applicant cannot establish a prima facie
claim, the FSP is entitled to deny liability for the claim.
Case No: 505704 Determination Page 4 of 7
3 Supporting information
3.1 Policy Wording
General definitions
Accidental damage
For the purposed of any limit or sub-limit of liability or Deductible as shown in the Schedule means
damage caus ed by any peril or circumstance not more specifically covered or excluded by this policy
[...]
Section 1 Material Loss or Damage
The Property Insured
All real property and personal property of every kind and description (except as hereinafter excluded)
belonging to the insured or which the insured is responsible, or has assumed responsibility to insure
prior to the occurrence of any damage, including such property in which the insured may acquire a
pecuniary or economic interest during the Period of Insurance.
[…]
Property Exclusions
[…]
Perils Exclusions
The Insurer shall not be liable under Section 1 and /or 2 in respect of:
2. Physical loss, destruction or damage occasioned by or happening through
[…]
b) Wear and tear, fading, scratching or marring, gradual deterioration or developing fl aws,
normal upkeep or making good;
d) normal settling, seepage, shrinkage or expansion in buildings or foundations, walls, pavements,
roads and ot her structural improvements, creeping, heaving and vibration.
[..]
6. Physical loss, destruction or damage occasioned by or happening through:
[..]
c) Erosion, subsidence, earth movement or collapse resulting therefrom
Case No: 505704 Determination Page 5 of 7
3.2 Expert Reports
Record Key points
Applicant’s expert ( PL
contracted by HC )
Email
11 - 01 - 2017
Plumber inspection by (FP) on 11 January 2017 noted that the
sewer bend had broken right through and it was evident it had
been broken for a long period of time and been leaking water and
effluent in under the foundations.
FSP’s expert (K )
Engineer Report
23 - 03 - 2017
Two storey full masonry building i s about 90 years old [..]
This report addresses the claim of the cracked sewer pipe and its
relationship to the need or caus e of underpinning.
Doing a Nearmap search on this building, revealed that a large
mature tree that was located at the North West building corner,
was removed in about 2014 and not ed the opinion that would have
had an influence and effect on the foundation material supporting
the building, which is understood to be reactive or plastic clays.
These clays are affected by changes of moi sture content and
during dry seasons, the tree would have caused drying out of the
reactive clays, giving rise to settlement and building cracking from
our experience.
We comment that the main sewer line in the laneway, would
appear to be about two meters deep, based on evidence of the
„domestic pipework‟ that was cracked and the dept h of excavation
near the building. Also the domestic sewer pipework excavation
was also deep, closer to the building.
Reviewing the information pres ented to us and the history search,
our opinion is that the small amount of moisture from a cracked
sewer pipe in about the middle of the western wall length is not
likely to influenc e the main sewer pipework excavation and the
mature tree is the cause of settlement issues at these b uilding
corners.
We also comment that the bulk of the western wall length in our
opinion, did not show sufficient distress that would warrant
underpinning.
The need for underpinning was not caused by a crack in the
„domestic‟ sewer pipework, found and repa ired during the
underpinning works.
The building has been monitored for five years or more for cracking
and movement and was intended to be underpinned in August
2015, therefore this is long term issue and not a single event.
A large tree was removed from near the North West building corner
and this in our opinion, would have influenc ed the footing
performance at this location res ulting in settlement and cracking.
Applicant’s expert (RIB )
Engineer Report
26 - 07 - 2017
As there is cracking and dropping at the north - west and south - west
corner, it is believed that it most probable that there has been a
heave situation in the middle of the wall which has res ulted from
plumbing leaks. This is due to the fact that there is no trees that
could initiate drying out at the south end of the building and to be
affecting this site they would need to go through the sewer trench
which we believe would be holding sufficient water to satisfy the
Case No: 505704 Determination Page 6 of 7
trees and this eliminate s their need to seek moisture from the
ground site. Hence, the central heave is the causation of the
crackling picked up in phot os 19 to 21.
The above does not diminish the concept that a large tree (now
removed) at the nort h west corner had a deleterious effect in drying
out the ground and this initiating some cr acking o f the corner,
however this is a secondary effect to the heave effect in the middle
of the building.
In conclusion some 10m of the wall in the middle has heaved
upwards as a result of the leak and the cracking that has continued
(after the tree has been removed) is a consequence of such heave.
Whilst tree drying may have had some effect, it is not possible to
be the primary causation, as the drying actions by trees would
have reached its peak over 30 years ago.
Applicant’s expert (HC )
Underpinning contractor
24 - 02 - 2017
After 30 years of experience in underpinning, is that as a result of
the leaking sewer pipe over these years, the bearing capabilities of
the clay failed over the numerous seasons and the building
subsided as a result of this bearing loss.
It is obvious that the building has been built over the existing sewer
pipe and over an unknown period of time the pipe had broken
under the weight of the building resulting in leaking of sewerage for
a considerable number of years, with the soils a round the pipe
turning black as a result of the leak age.
Nobody can actually say how long the pipe was leaking, but again,
my experience suggests it was a decade, minimum.
Applicant’s expert (JK)
Structural and Civil Engineer Site
Inspection report
10 - 03 - 2013
Inspection carried out to evaluat e certain items of concern
pertaining to settlement, brick, cracking and advis e of any possible
remedial work.
An external inspection along the western side or the right of way
(ROW) revealed that there is substa ntial and severe cracking that
is occurring, especially at approx. 10 met res from the southern end
The building in general would be close to 100 years old hence
there are a large number of structural elements that could be
undersized when compared to curre nt code requirements. This
however does not alleviate the conc erns relating to structural
adequacy and the excessive amount of movement occurring.
Clearly this is happening along the western side and internally.
Note, underpinning may be required additionally in previously
mentioned areas consisting of severe cracking and movement
along west side or the right way (ROW).
Applicants expert (LD)
Leak Detection Test
2 8 - 10 - 200 8
A camera inspection of the sewer pipe work was carried out on 24
October 20 08. Sections of the sewer appear to be flat and hold
water, however there is no obvious damage to the sewer that could
leak into the ground.
Applicant’s expert (RIB)
Engineer Report
01 - 03 - 2018
Review of email provided by K, dated 22 August 2017.
The overall comment that those areas not underpinned are likely to
crack in the future is a standard clause and most of which can be
Case No: 505704 Determination Page 7 of 7
handled by the use of articulation joins or the understanding that
the client realizes that differential movement is likely to occur
between that which is underpinned and not underpinned. The
degree of differential will likely diminish particularly if the causation
of the movement has been terminated and in this case, RIB believe
that the underpinning has terminated the reason for the movement
and has isolated the building from major differential movement.
Thus, the need for worrying about major cracking in the future is
diminished (the key word being 'major'). Minor cracking is
inevit able in buildings on reactive soils; most o f us accept it.
[ … ] RIB cannot see such high ground being deserved in this case
as the building is two storey , solid brick and can to some extent
dominate ground movement particularly that of heave. Clearly it
can do nothing at all to stop dropping caused by the removal of
moisture from the soil relieving the soil from supporting the
structure.
RIB not detect any upwards heave of the central section of the
western wall and at no time did RIB indicate that recovery would
happen, RIB indicated that recovery " should have resulted". The
reason for the word "should" is that once buildings crack and move,
dust, dirt and granular materials fall int o the cracks and thus resist
any form of recovery occurring as they resist the closure of cracks.
RIB felt quite secur e in my knowledge that whilst a leak did occur,
the moisture from such leak tended to drop down into the trench
related to the sewer main in the Council laneway and as a
consequence, the tree roots would have been attracted to it, being
a granular fill mat erial and thus a readily available source of
moisture. Why would the tree roots go through a highly compacted
reactive clay to get to the source of the leak at the top? They would
follow to the bottom, t hus causing the building to move […]
[…] Given the ag e of the building RIB cannot deny that various
cracks have been filled over time. Buildings of this age are
sometimes infilled several times but that does n't alter the fact that
after monitoring the Council took out their trees and underpinning
was then de termined to be a sensible methodology.