Home / Financial Firm (Unknown - Insurer) / Determination 505549
Determination 505549
Cyclone Debbie storm damage claim partly declined and cash settlement amount
Summary
A homeowner disputed the insurer's partial decline and $25,620.98 cash settlement for cyclone damage. AFCA rejected most of the decline but ordered the cash settlement increased by the cost of two omitted repairs, plus interest from 24 April 2017.
The proximate cause of most damage was wear, tear and deterioration excluded by the policy, but the storm caused some damage the insurer's settlement omitted.
Issues
- Claim denial primary · not upheld
“I consider that the proximate cause of the majority of damage to the property was due to wear and tear, deterioration, poor workmanship and a lack of maintenance.”
- Claim amount dispute secondary · upheld
“I am not satisfied that this includes all of the damage.”
Subjects and remedies
home or building damagenatural disasterpay claimpay interest
Text of the determination
Determination
Case No: 505549 Determination Page 1 of 4
Case number: 505549 31 July 2018
1 Overview
1.1 Dispute
The applicant held a home and building contents insurance policy with the Financial
Services Provider (FSP).
The applicant lodged a claim with the FSP as the result of damage from tropical
Cyclone Debbie in March 2017.
The FSP accepted part of the claim, but declined some damage stating that it was
not caused by the Cyclone.
The Case Manager provided the parties with a recommendation on issues in the
dispute. The recommendation was partly in favour of the applicant. The applicant
rejected the recommendation and it has been referred for determination.
1.2 Issues and key findings
Is the amount offered by the FSP fair and reasonable?
The FSP has offered a cash settlement of $25,620.98.
This sum is insufficient because it does not include all the damage that was caused
by the Cyclone.
The FSP is to obtain a quote for the repairs as set out in PW’s report which are as
follows:
replace cladding from back wall of shed
repair stains in floor in front two bedrooms.
The FSP is too add cost of these repairs to the cash settlement already offered.
1.3 Determination
Determination is partly in favour of the applicant.
The FSP is to increase the cash settlement by the amount determined in 1.2 .
The FSP must include interest calculated at the statutory rate from 24 April 2017,
until the day of settlement on the total cash settlement.
Case No: 505549 Determination Page 2 of 4
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good
industry practise, codes of practise and previous FOS decisions. I have taken into
account all materials submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied upon has been
provided to both parties.
2.1 Is the amount offered by the FSP fair and reasonable?
Applicant has the burden of establishing an insured event.
The onus is on the applicant to establish an entitlement to cover under the policy.
The applicant must establish on the balance of probability, that he has suffered a loss
covered by an event covered by the policy. This is called a prima facie claim.
If the insured is able to establish a prima facie claim under the policy, the insurer is
then required to show on balance, the loss falls within an exclusion under the policy
or he is otherwise not covered.
The applicant holds a defined events policy. The policy only responds when one or
more of the listened events cau ses damage to the applicant’s property, subject to
any exclusions.
This policy provides cover for storm including damage by Cyclone.
The fact that the property suffered damage during Cyclone Debbie in March 2017 is
not in dispute.
I am therefore satisfied the applicant has established a prima facie claim.
It falls to the FSP to establish, on the balance of probabilities, that the damage was
caused by a policy exclusion.
Circumstances of loss
The applicant’s property received extensive damage during Cyclon e Debbie.
The FSP’s building consultant (CE) reported the following damage:
Rear and side fences
Guttering on shed and house
Awnings and window hood on front and left hand side of house.
However the applicant disputed the scope of works (SOW) stating that the stumps
and external walls had been damaged during the Cyclone.
The FSP disputed this damage.
The FSP appointed engineer (GA) to provide a report.
His report concluded as follows:
damage to the stumps was not a result of the Cyclone but was long term
deterioration.
Case No: 505549 Determination Page 3 of 4
The damage to the walls were not a result of the Cyclone but due to seasonal
variations from long term cyclical change causing expansion and contraction to
the structure.
The applicant engaged a building consultant (DM) he listed the damage that occurs
as follows:
Windows and shades
roller door to garage
screen doors
Exacerbation cracking of concrete stumps
cracking to external wall sheeting
stump movement
extensive mold growth to ceilings and walls
lifting of roof battings/ rafters
Lifting of roof sheeting and ridge capping.
The FSP engaged an engineer (PW) and his report concluded as follows:
The stumps were not as a result of the cyclone but long-term deterioration
the damage to the external walls was from normal wear and tear
the damage to the bargeboards was from normal wear and tear
the house roof framing gaps were the result of recycled timber batons to
seasoned hardwood.
ridge and hip gaps are the combination of capping been secured to uneven roof
framing members and poor workmanship
rust staining of timber floors array on nail heads is normal wear and tear
mould growth is result of poor maintenance rather than the Cyclone
deformation in house roof sheeting is due to new metal roof being fixed to old
timber framing which has sagged over time
gaps in shed roof are result of poor installation of roof sheeting.
PW also stated that the house and shed roof appear to be structurally sound and
weatherproof.
Proximate Cause.
In order to determine the whether the applicants claim is included in an insured event
it is necessary to determine the proximate cause of loss .
It is established law that the proximate cause of loss is the dominant, effective or
operative cause, regardless of whether it is the last in time or the sole cause. This
means that even if Cyclone Debbie was the last event to cause the damage to the
roof property, it is not necessary the proximate or dominant cause of all of the loss.
To determine the dominant cause, each cause must be examined for the qualities of
reality, predominance and efficiency as the active cause. If one cause such as
(deterioration) would have caused the harm in any case, and the other (storm) would
not have done so in the absence of the first, the first is proximate cause.
The FSP and FSP experts state that the majority of damage is result of wear tear,
and gradual deterioration all of which are excluded under the policy.
Case No: 505549 Determination Page 4 of 4
Having reviewed all of the expert reports I consider that the proximate cause of the
majority of damage to the property was due to wear and tear, deterioration, poor
workmanship and a lack of maintenance. This is excluded from cover.
I consider that the Cyclone was not the proximate cause of the following:
stump damage which was due to a deterioration.
roof external walls bargeboards rust staining to some timber floors rather as the
result of wear and tear.
gaps in shared roof are due to poor workmanship
gaps in house reframing, ridge, hips in deformation in house roof sheeting is
due to roof repairs.
On that basis the FSP is entitled deny this part of the applicant’s claim.
I do however, consider that the storm did cause some of the damage to the property.
FSP ’s cash settlement is not fair
The FSP has offered a cash settlement of $25,620.98.
I am not satisfied that this includes all of the damage.
In PW’s report he identified the following which does not appear to have been
assessed by the FSP:
cladding missing from back wall of shed
water stains on the floor of the front two bedrooms.
The FSP is to obtain quotes to repair this damage and to add it to the cash
settlement already offered. The FSP is also to pay interest on the cash settled sum
from 24 April 2017 until the date of payment.