Determination 505549

Cyclone Debbie storm damage claim partly declined and cash settlement amount

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner disputed the insurer's partial decline and $25,620.98 cash settlement for cyclone damage. AFCA rejected most of the decline but ordered the cash settlement increased by the cost of two omitted repairs, plus interest from 24 April 2017.

The proximate cause of most damage was wear, tear and deterioration excluded by the policy, but the storm caused some damage the insurer's settlement omitted.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 505549 Determination Page 1 of 4 Case number: 505549 31 July 2018 1 Overview 1.1 Dispute The applicant held a home and building contents insurance policy with the Financial Services Provider (FSP). The applicant lodged a claim with the FSP as the result of damage from tropical Cyclone Debbie in March 2017. The FSP accepted part of the claim, but declined some damage stating that it was not caused by the Cyclone. The Case Manager provided the parties with a recommendation on issues in the dispute. The recommendation was partly in favour of the applicant. The applicant rejected the recommendation and it has been referred for determination. 1.2 Issues and key findings Is the amount offered by the FSP fair and reasonable? The FSP has offered a cash settlement of $25,620.98. This sum is insufficient because it does not include all the damage that was caused by the Cyclone. The FSP is to obtain a quote for the repairs as set out in PW’s report which are as follows:  replace cladding from back wall of shed  repair stains in floor in front two bedrooms. The FSP is too add cost of these repairs to the cash settlement already offered. 1.3 Determination Determination is partly in favour of the applicant. The FSP is to increase the cash settlement by the amount determined in 1.2 . The FSP must include interest calculated at the statutory rate from 24 April 2017, until the day of settlement on the total cash settlement. Case No: 505549 Determination Page 2 of 4 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practise, codes of practise and previous FOS decisions. I have taken into account all materials submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied upon has been provided to both parties. 2.1 Is the amount offered by the FSP fair and reasonable? Applicant has the burden of establishing an insured event. The onus is on the applicant to establish an entitlement to cover under the policy. The applicant must establish on the balance of probability, that he has suffered a loss covered by an event covered by the policy. This is called a prima facie claim. If the insured is able to establish a prima facie claim under the policy, the insurer is then required to show on balance, the loss falls within an exclusion under the policy or he is otherwise not covered. The applicant holds a defined events policy. The policy only responds when one or more of the listened events cau ses damage to the applicant’s property, subject to any exclusions. This policy provides cover for storm including damage by Cyclone. The fact that the property suffered damage during Cyclone Debbie in March 2017 is not in dispute. I am therefore satisfied the applicant has established a prima facie claim. It falls to the FSP to establish, on the balance of probabilities, that the damage was caused by a policy exclusion. Circumstances of loss The applicant’s property received extensive damage during Cyclon e Debbie. The FSP’s building consultant (CE) reported the following damage:  Rear and side fences  Guttering on shed and house  Awnings and window hood on front and left hand side of house. However the applicant disputed the scope of works (SOW) stating that the stumps and external walls had been damaged during the Cyclone. The FSP disputed this damage. The FSP appointed engineer (GA) to provide a report. His report concluded as follows:  damage to the stumps was not a result of the Cyclone but was long term deterioration. Case No: 505549 Determination Page 3 of 4  The damage to the walls were not a result of the Cyclone but due to seasonal variations from long term cyclical change causing expansion and contraction to the structure. The applicant engaged a building consultant (DM) he listed the damage that occurs as follows:  Windows and shades  roller door to garage  screen doors  Exacerbation cracking of concrete stumps  cracking to external wall sheeting  stump movement  extensive mold growth to ceilings and walls  lifting of roof battings/ rafters  Lifting of roof sheeting and ridge capping. The FSP engaged an engineer (PW) and his report concluded as follows:  The stumps were not as a result of the cyclone but long-term deterioration  the damage to the external walls was from normal wear and tear  the damage to the bargeboards was from normal wear and tear  the house roof framing gaps were the result of recycled timber batons to seasoned hardwood.  ridge and hip gaps are the combination of capping been secured to uneven roof framing members and poor workmanship  rust staining of timber floors array on nail heads is normal wear and tear  mould growth is result of poor maintenance rather than the Cyclone  deformation in house roof sheeting is due to new metal roof being fixed to old timber framing which has sagged over time  gaps in shed roof are result of poor installation of roof sheeting. PW also stated that the house and shed roof appear to be structurally sound and weatherproof. Proximate Cause. In order to determine the whether the applicants claim is included in an insured event it is necessary to determine the proximate cause of loss . It is established law that the proximate cause of loss is the dominant, effective or operative cause, regardless of whether it is the last in time or the sole cause. This means that even if Cyclone Debbie was the last event to cause the damage to the roof property, it is not necessary the proximate or dominant cause of all of the loss. To determine the dominant cause, each cause must be examined for the qualities of reality, predominance and efficiency as the active cause. If one cause such as (deterioration) would have caused the harm in any case, and the other (storm) would not have done so in the absence of the first, the first is proximate cause. The FSP and FSP experts state that the majority of damage is result of wear tear, and gradual deterioration all of which are excluded under the policy. Case No: 505549 Determination Page 4 of 4 Having reviewed all of the expert reports I consider that the proximate cause of the majority of damage to the property was due to wear and tear, deterioration, poor workmanship and a lack of maintenance. This is excluded from cover. I consider that the Cyclone was not the proximate cause of the following:  stump damage which was due to a deterioration.  roof external walls bargeboards rust staining to some timber floors rather as the result of wear and tear.  gaps in shared roof are due to poor workmanship  gaps in house reframing, ridge, hips in deformation in house roof sheeting is due to roof repairs. On that basis the FSP is entitled deny this part of the applicant’s claim. I do however, consider that the storm did cause some of the damage to the property. FSP ’s cash settlement is not fair The FSP has offered a cash settlement of $25,620.98. I am not satisfied that this includes all of the damage. In PW’s report he identified the following which does not appear to have been assessed by the FSP:  cladding missing from back wall of shed  water stains on the floor of the front two bedrooms.  The FSP is to obtain quotes to repair this damage and to add it to the cash settlement already offered. The FSP is also to pay interest on the cash settled sum from 24 April 2017 until the date of payment.