Text of the determination
Amended Determination | Case number: 504320 Page 1 of 12
Case number: 504320 16 November 2018
1 Determination overview
1.1 Complaint
A severe storm on 26 November 2008 damaged the complainant ‟s property. The
complainant lodged a claim with the financial firm (the insurer) at that time.
The insurer accepted the claim. It cash settled the complainant for the repairs.
The complainant says there is further storm related damage not yet repaired.
The insurer declined to cover the further damage.
1.2 Issues and key findings
Can the insurer decline the further damage?
The complainant has established a prima facie claim. The available information
shows the proximate cause of the further damage claimed was the 2008 storm .
The insurer has not established any exclusions, or any reasons on which it can
decline the complainant ‟s claim for the further damage.
Is the complainant entitled to other costs?
The complainant is entitled to some of the costs claimed. This includes the FB
engineer and CT mould expert costs. He is also entitled to loss of rent.
He is not entitled to the other costs claimed.
Should the insurer pay non-financial loss?
The insurer should pay $3,000 in non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is required to:
settle the complainant ‟s claim in line with section 2.1
pay the expert costs for FB and CT
pay loss of rent in line with section 2.2
Amended Determination | Case number: 504320 Page 2 of 12
pay $3,000 in non-financial loss
Amended Determination | Case number: 504320 Page 3 of 12
2 Reasons for determination
2.1 Is the insurer liable for the further damage?
Policy provides cover for accidental damage
The complainant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the complainant is able to establish a prima facie claim, then the onus shifts to the
insurer to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy or is otherwise entitled to deny the claim.
The complainant ‟ s policy provides cover for damage caused by the events listed in
the policy, including the listed event of „storm‟.
The complainant ‟s policy schedule confirms that he had elected to take out the
optional cover for accidental damage available under the policy. The accidental
damage option provides cover for damage that occurs unintentionally.
Complainant has established a prima facie claim
It is not disputed a storm damaged the complainant ‟s rental pr operty on 26 November
2008.
The complainant promptly lodged a claim with the insurer. He submitted two
quotations to the insurer. One quotation was for the replacement of some damaged
carpet. Another quotation was for roof repairs.
The insurer accepted and cash settled the complainant based on the two quotations
provided.
In early 2016, the complainant discovered further damage to the house. He engaged
an engineer (FB) and microbial expert (RES) to investigate the damage.
FB found the storm event of 2008 damaged the roof structure and it no longer has
appropriate structural capacity. The resulting deflection and excessive load transfer
have further damaged other parts of the house, including:
the interior and external walls
the southern brick veneer gable wall and front loadbearing wall
multiple withdrawn nail plates, which is a serious concern
ceiling to sag and cracked ceilings, cornices and walls.
RES separately found widespread fungi contamination throughout the house
consistent with the 2008 event.
Amended Determination | Case number: 504320 Page 4 of 12
The insurer also engaged building consultants (SG and IT) and a builder (JL) to
review the damage. SG‟s report dated 29 June 2016 agreed the damage observed in
the home is consistent with a storm event. IT‟s report dated 19 December 2016 did
not consider the issue of what caused the damage.
It appears JLG provided a report dated 20 April 2016 that concluded the cause was
due to other factors. This is inconsistent with the findings of both SG and FB. Further,
the insurer does not appear to be relying on this report.
Based on the information available, the panel is satisfied the 2008 storm caused the
damage being claimed. Therefore, the complainant has established a prima facie
claim.
In these circumstances, the insurer is required to show that, on the balance of
probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny
the complainant ‟s claim.
The insurer has not established an exclusion applies
The insurer says it is entitled to deny liability for this further damage based on the
following policy exclusion:
we will not cover loss, damage or legal liability caused by … gradual loss or
damage of any kind.
The insurer refers to FB‟s report which says water has entered into the property for a
significant period of time.
Putting aside the confusion in how this exclusion is written (i.e. how does gradual loss
or damage of any kind cause the loss or damage being claimed), the panel is not
satisfied it applies for the following reasons.
Having read FB‟s initial and supplementary report in full, it is clear his opinion is that
the singular storm event of 2008 caused the damage to the house. In other words, the
2008 storm was the proximate cause of the loss.
This is consistent with SB ‟s report.
Further, there is no suggestion in either report that the cause of the loss was a
gradual process of any kind.
Therefore, the panel does not accept the insurer established the application of this
exclusion.
The insurer is liable for the further damage
The complainant has established a prima facie claim and the insurer has not shown
an exclusion applies. Therefore, the insurer is liable to accept the claim.
Amended Determination | Case number: 504320 Page 5 of 12
The insurer has provided a number of scope of works. However, it is plain they are
insuff icient as they do not address the damage to the roof trusses set out by FB. FB‟s
opinion in this regard is preferred because:
it is accompanied by photographs
the reasoning is plausible and logical
his evidence is not refuted by the other experts.
The complainant has estimated the cost of repairs to be around $444,995.52. This is
mainly based on a building costing solution estimate (CS). He says he is unable to
provide a copy of this estimation because of the cost to obtain it.
Given there is no full scope of works or quotation, then the panel considers it is fair in
all the circumstances for the complaint to be resolved in the following ways.
Claim to be resolved in this manner
If the complainant accepts this determination, the insurer is to decide within 14 days
of receiving notification of the complainant ‟s acceptance whether it will repair the
damage or cash settle the claim.
If the insurer decides to repair the damage, it must do so taking into account:
FB‟s report
the previous scope of works obtained
the mould remediation scope of works obtained by the complainant
If the insurer decides to cash settle the claim, then the parties must work together to
do the following:
1. engage an independent structural engineer (at the insurer ‟s cost) to settle on a
full scope of works – this must include FB‟s report, the previous scope of works
obtained, the mould remediation scope of works and any additional damage
2. obtain at least one quotation for these scope of works from a contractor
prepared to do the works for the complainant
3. cash settle the claim based on this actionable quote
In exercising its discretion to cash settle the complainant ‟ s claim, the insurer must do
so reasonably and consistent with the principles of utmost good faith. This means any
cash settlement must be sufficient to enable the complainant to complete the relevant
repairs and take into account the contingencies associated with the repair process
and the transfer of the risk of the repairs to the complainant.
Amended Determination | Case number: 504320 Page 6 of 12
2.2 Is the complainant entitled to other costs?
The complainant is entitled to some expert costs
Under the Financial Ombudsman Service (FOS) Terms of Reference, we may decide
the insurer should contribute to the professional costs incurred by the complainant in
the course of the complaint. A financial firm will generally not be required to contribute
more than $3,000 to a complainant ‟s costs unless exceptional circumstances apply.
The panel accepts exceptional circumstances apply. The claim had a long history.
FB‟s findings were significant as it identified structural issues with the roof that had
not been identified and fundamentally altered the course of this claim.
Therefore, it is fair the insurer reimburse the complainant for:
FB engineers cost $5,620
CT‟s mould expert cost $880
The panel does not accept the insurer is required to reimburse the complainant for:
CP claims preparation cost $6,256.80
From the information available, it is unclear what assistance CP provided to resolve
the complaint.
The complainant is entitled to loss of rent
The complainant has sought loss of rent for a period of 2.5 years. He says this is for
the 2 year period the house was left uninhabitable and for a 6 month period to rebuild
the house.
The insurer maintains the complainant is not entitled to loss of rent because the
complainant ‟s claim was not accepted.
Given the panel is satisfied the complainant has established a valid claim, the
complainant is entitled to the loss of rent.
The policy limits the loss of rent benefit to 12 months.
However, in the current circumstances, the insurer‟s conduct contributed to the delay
to repair the house. Particularly given the insurer failed to consider FB‟s findings that
the roof trusses were damaged.
Therefore, it is fair for the insurer cover the complainant ‟s rental loss associated with
this claim. The insurer is liable for this cost until the first of the following occurs:
if the insurer decides to repair the damages, when the repairs are complete
if the insurer decides to cash settle the claim:
> six months have passed since the insurer cash settled the claim, or
Amended Determination | Case number: 504320 Page 7 of 12
> when the repairs are complete.
The complainant is not entitled to travel expenses
The complainant says he incurred fuel cost to travel to the property during this claim.
He says the policy does not allow him to leave the property unoccupied.
The policy states if a property is left untenanted for more than 60 consecutive days,
the complainant is required to let the insurer know.
From the information available, it is clear the complainant made the insurer aware the
property was untenanted. The complainant had fulfilled his policy obligation. There
was no further requirement for him to travel to the property.
Given this, the insurer is not liable for the complainant ‟s travel ex penses.
2.3 Should the insurer pay non-financial loss?
The insurer is to pay $3,000 in non-financial loss
Under the FOS Terms of Reference we can award up to $3,000 for non-financial loss
if the insurer causes the complainant to suffer a substantive degree of inconvenience,
interference and delay.
This matter has been ongoing for nine years. The issue was substantively
exacerbated by the insurer‟s failure to recognise the extent of repairs required,
particularly the roof trusses. Further issues arose when the insurer initially decided to
accept the claim but later relied on an exclusion to deny liability. This is despite the
fact the insurer‟s expert, SB, accepted the damage was consistent with the claimed
event.
The insured property is an investment one. It is a source of income to the
complainant. Therefore, these factors would have substantively impacted him.
Given all this, the panel considers it is fair in all the circumstances the insurer pay
$3,000 in non-financial loss.
Amended Determination | Case number: 504320 Page 8 of 12
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
complainant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Summarise the key references Key policy wording
Storm
You are covered for loss or damage as a result of storm.
…
Accidental damage cover
In addition to the cover provided by the insured events detailed on pages 21 to
24, the accidental damage option is available with building cover. It covers
damage to the building that is caused unintentionally. We will cover the cost of
repairing or replacing that part of the building which suffers physical loss or
damage caused by an accident at the insured address.
The general exclusions on pages 18 and 19 apply. In addition, we will not cover
damage caused by or attributable to:
• atmospheric conditions, mould, mildew or rot;
• scratching, chipping or denting; or
• any cleaning process using chemicals other than domestic household
chemicals.
…
Loss of rent
We will pay the lost rent suffered as a result of an insured event for up to twelve
months. The amount will be based on the average weekly rent paid by the tenants
over the previous twelve months before the insured event occurred.
Amended Determination | Case number: 504320 Page 9 of 12
…
Let us know if the building is unoccupied or untenanted
If you have the Investment Home Package, you must let us know if the building is
going to be untenanted for 30 days or more as special conditions may apply.
These conditions will be listed on your policy schedule. If the building is
untenanted for more than 30 days and you haven’t told us, we may re duce or
deny any claim you make or cancel your policy.
3.3 Key information
Record Key points
The insurer’s expert ( JL )
Report
20 - 04 - 2016
Building or
Design
Faults
1. Roof tiles appear to have lost their glazing,
this may cause further water ingress.
2. Carport roof support brackets have been
installed under the main roof area tiles, this
installed does not allow for the roof tiles to
seat correctly.
3. Movement cracks are present through the
brick work at the Front, Rear and LHS of the
property.
Mainte nance
Issues
1. Front and Rear gutter: last 1.5m of gutters
where down pipe exits are completely blocked
with leaf debris.
2. All roof tiles appear to have lost their glaze
over time, this may cause water ingress.
3. Fascia falling off and not well maintained,
this will allow water to penetrate the eaves.
Builders
Opinion of
Incident And
Caus e of
Damage
The damages sustained to the residence
appear to be a direct result of water ent ering
through the roof. In 2008 when the Insured
had claimed roof d amaged the ridge/hip
cappings were repointed/rebedded. The
internal water damage may have been caused
by the 2008 event but we cannot say for sure.
Pre event: The internal water damage may
have been caused pre event (2008) due to a
lack of maintenance, but this can n ot be
proven as we do not have access to the
previous phot o's or report.
Cash
Settlement
Details
We cannot warrant any repairs due to the
following maintenance issues:
1.Roof tiles have lost their glazing and may
now be porous allowing further wat er
penetration.
2. Gutters are blocked and general
maintenance has not be maintained.
Amended Determination | Case number: 504320 Page 10 of 12
Record Key points
3. Fascia falling off and not maintained, this
allows water to penetrate in to the eaves.
At the time of the Inspection the Ins ured had
started to prep for a repaint a nd patch all of
the internal walls and ceilings
Scope of
works
Total incl. GST $13,748.00
The insurer’s expert ( SG )
Report
29 - 06 - 2016
Although I cannot det ermine the date of the water ingress to the
roof space of the residence I am of the opinion that the damage
observed to the plasterboard ceiling, wall sheets and cornices to
the interior of the residence is the result of water ingress
associated with the storm relat ed activity described by the Insured.
I have provided a Scope of Works for the repair o f the resultant
damage.
Complainant’s expert
( RES )
Report
5 - 10 - 2016
Based on the concentrations and species of fungi pres ent in the
dwelling at [complainant‟s address], compared to the WHO
guidelines (2009) and Guidelines for the investigation,
assessment and remediation of mould in workplaces, March
2001 (Canada, Workplace Safety and Health Division) –
The samples collected do pose a potential risk to susceptible
individuals due to pathogenic taxa being present.
The imprints of the black mould, visually r eferred to as “staining”,
in the Causation Inspection Report, 29 June 2016, has been
identified as Stachybotrys chartarum, which has highly toxic
characteristics (such as in animals that died from ingesting
contaminated grain). S. chartarum is typically gr eenish - black in
colour and wet and slimy to the touch. It can also appear greyish
or sooty, with a powdery appearance, aiding in its dispersal to
nearby surfaces, including insulation and wall cavities.
S. chartarum grows on mat erial with a high cellulose content,
particularly when water damaged, and requires a high level of
dampness to flourish. When spores are no longer viable,
mycotoxins remain, which can be toxic to humans and animals.
In hot, humid conditions (following the November 2008 hail
storm), S . chartarum can grow within a few weeks of inundation.
Water damage and widespread fungi contamination throughout
the residence, is consistent with a single ingress event, as
described by the client, and also stated in the Causation
Inspection Report, 29 June 2016.
Complainant’s expert
( FB )
Report
26 - 04 - 2017
CONCLUSIONS
Analysis of the elements in points 5 and 6, can reach only one
determination. That conclusion is the roof structure has been
compromised by the severe singular hail storm 26 November
2008 and, solely as a consequence of that singular storm event,
Amended Determination | Case number: 504320 Page 11 of 12
Record Key points
no longer has appropriate structural capacity. The resulting
deflection and excessive load transfer experienced by the roof
system (ie., trusses), has damaged the interior, along with
internal and external walls.
In particular, the southern brick veneer gable wall and front
loadbearing wall, have suffered compromised structural integrity.
Of serious concern are the multiple withdrawn nail - plates. These
are not limited to joints affected by obvious ingress staining, but
are occurring throughout the roof due to deflective forc es.
Trusses with withdrawn nail - plates and joint splitting are an
indication these connections are no longer structurally sound.
Trusses subjected to water damage lose over 40% o f their load -
carrying capacity. Besides obvious wat er staining, mould and
nail - plate wit hdraw, joint connections suffer permanent strength
loss. As a result, the trusses have deflected onto non -
loadbearing internal walls. At least three of these walls reve al
compression damage. More seem likely. That excessive
deflection and uneven load trans fer has structurally
compromised the front loadbearing wall and southern brick gable
wall. Internally, these stresses have caused ceilings to sag, and
in some areas cra cking to ceilings, cornices and walls. It‟s highly
probable there are more (nail - plated) joints that no longer have
adequate structural capacity, and may be nearing the point of
complete failure.
At over 12m, damage just to the eastern range (area 06),
rep resents 70% of the E - W trusses spanning the house‟s main
roof area, exhibiting deflection and excessive load transfer.
Toget her with the trusses over the detached laundry ceiling and
garage, the affected area rises to 100%.
Owing to the widespread nature o f the singular storm ingress
event, at least 93% of the total roof area (approx. 210m2) has
been structurally compromised by the 2008 singular storm event.
None of the damage obs erved is consistent with age or other
extraneous cause.
Complainant’s expert
( FB )
Report
08 - 06 - 2017
It is my belief, had the full storm damage been known in 2008,
only immediate action could have averted the current situation. I
don‟t know if an insurer is always compelled to undertake
assessments and reports before commenc ing what would be a
costly repair. Any deferral incurred by seasonal events (i.e.
Christmas), the claim procedure or trade availability would
render the following works of no us e. When a homeowner is
unaware of the full damage extent, the insurer is not pr event ed
from acting on their vast claims knowledge relating to causal
damage from severe singular storm events. Hindsight is 20/20.
This immediate work if achievable would have likely involved:
- Vacating the occupants;
- Pulling down ceilings and insulati on;
Amended Determination | Case number: 504320 Page 12 of 12
Record Key points
- Stabilising 30+ trusses;
- Installing blowers / dehumidifiers;
- Removing tile roof load, and
- Covering the expos ed roof.
But by late December 2008, the roof system was likely beyond
practicable repair – the impact of 1 month‟s prolonged saturation
and heat permanently weakening the truss members, especially
the nail - plated joints.
When subjected to persistent saturation and high ambient
temperatures, timber becomes malleable. Nail - plated joints and
loaded structural roof members and walls are partic ularly
vulnerable to strength loss (40%+) during this ductile state.
Ceiling cracks can develop at any stage during the resulting
deflection process and likely began as unnoticed hairlines in
2009. Unseen and easily misunderstood, a building consultant
wit h 50 years‟ experienc e, did not comprehend their cause. In
the [SG] report, 29 June 2016, he stated in error that ceiling
cracks were age related movement, when a result of the singular
storm event damaging the roof trusses and causing nail - plate
withdraw. I believe a compression fractured brick wall was also
mistakenly dismissed as an imaginary tree root incursion.
Singular storm damage identified in the nail - plated trusses of this
structure should not be underestimated. A fiscally motivat ed
decision to se lectively misinterpret the entire singular storm
event damage could lead to roof collapse and critical injury. The
Intech scope of works proposes the removal of all internal
surfaces to remediate for mould, with no consideration of the
damaged roof and wal ls (a result of the same singular storm
event). Plasterboard sheeting provides proven bracing to thes e
surfaces that are ex periencing abnormal forces from truss
deflection and excessive load transfer. By flouting rebuilding
Recommendations for the roof and walls (Engineer Report p.12),
interior rectification works could exacerbate the existing failures
and load transfer in the trusses. The truss system could then
become overloaded and the failures rapidly propagate along the
roof line. Complete failure can be sudden and provide occupants
with little or no advanced warning to escape.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.