Home / Financial Firm (Unknown - Insurer) / Determination 504320

Determination 504320

Declined further storm damage after earlier cash settlement of storm claim

FirmFinancial Firm (Unknown - Insurer)
Decided2018-11-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$6,500
Non-financial loss$3,000
Amount claimed$444,996
SourceAFCA PDF

Summary

A 2008 storm damaged the complainant's rental property, which the insurer cash settled, and later declined further storm-related damage under a gradual loss exclusion. AFCA ordered the claim settled by repair or cash settlement, expert costs of $6,500, loss of rent, and $3,000 non-financial loss.

The insurer did not establish that the gradual loss exclusion applied, and the expert evidence showed a single storm event caused the further damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Amended Determination | Case number: 504320 Page 1 of 12 Case number: 504320 16 November 2018 1 Determination overview 1.1 Complaint A severe storm on 26 November 2008 damaged the complainant ‟s property. The complainant lodged a claim with the financial firm (the insurer) at that time. The insurer accepted the claim. It cash settled the complainant for the repairs. The complainant says there is further storm related damage not yet repaired. The insurer declined to cover the further damage. 1.2 Issues and key findings Can the insurer decline the further damage? The complainant has established a prima facie claim. The available information shows the proximate cause of the further damage claimed was the 2008 storm . The insurer has not established any exclusions, or any reasons on which it can decline the complainant ‟s claim for the further damage. Is the complainant entitled to other costs? The complainant is entitled to some of the costs claimed. This includes the FB engineer and CT mould expert costs. He is also entitled to loss of rent. He is not entitled to the other costs claimed. Should the insurer pay non-financial loss? The insurer should pay $3,000 in non-financial loss. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to:  settle the complainant ‟s claim in line with section 2.1  pay the expert costs for FB and CT  pay loss of rent in line with section 2.2 Amended Determination | Case number: 504320 Page 2 of 12  pay $3,000 in non-financial loss Amended Determination | Case number: 504320 Page 3 of 12 2 Reasons for determination 2.1 Is the insurer liable for the further damage? Policy provides cover for accidental damage The complainant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the complainant is able to establish a prima facie claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The complainant ‟ s policy provides cover for damage caused by the events listed in the policy, including the listed event of „storm‟. The complainant ‟s policy schedule confirms that he had elected to take out the optional cover for accidental damage available under the policy. The accidental damage option provides cover for damage that occurs unintentionally. Complainant has established a prima facie claim It is not disputed a storm damaged the complainant ‟s rental pr operty on 26 November 2008. The complainant promptly lodged a claim with the insurer. He submitted two quotations to the insurer. One quotation was for the replacement of some damaged carpet. Another quotation was for roof repairs. The insurer accepted and cash settled the complainant based on the two quotations provided. In early 2016, the complainant discovered further damage to the house. He engaged an engineer (FB) and microbial expert (RES) to investigate the damage. FB found the storm event of 2008 damaged the roof structure and it no longer has appropriate structural capacity. The resulting deflection and excessive load transfer have further damaged other parts of the house, including:  the interior and external walls  the southern brick veneer gable wall and front loadbearing wall  multiple withdrawn nail plates, which is a serious concern  ceiling to sag and cracked ceilings, cornices and walls. RES separately found widespread fungi contamination throughout the house consistent with the 2008 event. Amended Determination | Case number: 504320 Page 4 of 12 The insurer also engaged building consultants (SG and IT) and a builder (JL) to review the damage. SG‟s report dated 29 June 2016 agreed the damage observed in the home is consistent with a storm event. IT‟s report dated 19 December 2016 did not consider the issue of what caused the damage. It appears JLG provided a report dated 20 April 2016 that concluded the cause was due to other factors. This is inconsistent with the findings of both SG and FB. Further, the insurer does not appear to be relying on this report. Based on the information available, the panel is satisfied the 2008 storm caused the damage being claimed. Therefore, the complainant has established a prima facie claim. In these circumstances, the insurer is required to show that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the complainant ‟s claim. The insurer has not established an exclusion applies The insurer says it is entitled to deny liability for this further damage based on the following policy exclusion: we will not cover loss, damage or legal liability caused by … gradual loss or damage of any kind. The insurer refers to FB‟s report which says water has entered into the property for a significant period of time. Putting aside the confusion in how this exclusion is written (i.e. how does gradual loss or damage of any kind cause the loss or damage being claimed), the panel is not satisfied it applies for the following reasons. Having read FB‟s initial and supplementary report in full, it is clear his opinion is that the singular storm event of 2008 caused the damage to the house. In other words, the 2008 storm was the proximate cause of the loss. This is consistent with SB ‟s report. Further, there is no suggestion in either report that the cause of the loss was a gradual process of any kind. Therefore, the panel does not accept the insurer established the application of this exclusion. The insurer is liable for the further damage The complainant has established a prima facie claim and the insurer has not shown an exclusion applies. Therefore, the insurer is liable to accept the claim. Amended Determination | Case number: 504320 Page 5 of 12 The insurer has provided a number of scope of works. However, it is plain they are insuff icient as they do not address the damage to the roof trusses set out by FB. FB‟s opinion in this regard is preferred because:  it is accompanied by photographs  the reasoning is plausible and logical  his evidence is not refuted by the other experts. The complainant has estimated the cost of repairs to be around $444,995.52. This is mainly based on a building costing solution estimate (CS). He says he is unable to provide a copy of this estimation because of the cost to obtain it. Given there is no full scope of works or quotation, then the panel considers it is fair in all the circumstances for the complaint to be resolved in the following ways. Claim to be resolved in this manner If the complainant accepts this determination, the insurer is to decide within 14 days of receiving notification of the complainant ‟s acceptance whether it will repair the damage or cash settle the claim. If the insurer decides to repair the damage, it must do so taking into account:  FB‟s report  the previous scope of works obtained  the mould remediation scope of works obtained by the complainant If the insurer decides to cash settle the claim, then the parties must work together to do the following: 1. engage an independent structural engineer (at the insurer ‟s cost) to settle on a full scope of works – this must include FB‟s report, the previous scope of works obtained, the mould remediation scope of works and any additional damage 2. obtain at least one quotation for these scope of works from a contractor prepared to do the works for the complainant 3. cash settle the claim based on this actionable quote In exercising its discretion to cash settle the complainant ‟ s claim, the insurer must do so reasonably and consistent with the principles of utmost good faith. This means any cash settlement must be sufficient to enable the complainant to complete the relevant repairs and take into account the contingencies associated with the repair process and the transfer of the risk of the repairs to the complainant. Amended Determination | Case number: 504320 Page 6 of 12 2.2 Is the complainant entitled to other costs? The complainant is entitled to some expert costs Under the Financial Ombudsman Service (FOS) Terms of Reference, we may decide the insurer should contribute to the professional costs incurred by the complainant in the course of the complaint. A financial firm will generally not be required to contribute more than $3,000 to a complainant ‟s costs unless exceptional circumstances apply. The panel accepts exceptional circumstances apply. The claim had a long history. FB‟s findings were significant as it identified structural issues with the roof that had not been identified and fundamentally altered the course of this claim. Therefore, it is fair the insurer reimburse the complainant for:  FB engineers cost $5,620  CT‟s mould expert cost $880 The panel does not accept the insurer is required to reimburse the complainant for:  CP claims preparation cost $6,256.80 From the information available, it is unclear what assistance CP provided to resolve the complaint. The complainant is entitled to loss of rent The complainant has sought loss of rent for a period of 2.5 years. He says this is for the 2 year period the house was left uninhabitable and for a 6 month period to rebuild the house. The insurer maintains the complainant is not entitled to loss of rent because the complainant ‟s claim was not accepted. Given the panel is satisfied the complainant has established a valid claim, the complainant is entitled to the loss of rent. The policy limits the loss of rent benefit to 12 months. However, in the current circumstances, the insurer‟s conduct contributed to the delay to repair the house. Particularly given the insurer failed to consider FB‟s findings that the roof trusses were damaged. Therefore, it is fair for the insurer cover the complainant ‟s rental loss associated with this claim. The insurer is liable for this cost until the first of the following occurs:  if the insurer decides to repair the damages, when the repairs are complete  if the insurer decides to cash settle the claim: > six months have passed since the insurer cash settled the claim, or Amended Determination | Case number: 504320 Page 7 of 12 > when the repairs are complete. The complainant is not entitled to travel expenses The complainant says he incurred fuel cost to travel to the property during this claim. He says the policy does not allow him to leave the property unoccupied. The policy states if a property is left untenanted for more than 60 consecutive days, the complainant is required to let the insurer know. From the information available, it is clear the complainant made the insurer aware the property was untenanted. The complainant had fulfilled his policy obligation. There was no further requirement for him to travel to the property. Given this, the insurer is not liable for the complainant ‟s travel ex penses. 2.3 Should the insurer pay non-financial loss? The insurer is to pay $3,000 in non-financial loss Under the FOS Terms of Reference we can award up to $3,000 for non-financial loss if the insurer causes the complainant to suffer a substantive degree of inconvenience, interference and delay. This matter has been ongoing for nine years. The issue was substantively exacerbated by the insurer‟s failure to recognise the extent of repairs required, particularly the roof trusses. Further issues arose when the insurer initially decided to accept the claim but later relied on an exclusion to deny liability. This is despite the fact the insurer‟s expert, SB, accepted the damage was consistent with the claimed event. The insured property is an investment one. It is a source of income to the complainant. Therefore, these factors would have substantively impacted him. Given all this, the panel considers it is fair in all the circumstances the insurer pay $3,000 in non-financial loss. Amended Determination | Case number: 504320 Page 8 of 12 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term complainant complainant financial services provider financial firm dispute complaint claim claim 3.2 Summarise the key references Key policy wording Storm You are covered for loss or damage as a result of storm. … Accidental damage cover In addition to the cover provided by the insured events detailed on pages 21 to 24, the accidental damage option is available with building cover. It covers damage to the building that is caused unintentionally. We will cover the cost of repairing or replacing that part of the building which suffers physical loss or damage caused by an accident at the insured address. The general exclusions on pages 18 and 19 apply. In addition, we will not cover damage caused by or attributable to: • atmospheric conditions, mould, mildew or rot; • scratching, chipping or denting; or • any cleaning process using chemicals other than domestic household chemicals. … Loss of rent We will pay the lost rent suffered as a result of an insured event for up to twelve months. The amount will be based on the average weekly rent paid by the tenants over the previous twelve months before the insured event occurred. Amended Determination | Case number: 504320 Page 9 of 12 … Let us know if the building is unoccupied or untenanted If you have the Investment Home Package, you must let us know if the building is going to be untenanted for 30 days or more as special conditions may apply. These conditions will be listed on your policy schedule. If the building is untenanted for more than 30 days and you haven’t told us, we may re duce or deny any claim you make or cancel your policy. 3.3 Key information Record Key points The insurer’s expert ( JL ) Report 20 - 04 - 2016  Building or Design Faults  1. Roof tiles appear to have lost their glazing, this may cause further water ingress.  2. Carport roof support brackets have been installed under the main roof area tiles, this installed does not allow for the roof tiles to seat correctly.  3. Movement cracks are present through the brick work at the Front, Rear and LHS of the property.  Mainte nance Issues  1. Front and Rear gutter: last 1.5m of gutters where down pipe exits are completely blocked with leaf debris.  2. All roof tiles appear to have lost their glaze over time, this may cause water ingress.  3. Fascia falling off and not well maintained, this will allow water to penetrate the eaves.  Builders Opinion of Incident And Caus e of Damage  The damages sustained to the residence appear to be a direct result of water ent ering through the roof. In 2008 when the Insured had claimed roof d amaged the ridge/hip cappings were repointed/rebedded. The internal water damage may have been caused by the 2008 event but we cannot say for sure.  Pre event: The internal water damage may have been caused pre event (2008) due to a lack of maintenance, but this can n ot be proven as we do not have access to the previous phot o's or report.  Cash Settlement Details  We cannot warrant any repairs due to the following maintenance issues:  1.Roof tiles have lost their glazing and may now be porous allowing further wat er penetration.  2. Gutters are blocked and general maintenance has not be maintained. Amended Determination | Case number: 504320 Page 10 of 12 Record Key points  3. Fascia falling off and not maintained, this allows water to penetrate in to the eaves.  At the time of the Inspection the Ins ured had started to prep for a repaint a nd patch all of the internal walls and ceilings  Scope of works  Total incl. GST $13,748.00 The insurer’s expert ( SG ) Report 29 - 06 - 2016 Although I cannot det ermine the date of the water ingress to the roof space of the residence I am of the opinion that the damage observed to the plasterboard ceiling, wall sheets and cornices to the interior of the residence is the result of water ingress associated with the storm relat ed activity described by the Insured. I have provided a Scope of Works for the repair o f the resultant damage. Complainant’s expert ( RES ) Report 5 - 10 - 2016  Based on the concentrations and species of fungi pres ent in the dwelling at [complainant‟s address], compared to the WHO guidelines (2009) and Guidelines for the investigation, assessment and remediation of mould in workplaces, March 2001 (Canada, Workplace Safety and Health Division) –  The samples collected do pose a potential risk to susceptible individuals due to pathogenic taxa being present.  The imprints of the black mould, visually r eferred to as “staining”, in the Causation Inspection Report, 29 June 2016, has been identified as Stachybotrys chartarum, which has highly toxic characteristics (such as in animals that died from ingesting contaminated grain). S. chartarum is typically gr eenish - black in colour and wet and slimy to the touch. It can also appear greyish or sooty, with a powdery appearance, aiding in its dispersal to nearby surfaces, including insulation and wall cavities.  S. chartarum grows on mat erial with a high cellulose content, particularly when water damaged, and requires a high level of dampness to flourish. When spores are no longer viable, mycotoxins remain, which can be toxic to humans and animals.  In hot, humid conditions (following the November 2008 hail storm), S . chartarum can grow within a few weeks of inundation.  Water damage and widespread fungi contamination throughout the residence, is consistent with a single ingress event, as described by the client, and also stated in the Causation Inspection Report, 29 June 2016. Complainant’s expert ( FB ) Report 26 - 04 - 2017  CONCLUSIONS  Analysis of the elements in points 5 and 6, can reach only one determination. That conclusion is the roof structure has been compromised by the severe singular hail storm 26 November 2008 and, solely as a consequence of that singular storm event, Amended Determination | Case number: 504320 Page 11 of 12 Record Key points no longer has appropriate structural capacity. The resulting deflection and excessive load transfer experienced by the roof system (ie., trusses), has damaged the interior, along with internal and external walls.  In particular, the southern brick veneer gable wall and front loadbearing wall, have suffered compromised structural integrity.  Of serious concern are the multiple withdrawn nail - plates. These are not limited to joints affected by obvious ingress staining, but are occurring throughout the roof due to deflective forc es. Trusses with withdrawn nail - plates and joint splitting are an indication these connections are no longer structurally sound.  Trusses subjected to water damage lose over 40% o f their load - carrying capacity. Besides obvious wat er staining, mould and nail - plate wit hdraw, joint connections suffer permanent strength loss. As a result, the trusses have deflected onto non - loadbearing internal walls. At least three of these walls reve al compression damage. More seem likely. That excessive deflection and uneven load trans fer has structurally compromised the front loadbearing wall and southern brick gable wall. Internally, these stresses have caused ceilings to sag, and in some areas cra cking to ceilings, cornices and walls. It‟s highly probable there are more (nail - plated) joints that no longer have adequate structural capacity, and may be nearing the point of complete failure.  At over 12m, damage just to the eastern range (area 06), rep resents 70% of the E - W trusses spanning the house‟s main roof area, exhibiting deflection and excessive load transfer. Toget her with the trusses over the detached laundry ceiling and garage, the affected area rises to 100%.  Owing to the widespread nature o f the singular storm ingress event, at least 93% of the total roof area (approx. 210m2) has been structurally compromised by the 2008 singular storm event.  None of the damage obs erved is consistent with age or other extraneous cause. Complainant’s expert ( FB ) Report 08 - 06 - 2017  It is my belief, had the full storm damage been known in 2008, only immediate action could have averted the current situation. I don‟t know if an insurer is always compelled to undertake assessments and reports before commenc ing what would be a costly repair. Any deferral incurred by seasonal events (i.e. Christmas), the claim procedure or trade availability would render the following works of no us e. When a homeowner is unaware of the full damage extent, the insurer is not pr event ed from acting on their vast claims knowledge relating to causal damage from severe singular storm events. Hindsight is 20/20.  This immediate work if achievable would have likely involved:  - Vacating the occupants;  - Pulling down ceilings and insulati on; Amended Determination | Case number: 504320 Page 12 of 12 Record Key points  - Stabilising 30+ trusses;  - Installing blowers / dehumidifiers;  - Removing tile roof load, and  - Covering the expos ed roof.  But by late December 2008, the roof system was likely beyond practicable repair – the impact of 1 month‟s prolonged saturation and heat permanently weakening the truss members, especially the nail - plated joints.  When subjected to persistent saturation and high ambient temperatures, timber becomes malleable. Nail - plated joints and loaded structural roof members and walls are partic ularly vulnerable to strength loss (40%+) during this ductile state. Ceiling cracks can develop at any stage during the resulting deflection process and likely began as unnoticed hairlines in 2009. Unseen and easily misunderstood, a building consultant wit h 50 years‟ experienc e, did not comprehend their cause. In the [SG] report, 29 June 2016, he stated in error that ceiling cracks were age related movement, when a result of the singular storm event damaging the roof trusses and causing nail - plate withdraw. I believe a compression fractured brick wall was also mistakenly dismissed as an imaginary tree root incursion.  Singular storm damage identified in the nail - plated trusses of this structure should not be underestimated. A fiscally motivat ed decision to se lectively misinterpret the entire singular storm event damage could lead to roof collapse and critical injury. The Intech scope of works proposes the removal of all internal surfaces to remediate for mould, with no consideration of the damaged roof and wal ls (a result of the same singular storm event). Plasterboard sheeting provides proven bracing to thes e surfaces that are ex periencing abnormal forces from truss deflection and excessive load transfer. By flouting rebuilding Recommendations for the roof and walls (Engineer Report p.12), interior rectification works could exacerbate the existing failures and load transfer in the trusses. The truss system could then become overloaded and the failures rapidly propagate along the roof line. Complete failure can be sudden and provide occupants with little or no advanced warning to escape.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.