Text of the determination
Determination
Case No: 504294 Determination Page 1 of 5
Case number: 504294 21 August 2018
1 Overview
1.1 Dispute
The applicant holds a home and contents insurance policy with the financial services
provider (FSP). He lodged a claim against the policy when rainwater entered his
home and caused damage. The FSP assessed the damage and relied on policy
exclusions to deny the claim.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the applicant. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Was the FSP entitled to deny the claim?
The FSP has not established the application of the policy exclusions.
Is the applicant entitled to compensation for non-financial loss?
The applicant has not established an entitlement to compensation.
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is required to settle the claim in accordance with the policy terms and
conditions and in accordance with this determination.
If the FSP decides to cash settle the claim, it is to pay the applicant based on a quote
that can be actioned. In addition, the FSP is to pay interest on that amount in
accordance with section 57 of the Insurance Contracts Act 1984, calculated from the
date of the quotation, until the date of payment.
Case No: 504294 Determination Page 2 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case manager‟s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Was the FSP entitled to deny the claim?
FSP is relying on policy exclusions
The applicant‟s policy covers loss or damage due to storm, rainwater or run-off. The
applicant provided a copy of a Bureau of Meteorology (BoM) record for April 2017, in
support of his assertion the damage occurred after two days of “heavy rainfall, wind
and hail”. Since the policy covers damage resulting from a storm, t he applicant has
established a valid claim for which the policy responds.
The coverage under the policy is subject to the exclusions detailed within the policy
documentation and at 3.1 of this determination.
The FSP said water penetrated the home because of structural defects, faulty
design, or faulty workmanship in the construction of the balcony, all of which are
policy exclusions. The FSP is also relying on there being no evidence of a storm
created opening. Since the FSP is relying on policy exclusions, it bears the onus of
establishing the application of the exclusions.
The applicant initially said the FSP had not sent him a policy disclosure statement
(PDS) at inception. The FSP provided proof of dispatch and as such, it can rely on
these policy exclusions when assessing the claim.
FSP’s builder provided reports on cause of damage
The FSP is relying on the policy exclusions, so it needs to show that the proximate
cause of the damage (that is the dominant, effective or operative cause) was the
balcony‟s construction rather than the storm that occurred in April 2017.
The FSP‟s builder had suggested there was insufficient drainage for the balcony.
There was a 50mm drainage grate located at the far right-hand corner, but no
overflow. The builder said this would not be enough to cope with heavy rain and
would result in ponding on the balcony. The builder said rainwater entered the home
through the underside of the balcony, which he believed indicated the waterproof
membrane on the balcony had failed.
Case No: 504294 Determination Page 3 of 5
The FSP said the balcony‟s construction was not in accordance with the relevant
building regulations. The FSP referred to insufficient drainage, lack of overflow on the
drainage grate and lack of or failed waterproofing, as an indication the balcony‟s
construction was the cause of the damage. The FSP also said the lack of evidence of
a storm created opening is also indicative the water entered the home because of
what it says are the identified building defects.
Builder’s comments do not assist FSP’s position
The builder said there would not have been any resultant damage had the drainage
system on the balcony been sufficient. The rainwater would have drained away
rather than pool on the balcony. However, the builder never indicated how the water
entered the home through the underside of the balcony, if it had pooled on top or why
he believed it had entered the home there.
The builder said he did not conduct an invasive test because the very nature of the
test would have compromised the water proofing membrane if there was one in
place. This would have necessitated repairing the balcony. The FSP said that, while
an invasive test was not carried out, it relied on the builder‟s visual inspection and his
“advice and experience” to assess the cause of damage.
The builder subsequently provided clarification on various matters which were not
sufficiently covered in his reports. However, these do not do fully cover all relevant
matters. There is an assertion the water proofing membrane failed. However, no one
is certain as to whether there is a membrane in place and if there is, whether it did
fail.
The builder referred to leaves covering the grate, although the photographs he took
showed no sign of anything covering the grate. There is an assumption this would
have led to a pooling of water on the balcony and then the water would have seeped
into the home.
In addition, the builder had indicated the size of outlet and number of outlets would
have coincided with the engineering and architectural drawings for the property. He
said there would have been set computations within those drawings. This raises
doubt about whether the drainage was insufficient.
There is also an assumption the recommended drainage system for balconies would
have dealt with all types of rainfall. However, there is no discussion as to whether the
rain on the days in question was of such intensity that it would have overrun any
drainage system, including one with an overflow.
FSP added further ground for denying claim
Whilst not relied upon in its original submission, post the recommendation, the FSP
now seeks to rely upon what it says is the lack of a storm created opening, to deny
the claim. The applicant said there had been two days of heavy rain, wind and hail.
This indicates intensive storm conditions that resulted in rainwater entering the home
around the balcony area.
As stated, it is the FSP that carries the onus to establish the application of its
exclusion.
Case No: 504294 Determination Page 4 of 5
The available information is not sufficiently compelling in support of the application of
the policy exclusions. Instead, the information indicates the heavy rainfall over two
days was sufficient to force an entry into the home. As such, the proximate cause of
the damage to the applicant‟s home was the storm in April 2017 and not the
structural defects, faulty design or faulty workmanship.
The FSP is required to select whether to repair the resultant internal damage to the
home or cash settle the claim. If the FSP chooses to cash settle, it can choose the
quote, but only on the basis the repairer would be willing to undertake the work for
that amount.
The FSP s hould provide evidence of the repairer‟s willingness to complete the work
for the quoted amount.
Further, if the FSP elects to cash settle the claim, the FSP must add 10% to the
quotation amount, to account for the fact that the risk and responsibility for the
repairs will be transferred from the FSP to the applicant.
The FSP is also to pay interest on the quotation amount, from the date of the
quotation, until the date of payment.
2.3 Is the applicant entitled to compensation for non-financial loss?
The applicant has not established an entitlement to compensation
The applicant expressed concern about the length of time taken in relation to the
claims process. He indicated this had caused stress to he and his wife.
There were issues about the cause of the rainwater intrusion into the home. The FSP
needed to obtain further clarification from its expert when additional matters arose.
However, this did not unduly increase the duration of the claims process, given the
nature of those additional matters.
Further, the applicant has provided no information in support of his assertion the
claims process had caused him stress. As such, the applicant has not established an
entitlement to compensation for non-financial loss.
Case No: 504294 Determination Page 5 of 5
3 Supporting information
3.1 Policy provisions
9 . Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater
or run-off.
“storm” means violent wind (including cyclones and
tornadoes), thunderstorms and hail which may be
accompanied by rain or snow.
…
We will not pay for loss or damage:
…
g. caused by water seeping, percolating or otherwise
penetrating into the buildings as a result of:
• structural defects,
• faulty design of the buildings,
• faulty workm anship in the construction of the
buildings, or
• your failure to adequately maintain the buildings;
h. caused by wind, rainwater, hail or snow entering
the buildings through an open window or door or any
opening not made by the storm, unless the loss or
damage is caused by run-off;
…
When we will not pay a claim
under your policy
1.This policy does not cover loss, liability, injury or damage:
…
g. Inherent defects
caused directly or indirectly through inherent
defects, faulty design, structural defects or poor
workmanship;
…
2. Unless we state differently in your policy, we will not
pay for:
…
b. any loss or damage which is not caused directly
by one of the insured events;
…
j. consequential loss.
…
Recommendation
Case No: 504294 Recommendation Page 1 of 5
Case number: 504294 13 June 2018
4 Overview
4.1 Dispute
The applicant lodged a claim under his insurance policy with the financial services
provider (FSP) for storm related damage to the internal ceilings, door frames and
flooring areas of his property.
The FSP denied the applicant‟s claim on the basis the dominant cause of damage
was a combination of policy excluded factors.
The FSP disputes the FSP‟s denial of the claim and seeks cover for the cost of
repairing the damage. In addition, the applicant says he never received the policy
documentation.
4.2 Issues and key findings
Is the FSP entitled to deny the applicant’s claim?
The FSP is not entitled to deny the applicant‟s claim for internal damage. This is
because the FSP failed to show the operation of policy exclusions. In particular:
the expert findings are based on visual observations
there is insufficient material to show structural/workmanship/design defect.
Has the FSP caused unreasonable delays?
The claim was lodged with the FSP on 4 May 2017, with the final decision letter
issued on 1 August 2017. Given this, I am satisfied the FSP did not delay the
processing of the applicant‟s claim.
4.3 Recommendation
This recommendation is substantially in favour of the applicant.
Should both parties accept this recommendation, within a 14-day period of the
parties‟ acceptance, the FSP is to settle the applicant‟s claim pursuant to the terms
and conditions of the policy.
If the FSP decides to cash settle, the FSP is to pay the applicant:
based on a quote which can be actioned
the applicable interest at the statutory rate payable under section 57 of the
insurance Contracts Act from 1 August 2017, to the date when payment is
made.
Case No: 504294 Recommendation Page 2 of 5
5 Reasons for recommendation
5.1 Is the FSP entitled to d eny the applicant’s claim?
Each party carries a different burden of proof
Whether the insurance policy covers a loss is determined on the balance of
probabilities, and in consideration of a burden of proof.
A burden of proof is a legal standard that requires parties to demonstrate a claim is
valid or invalid based on information and documents. Essentially, the insured has the
burden to demonstrate the policy covers the loss (also referred to as a valid or a
prima facie claim).
Once the insured meets her/his onus, the onus shifts to the insurer to demonstrate a
policy exclusion applies, or cover is otherwise limited.
Evidence establishes the FSP sent the applicant the policy documentation
The applicant says the FSP did not provide him with the relevant policy
documentation. In response, the FSP says it sent the policy documentation to the
applicant‟s preferred address (his work address). In support, the FSP provided the
documentation to show proof of dispatch:
A statutory declaration of (S) saying following policy inception on 6 March 2016,
the applicable product disclosure statement (PDS) and certificate of insurance
(CIO) were posted to the applicant.
Documentation to show the FSP did not received a „return to sender‟
notification.
Mail-house reconciliation report.
The FSP is required to satisfy FOS it has a satisfactory process in place for the
issuing of documentation. It is not required to show the applicant actually received it.
Having reviewed the above material, I am satisfied the FSP informed the applicant of
the terms of the policy and so is entitled to rely upon those terms when considering
the applicant‟s claim.
Policy covers storm damage, subject to the terms and conditions
The applicant‟s cover is limited to the insured events listed in the appli cable product
disclosure statement (PDS). Relevant to this dispute, the PDS covers storm,
rainwater or run-off as one of those insured events.
The applicant says a two-day storm event consisting of heavy rainfall, wind and hail
caused damage to his property.
It is not in dispute internal areas of the applicant‟s property sustained water related
damage following the storm event on 14 April 2017. Consequently, on balance, I am
satisfied the applicant has established a valid claim.
Accordingly, the FSP bears the burden of proof to show it is entitled to rely on a
policy exclusion to deny or otherwise limit its liability for cover.
Case No: 504294 Recommendation Page 3 of 5
FSP relies on a combination of policy exclusions to deny the claim
The FSP says the water penetrated the internal areas of the applicant‟s property due
to issues with the balcony. The FSP says the balcony does not have an adequate
waterproofing membrane under the tiles and the balcony‟s drainage grate is missing
an overflow.
Consequently, the FSP says it is entitled to rely on a combination of policy exclusions
to deny the claim. I am satisfied the PDS contains general exclusions for loss or
damage caused by or arising from water entering the building as a result of:
structural defects
faulty design of the buildings
faulty workmanship in the construction of the buildings
the insured‟s failure to adequately maintain the building.
Insufficient evidence to conclude damage caused by excluded factors
As per the above discussion, the FSP bears the burden of proving an exclusion
clause applies. Given the available information, I am not satisfied the FSP
established any of the exclusions it seeks to rely on.
This is because, overall, the expert reports lack comprehensive investigation to
substantiate their respective findings.
The exclusion for lack of maintenance is to protect the insurer from risk associated
with damage arising from insured‟s failure to keep the property in good condition. The
exclusion is closely associated wi th normal wear. The applicant‟s property is of
recent build. In addition, the FSP‟s appointed assessor (C) observed it was
„maintained to a high standard‟.
There is no material to show the waterproofing membrane is defective or had
deteriorated over time. The finding was made by the FSP‟s appointed construction
investigator (A) who visually inspected the balcony floor. No testing (such as lifting
one of the tiles to check the membrane) was conducted.
Buildings are designed pursuant to building regulations. The applicant says the
balcony was constructed pursuant to any building regulations that apply. In support,
the applicant provided a copy of the building approval for the construction of the
balcony and awning dated 5 February 2016. On the other hand, the FSP relies on
documents offering recommendations and interpretation of rules (see attached). I
accept an occupancy permit is not evidence the relevant building regulations have
been complied with. However, the onus rests with the FSP to show the construction
of the balcony is inconsistent with the building regulations (whether current or at the
time of roof‟s construction). The FSP has not provided sufficient material to show
this.
On balance, I am not satisfied the FSP provided sufficient material to sho w the
operation of the policy exclusions. Consequently, it follows the FSP was not entitled
to deny the applicant‟s claim for damage.
For clarity, the FSP‟s liability is limited to the internal damage only. This is because
there is no material to show the storm caused damage to the balcony.
Case No: 504294 Recommendation Page 4 of 5
The FSP entitled to choose how to settle a claim
There is no dispute the FSP is entitled to choose how to settle the claim as outlined
on page 17 of the PDS.
Having regard to the nature of the damage, the FSP has the option of either
arranging the repairs to the internal areas, or paying the cost required to repair the
internal damage.
A review of the available estimates for damage shows two quotes:
$13,010 (excluding balcony repairs) issued by D.
$8,719.59 issued by ARC.
The FSP is entitled to select the settlement quote. However, when doing so it must
ensure the repairer is willing to repair the damage for the same quoted amount if
engaged directly by the applicant.
5.2 Is the FSP liable for compensation?
Applicant says FSP’s claim processing resulted in stress and inconvenience
The applicant says the FSP caused unreasonable delays to the processing of the
claim. As a result, the applicant says he and his wife suffered high levels of
inconvenience and stress. The applicant did not provide any material and/or detailed
information in support.
When handling claims, insurance companies are required to comply with the
timeframes contained in the General Insurance Code of Practice (the Code).
Pursuant to the Code (unless exceptional circumstances apply) the FSP is required
to issue a decision letter within four months of claim receipt.
Based on the available material, the FSP complied with this timeframe. The details of
the relevant timeframe are contained under section 3.1 o f this recommendation.
The FSP is required to issue a claim decision letter. However, instead the FSP
offered the applicant an option to withdraw his claim, or issue a formal denial letter.
Inconvenience is a form of non-financial loss. FOS considers compensation should
not be provided where an insured merely suffers inconvenience that is a normal part
of doing business. We expect an insured to be moderately robust and bear the
normal degree of inconvenience experienced when a problem occurs .
Overall, I accept the FSP‟s handling of the claim was reasonable. As such, no award
of compensation is warranted in the circumstances.
Case No: 504294 Recommendation Page 5 of 5
6 Supporting information
6.1 Relevant timeline of events
Date Action
04 - 05 - 2017 Applicant lodged a claim under storm cover.
25 - 05 - 2017 FSP obtained C‟s initial report.
30 - 06 - 2017 FSP obtained A‟s report.
07 - 07 - 2017 FSP obtained C‟s second report.
25 - 07 - 2017 FSP verbally informed the applicant his claim will be denied, the applicant requested
a formal denial letter.
01 - 08 - 2017 FSP issued initial denial letter.
12 - 09 - 2017 Applicant advised FSP dissatisfaction with claim outcome and processing and
requested escalation of the same.
12 - 09 - 2017 FSP escalated the applicant‟s claim and sought further details form the applicant.
22 - 11 - 2017 FSP issued a final decision letter.
6.2 Relevant expert report findings
Record Relevant key points
FSP’s a sse ssor (C)
First report – water damage claim
22 - 05 - 2017
Three storey townhouse constructed circa 2008, maintained
to a high standard.
Water ingress to the first floor ceiling areas (situated under
bedroom balconies).
Caus e of rainwat er ingress pending contractor‟s report.
FSP’s construction asse sso r (A)
30 - 06 - 2017
The balcony does not have an overflow, as a result during
heavy downpour water pools on the balcony.
Water penetration of the underside of the balcony is a strong
indication the waterproofing membrane has failed.
FSP’s a sse ssor (C)
Water damage claim report two
07 - 07 - 2017
Leak det ection report shows balcony defects allowed water
into the property.
Policy excludes inherent defects, recommend denial of the
applicant‟s claim.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.