Text of the determination
Determination
Case No: 504135 Determination Page 1 of 6
Case number: 504135 17 July 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her home insurance policy with the financial
services provider (FSP) for hail damage to her roof. The applicant says the damage
was caused by a severe hail storm in November 2014.
The FSP denied the applicant’s claim on the basis that the damage pre -existed the
storm in November 2014 and was caused by wear and tear, corrosion and
deterioration over an extended period of time.
The applicant disputes the FSP’s decision and seeks cover for the cost of replacing
the roof.
1.2 Issues and key findings
Is the FSP liable for the damage to the roof?
The available information establishes that the applicant’s roof s uffered extensive hail
damage during the storm in November 2014. The roof needs to be replaced as a
result of the hail damage.
Under the terms of the policy, the FSP is required to restore the roof to its condition
when new. The policy does not provide for any reduction in the FSP’s liability to take
account of any pre-existing damage to the roof at the time the damage occurred.
Accordingly, the FSP is required to cash settle the applicant for the cost of replacing
the damaged asbestos roof sheeting and aluminium awnings.
1.3 Determination
This determination is in favour of the applicant.
The FSP is required to cash settle the applicant for a total of $49,488.69. The FSP is
not required to pay interest on this amount.
Case No: 504135 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the FSP liable for the damage to the roof?
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, it has suffered
a loss caused by a risk insured against under the policy. This is known as a valid (or
prima facie ) claim.
If the applicant is able to establish a valid claim, then the onus shifts to the FSP to
show that, on the balance of probabilities, it is entitled to rely on an exclusion under
the policy or is otherwise entitled to deny the claim.
The applicant’s policy provides cover for loss or damage caused by the insured
events listed in the policy (including ‘storm’), subject to the conditions and exclusions
contained in the policy.
The policy excludes cover for damage caused by corrosion, gradual deterioration,
depreciation or wear or tear. Further, there is no cover for damage which occurred
before the period of insurance commenced.
Applicant has established a prima facie claim
The applicant says her roof suffered hail damage during a storm which occurred in
November 2014. She says the damage to the asbestos roof sheeting is so extensive
that the roof requires replacement.
Media reports confirm th at the area in which the applicant’s property is located was
affected by a severe hail storm on 27 November 2014. The Bureau of Meteorology
reportedly described the storm as the worst to hit Brisbane in a decade.
The applicant has provided reports from her builder (MB) and asbestos consultant
(RD) which identify visible hail damage to the ridge cappings, flashings, asbestos
roof sheets and aluminium awnings. MB and RD state that the nature of the damage
is consistent with having been caused by the hail storm in November 2014.
In these circumstances, I am satisfied that the applicant has established a prima
facie claim for storm damage under the policy. Accordingly, the FSP is required to
show that, on the balance of probabilities, it is entitled to rely on a policy exclusion in
order to deny the claim.
FSP says damage is due to wear and tear over an extended period of time
The FSP disputes the findings in the reports provided by the applicant’s consultants.
It says the damage to the roof was caused by wear and tear over the 50 to 60 year
life of the roof.
The FSP has provided a report from its engineer (DF) which states that he did not
identify any impact damage to the roof which was consistent with having been
caused by the hail storm in November 2014.
Case No: 504135 Determination Page 3 of 6
DF identified various forms of pre-existing damage to the roof, including movement of
cement grouting, cracking in the ridge capping and flashing, broken roof sheets,
corrosion of gutters and extensive surface mould.
However, DF advised that there was no evidence of storm damage which was likely
to have occurred within the two years prior to his inspection in September 2016.
Available information does not show damage was caused by excluded factors
The available information establishes that the applicant’s roo f had pre-existing
damage at the time of the storm.
Some of the damage identified by the FSP’s engineer (DF) is consistent with usual
wear and tear over the life of the roof (such as corrosion of the gutters and
displacement of the grouting).
However, having carefully reviewed the reports provided, I am satisfied that there is
also evidence of impact damage to the roof caused by hail.
The reports provided by the applicant’s contractors (MB and RD) include several
close-up, colour photographs which appear to show multiple examples of ‘pitting’
damage caused by the impact of hail stones.
In his report, RD states that the white spotting evident in the photographs is pitting
damage caused by the removal of small amounts of the upper surface of the
asbestos roofing materials due to the impact of hail stones.
RD advised that the northern and western facing roof sheets had significant pitting
damage, while the roof above the northern deck had suffered delamination of the
roofing sheets (typical of extreme hail damage). MB estimated there was damage to
75% of the area of the roofing sheets.
The roofing contractor (RT) appointed by the FSP also reported that there was visible
hail damage to the ridge capping and asbestos sheeting (including impact damage
shown by the whiter areas and delamination of the deck roof). RT considered the
damage was sufficient to require the replacement of the roof.
However, the FSP’s engineer (DF) subsequently advised that there was no evidence
of pitting or breakage damage which was consistent with the hail storm in November
2014.
While DF did not expressly address the delamination of the roof above the northern
deck, he did acknowledge that there was impact damage to the asbestos roof
sheeting in various areas, as shown by the cracked and broken edges of the roof
sheets.
However, given the build-up of surface mould on the damaged edges, DF considered
this damage had not been caused by a single storm, but was more likely to be the
result of a number of storms over the life of the roof.
DF considered the white spotting identified by RD was not ‘damage’ but rather
isolated spot removal of the built-up surface mould on the roof, revealing the original
fibro roof sheets underneath.
Case No: 504135 Determination Page 4 of 6
In light of the conflicting opinions expressed by the various consultants, I am not
satisfied that the FSP has established that all of the damage to the roof was caused
by wear and tear and gradual deterioration.
I am satisfied there is also evidence of e xtensive hail damage to the roof. In reaching
this conclusion, I have had particular regard to:
the photographs included in the reports provided by the various contractors
the views expressed by RD (an asbestos specialist), and
the fact that the FSP’ s own contractor (RT) identified extensive hail damage to
the roof during his inspection.
Bulk of damage occurred during period of cover
The FSP says that any hail damage to the applicant’s roof cann ot be attributed to the
storm on 27 November 2014, as the roof will have been affected by a number of
storms over its lifetime. By way of example, the FSP’s engineer (DF) referred to
previous storms in 1974, 2011 and 2013.
However, given the severity of the hail storm in November 2014 (and the extensive
damage to the surrounding area), I am satisfied that on the balance of probabilities, a
significant proportion of the damage to the applicant’s roof occurred during this
storm.
Further, to the extent that any of the damage was caused by the earlier hail storm in
November 2013, the FSP would also be liable for this damage. The applicant had
held a home insurance policy with the FSP since November 2011.
The FSP says its ability to determine when the damage occurred has been
prejudiced by the applicant’s late lodgement of her claim. The applicant did not lodge
her claim until July 2016 (almost two years after the storm occurred).
Any delay in lodging a claim will often make it more difficult to identify the cause of
damage and determine exactly when it occurred.
However, in the present case, it appears that the applicant lodged her claim as soon
as she became aware of the damage to her roof (following the inspection carried out
by MB). Further, both parties have engaged consultants whose opinions have been
of value in determining how and when the damage occurred.
In these circumstances, I am not satisfied that any prejudice suffered by the FSP is
sufficient to justify reducing its liability to the applicant.
FSP is required to cash settle applicant for replacement cost
For the reasons outlined above, the FSP is not entitled to rely on the relevant
exclusions under the policy to deny the applicant’s clai m. Accordingly, the FSP is
required to settle the claim in accordance with the terms of the policy.
The policy schedule confirms that the applicant had elected to take out ‘replacement
cover’ available. Accordingly, under the terms of the policy, the FSP is required to
restore the roof to its condition when new.
Case No: 504135 Determination Page 5 of 6
The policy does not provide for any reduction in the FSP’s liability to take account of
the condition of the roof at the time the damage occurred.
The reports provided by MB, RD and RT confirm that the extent of the hail damage to
the roof is such that it requires complete replacement (independent of any pre-
existing damage caused by wear and tear). RD advised that the impact damage
creates an ongoing risk of asbestos fibres being released during future storms.
The applicant’s asbestos removal contractor (GB) has confirmed that alternative
repair methods will not be effective. GB has provided a quotation for $40,538.69 for
the removal of the existing asbestos roof, decontamination of the ceiling cavity and
installation of a replacement roof.
Accordingly, I consider the FSP is required to cash settle the applicant for the full
amount of GB’s quotation.
The applicant has advised that the aluminium awnings have also suffered hail
damage and require replacement at a quoted cost of $8,950.
The FSP’s builder (AB) identified hail damage to the front and rear awnings during
his initial assessment in August 2016. AB considered the damage was consistent
with having been caused by the hail storm in November 2014. He recommended that
the awnings be replaced at an estimated cost of $7,573.96.
In these circumstances, I am satisfied that the applicant’s quotation for the
replacement of the awnings is reasonable (given the passage of time).
Accordingly, the FSP is required to cash settle the applicant for a total of $49,488.69.
The FSP is not required to pay interest on this amount.
Case No: 504135 Determination Page 6 of 6
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) Australia on 21 February 2018. The recommendation
was rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
During the course of this dispute, the applicant has been represented by her builder
(MB) . For the purposes of this determination, submissions made by the applicant’s
representative have been treated as if they had been made by the applicant herself.
3.2 Terms of policy
Subject Terms
Cover for
listed events
– storm
We will cover your buildings or contents for loss or damage as a result of the
incidents listed on the following pages …
Storm, flood rainwater or wind
We will cover your buildings or contents for loss or damage as a result of storm,
flood, rainwater or wind …
Listed events
- e xclusions
Any cover we provide is subject to the following exclusions …
We will not cover any loss or damage as a res ult of, or caused by: ….
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear …
General
exclusions
We will not cover any loss or damage, or liability as a result of, or arising from:
any incident that does not occur with your period of insurance …
Settlement of
claims
If your buildings suffer loss or damage, we will decide whether to:
repair
rebuild, or
pay you th e cost to repair or rebuild that part of your buildings that suffered
loss or damage.
If we do, we will only repair, rebuild or pay you for the part or parts of the building
that actually sustained loss or damage …
If we decide to repair or rebuild your buildings and the current schedule
show s ‘including replacement benefit’
We will repair or rebuild the part of your buildings that suffered the loss or
damage to a condition as close as possible to when new, but not better.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.