Text of the determination
Determination | Case number: 504025 Page 1 of 11
Determination
Case number: 504025 9 November 2018
1 Determination overview
1.1 Complaint
The complainants own an investment unit (Unit 2) which is insured under a building
insurance policy held by the body corporate with the financial firm (insurer).
In June 2014, the complainants lodged a claim under the policy for cracking and
movement damage to the western wall of their unit. The complainants say the
damage was caused by one or more leaking pipes located near the unit.
The insurer denied the claim on the basis that the damage was not caused by water
leaking from broken pipes, but by naturally occurring earth movement over an
extended period of time.
The complainants dispute the insurer’s denial of their claim. They say the insurer did
not properly investigate the potential effect of all the water leaks at the property.
The complainants seek cover for the cost of repairing the wall and reinstating
concrete paths and landscaping. They are also dissatisfied with the manner in which
the insurer handled their claim.
1.2 Issues and key findings
Is the insurer liable for the damage to Unit 2?
Based on the available information, the damage to Unit 2 was caused by earth
movement which was not related to the leaking pipes. The nature and extent of the
damage is not consistent with it having been caused by the water leaks identified.
Accordingly, the insurer is not liable for the damage.
Is the insurer responsible for reinstating the paving and landscaping?
The insurer’s liability depends on why and by whom the paving and landscaping were
removed. As this is not clear from the information provided, the ins urer is to re-attend
the property to clarify the circumstances in which these works were carried out.
Determination | Case number: 504025 Page 2 of 11
Are the complainants entitled to compensation?
The complainants are entitled to compensation of $750 for stress and inconvenience
due to the manner in which the insurer handled their claim.
1.3 Determination
This determination is substantially in favour of the financial firm (insurer).
The insurer is not liable for the cracking and movement damage to Unit 2.
However, within 30 days after the complainants accept this determination, the insurer
is required to re-attend the property to confirm the circumstances in which the paving
and landscaping were removed.
Following the insurer’s re -attendance at the property, liability for the reinstatement of
the paving and landscaping will be determined in accordance with section 2.2 below.
The insurer is also required to pay the complainants the amount of $750 as
compensation for non-financial loss.
Determination | Case number: 504025 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer liable for the damage to Unit 2?
Policy provides cover for escape of water subject to exclusions
The complainants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the complainants are able to establish a prima facie claim, then the onus shifts to
the insurer to show that, on the balance of probabilities, it is entitled to rely on a n
exclusion under the policy or is otherwise entitled to deny the claim.
The policy provides cover for damage caused by the events listed in the policy,
subject to the conditions and exclusions set out in the policy. The insured events
include damage caused by liquid leaking from a fixed domestic apparatus or system.
However, the policy contains general exclusions for damage caused by:
earth movement, vibration, erosion, landslide or subsidence (except when caused
by earthquake)
settling, shrinkage or expansion in the building or its foundations, or
wear, tear, depreciation or gradual deterioration.
Complainants say damage was caused by water leaks
The unit owned by the complainants (Unit 2) is one of four free standing units which
are approximately forty years old.
The complainants acknowledge that Unit 2 has suffered cracking and movement
damage over its lifetime, due to differential earth movement resulting from naturally
occurring moisture changes in the reactive clay foundation soils.
However, the complainants say that for many years this damage was relatively minor.
They say that the cracking damage to the western wall which is the subject of the
current claim is far more severe.
The reports provided by the insurer’s engineer (FE) confirm there is significant
cracking and movement damage to the western wall of Unit 2. F loor level surveys
carried out by FE identified relative settlement of 65 millimetres towards the north-
east corner of the unit and 100 millimetres towards the north-west corner.
When the complainants lodged their claim in June 2014, they advised that the
damage to the wall had worsened significantly over a period of several years. While
the date of loss was recorded as June 2009, the complainants are unsure exactly
when the damage commenced.
Determination | Case number: 504025 Page 4 of 11
At the time they lodged their claim, the complainants did not know what had caused
the damage. However, they have since identified a number of water leaks which they
consider (either alone or in combination) may have caused the damage to the wall.
The water leaks identified by the complainants include:
a leak from a stormwater drain located under the garage of Unit 1, which was
accepted by the insurer as having damaged the garage, under a separate claim
lodged in 2012,
two further leaks from stormwater drains, which were identified by a plumber (MF)
in August 2014 (referred to in the claim documents as Leak 1 and Leak 2), and
two additional leaks from water supply pipes which the complainants say were
identified in late 2013 or early 2014.
Insurer says damage was not caused by any of the water leaks identified
After the complainants lodged their claim, the insurer appointed a structural engineer
(FE) to determine the cause of the damage. FE subsequently engaged a geotechnical
engineer (GT) to undertake various tests at the property.
FE and GT carried out extensive investigations at the property over a twelve month
period and produced a number of reports. During the investigative process, FE also
considered and responded to a number of issues raised by the complainants.
FE concluded that the damage to Unit 2 had occurred over an extended period of
time and had been caused by naturally occurring earth movement due to long-term
factors affecting the property. Such factors included:
the slab and footings being structurally inadequate to deal with differential
movement resulting from usual seasonal changes in the moisture content of the
reactive clay soil, and
abnormal moisture conditions such as the drying effects of trees located near the
north-west corner of Unit 2 and the proximity of the common sewer trench parallel
to the western wall, which FE considered had contributed to the pattern of
settlement observed.
GT identified abnormally high moisture in the sub-soils near the south-west corner of
Unit 2, resulting in possible bearing failure in that area. However, FE noted that the
relative downwards movement in this area was less than in other areas where the
soils were drier.
After reviewing the information provided, FE advised that the nature and location of
the damage to Unit 2 was not consistent with having been caused by any of the
leaking pipes identified.
Determination | Case number: 504025 Page 5 of 11
Damage caused by naturally occurring earth movement is excluded from cover under
the policy. Accordingly, based on the findings of its engineers, the FSP says it is not
liable for the claimed damage.
I accept that, as engineers, FE and GT are appropriately qualified to determine the
cause of damage to the complainants’ property.
However, I acknowledge that the complainants have provided detailed submissions,
which raise a number of questions about FE and GT’s findings.
The complainants have also provided a report from their building consultant (IB) who
considered that the various reports provided by FE were conflicting and did not reach
a final conclusion about the cause of damage.
IB stated that the damage had been caused by the soils surrounding the property
becoming saturated due to leaking water and then subsequently drying out.
I have carefully reviewed the various reports and other information provided for the
purpose of determining the proximate cause of the damage to Unit 2 (that is, the
dominant, effective or operating cause).
Property was subject to long-term earth movement
It is clear that both Unit 2 and the other units at the property have been subject to
long-term earth movement, due to the impact of various environmental factors
affecting the moisture content of the highly reactive clay foundation soils.
Such factors include the drying effects of the various trees located at the property (as
evident in the photographs provided), as well as seasonal weather conditions
(including a lengthy drought and periods of heavy rainfall).
The insurer’s engineers (FE and GT) also identified the presence of sub -soil
rehydration drains as potentially contributing to abnormal moisture conditions at the
property. However, the complainants have advised that these drains were installed
many years earlier and were only operational for a short period of time.
The floor level surveys carried out by FE identified that all four units at the site had
suffered differential earth movement, resulting in relative settlement (downwards
movement) across each unit. In the case of Units 1, 3 and 4, the overall settlement for
each unit was between 50 and 76 millimetres.
GT considered that these results were consistent with the nature of the reactive clay
soils at the site, which would be expected to result in movement of up to 75
millimetres (or higher in the case of abnormal moisture conditions, including the
presence of trees).
Determination | Case number: 504025 Page 6 of 11
Nevertheless, the level of movement identified at Unit 2 (in particular, at the north-
west corner) was noticeably greater than for the other units.
Accordingly, it is necessary to consider whether any specific, localised factors (in
particular, leaking pipes) may have caused or contributed to this movement.
Damage was not caused by leaking stormwater pipe under garage of Unit 1
In their submissions, the complainants have suggested that the damage to Unit 2 may
have been caused by a leaking stormwater pipe near the garage of Unit 1.
The collapse of the garage was the subject of a separate claim lodged in 2012. The
insurer accepted liability for that claim on the basis that water had leaked from the
broken pipe into the common sewer trench located directly under the garage, causing
it to collapse.
The insurer has advised that only limited investigations were carried out in relation to
the earlier claim, as the cause of damage was not in dispute.
The complainants say that the leaking stormwater pipe under the Unit 1 garage may
have caused or contributed to the damage to Unit 2. They consider that water from
the leaking pipe could have tracked along the common sewer trench, which runs
parallel to the western wall of Unit 2.
The insurer’s engineer (FE) considered the potential impact of the earlier stormwater
leak and advised that it would not have caused the damage to Unit 2.
FE noted that the leak caused significant damage to the Unit 1 garage because the
footings of the garage had been constructed directly over the sewer trench, which
was affected by the leak.
By contrast, Unit 2 was not constructed over the sewer trench and was located further
from the leak. The volume of stormwater run-off collected by the leaking pipe was
also limited to the run-off from the roof of the carport.
Having regard to the matters outlined above, I am not satisfied that the damage to
Unit 2 was caused by the leaking stormwater pipe under the Unit 1 garage.
Damage was not caused by subsequent stormwater leaks (Leak 1 and Leak 2)
During the early stages of the current claim, the plumber (MF) carried out testing of
the underground sewer and stormwater pipes in the vicinity of Unit 2.
MF identified two leaks in the stormwater pipes, as follows:
a leak from a major break in the two stormwater pipes near the south-west corner
of Unit 3 (and the north-west corner of Unit 2). These pipes discharge all of the run-
off from the roofs of Units 3 and 4 (referred to as Leak 1), and
Determination | Case number: 504025 Page 7 of 11
a leak from the top of the stormwater drain near the south-west corner of Unit 2.
This drain collects run-off from the roof of the Unit 2 carport (referred to as Leak 2).
The complainants say that water from Leaks 1 and 2 could have run along the service
trench, draining the north-west corner of Unit 2 and causing the south-west corner to
become abnormally moist.
However, FE considered that neither of these leaks had caused or contributed to the
damage to Unit 2 because:
the soils in the vicinity of Leak 1 (the north-west corner of Unit 2) were drier than in
other corners of Unit 2, and this area had experienced relative settlement rather
than heave, and
Leak 2 would have resulted in only limited volumes of water being discharged, due
to the limited run-off collected and because there was not a complete break in the
pipe.
I consider that FE’s report provides a logi cal and reasonable explanation of the likely
effect of Leaks 1 and 2 on Unit 2. Based on FE’s findings, I am not satisfied that the
damage to Unit 2 was caused by these leaks.
Complainants have provided insufficient information about leaking water pipes
In their submissions, the complainants have identified an additional two leaks from
water supply pipes which they say may have caused or contributed to the damage to
Unit 2. The complainants say that:
a leaking water supply pipe was identified in the yard o f Unit 1 (approximately 8
metres from the south-west corner of Unit 2) in or around late 2013, and
a further leaking water pipe was identified near the common sewer trench less than
10 metres from Unit 2.
The complainants say these leaks resulted in the release of approximately 400,000
litres of water into the foundation soils in the vicinity of Unit 2.
Both of the above leaks were discovered some time before the complainants lodged
their claim. However, the complainants say they only became aware of the potential
relevance of the leaking water supply pipes during the claim process.
The complainants say the insurer (and its engineers) did not properly consider the
potential effect of these leaks.
During the course of this dispute, the insurer acknowledged that leaking water supply
pipes of the kind described by the complainants may have contributed to the
abnormally high moisture identified in the south-west corner of Unit 2.
Determination | Case number: 504025 Page 8 of 11
The insurer was unable to inspect the leaking pipes, as they had already been
repaired before the claim was lodged.
However, the insurer agreed to consider the potential effect of the leaks, subject to
the complainants providing independent information co nfirming the nature and
location of the leaks, including:
copies of water bills confirming comparative water usage during the relevant
period, and
a report (and invoice) from the plumber who identified and repaired the leaks.
The complainants have provided copies of their water bills which reflect a significant
increase in water usage during late 2013 and early 2014.
However, despite repeated requests, the complainants have not provided a report
from the plumber (or any other contractor) involved in the relevant works.
Among other things, this information is required to confirm the nature of the damage
to the water supply pipes, the exact location of the leaks and the date when the leaks
were discovered and repaired.
In the absence of this information, it is not possible to determine whether (and, if so,
to what extent) the leaking water supply pipes may have contributed to the damage to
Unit 2.
Accordingly, based on the limited information available, I am not satisfied that the
damage to Unit 2 was caused by leaking water supply pipes.
Insurer is not liable for damage to Unit 2
The parties agree that the damage to Unit 2 was caused by differential earth
movement, resulting from changes in the moisture content of the reactive clay
foundation soils.
However, under the terms of the policy, the insurer is only liable for the damage if the
proximate cause of the movement was one or more of the leaking pipes at the
property.
For the reasons outlined above, I am not satisfied that this is the case.
While the insurer’s engineer identified abnormally high moisture near the south -west
corner of the building (resulting in bearing failure), the available information does not
establish this moisture was caused by a leaking pipe.
In any event, the results of the leve l surveys confirm that the greatest settlement has
occurred in the driest areas (in particular, the north-west corner). This is consistent
Determination | Case number: 504025 Page 9 of 11
with FE’s conclusion that the damage has been caused by environmental factors,
such as the drying effect of trees.
Accordingly, the fact that the insurer did not definitively identify the source of the sub -
soil moisture in the south-west corner does not invalidate its conclusion that the
damage was not caused by an insured event.
FE also noted that the presence of the deep, common sewer trench (and the poorly
compacted fill material) parallel to the western wall of the property, which he
considered was likely to have contributed to the settlement observed.
FE’s conclusions are supported by photographs which show damage to various other
structures located near the sewer trench (including the shed of Unit 4 and the
boundary fence between Units 3 and 4), which appear to be leaning towards the west.
For the reasons outlined above, I am satisfied that the damage to Unit 2 was caused
by earth movement resulting from factors other than the leaking pipes. Accordingly,
the insurer is not liable for this damage.
2.2 Is the insurer responsible for reinstating the paving and landscaping?
Liability for concrete paths and landscaping depends on purpose of removal
The complainants say the insurer should be required to reinstate concrete paving and
landscaping around the western side of Unit 2, which was removed during the claim
process.
It is unclear from the information provided when, b y whom and for what purpose the
concrete paving and landscaping was removed.
The complainants say the paving was removed by FE or GT during their initial
investigations. However, in his report, the complainants’ building consultant states
that the paving and landscaping was removed by the contractor who completed the
repairs to the Unit 1 garage (which was the subject of a separate claim).
Further, the photographs taken by the plumber (MF) in August 2014 indicate that
paving had already been removed from the area where the leaking stormwater drains
were located. This appears to have occurred before FE and GT were appointed to
investigate the cause of the damage to Unit 2.
The insurer has offered to re-attend the property to identify the areas from which
concrete paving and landscaping has been removed. I consider a further inspection is
appropriate.
The insurer’s liability depends on why and by whom the paving and landscap ing were
removed. If the works were carried out:
Determination | Case number: 504025 Page 10 of 11
by the insurer’s consultants (FE and GT) in the course of investigating the cause of
the damage to Unit 2, then the insurer is liable for the cost of reinstatement,
as part of the repairs to the Unit 1 garage, then reinstatement should be addressed
in the context of that claim (and not the current complaint), and
for the purpose of identifying or repairing leaking pipes at the property, then the
insurer is not liable for the reinstatement (as the leaks have not caused damage
which is covered under the terms of the policy).
2.3 Are the complainants entitled to compensation?
Complainants are entitled to compensation for non-financial loss
Under the FOS Terms of Reference, compensation for non-financial loss (capped at
$3,000) may be awarded where a complainant has suffered an unusual degree or
extent of physical inconvenience, time taken to resolve the situation or interference
with the complainant ’s expectation of enjoyment or peace of mind.
The complainants are dissatisfied with the manner in which the insurer handled their
claim. In particular, the complainants say the insurer and its engineers failed to take
into account the additional information they provided during the course of the claim.
Having reviewed the claim history, I am satisfied that the insurer handled the claim
reasonably overall. As outlined above, the insurer undertook extensive investigations
to determine whether the damage to Unit 2 had been caused by leaking pipes.
However, it appears from the information provided that the insurer did not promptly
pass on to its engineers the additional information provided by the complainants
regarding the leaking water pipes.
This oversight by the insurer did not affect the outcome of the claim because the
complainants did not provide enough information (either at the time or subsequently)
to substantiate the effect of the leaking pipes.
However, I accept that the insurer’s conduct has caused the complainants additional
stress and inconvenience, as it led them to believe their claim had not been properly
investigated.
In the circumstances, I consider the complainants are entitled to the amount of $750
as compensation for non-financial loss.
Determination | Case number: 504025 Page 11 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
Applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this dispute
We have considered it appropriate to expedite this dispute in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this dispute has not been the subject of a preliminary
assessment and has proceeded directly to determination.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.