Home / Financial Firm (Unknown - Insurer) / Determination 503570
Determination 503570
claim_denial
Summary
The applicant sought the FSP to pay for waterproofing and retiling a shower recess and to carry out repairs rather than cash settle. AFCA found the shower recess waterproofing was excluded, the cash settlement of $6,495.44 was fair, and the assessor's inconsistent report caused no detriment.
The shower recess waterproofing is excluded maintenance, the policy allows cash settlement at the FSP's discretion, and no estoppel arose because the applicant did not rely on the assessor's error to his detriment.
Issues
- Claim denial primary · not upheld
“The FSP is not liable for the cost of stripping out, water proofing and retiling the shower recess”
- Claim amount dispute secondary · not upheld
“the FSP is entitled to cash settle the applicant... the cash settlement amount is fair and reasonable”
- Poor communication secondary · not upheld
“the assessor's initial report noted waterproofing and retiling as an insurable repair, but the applicant suffered no detriment from the assessor's mistake”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 503570 Determination Page 1 of 4
Case number: 503570 21 March 2018
1 Overview
1.1 Dispute
The applicant (and his wife) holds a landlord insurance policy with the financial
services provider (FSP) to cover their investment property against certain insured
events, such as an escape of liquid.
Leakage from a copper pipe connected to the hot water system in the laundry
affected carpet in the adjoining area. The property manager sent out a plumber who
cut a hole in the laundry wall and replaced the copper pipe. The FSP has accepted
the cost of repairing the wall. This aspect of the claim is not in dispute.
Leakage from a failed waterproof membrane in the shower recess affected the
particle-board bathroom sub-floor. Although the F SP’s assessor originally noted
waterproofing and retiling the shower recess as part of the insurable repairs, the
scope of works has since been amended to exclude such repairs. However, the FSP
agreed to replace the particle-board flooring in the entire bathroom.
The FSP says that maintenance works such as waterproofing the bathroom are
excluded from the policy, and are required to be done by the applicant. The FSP
decided to cash settle the applicant because he has not yet performed such
maintenance. The FSP waived any applicable excess and paid the applicant
$6,495.44 for damage to the carpet, particle-board, and other items.
The applicant says the copper pipe to the hot water system caused the bathroom
damage and so the FSP should be responsible for waterproofing and tiling the
bathroom. The applicant says it is not reasonable to cash settle his claim.
1.2 Issues and key findings
Has the FSP fulfilled its policy obligations?
The FSP has fulfilled its policy obligations because:
the copper pipe leak in the laundry did not damage the bathroom floor
the cost of waterproofing and tiling the shower recess floor is not covered
the FSP is entitled to cash settle the applicant in discharge of its policy
obligations, and the cash settlement amount is fair and reasonable.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not required to pay any compensation to the applicant.
Case No: 503570 Determination Page 2 of 4
2 Reasons for determination
2.1 What is the first issue?
The applicant has the onus of proving the loss was caused by an insured event
The applicant has the onus of proving on the balance of probabilities the insured
event occurred and that the event caused the loss or damage claimed. This is known
as establishing a prima facie claim. It is not disputed that the applicant has suffered
damage to the particle-board flooring in the bathroom. It is also not disputed that an
insured event of an escape of liquid occurred.
In order to be successful in his claim, the applicant must show that the escape of
liquid from the laundry copper pipe caused damage to the bathroom flooring.
In order to defeat the claim, the FSP must show that the escape of liquid from the
failed waterproof membrane in the shower recess (which is an exclusion under the
policy) caused damage to the bathroom flooring.
The copper pipe leak in the laundry did not damage the bathroom floor
There were two escapes of liquid. One leak came from a copper pipe on the hot
water system located in the laundry. The applicant says the leaking copper pipe in
the laundry caused the damage to the bathroom flooring. However, the applicant has
provided no documents or evidence to support his position. The FSP appointed
professionals to inspect and assess the property. The FSP’s assessor noted only the
access hole but into the laundry wall by the insured’s plumber in order to replace the
copper pipe, but otherwise there were no signs of water damage to the laundry. The
assessor did not identify any possible damage to the bathroom from the laundry leak.
The available information limits the damage from the copper pipe leak to the laundry.
Although the laundry is next to the bathroom, I am not satisfied that the copper pipe
leak in the laundry damaged the bathroom floor.
The failed waterproofing in the shower recess damaged the bathroom floor
The second leak came from the failure of the waterproof membrane in the shower
recess. The FSP’s assessor used thermal imaging to identify the fixing of a grab rail
in the shower had caused water entry and swelling of the bottom plate of the timber
wall and particle-board sub-floor. Water pressure tests revealed that the failed
waterproofing was not caused by any leaks in the potable or hot water pipes.
The applicant has not provided any contrary information or reports. I am satisfied that
the proximate cause of the damage to the bathroom flooring was the failed
waterproof membrane in the shower recess. The policy does not cover the cost of
retiling the walls or floor of the shower recess in circumstances where liquid escaped
from a shower recess.
Case No: 503570 Determination Page 3 of 4
The FSP is not liable for waterproofing and tiling the shower recess
The FSP’s assessor noted in the body of his initial report that the insured must
engage his own tradesperson to fix the failed waterproofing. However, under the
scope of works at the end of the same report, the assessor noted water proofing and
retiling as an insurable repair:
… we have considered the repair to the shower recess to be (sic) render [it] water tight as
maintenance and has been advised to the insured to carry out works at their expense prior
to insurable repairs can be engaged.
We recommend acceptance of this claim under the defined event of escape of liquid
pending the insured engaging a suitably qualified specialist to repair the failed water proof
membrane to the shower recess.
Insurable repairs
1. Engage suitably qualified tradesman to strip out the shower recess, install
affective water proofing and retile shower recess.
This reference to stripping out, water proofing and retiling the shower recess was
removed from the scope of works in a later (corrected) report. The applicant noticed
the inconsistency in the assessor’s initial report and seeks to hold the FSP to its
assessor’s mistake by making the FSP bear the cost of water proofing and retiling
the shower recess. The applicant also says the assessor told his tenant that the
shower recess would need to stripped. By doing so, the applicant says the FSP is
prevented from denying liability for repairs.
Estoppel arises where a contracting party unequivocally represents that he will not be
relying on contractual rights or remedies, and there is detrimental reliance upon that
statement by the other contracting party. The FSP has not unequivocally represented
that it would bear the cost of waterproofing and retiling the shower recess. It is clear
from the context of the assessor’s report that the applicant was responsible for the
cost to fix the failed waterproofing. Further, the applicant has not relied upon the
representation to his detriment. The applicant has taken no steps nor suffered any
loss as a result of the assessor’s mistake.
The FSP is not liable for the cost of stripping out, water proofing and retiling the
shower recess.
The FSP is entitled to cash settle the applicant
Although the applicant has received the FSP’s $6,495.44 cash settlement cheque, he
has not yet presented it because he prefers the FSP to undertake repairs rather than
cash settle.
The applicant wants the FSP to conduct the repairs because he is concerned that
tradespeople might find further water damage to the sub-floor. Even if there was
water damage beyond the immediate vicinity of the shower recess, the FSP
increased its allowance to repair the particle board bathroom flooring from 1m 2 to
5m 2 . This anticipates that the entire bathroom sub-floor might need to be replaced,
and takes into account any additional water da mage elsewhere in the bathroom. The
applicant suffers no loss because the FSP has elected to cash settle.
When settling the claim the policy allows the FSP a discretion to either repair the loss
or damage, or pay a cash amount representing the reasonable cost to repair or
Case No: 503570 Determination Page 4 of 4
replace such damaged property. In circumstances where the applicant has not yet
performed the underlying and necessary waterproofing, the applicant is best placed
to coordinate the tradespeople engaged to perform works where some of the works
are not part of his insurance claim. I am not persuaded that it is fair for the FSP to be
held responsible for coordinating tradespeople to conduct the repairs.
The cash settlement amount of $6,495.44 was determined based on the previous
quotes of the FSP’s provider, and the FSP elected to waive any applicable excess.
The applicant has not said this settlement amount is insufficient to perform the
insurable repairs. In the absence of any quotes provided by the applicant to the
contrary, I consider the cash settlement amount to be fair and reasonable.
3 Supporting information
3.1 FOS approach
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only. The applicant says that the FSP’s
assessor’s initial report noted estimat ed start and finish dates which did not turn out
to be true. The applicant also says that despite promises to return telephone calls,
emails and the like, the FSP’s various agents did not do so. These matters do not
affect the outcome of the dispute and do not warrant additional compensation.