Cyclone Debbie claim: liability for wall damage caused by structural defects and deterioration, and cash settlement amount
Text of the determination
Determination | Case number: 503479 Page 1 of 15
Determination
Case number: 503479 6 December 2018
1 Determination overview
1.1 Complaint
The complainants lodged a claim under their home building insurance policy with the
financial firm (insurer) for damage to their investment property following Cyclone
Debbie in March 2017.
After assessing the damage, the insurer accepted the claim and authorised its
contractors to commence repairs. However, the insurer’s contractors stopped work
after they discovered additional damage to the walls at the property.
The insurer offered to cash settle the complainants for the cost of the outstanding
repairs. However, the insurer says it is not responsible for repairing the additional
damage, because this damage was caused by factors which are excluded from cover
(such as structural defects, gradual deterioration and a lack of maintenance).
The complainants di spute the insurer’s decision and seek cover for the cost of
repairing all of the cyclone-related damage to their property. They say that any pre-
existing damage was caused by inadequate repairs carried out by the insurer during
previous claims.
The complainants are also dissatisfied with the manner in which the insurer handled
their claim, as well as its refusal to provide ongoing cover for the property. The
complainants seek a refund of policy premiums paid since the C yclone Debbie.
1.2 Issues and key findings
Is the insurer liable for the disputed damage?
The available information establishes that the proximate cause of the disputed
damage was structural defects (arising from the failure to upgrade the property on
relocation to the current site) and gradual deterioration over an extended period of
time .
Determination | Case number: 503479 Page 2 of 15
Damage caused in this manner is not covered under the policy. The disputed damage
was not caused by the repairs carried out by the insurer following previous claims.
Accordingly, the insurer is not liable for the cost of repairing the disputed damage.
Is the insurer required to increase the cash settlement for the repairs?
The insurer is required to increase the cash settlement for the building repairs by
$6,951.46, to better reflect the cost to the complainants .
Are the complainants entitled to any additional amounts?
The complainants are entitled to compensation of $2,000 for stress and
inconvenience suffered due to the insurer’s failure to complete the roof repairs to an
appropriate standard during the earlier claims. The complainants are not entitled to
any other amounts.
1.3 Determination
This determination is partly in favour of the complainants.
The insurer is not liable for the cost of repairing the disputed damage to the property.
However, the insurer is required to increase the cash settlement amount for the
building repairs by $6,951.46 (to a total of $41,708.77).
The insurer is required to pay interest on the settlement amount at the rate calculated
in accordance with section 57 of the Insurance Contracts Act 1984 (Cth) from
1 December 2017 until the payment date.
The insurer is also required to pay the complainants the amount of $2,000 as
compensation for non7-financial loss.
Determination | Case number: 503479 Page 3 of 15
2 Reasons for determination
2.1 Is the insurer liable for the disputed damage?
Complainants have established a prima facie claim for storm damage
The complainants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the complainants are able to establish a prima facie claim, then the onus shifts to
the insurer to show that, on the balance of probabilities, it is entitled to rely on a n
exclusion under the policy to deny the claim.
The complainants’ policy provides cover for damage caused by the insured events
listed in the policy (including storm), subject to the conditions and exclusions set out
in the policy.
The insurer accepts that the complainants’ property suffered significant damage
following Cyclone Debbie. In these circumstances, I am satisfied that the
complainants have established a valid (or prima facie ) claim for storm damage.
Accordingly, in order to be able to deny cover for any part of the damage, the insurer
must show that, on the balance of probabilities, that damage was caused by factors
which are excluded from cover under the policy.
Additional damage was discovered after repairs commenced
After assessing the damage to the property, the insurer arranged for its builder (QA)
to undertake repairs, in accordance with a scope of work prepared in June 2017. QA
estimated the cost of the repairs at $14,103.76.
The scope of works for the repairs included refixing the timber framing and installing
extra framing and bracing tie downs to the north and south gable walls.
These items were added after an initial inspection by the insurer’s engineer (GT)
revealed that the gable walls had detached from the ceiling and floor framing and
some damage was apparent to the wall framing.
However, GT noted that the full extent of the damage to the gable walls would not
become clear until the walls had been stripped of their cladding.
When the builders removed the wall linings during the early stages of the repairs, they
discovered that the damage was far more extensive than previously identified.
QA advised that the gable walls had not been properly fixed or braced and the timber
wall framing had been poorly constructed. He noted that the wall framing showed
Determination | Case number: 503479 Page 4 of 15
signs of significant long-term deterioration with evidence of termite activity and timber
rot, particularly in the areas around the windows.
QA concluded that the condition of the gable walls was so poor that they would need
to be replaced in their entirety (rather than being repaired, as had been provided for
under the scope of works).
During the repairs, it was also discovered that the roof (which had been replaced by
the insurer during an earlier claim) did not comply with the provisions of the building
code in relation to tie downs and strapping. However, the roof did not suffer any
damage during the cyclone.
Insurer says additional damage to walls was caused by excluded factors
The insurer accepts that it is liable for the replacement of the non-compliant roof
which was installed by its builders following a claim for cyclone damage in 2014.
However, the insurer says it is not liable for the additional damage to the gable walls
discovered during the course of the repairs because this damage was not caused by
the cyclone in March 2017, but by factors which are excluded from cover under the
policy.
The insurer says the disputed damage to the walls was caused by:
the failure by the previous owners to upgrade the building when it was relocated to
the current site in or around 1989, and
long-term deterioration of the timber wall framing due to wood rot and termite
activity, as a result of water entering around the window frames.
The policy excludes cover for damage caused by:
rain entering through openings which were not caused by a storm
defects in the structure and design of the property, and
wear and tear, rot or any gradual deterioration or process.
In order to deny liability for the additional damage to the walls, the insurer must show
that, on the balance of probabilities, the proximate cause of the damage (that is, the
real, effective or dominant cause) was one or more of the excluded factors referred to
above.
It is well established at law that the proximate cause of a loss is not necessarily the
first (or the last) or the sole cause of the loss. It is the effective or dominant or
operative cause.
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances. Where there are several causes
Determination | Case number: 503479 Page 5 of 15
operating, each must be examined for the qualities of predominance and efficacy in
relation to the resultant damage.
Property did not comply with building requirements following relocation
The property is estimated to be at least 50 years old. It was originally built in another
location and was moved to the current site in or around 1989, before being purchased
by the complainants in 2000.
The insurer’s engineer (GT) has advised that, as the property was being relocated to
a cyclone prone region, it would have required structural upgrading, in accordance
with the provisions of the Building Act 1975 (Qld) in force at the time. This was also
confirmed by the insurer’s building certifier (JH).
Documents obtained from the local council indicate that architectural drawings for
upgrade works designed by a structural engineer were lodged with the council in
1989.
While the council file is incomplete, it appears likely that approval for the relocation
was granted based on the documents submitted. However, the upgrade works
described in the engineering documents were never completed and it is unclear
whether a certificate of occupancy was granted.
GT has advised that, in addition to the lack of tie downs and bracing to the gable
walls, the property has a number of other major deficiencies as a result of the
upgrade works not having been carried out.
GT considered that, if the upgrade works had been completed, it was unlikely that any
significant cyclone damage would have occurred. In addition to the current claim, the
insurer has previously repaired the property following cyclones in 2010 and 2014.
Based on the information provided, I am satisfied that the previous owners of the
property failed to comply with relevant building requirements when the building was
relocated in 1989.
Further, I am satisfied that the failure to undertake the upgrade works has contributed
significantly to the damage sustai ned by the property during the various cyclone
events.
In particular, the absence of appropriate tie downs, fixing and bracing has resulted in
the detachment of the gable walls in March 2017.
Deterioration of wall frames occurred over an extended period of time
As outlined above, the insurer’s builder (QA) identified significant deterioration of the
timber wall framing due to water entry, wood rot and termite damage. QA advised that
this damage had occurred over an extended period of time and therefore pre-existed
Cyclone Debbie in March 2017.
Determination | Case number: 503479 Page 6 of 15
The records for the claim lodged following Cyclones Dylan and Ita in 2014 confirm
there was evidence of water damage to the internal wall framing at that time. Reports
prepared by the insurer’s contra ctors identify bulging and instability in the areas of the
walls under the windows.
The engineer (CS) appointed by the insurer in 2015 concluded that rainwater had
entered the wall cavities over time due to the dilapidated state of the window frames
and/or gaps between the cladding and around the windows. These issues are clearly
evident in photographs taken at the time.
The claim records confirm that the insurer initially denied liability for the water damage
to the walls and advised the complainants that they were responsible for repairing this
damage.
The insurer reassessed its position after the complainants queried the denial.
However, the insurer ultimately upheld its original decision in May 2015, after
obtaining a further report from its builder (TM). In his report, TM confirmed that the
damage had not been caused by the recent cyclones but had occurred over an
extended period of time.
The complainants acknowledge that there is some damage due to the age of the
building but say they have undertaken maintenance to prevent ongoing water entry.
The complainants have provided copies of inspection reports prepared by their real
estate agent showing the condition of the property at various dates.
The information provided by the complainants confirms that they have taken steps to
prevent water entry, including by applying silicone around the window frames,
installing awnings over the windows and painting exposed areas.
However, it is clear from the photographs taken by QA in October 2017 that there are
still gaps where water can enter. Further, a comparison between the reports provided
by the insurer’s engineers (CS and GT) indicates that the water damage to the walls
identified in 2014 was not repaired prior to the cyclone in March 2017.
For the reasons outlined above, I am satisfied that the damage to the timber wall
framing has occurred as a result of gradual deterioration over an extended period of
time due to water entry.
Further, I am satisfied that the deterioration of the wall framing has also contributed to
the additional damage sustained to the property during the cyclone in March 2017.
The building certifier (JH) appointed by the insurer stated that the wood rot resulted in
low joint strength, which contributed to the wall studs and plates becoming
disconnected during the cyclone.
Determination | Case number: 503479 Page 7 of 15
Pre-existing damage was not caused by previous repairs
The complainants say the pre-existing water damage to the wall framing was caused
by inadequate repairs carried out by the insurer’s contractors during the earlie r
claims.
As outlined above, long-term damage to the wall framing was evident at the time of
the claim in 2014. Accordingly, such damage can only have been attributable to the
repairs carried out by the insurer’s builder (MB) following Cyclone Ului in 2010.
The insurer acknowledges that the repairs to the roof carried out by MB were
defective.
The engineer (CS) appointed by the insurer in 2014 to review the repairs advised that:
MB should have upgraded the roof battens and sheet fixings to meet the Australian
Standards which applied in 2010, rather than reinstating them to their pre-existing
condition, and
MB had failed to replace 90% of the soffits to the property.
CS advised that the defects in the 2010 repairs had resulted in the property suffering
further damage during the cyclones in 2014.
Specifically, the failure to upgrade the roof allowed water to enter the roof cavity,
while the lack of soffits resulted in water entering by way of the eaves, causing
damage to the ceilings and cornices. This damage was addressed as part of the
claim-related repairs in 2014.
However, I am not satisfied that the water damage to the gable walls which is the
subject of the current complaint was caused by the repairs carried out by MB in 2010.
The disputed damage is localised to the areas around and underneath the windows.
Accordingly, it is not consistent with having been caused by water entry through the
eaves (which would be expected to result in consistent damage along the lengths of
the walls).
The complainants say that the insurer should have advised them of the issues with
the wall framing when the previous repairs were carried out. They say the walls were
opened up and resealed on both occasions.
However, the scope of works for the 2010 repairs reflects that, other than the roof
works, the repairs were limited to the removal and replacement of the ceilings and
one internal wall lining (between the kitchen and dining room). This is consistent with
the nature of the repairs as shown in photographs taken at the time.
In these circumstances, I am not satisfied that the works undertaken during the 2010
repairs would have revealed the issues with the walls identified in 2017. The full
Determination | Case number: 503479 Page 8 of 15
extent of these issues were not apparent until the walls were thoroughly stripped of
their cladding by QA in September 2017.
As outlined above, the insurer advised the complainants there was damage to the
walls caused by long-term water entry in 2014, when it denied liability for this part of
the damage. Accordingly, the complainants were made aware of this damage at that
time.
On this basis, I do not consider that the disputed damage was caused by the repairs
carried out by the insurer following the earlier claims for cyclone damage in 2010 and
2014.
Additional damage was caused by structural defects and gradual deterioration
For the reasons outlined above, I am satisfied that the disputed damage to the
complainant’s property was caused by structural defects (arising from the failure to
upgrade the property on relocation) and gradual deterioration over an extended
period of time.
The reports provided by the insurer’s builder (QA), engineer (GT) and building certifier
(JH) all support this conclusion. In particular, GT advised that the extent of any
additional damage to the wall framing caused by Cyclone Debbie would not have
been significant, given the pre-existing condition of the timber.
The findings of the insurer’s contractors are supported by the information in the
council files, claim records and contemporaneous photographs.
The complainants dispute the findings of the insurer’s contractors. They consider the
insurer is liable for repairing all of the damage to the property and upgrading it to
comply with current building standards.
The complainants have provided a report from their building consultant (DM) in
support of their position.
In his report, DM identifies damage to various areas including the sub -floor stumps,
external cladding, wall framing and the internal walls, floors and ceilings. DM states
that all of the damage has been caused by the cyclone in March 2017.
However, while DM’s report contains numerous photographs of the damaged areas, it
does not explain the basis for his conclusion that all of the damage was caused by the
cyclone.
Further, DM’s statement that the re are no pre-existing issues with the property which
may have contributed to the damage appears inconsistent with the observed facts
(given the nature of the damage that occurred and the undisputed absence of tie
downs, bracing and fixings).
Determination | Case number: 503479 Page 9 of 15
In these circumstances, I am not satisfied that all of the damage to the property was
caused in the manner described in DM’s report.
In addition to the matters already addressed, I am not satisfied that the insurer is
liable for any damage caused by the movement of the sub-floor stumps.
The presence of packing to the stumps indicates that the building had been subject to
prior earth movement over time. To the extent that any additional damage occurred
during the cyclone, I accept the findings of the insur er’s engineer (GT) that this was
due to the absence of adequate bracing when the building was relocated to the
current site.
Insurer is not liable for additional damage
As outlined above, the complainant’s policy contains general exclusions for damage
caused by structural defects and gradual deterioration.
Further, the cover provided under the insured event of storm excludes damage
caused by rain entering the property through an opening which was not directly
caused by the storm.
I accept that the complainants may have been unaware of the pre-existing issues with
the property - in particular, the failure of the previous owners to complete the
necessary upgrade works when the building was relocated.
However, the application of the exclusions on which the insurer seeks to rely depends
solely on the cause of the damage (regardless of the complainants’ lack of
awareness).
For the reasons outlined above, I am satisfied that the insurer is entitled to rely on the
relevant policy exclusions to deny liability for the additional damage discovered during
the course of the repairs.
2.2 Is the insurer required to increase the cash settlement for the repairs?
Insurer acted reasonably in deciding to cash settle claim
After the insurer’s builders identified the pre -existing issues with the property, the
insurer ceased repairs and offered to cash settle the claim.
Given the extent of the pre-existing issues, I am satisfied that the insurer acted
reasonably. The insurer’s contractors had advised that, given the nature of the
structural defects, it was not possible to complete the claim-related repairs on a
standalone basis.
However, the insurer was required to ensure that the amount of the cash settlement
was sufficient to enable the complainants to repair the damage to the property caused
by the cyclone in March 2017.
Determination | Case number: 503479 Page 10 of 15
Cash settlement was based on cost of outstanding repairs
The cash settlement amount of $34,757.31 offered by the insurer was based on the
estimated cost of replacing the roof (which was identified as non-compliant during the
claim process), plus the cost of completing the outstanding repairs set out in QA’s
scope of works.
The insurer has provided a quotation for $23,482.80 from QA for the cost of replacing
the roof. Q A’s quotations include a number of provisional sum allowances.
The insurer adjusted the original amount of $14,103.76 quoted by QA for the claim-
related repairs by:
deducting the cost of the initial works already undertaken by QA, as well as a
separate payment made for damage to carpets and vinyl flooring, and
adding an additional amount for the tiled splashback which had been mistakenly
omitted from the original scope of works.
The insurer considers the resulting amount of $11,274.51 for the outstanding repairs
potentially overestimates the cost of the claim-related repairs, given the scope of
works on which it is based was prepared before the extent of the pre-existing damage
became apparent.
However, the complainants say the claim settlement amount is insufficient (even
putting aside the insurer’s liability for the disputed damage).
Among other things, the complainants say that the scope of works does not allow for
additional damage to the bathroom wall caused by the insurer’s contractors extra
costs associated with the repairs, given the discovery of asbestos at the property.
Insurer is required to increase cash settlement amount by $6,951.46
As outlined above, the insurer has accepted that it is liable for the cost of completing
the outstanding repairs. While the insurer considers the estimate included in the initial
scope of works to be generous, I am not satisfied this is necessary the case.
While the additional damage discovered during the course of the repairs was caused
by excluded factors, the cyclone was nevertheless a significant event capable of
causing other damage to the property.
The insurer has determined the cash settlement amount based on the estimated cost
of the roof replacement and the outstanding repairs in the scope of works, in
accordance with quotations provided by its builders .
However, having carefully reviewed the available information, I consider that the
amount of $34,757.31 offered by the insurer should be increased by an amount of
$6,951.46 (20%) to make appropriate allowance for:
Determination | Case number: 503479 Page 11 of 15
any additional costs arising from the presence of asbestos. Although there is
conflicting information about this issue, the presence of asbestos was expressly
confirmed by the insurer’s loss adjuster (AS) based on the initial works undertaken
by the builder (QA) in September 2017
an allowance for minor variations to the works, including the repair of the additional
damage to the bathroom,
the cost to the complainants of undertaking the repairs, given their lack of access
to the volume discounts and rebates provided by the insurer’s contractors, and
the additional risks assumed by the complainants due to the absence of the lifetime
guarantee.
Accordingly, the insurer is to cash settle the complainants for a total of $41,708.77 for
the building repairs.
The insurer is to pay interest on the cash settlement amount at the rate calculated in
accordance with section 57 of the Act for the period from 1 December 2017 until the
payment date.
While the initial cash settlement offer was rejected by the complainants, I am not
satisfied that the insurer clearly explained to them that they could accept the offer
while continuing to dispute that it was sufficient.
2.3 Are the complainants entitled to any additional amounts?
AFCA may award compensation
Under the Terms of Reference, a complainant may be awarded compensation for
non-financial loss (capped at $3,000) where they have suffered an unusual degree or
extent of physical inconvenience, time taken to resolve the situation or interference
with their expectation of enjoyment or peace of mind.
However, we adopt a conservative approach to the award of compe nsation for non-
financial loss. We expect a complainant to bear the usual stress and inconvenience
associated with an insurance claim.
Under the Terms of Reference, a complainant may also be awarded compensation
(capped at $3,300) for consequential financial loss incurred in connection with their
claim.
Complainants are entitled to compensation of $2,000
The complainants are dissatisfied with the manner in which the insurer handled their
claim. Among other things, they say the insurer unnecessarily delayed the repairs to
the property.
Having carefully reviewed the claim history, I do not consider the insurer’s
management of the claim was unreasonable in the circumstances.
Determination | Case number: 503479 Page 12 of 15
The claim arose from a significant weather event which caused widespread damage.
The assessment of the damage and preparation of a scope of works for the
necessary repairs required input from multiple contractors, which prolonged the
process.
The insurer has paid the complainants benefits for loss of rent for twelve months (i.e.
to March 2018), in accordance with the maximum period provided under the policy.
The insurer was not responsible for any further delay in the repairs being completed
after that date, given it had offered the complainants a cash settlement several
months earlier.
However, I consider the complainants are entitled to compensation for non-financial
loss due to the inadequate repairs to the roof carried out by the insurer’s contractors
during the earlier claims.
The failure of the insurer to complete the repairs to an adequate standard and obtain
the required certification has resulted in the roof having to be replaced on two
additional occasions. This has caused the complainants additional stress and
inconvenience.
In the circumstances, I consider the complainants are entitled to an amount of $2,000
as compensation for non-financial loss.
Complainants are not entitled to reimbursement of fees
The complainants seek reimbursement of fees paid to their building consultant (DM)
for inspecting the property and preparing his report.
Under the Terms of Reference, we may require an insurer to reimburse legal or
professional fees incurred by a complainant in connection with their complaint.
However, in the present case, I am not satisfied that the information provided in DM’s
report was material to the outcome of the complaint. In these circumstances, the
insurer is not required to reimburse the complainants for fees paid to DM.
Insurer is not required to refund premiums
The complainants seek a refund of policy premiums paid since the cyclone in March
2017. They say that, as the insurer has declined to renew cover on the basis that the
property is not in a liveable condition, it should not have charged them premiums for
the previous 12 months (when it was in the same condition).
However, while the property may not have been habitable following the cyclone, it
was not a total loss following the cyclone.
Accordingly, the complainants obtained the benefit of insurance cover during the
previous policy period. If the property had suffered additional damage (for example,
Determination | Case number: 503479 Page 13 of 15
from a fire), the complainants would have been able to lodge a claim for that damage
under the policy.
On this basis, the insurer is not required to refund the policy premiums.
Determination | Case number: 503479 Page 14 of 15
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
3.2 Our approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
dispute. Accordingly, this complaint has not been the subject of a preliminary
assessment and has proceeded directly to determination.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
3.3 Key policy terms
Subject Terms
Insured event – storm What we insure you for
We insure you for loss or damage to the home caused by storm (including
cyclone), snow or hail.
By ‘storm’ we mean a violent wind that may occur wit h thunder or heavy
rain.
What we do not insure you for
Determination | Case number: 503479 Page 15 of 15
Subject Terms
We do not insure you for loss or damage caus ed by wind, rain, snow or
hail entering the home unless it enters becaus e of structural damage to
the home that is directly caused by the storm, snow or hail.
General exclusions We do not insure you for loss or damage that is not directly caused by an
event that we ins ure you for, unless we say that we do in this policy …
We do not insure you for loss or damage or legal liability caused by:
failing to keep the home or s ite in good repair and condition …
defects in structure, design, work done, or materials used on the home
or at the site …
wear and tear
… any gradual deterioration or process
Settlement of claims If we agree to pay a claim for loss or damage to the home, we may:
pay you a cash amount for what we think are the reasonable costs of
repairing or rebuilding the home, or
pay the reasonable costs you actually incur in repairing the home if it is
damaged ….
We will pay the reasonable costs of repairing or rebuild ing the home of a
‘new for old’ basis to a condition substantially the same as but not better
than when new …
We will only pay the costs of repairing or rebuilding those parts of the
home that are directly destroyed or damaged by an event …
Please not e, we will only pay the reasonable costs of repairing or
rebuilding the home if:
the home has been kept in good repair and condition. This means it
must be structurally sound, secure, and well maintained. If it is not, we
have to reassess the value of the home before we work out the costs we
will pay you. We do this by decreasing the value of the home, taking into
account its age and the extent it has deteriorated …
Please note we will only pay your costs in getting quotes or inspection
report if we agree to do so before you get them.