Determination 502243

Cash settlement amount for lightning-damaged air conditioning units

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-21
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$85,000
SourceAFCA PDF

Summary

The applicant business claimed for lightning damage to two roof-mounted air conditioning units, and the FSP offered a $6,680 cash settlement. AFCA ordered the FSP to cash settle the cost of replacement units in their current location, plus Insurance Contracts Act interest, but rejected the relocation and roof works costs as caused by gradual deterioration.

Under reinstatement or replacement cover the insurer must pay to replace the damaged units, while the wear-and-tear and gradual deterioration exclusion removes liability for the platform and roof costs.

Issues

Subjects and remedies

home or building damagesmall businesspay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 502243 Determination Page 1 of 5 Case number: 502243 15 August 2018 1 Overview 1.1 Dispute The applicant held a business insurance policy with the financial services provider (FSP) which provided cover for its kitchen installation business. The applicant lodged a claim under the policy, after two air conditioning units (AC units) on the roof of its premises were damaged by lightning. The FSP accepted the claim and offered to cash settle the applicant for $6,680, based on the cost of replacing certain parts used in the AC units. The FSP has offered to consider further payment if additional repairs are required once these parts have been replaced. The applicant says the cash settlement offered by the FSP is not sufficient to address all of the damage caused by the storm. The applicant says the FSP should be required to pay for the cost of replacing and relocating the AC units and undertaking works to the surrounding roof area (estimated at over $85,000). 1.2 Issues and key findings Is the FSP required to increase the cash settlement amount? The additional costs associated with relocating the AC units to a different section of the roof are due to the poor condition of the platforms and roof cladding, which was caused by wear and tear and gradual deterioration. The policy excludes cover for damage caused in this manner. Accordingly, the FSP is not liable for these costs. The FSP has been unable to assess the full extent of the damage, due to safety concerns. However, based on the nature of the damage and the reports provided, the cash settlement amount should be increased to reflect cost of replacing the AC units in their current location (assuming this could be done safely). 1.3 Determination This determination is partially in favour of the applicant. The FSP is required to:  obtain a quotation from LC or AR for the cost of purchasing equivalent AC units, together with a standard allowance for installation costs (assuming the units could be reinstalled in the existing location), and  cash settle the applicant for the amount of the quotation, plus interest at the rate calculated in accordance with section 2.1 below. Case No: 502243 Determination Page 2 of 5 2 Reasons for determination 2.1 Is the FSP required to increase the cash settlement amount? Policy sets out how claims will be settled The applicant’s policy sets out how claims for damage to the business property will be settled. The policy schedule confirms that the applicant had cover for ‘reinstatement or replacement value’. In these circumstances, the FSP is required to pay the cost of rebuilding, replacing or repairing any damaged part of the business property to the same condition as when it was new. The FSP accepts that the applicant’s roof mounted AC units suffered damage when they were struck by lightning during a storm in or around December 2015. Accordingly, under the terms of the policy, the FSP is required to pay the cost of repairing the AC units to their condition (when new) or providing equivalent replacements. FSP has been unable to fully assess damage to AC units The FSP has been unable to fully assess the extent of the damage to the AC units because the area in which the units are located is unsafe. Both of the air conditioning contractors (LC and AR) engaged by the applicant confirmed that the compressor and printed circuit board (PC board) of the AC units had failed. LC advised that he was unable to confirm whether any other components of the AC units had been damaged until the compressor and PC board were replaced (so the units could be run). However, both LC and AR advised that it was unsafe to carry out any works on the AC units in their existing location, due to the poor condition of the timber platforms supporting the units and the asbestos roof sheeting on which they were mounted. Due to the safety issues, the FSP was unable to arrange for the replacement of the compressor and PC board so that further testing could be carried out. Accordingly, the FSP offered to cash settle the applicant for $6,680, being the cost of replacing these parts (less the policy excess). The FSP acknowledged that, based on LC’s advice, further repairs may be required once the replacement parts installed and additional testing completed. The FSP has offered to consider any quotations for further repairs required at this stage. Applicant says cash settlement amount is insufficient The applicant considers the cash settlement amount offered by the FSP is insufficient to indemnify it for the loss suffered and return it to its position prior to the storm. Case No: 502243 Determination Page 3 of 5 The applicant says the FSP should pay for the cost of undertaking works to the asbestos roof, so its contractors can gain access to the AC units. The applicant says the units have been in their present position for a number of years and the roof complied with applicable requirements when it was built. The roofing works involve replacing a 50 square metre section of the existing asbestos roof sheets with metal sheeting, at an estimated cost of $19,780 (plus GST). The applicant says the FSP should also pay for the cost of replacing the damaged AC units with equivalent units to be installed on a newly constructed platform located on a different section of the roof, which does not contain asbestos. Both LC and AR advised that the AC units should be relocated from their existing position. LC considered that, if the units were left to run in their current location, it was inevitable that the roof would eventually collapse. The applicant has provided a quotation from AR for these works, at a cost of $65,290 (plus GST). LC had previously provided a quotation for $71,336.36 (plus GST) for similar works (although he may have included an allowance for the roof sheeting). Damage to platforms and roof was caused by gradual deterioration After LC advised that it was unsafe to carry out works on the AC units, the FSP engaged a building consultant (CR) to inspect the timber support platforms and the asbestos roof sheeting. CR reported that:  the timber support platforms no longer had sufficient structural integrity to support the AC units  the timber framing of the platforms had rotted and the structural plywood had deteriorated due to long term exposure to moisture  the asbestos roof cladding had lost the majority of its seal and therefore had become too brittle to allow safe access, and  the roof cladding had reached the end of its useful life and required repair (resealing) or replacement. CR confirmed that none of the damage to the support platforms and the roof cladding had been caused by the storm in December 2015. FSP is not liable for costs arising from damage to platforms and roof Under the terms of the policy, the FSP is required to indemnify the applicant for the damage to the AC units caused by the storm. However, the FSP is not liable for any additional costs that arise as a result of damage caused by factors which are not covered under the policy. The support platforms and the asbestos roof may have complied with applicable building requirements when the AC units were installed. Case No: 502243 Determination Page 4 of 5 However, the extent to which the platforms and roof have deteriorated means that it is no longer possible for the AC units to be repaired or (or new units installed) in their current location. As outlined by CR, the damage to the platforms and roof cladding were caused by wear and tear and gradual deterioration. The policy excludes cover for damage caused in this manner. Accordingly, the FSP is not liable for the costs of removing the existing platforms and relocating the AC units to a different section of the roof. Cash settlement amount should be increased to cover replacement cost The FSP has been unable to assess the full extent of the damage to the AC units, due to factors outside its control (namely, the deteriorated condition of the surrounding area). As outlined above, the FSP has offered to cash settle the applicant for the cost of replacing the damage compressor and PC board. However, the FSP has acknowledged that this amount may not be sufficient to repair the AC units, in the event there is damage to other components. The FSP has offered to consider further quotations provided by the applicant once the initial repairs have been carried out. However, this does not resolve the issue in a practical sense, given the dangers associated with accessing the units. When AR provided his quotation, he advised that it was not worth replacing the existing AC units, given the PC boards and compressor had failed due to fusion. In his initial report, LC also advised that the un its were ‘not economical to repair’. The FSP has suggested that LC based his conclusion solely on the additional costs arising from the location of the units. However, this is not entirely clear from the reports provided. Further, it is not possible to conclude that the AC units can be economically repaired (putting aside the additional costs), without knowing the full extent of the damage. Having regard to the nature of the damage and the comments made by AR and LC, I consider it is fair in the circumstances that the FSP be required to cash settle the claim based on the cost of replacing the AC units in their current location (assuming this could be done safely). The quotations provided by the applicant’s contractors are not sufficiently itemised to determine an appropriate settlement amount. Accordingly, the FSP is required to:  obtain a quotation from LC or AR for the cost of purchasing equivalent AC units, together with a standard allowance for installation costs (assuming the units could be reinstalled in the existing location, and  cash settle the applicant for the amount of the quotation, plus interest at the rate calculated in accordance with section 57 of the Insurance Contracts Act (1984), for the period from 1 April 2017 until the payment date. Case No: 502243 Determination Page 5 of 5 3 Supporting information 3.1 FOS approach to this dispute This dispute has not been the subject of a Financial Ombudsman Service (FOS) recommendation. Due to the nature of the dispute, it has been referred directly for determination, in line with the Operational Guidelines to the FOS Terms of Reference. This dispute has been decided based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The applicant is a proprietary company which has been represented by its broker during the course of this dispute. For the purposes of this determination, submissions made by the applicant’s broker have been treated as if they had been made by the applicant itself. 3.2 Terms of policy Subject Terms Fire and Perils - settlement of claims Basi s of settlement There are two methods of paying Your claims. They are ‘Reinstatement or replacement value’ and ‘Indemnity value’. The claim payment method You are covered for is shown on the current Policy Schedule. 1. Reinstatement or replacement value We will pay the cost of rebuilding, replacing or repairing any damaged part of Your Business Property to the same condition as when they were new ... Fire and Perils - exclusions We will not pay for loss or damage under the Fire and Perils Cover Section caused by: …  wear and tear - … rust, corrosion or oxidation … rotting …  wear, tear , fading or gradual det erioration, provided that this Exclusion … shall not apply to subsequent loss or damage to Your Business Proper ty occasioned by a peril (not otherwise excluded) resulting from any event referred to in this Exclusion …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.