Home / Financial Firm (Unknown - Insurer) / Determination 502243
Determination 502243
Cash settlement amount for lightning-damaged air conditioning units
Summary
The applicant business claimed for lightning damage to two roof-mounted air conditioning units, and the FSP offered a $6,680 cash settlement. AFCA ordered the FSP to cash settle the cost of replacement units in their current location, plus Insurance Contracts Act interest, but rejected the relocation and roof works costs as caused by gradual deterioration.
Under reinstatement or replacement cover the insurer must pay to replace the damaged units, while the wear-and-tear and gradual deterioration exclusion removes liability for the platform and roof costs.
Issues
- Claim amount dispute primary · upheld
“the FSP is required to obtain a quotation ... and cash settle the applicant for the amount of the quotation, plus interest.”
- Claim denial secondary · not upheld
“The FSP is not liable for the costs of removing the existing platforms and relocating the AC units to a different section of the roof.”
Subjects and remedies
home or building damagesmall businesspay claimpay interest
Text of the determination
Determination
Case No: 502243 Determination Page 1 of 5
Case number: 502243 15 August 2018
1 Overview
1.1 Dispute
The applicant held a business insurance policy with the financial services provider
(FSP) which provided cover for its kitchen installation business. The applicant lodged
a claim under the policy, after two air conditioning units (AC units) on the roof of its
premises were damaged by lightning.
The FSP accepted the claim and offered to cash settle the applicant for $6,680,
based on the cost of replacing certain parts used in the AC units. The FSP has
offered to consider further payment if additional repairs are required once these parts
have been replaced.
The applicant says the cash settlement offered by the FSP is not sufficient to address
all of the damage caused by the storm. The applicant says the FSP should be
required to pay for the cost of replacing and relocating the AC units and undertaking
works to the surrounding roof area (estimated at over $85,000).
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The additional costs associated with relocating the AC units to a different section of
the roof are due to the poor condition of the platforms and roof cladding, which was
caused by wear and tear and gradual deterioration. The policy excludes cover for
damage caused in this manner. Accordingly, the FSP is not liable for these costs.
The FSP has been unable to assess the full extent of the damage, due to safety
concerns. However, based on the nature of the damage and the reports provided, the
cash settlement amount should be increased to reflect cost of replacing the AC units
in their current location (assuming this could be done safely).
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is required to:
obtain a quotation from LC or AR for the cost of purchasing equivalent AC units,
together with a standard allowance for installation costs (assuming the units
could be reinstalled in the existing location), and
cash settle the applicant for the amount of the quotation, plus interest at the rate
calculated in accordance with section 2.1 below.
Case No: 502243 Determination Page 2 of 5
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement amount?
Policy sets out how claims will be settled
The applicant’s policy sets out how claims for damage to the business property will
be settled. The policy schedule confirms that the applicant had cover for
‘reinstatement or replacement value’.
In these circumstances, the FSP is required to pay the cost of rebuilding, replacing or
repairing any damaged part of the business property to the same condition as when it
was new.
The FSP accepts that the applicant’s roof mounted AC units suffered damage when
they were struck by lightning during a storm in or around December 2015.
Accordingly, under the terms of the policy, the FSP is required to pay the cost of
repairing the AC units to their condition (when new) or providing equivalent
replacements.
FSP has been unable to fully assess damage to AC units
The FSP has been unable to fully assess the extent of the damage to the AC units
because the area in which the units are located is unsafe.
Both of the air conditioning contractors (LC and AR) engaged by the applicant
confirmed that the compressor and printed circuit board (PC board) of the AC units
had failed.
LC advised that he was unable to confirm whether any other components of the AC
units had been damaged until the compressor and PC board were replaced (so the
units could be run).
However, both LC and AR advised that it was unsafe to carry out any works on the
AC units in their existing location, due to the poor condition of the timber platforms
supporting the units and the asbestos roof sheeting on which they were mounted.
Due to the safety issues, the FSP was unable to arrange for the replacement of the
compressor and PC board so that further testing could be carried out. Accordingly,
the FSP offered to cash settle the applicant for $6,680, being the cost of replacing
these parts (less the policy excess).
The FSP acknowledged that, based on LC’s advice, further repairs may be required
once the replacement parts installed and additional testing completed. The FSP has
offered to consider any quotations for further repairs required at this stage.
Applicant says cash settlement amount is insufficient
The applicant considers the cash settlement amount offered by the FSP is insufficient
to indemnify it for the loss suffered and return it to its position prior to the storm.
Case No: 502243 Determination Page 3 of 5
The applicant says the FSP should pay for the cost of undertaking works to the
asbestos roof, so its contractors can gain access to the AC units.
The applicant says the units have been in their present position for a number of years
and the roof complied with applicable requirements when it was built.
The roofing works involve replacing a 50 square metre section of the existing
asbestos roof sheets with metal sheeting, at an estimated cost of $19,780 (plus
GST).
The applicant says the FSP should also pay for the cost of replacing the damaged
AC units with equivalent units to be installed on a newly constructed platform located
on a different section of the roof, which does not contain asbestos.
Both LC and AR advised that the AC units should be relocated from their existing
position. LC considered that, if the units were left to run in their current location, it
was inevitable that the roof would eventually collapse.
The applicant has provided a quotation from AR for these works, at a cost of $65,290
(plus GST). LC had previously provided a quotation for $71,336.36 (plus GST) for
similar works (although he may have included an allowance for the roof sheeting).
Damage to platforms and roof was caused by gradual deterioration
After LC advised that it was unsafe to carry out works on the AC units, the FSP
engaged a building consultant (CR) to inspect the timber support platforms and the
asbestos roof sheeting.
CR reported that:
the timber support platforms no longer had sufficient structural integrity to
support the AC units
the timber framing of the platforms had rotted and the structural plywood had
deteriorated due to long term exposure to moisture
the asbestos roof cladding had lost the majority of its seal and therefore had
become too brittle to allow safe access, and
the roof cladding had reached the end of its useful life and required repair
(resealing) or replacement.
CR confirmed that none of the damage to the support platforms and the roof cladding
had been caused by the storm in December 2015.
FSP is not liable for costs arising from damage to platforms and roof
Under the terms of the policy, the FSP is required to indemnify the applicant for the
damage to the AC units caused by the storm.
However, the FSP is not liable for any additional costs that arise as a result of
damage caused by factors which are not covered under the policy.
The support platforms and the asbestos roof may have complied with applicable
building requirements when the AC units were installed.
Case No: 502243 Determination Page 4 of 5
However, the extent to which the platforms and roof have deteriorated means that it
is no longer possible for the AC units to be repaired or (or new units installed) in their
current location.
As outlined by CR, the damage to the platforms and roof cladding were caused by
wear and tear and gradual deterioration. The policy excludes cover for damage
caused in this manner.
Accordingly, the FSP is not liable for the costs of removing the existing platforms and
relocating the AC units to a different section of the roof.
Cash settlement amount should be increased to cover replacement cost
The FSP has been unable to assess the full extent of the damage to the AC units,
due to factors outside its control (namely, the deteriorated condition of the
surrounding area).
As outlined above, the FSP has offered to cash settle the applicant for the cost of
replacing the damage compressor and PC board. However, the FSP has
acknowledged that this amount may not be sufficient to repair the AC units, in the
event there is damage to other components.
The FSP has offered to consider further quotations provided by the applicant once
the initial repairs have been carried out. However, this does not resolve the issue in a
practical sense, given the dangers associated with accessing the units.
When AR provided his quotation, he advised that it was not worth replacing the
existing AC units, given the PC boards and compressor had failed due to fusion.
In his initial report, LC also advised that the un its were ‘not economical to repair’.
The FSP has suggested that LC based his conclusion solely on the additional costs
arising from the location of the units. However, this is not entirely clear from the
reports provided.
Further, it is not possible to conclude that the AC units can be economically repaired
(putting aside the additional costs), without knowing the full extent of the damage.
Having regard to the nature of the damage and the comments made by AR and LC, I
consider it is fair in the circumstances that the FSP be required to cash settle the
claim based on the cost of replacing the AC units in their current location (assuming
this could be done safely).
The quotations provided by the applicant’s contractors are not sufficiently itemised to
determine an appropriate settlement amount.
Accordingly, the FSP is required to:
obtain a quotation from LC or AR for the cost of purchasing equivalent AC units,
together with a standard allowance for installation costs (assuming the units
could be reinstalled in the existing location, and
cash settle the applicant for the amount of the quotation, plus interest at the rate
calculated in accordance with section 57 of the Insurance Contracts Act (1984),
for the period from 1 April 2017 until the payment date.
Case No: 502243 Determination Page 5 of 5
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a Financial Ombudsman Service (FOS)
recommendation. Due to the nature of the dispute, it has been referred directly for
determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
This dispute has been decided based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous
FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The applicant is a proprietary company which has been represented by its broker
during the course of this dispute. For the purposes of this determination, submissions
made by the applicant’s broker have been treated as if they had been made by the
applicant itself.
3.2 Terms of policy
Subject Terms
Fire and
Perils -
settlement of
claims
Basi s of settlement
There are two methods of paying Your claims. They are ‘Reinstatement or
replacement value’ and ‘Indemnity value’. The claim payment method You are
covered for is shown on the current Policy Schedule.
1. Reinstatement or replacement value
We will pay the cost of rebuilding, replacing or repairing any damaged part of
Your Business Property to the same condition as when they were new ...
Fire and
Perils -
exclusions
We will not pay for loss or damage under the Fire and Perils Cover Section
caused by: …
wear and tear - … rust, corrosion or oxidation … rotting …
wear, tear , fading or gradual det erioration, provided that this Exclusion … shall
not apply to subsequent loss or damage to Your Business Proper ty occasioned
by a peril (not otherwise excluded) resulting from any event referred to in this
Exclusion …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.