Home / Financial Firm (Unknown - Insurer) / Determination 501825

Determination 501825

Claim denial for cyclone damage to tanks, dam wall and escarpment

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-21
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded$30,000
Non-financial loss—
Amount claimed$479,578
SourceAFCA PDF

Summary

The applicant claimed $479,578 for Cyclone Debbie damage to water tanks, a dam retaining wall and an escarpment. AFCA found the claim largely excluded for structural defects and poor design, but ordered the FSP to pay $20,000 for one tank and $10,000 for make-safe damage, totalling $30,000.

The proximate cause of the loss was ongoing structural defects and poor design rather than the storm, so the policy's structural defect and gradual deterioration exclusions apply, except for the tank the cyclone may have damaged and the make-safe works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 510825 Determination Page 1 of 9 Case number: 501825 7 August 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) for damage sustained to his property following Cyclone Debbie, in March 2017. The FSP assessed the damage and subsequently denied the cost associated with:  removing and replacing the three 30,000 litre tanks  replacing the retaining dam wall  rectifying the escarpment behind the shed. The applicant disagrees and seeks $479,578 for his loss. He also says the escarpment behind the shed suffered further damage because of the FSP’s make safe repairs. 1.2 Issues and key findings Is the FSP entitled to deny the substantial portion of the claim? The FSP is entitled to deny the claim because:  the damage is not attributed to Cyclone Debbie but rather to inadequate design and construction and some areas were already failing prior to the cyclone  the policy does not provide cover where damage results from poor design or structural defects. However, The FSP is to pay the applicant $20,000 for the cost to replace one of the three tanks. Has the applicant suffered a loss due to make safe repairs? The FSP’s engineer says the structural integrity of the slope was further impacted due to the FSP’s make safe repairs. It is fair in the circumstances the FSP pays the applicant 50% of the slope reinstatement totalling $10,000. 1.3 Determination This determination is substantially in favour of the FSP. Upon acceptance of this determination by the applicant, the FSP is to pay the applicant $30,000 to finalise its obligations under the policy. The FSP is not required to pay interest on this amount. Case No: 501825 Determination Page 2 of 9 2 Reasons for determination 2.1 Is the FSP entitled to deny the claim? Applicant has established a valid claim It is accepted insurance law that the applicant carries the initial onus to establish the policy covers the loss and damage claimed. This is known as a valid claim. Once established, the onus shifts to the FSP to show, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicant’s policy is a defined events policy. This means the policy only responds where one or more of the defined insured events causes loss or damage to the property, subject to any exclusions. Relevantly, storm is one of the defined insured events. The applicant says Cyclone Debbie, caused damage to the:  back of the shed escarpment  three water tanks  dam’s retaining wall. There is no dispute the effects of Cyclone Debbie were widespread and covered the vicinity of the applicant’s property. Given the above, the Panel accepts the applicant has a valid claim which is subject to the policy exclusions. Damaged structures have been subject to landslides The applicant says the cyclone rendered the damaged structures a total loss that require replacement. Subsequently, the FSP engaged loss adjuster (CR) to assess and report on the damage. CR arranged for make safe repairs to the shed’s drain service caused by a l andslide. This is the ‘escapement behind the shed’ which the applicant refers to. The Panel will address these make safe repairs in a later section of this determination. The FSP’s engineers say these structures were:  built without permit  defective  already failing prior to Cyclone Debbie. Consequently, the FSP denied the claim based on its engineers’ findings. The applicant disagrees and maintains the cyclone is the proximate cause of the damage. The proximate cause of damage must be established In order to determine whether the applicant’s claim falls within the scope of cover, it is necessary to determine the proximate cause of the loss. What is the proximate cause of the loss is a question of fact depending upon the circumstances of each case. Case No: 501825 Determination Page 3 of 9 It is well established that the proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active efficient cause that sets a relevant train of events in motion. Courts have said if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. ES says inadequate design and construction is the proximate cause CR engaged a geotechnical engineer (ES) to report on the causation/extent of the claimed damage. Following a site visit on 24 August 2017, i n relation to the area behind the shed escarpment, the geotechnical engineer says:  the cut slopes (undertaken in April 2013) was and is too steep to remain stable long term  ES inspected the slope in 2013, where it advised the applicant the slopes were unstable  the applicant needed to obtain certification from engineers following remediation and this was not undertaken  the cut behind the shed failed due to inadequate design and construction  the primary cause is not directly attributed to Cyclone Debbie. Further, ES says if an engineer designed and certified the cut batters, the applicant would have avoided such loss. Since 2013, ES considers the batter as unstable and expected future landslides. In regard to the water tanks, ES says:  the tanks are generally i n poor condition with numerous cracks in almost all joints  the dislocation of the tanks’ segments is due to age  there is no evidence of landslides impacting the tanks or debris flow  debris around the tank has been accumulating for decades and considered historic debris  there is insignificant shallow fresh debris between the rear and middle tanks  there is no evidence of fast water flow impacting the tanks  there is no evidence of recent movement with the exposed joints and internal cracks/gaps showing weathering  the tanks have been moving over a long period of time and Cyclone Debbie has exacerbated this defect. ES further says the rear tank dislodged due to soil/debris behind it causing it to act as a retaining structure. In his opinion, Cyclone Debbie worsened the situation by saturating the retained material and applying continued load on the tank. ES says there is no evidence the escarpment including the filling, dam, dam wall and spillway were adequately designed. He further notes even if it was, the recent rain event was extreme and water volumes exceeded capacities. Case No: 501825 Determination Page 4 of 9 ES also noted the poor drainage to be a contributing loss factor to the dam retaining wall and escarpment behind the shed. The property was subject to a GCCC show cause notice Of relevance to this dispute, the GCCC (Gold Coast City Council) served the applicant a ‘show cause notice’ in 2013 raising concerns regarding the retaining structures on the property. ES prepared a quote in response to the council’s notice. Pertinent to this dispute, par t of the work ES proposed was the ‘design of cut and fill batters’. Furthermore, the applicant was supposed to submit to the Council certification of batters/retaining structures and long-term factor of safety. Information ES and the applicant’s geotechnic al engineer (ASG) submitted indicates the applicant carried out the earthworks and excavation of the slopes at different stages prior to the cyclone. The applicant says he is a mechanical engineer and he has carried out all the work ES quoted for himself. He believes he carried out this work up to GCCC’s standard and therefore the lack of design/construction is not a contributing factor to the claimed damage. Further, the applicant tendered a report from ASG dated 22 February 2014 addressing the slope stability. In his report, the engineer says:  there is no history of landslides  there is no need to alter the retaining structures  cuts and fills are limited to the difference in surface levels, provided adequate batters are maintained. ASG noted any assessment to the retaining structures is not required. Further, ASG says surface and slope drains shall be required. Of relevance, ASG noted long-term stability. The applicant then submitted:  a decision notice to the applicant dated 6 September 2013  earthworks practical completion dated 16 May 2014  operational Works Civil dated 15 May 2014  a site plan. Forensic engineer RB establishes proximate cause Following questions raised by the Service at conciliation, the FSP engaged a forensic engineer (RB) to provide further comments on the causation of the claimed damage and the earthwork which the applicant undertook to the site. The Service exchanged the full report between parties and due to its length, the Panel will address the relevant sections of it. In shedding light on the claimed structures, RB says:  the bench workspace for the shed begun in 2013 and a larger parking space and turning area was added soon after  the northern parking area, behind and above the dam was enlarged and the dam was extended on or around later 2015 Case No: 501825 Determination Page 5 of 9  at some time between 15 May 2016 and 1 July 2016, part of the dam wall and the parking area embankment collapsed, due to the rain fall in June 2016. Parking embankment  this embankment was apparently created between May and September 2015  the face of the parking area fill was overlaid at some time by boulders  around 15 May 2015, there was some disturbance to the base of the embankment which looks like a slip  the boulders were brought in an attempt to halt this slip  on or around 22 September 2016, the parking area suffered a further partial collapse causing a slide towards the dam  on or around 24 February 2017 the embankment has been repaired  the embankment was not only poorly constructed but appears not to have been subject to any engineering design  the embankment’s design was inadequate to handle moderate rainfall in 2016 and completely failed during the cyclone  boulders did not provide any kind of retaining wall, and did not meet the correct standard of a designed boulder wall. The original dam may have been dug in 1994; however, all the alterations to it and the embankment above it were made after GCCC came into existence and therefore triggers a permit requirement and a compliance certificate following work completion. Dam and Dam wall RB says the original dam was only a hole in the sloping ground forming a natural valley to retain the water. The Queensland Department of Natural Resources and Water produced a publication ‘Farm Dam Construction’ in March 2006. This publication outlines the requirements for designing and building a dam. The applicant carried out alterations to the dam around 2015 whilst constructing the parking embankment. RB concluded the cause of damage to the dam wall was due to:  earth fill not rolled and compacted, and had it been compacted, the fill would be solid and ‘structural’  the spill way installed after the 2016 collapse was not large enough to cope with the inflow of heavy pour. A proper spillway needs to be much wider and needs protective rock or concrete in its flow path  this wall or any other part of the dam not being built to a design by an engineer or appropriate advice or documentation  the enlarged dam being far too big for the capability of which the extreme slope of this property provides. Of relevance, RB recommended the reinstatement of the dam wall should be the small dam rather than the enlarged one. Water Tanks RB agrees with ES; the tanks have all reached the end of their useful lives. Further, there is considerable evidence of cracking and deterioration irrespective of any applied damage by the cyclone. Case No: 501825 Determination Page 6 of 9 The sediment around the western tank reached the height where it is exerting lateral force on the tank, which is acting as a retaining wall. RB says he cannot fully exclude the possibility of the cyclone damaging the western most tank. However, whilst there is sediment from higher levels, it is unlikely to cause a jet of water to impact the tank. Of great relevance, most of the development work involving earthworks on this property relevant to this claim occurred after 2003 and completion was before 2016. It follows, the applicant should have complied with the requirements set out in the 2003 Planning Scheme. It appears the applicant did not obtain any of these documents prior to the excavation or filling around the workshop site in 2013, which was the first such development on this property after the scheme came into effect in 2003. The ES fee proposal in response to the GCCC’s notice shows some idea of the range and complexity of the documentation required by council for approval for earthworks on this property. RB concludes, the damaged assets on this property were defective well before Cyclone Debbie struck. The question of fact in this dispute is, whether the policy responds to poor design, faulty or non-compliant constructions. Applicant’s geotechnical reports are inconclusive Following a disagreement from the applicant, ASG who has prior knowledge of the site, carried out assessment into the causation of the damage. In his report dated 8 September 2017, ASG says: Dam and escarpment  the hydrostatic pressures became too high for the wall due to the amount of water coming down the slope  the wall failed and the boulders crashed into the nearby dam  the force of the boulders crashing caused a rapid increase in the hydrostatic forces downslope of the dam. Water tanks  water and eroded dirt from upslope came crashing into the first two tanks  pressure was great resulting in the tanks moving off their footings  this caused water and dirt to flow into tanks. On 16 October 2017, ASG provided further comments in response to questions the Service has raised:  the retaining wall constructed in 1994 showed no sign of failure until the cyclone  when assessed in 2013, the water tanks were undamaged and functioning. In response to RB’s report, ASG provided his third report dated 20 April 2018. He further says:  in 2014, applicant applied through the Council for a change in ground level request  the applicant then started to create the spillway and wall and placing boulders  the water tanks, the quick runoffs from the upper parts put pressure on the sides and walls of the tanks causing the dislodgements Case No: 501825 Determination Page 7 of 9  the washout near the shed demonstrates the intensity of runoff coming from up slope. Whilst ASG opines Cyclone Debbie is the only and proximate cause of the damage, ASG did not provide any plausible/valid counterstatement to the issues RB raised in his report. Further ASG asserts these structures were not showing any signs of failure, which contradicts the forensic photographs and analysis RB tendered. Conversely, regarding the parking embankment, ASG did not provide any proof to discredit RB. ASG did not establish how the dam’s spillway, which the applicant compiled, was compliant with the council’s requirements. The a pplicant did not tender a hydrologist or engineer’s report to address such design. ASG reached a number of conclusions; however, did not adequately provide proof of how he reached such conclusions. Further, ASG did not provide any compelling explanations a s to why ES’s and RB’s findings are not acceptable or were flawed. Applicant’s tendered GCCC documents did not advance his position The applicant tendered Earthworks Practical Completion. This certificate addresses the excavation at the rear of the worksho p on the southern side of the applicant’s property. The documentation suggests the applicant was listed as the contractor. Further, these documents do not relate to the work involved in the dam and the parking embankment, which the applicant carried out between December 2014 and May 2016. The Service requested information from the applicant, being:  construction and design details of the dam, dam and water tanks  compliance certificates for these structures. The applicant did not provide any documentation to discredit ES’s and RB’s assertion the dam and the wall were poorly designed and constructed. In the Panel’s opinion, these documents did not advance the applicant’s position. The policy excludes the proximate cause of the claimed damage The Panel questions the adequacy of the applicant’s input in the construction of the claimed structures and whether in fact there was an acceptable engineer’s input. The Panel does not accept the applicant’s argument he has the correct qualifications to carry such complex works. The applicant has not substantiated the design and construction of the claimed structures which he undertook were in fact engineered and approved by the local council. Information on file indicates the applicant was well aware since 2013 of the risks associated with his retaining structures and land status. Further, he was required to provide the GCCC with the relevant documentation. The Panel is of the view that the applicant’s initial construction work and his ongoing maintenance/reinstatement were i nadequate and substantially lacks an engineer’s input and GCCC’s approval. Case No: 501825 Determination Page 8 of 9 The information on file also shows the applicant did not adequately address these risks to mitigate further losses such as the claimed loss because of Cyclone Debbie. Further, the applicant carried out works such as enlarging the dam and its retaining wall without obtaining the correct permits. The Panel notes these structures failed in 2016 and whilst the applicant carried out repairs, clearly it was inadequate given the same struc tures failed again in 2017. On balance, the applicant did not carry out these repairs to a safe and acceptable standard. Whilst RB asserts the possibility of the cyclone damaging the western most tank, the tanks were showing deterioration and cracks, evident by the weathering concrete. The Panel accepts the cyclone might have caused the loss of function of this tank; In these circumstances, applying relevant legal principles, as landslides and structure failures would have occurred and have been occurring in the absence of Cyclone Debbie, the Panel is satisfied on balance, the proximate cause of the loss was the ongoing structural defects and the poor design. The documentation suggests the failed structure was independent of any damage caused by Cyclone Debbie. The Panel accepts the loss would have occurred regardless of the cyclone. The FSP’s policy clearly and unequivocally excludes damage because of structural defects, poor designs and gradual deterioration. It follows the dam, the retaining wall and the water tanks were of poor design and failed because of structural defects rather than the storm. Further, the applicant is claiming for the slope escarpment behind the shed. The policy covers resultant damage from the landslide but does not respond to the actual landslide. In the absence of any other information and on balance, the Panel is satisfied the FSP is entitled to deny the balance of the applicant’s claim. However, noting RB’s acceptance that the Cyclone possibly damaged the western most tank, the panel is of the view it is fair that the FSP pay $20,000 in respect to that damage. 2.2 Has the applicant suffered a loss due to make safe repairs? RB concludes escarpment lost structural integrity due to make safe repairs Following a landslide behind the shed, the face of this excavation slipped and slumped against the wall of the workshop. CR arranged for a panel builder to remove the fallen earth behind the shed as a make safe precaution. The applicant says the make safe repairs worsened the slope’s dama ge and he seeks compensation for the escarpment behind the shed. In his report, RB says the contractor seriously cut away the slope, which undermined it. Further, there is no evidence of an engineer’s input or permit obtained prior to carrying out this work. RB opines the make safe repairs destroyed the structural integrity of the excavated face. Case No: 501825 Determination Page 9 of 9 It is fair in the circumstances the FSP pays the applicant $10,000 It is not in dispute the contractor’s make safe repairs further damaged the structural integrity of the escarpment behind the shed. Whilst information on file suggests the slope’s initial cut was very steep, RB says the make safe repairs caused further damage to the slope. The FSP’s policy will not respond to the landslide itself; however, the FSP’s contractors caused further damage to the uninsured loss. The question is to what extent have these actions prejudiced the applicant. The applicant submitted a builder’s quote (MC). The quote only provides provisional/indicative costs rather than a detailed scope of works. The Panel reviewed this quote where it outlined works associated with the ‘behind the shed escarpment’ as:  supply random boulder rock wall $3,600  supply mattress rock for drain behind shed $6,400. Further, such works trigger associated cos ts such as engineers’ input, consents, project management, labour and machinery. The Panel estimates such work at $10,000. The Panel estimates the slope reinstatement totals $20,000 ($10,000 material + $10,000 associated cost). It is fair in the circumstances the FSP pays for 50% of this cost involved in reinstating the slope.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.