Determination 501573
Quality and completion of repairs following an insured storm and sewage escape claim
Summary
The applicant's home was damaged by sewage after a storm and disputes continued over repair quality, delays, contents and further damage. AFCA ordered further repairs, a contents settlement and $1,500 for non-financial loss, but rejected the claim for the patio, retaining wall and termite damage.
The agreed scope of works was not completed, and the patio and retaining wall damage was not caused by an insured event.
Issues
- Repairs or contractors primary · upheld
“The FSP has not completed the agreed SOW. The FSP is to appoint an independent building inspector”
- Claim amount dispute secondary · upheld
“The FSP is to then either restore/repair or cash settle the applicant for the contaminated or damaged contents”
- Claim denial secondary · not upheld
“The FSP is otherwise entitled to deny the applicant's claim for damage to the patio and retaining wall”
- Delay secondary · upheld
“The FSP concedes there have been delays in completing the repairs”
Subjects and remedies
pay claimpay non financial lossrepair or rectify
Text of the determination
Determination
Case No: 501573 Determination Page 1 of 7
Case number: 501573 11 September 2018
1 Overview
1.1 Dispute
On 30 November 2014 the applicant lodged a claim with the financial services
provider (FSP) after he returned from holidays to find his home flooded with sewage.
The FSP accepted the applicant’s claim and after FOS intervention in November
2016, a scope of works (SOW) for repairs was agreed on by the parties. However,
despite the agreement further disputes have arisen as to:
quality of the repairs conducted by the FSP and delays
contamination of contents placed in storage containers
additional damage caused to the property during the repair process
damage to the rear patio and retaining wall
consequential loss suffered as a result of the FSP’s actions .
1.2 Issues and key findings
Has the FSP satisfactorily completed the agreed scope of works (SOW)?
The FSP has not completed the agreed SOW. In order to resolve this the FSP is to
appoint an independent building inspector, as set out in section 2.1 of this
determination, to determine any additional work required to complete the repairs
according to the scope of works.
Is the FSP liable for further damage to contents?
The applicant is to provide the FSP access to the storage containers to allow for a
further inspection of the contents. The FSP is to then settle the applicant’s claim for
the identified contaminated or damaged contents as set out under section 2.2 of this
determination.
Is the FSP liable for additional damage?
The FSP is to have the independent building inspector assess the extent any
damage to the driveway and drains as set out under section 2.1 of this determination.
In addition, the FSP is to topsoil and seed the damaged lawn area surrounding the
water tank. The FSP is otherwise entitled to deny liability with respect to the damage
to the rear patio and retaining wall and termite damage to the back garage.
Case No: 501573 Determination Page 2 of 7
Is the applicant entitled to compensation?
The applicant is entitled to compensation for non-financial loss of $1,500 due to the
ongoing delays and issues arising from the repair process. The FSP is otherwise
entitled to deny the applicant’s claim with respect to further compensation for
consequential loss.
1.3 Determination
This determination is partially in favour of the applicant.
Within 14 days of the applicant’s acceptance of this Determination the FSP is to
appoint an independent building inspector as set out under section 2.1 of this
determination to identify the further work required to complete the repairs in
accordance with the scope of works.
Within 14 days of the acceptance of this determination and subject to the applicant
providing access to the storage containers, the FSP is to appoint an independent
assessor to inspect the stored contents and identify those items contaminated and/or
damaged whilst in storage. The FSP is to then either restore/repair or cash settle the
applicant for the cost to repair/replace the contaminated or damaged items.
Upon completion of all works to the property, the FSP is to arrange for the
independent building inspector to assess and determine the extent of damage to the
drainage, garden and/or plants caused as a result of the repair process. In addition,
the FSP is to topsoil and seed the area surrounding the new water tank.
The FSP is otherwise entitled to deny the applicant’s claim with respect to damage
sustained to the patio and retaining wall and deny the applicant’s claim with respect
to termite damage to the back garage.
The FSP is to pay the applicant $1,500 compensation for non-financial loss pursuant
to paragraph 9.3 of the Terms of Reference.
Case No: 501573 Determination Page 3 of 7
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had an opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all of the information provided and is
based on what is fair in all the circumstances having regard to relevant legal
principles, terms of the policy, good industry practice including codes of prac tice and
prior determinations where applicable.
2.1 Has the FSP satisfactorily completed the agreed scope of works ?
Issues with work performed by FSP’s contractors
The applicant has raised a number of issues with the quality of the works performed
by the FSP’s contractors and the time taken for the works to be done.
He says there are a number of issues that still need to be addressed including:
damaged blinds – the FSP has agreed to pay for one, but all the blinds were
removed and left uncovered, causing damage
top soil and turf around the water tank – he says the FSP has filled the area
with clay and rocks but it should be returned to how it was beforehand
filtration needs to be reinstalled on the water tank as the tap filter is not doing a
good enough job
the ceiling – several painters have attended to try and fix the issue but the only
way it can be resolved is by replacing it
damage to garden beds
the back garage/living area, has issues that started not long after the ensuite
and collection tanks were installed
loss of power during heavy rain – switch damaged either by the original insured
event or the FSP’s contractors runni ng too many items from it
front door – was varnished but should have been stained and needs to be fixed
kitchen splashback – allowance needs to be made as carpenter cannot build
around it
mirrors in bathroom need to be replaced as do not fit now that tiling goes to
ceiling.
FSP says cannot address issues until applicant provides full cooperation
The FSP says it cannot address the applicant’s concerns until he consents to an
inspection of the property by one of its building consultants and co-ordinator or
assessor familiar with the claim. I accept that the FSP must be provided reasonable
access to the property to allow for any inspection and assessment to be made.
Further inspection of the repairs required by a building inspector
The applicant has indicated he is open to a final inspectio n of the property but says it
should be conducted by an independent builder with no prior association to the FSP.
Case No: 501573 Determination Page 4 of 7
I do not consider this a reasonable position and I accept that it is fair in the
circumstances that the FSP be entitled to appoint a n independent building inspector
of its choice to assess the extent of the repairs.
I accept given the history of the dispute that the FSP should appoint a building
inspector who has not previously been involved with the applicant’s claim . The
appointed building inspector must be provided with all relevant expert reports and the
agreed scope of works. The applicant must cooperate with the FSP and allow
reasonable access to the property to enable the building inspection to be completed.
The applicant should be present during the inspection and may, at his choice,
appoint his own independent building inspector to attend the property at the same
time. The parties are encouraged to discuss and agree on the extent of any
additional work required to be complete the repairs in accordance with the scope of
works.
Upon completion of the inspection the FSP is to arrange for the agreed works to be
completed in accordance with the terms of the policy. Upon completion of the repairs
the FSP’s building inspector should reattend the property to confirm works have been
completed as specified.
2.2 Is the FSP liable for further damage to the contents?
Independent assessor to inspect the stored contents
The applicant says the contents stored in the containers have been further damaged
and contaminated. The applicant also says that some of the contents have not been
accounted for in the FSP’s offer s of settlement.
The applicant has refused to allow the FSP to remove the storage containers until all
contents are accounted for. He had previously agreed for items stored in the
‘damage d container’ to be collected, but upon opening, it was found to have items
that had not been accounted for by the FSP. These items had been placed into the
container by the FSP’s contractor without his knowledge or au thority. He considers
that cross contamination may have occurred.
The only way the dispute as to the contamination and damage to contents can be
resolved, is if the FSP is provided access to the containers so that a further
assessment can be conducted.
Subject to the applicant allowing the FSP access to the storage containers, then
within 14 days of the applicant’s acceptance of this determination, t he FSP is to
arrange for an independent assessor to attend the property to inspect the contents.
The applicant may be present at that time.
The assessor is to identify all contents that have either been damaged through
contamination or damaged during the storage process and provide the applicant with
a detailed itemised list of those contents.
The FSP is then entitled to either repair or restore the contents damaged or
contaminated in accordance with the terms and conditions of the policy and cash
settle the applicant’s claim for those contents that cannot be repaired or restored.
Case No: 501573 Determination Page 5 of 7
Should the applicant not be prepared to allow the FSP to restore or repair the
contents then the FSP is entitled to cash settle that aspect of the claim for the
amount it would cost the FSP to repair or restore the items.
2.3 Is the FSP liable for additional damage?
FSP to top soil and seed area near water tank
The applicant says that, the area around the water tank has been damaged during
the repairs. The applicant says that when replacing the water tank, the FSP has
failed to restore the lawn area. The soil in the area now is a clay based soil that will
not allow any lawn to grow. The applicant wants top soil placed in the area and the
area returfed.
The FSP says there is some minor subsidence in the area and that it is prepared to
put fill on the damaged area and apply seed to allow the lawn to grow.
Photographs have been supplied of the damaged area. The area appears barren
with an absence of any top soil.
I consider it reasonable in the circumstances that the FSP supply top soil to the area
which it can then seed to promote suitable growth.
Damage to driveway, garden and drains to be inspected
The applicant says the drainage in the driveway and garden area was damaged
during the works that have been carried out. The FSP has indicated that it is
prepared to review this damage once all claim works have been completed.
The applicant now says that as a result of the damage to the drainage area , some
water has been draining into the garage area. Whilst the FSP has cleared some of
drains, other drains are blocked by rubble and crus hed rock.
In the circumstances I consider it fair that the FSP arrange for its building inspector to
inspect the damage when onsite. If necessary, the FSP should arrange for the drains
to be unblocked.
The FSP must then at the completion of the SOW arrange for the area to be
inspected and any further necessary repairs completed. If the applicant is not
prepared to allow the FSP on site to complete those repairs then the FSP may cash
settle the applicant’s claim with respect to that part of the dispute.
Damage to the patio, retaining wall and garage/living area not caused by
insured event
The FSP says the applicant’s claim was accepted under the insured event of storm,
with the assessor at the time attributing the damage to storm water runoff following a
severe storm on 27 November 2014. It notes a leak detection test found no evidence
of leaking pipework. The damage caused by termites to the inside of the property
was accepted purely as a goodwill gesture and to avoid further delays.
Case No: 501573 Determination Page 6 of 7
The FSP submits termite damage is specifically excluded from cover unless the
damage is a direct result of a fire or escape of liquid event, and as such, the
applicant’s claim for damage to the patio and retaining wall caused by termites falls
outside the scope of cover.
The applicant says the patio area and retaining wall have been damaged by termites
due to the time involved in completing repairs. He considers the FSP should
complete the repair to these areas, noting it agreed to repair termite damage to the
interior of the property.
He says the appropriate i nsured event is ‘ escape of water ’ but notes the FSP trying
to chang e it to ‘storm’ to avoid paying for termite and rodent damage. He says
70,000L water used in one month is evidence the escape of liquid event should be
applied to the loss rather than storm.
The available information establishes that the initial claim arose following a severe
storm in November 2014 and the escape of sewerage from the pipes. I accept the
insured event was both a storm and the escape of liquid.
Regardless of the exclusions, I do not accept that the damage to the patio or timber
retaining wall was caused by either insured event. I do not accept the termite
damage flows from the insured events or from the delays in the repair process.
JHA identified in 2015 that the rear patio area was regularly hosed down as the
applicant had dogs in the area. The area was often moist. This is not disputed.
TC identified visual evidence of subterranean termites present in the front yard, in
trees in a stump beside the garage and in the retaining wall beside the swimming
pool as well as in some internal areas of the house. There was evidence of previous
termite treatment although it had expired. TC further identified that the timber used
for the retaining wall may not be fit for purpose.
Although TC refers to water leaks being conducive to conditions leading to termite
attacks, he does not relate the damage to the 2014 event or delays in the repair
process.
I accept that the area is likely to have been subject to termite activity of a
longstanding nature. I accept that this would likely have caused damage to the rear
patio and the retaining wall.
I also accept that the damage to the garage/ living area was most likely caused by
the slab edge of the con crete slab being concealed. TC has identified the “Converted
shed slab edge doesn’t comply’.
The onus is on the applicant to establish the claim falls within the terms of cover
under the policy. I am not satisfied the applicant has established, on the balance of
probabilities, a claim under the terms of the policy for the damage to the rear patio,
retaining wall or the garage /living area.
Case No: 501573 Determination Page 7 of 7
2.4 Is the applicant entitled to compensation for non-financial loss?
FOS may award up to $3,000 compensation for non-financial loss under paragraph
9.3 of the terms of reference and takes a conservative view when awarding such
compensation.
Applicant has suffered further inconvenience
The applicants dispute 412459 resolved in January 2017 with the FSP to complete
certain works in addition to the SOW. The additional work was extensive. At that time
the applicant was also paid $3,000 compensation for non-financial loss.
The FSP concedes there have been delays in completing the repairs. Whilst I accept
that not all of the delays are due to the FSP’s conduct , the work performed by the
FSP’s contractors has contributed to those delays. The delays have caused an
unusual degree of inconvenience and enjoyment of life for the applicant with the
added stress contributing to the inconvenience.
In the circumstances I consider that an award of compensation for non-financial loss
of $1,500 is fair.
No other compensation payable
I am not satisfied the available information establishes any further direct or
consequential loss.
The FSP has agreed to pay $1,266.87 for electrical and other items that have gone
missing. The applicant has not provided information to establish any loss of solar
capacity is due to the FSP’s conduct or that any unused items are now out of
warranty due to the FSP’s con duct.
In so far as some replacement items may have been damaged this should be
assessed as part of the review of the contents by the independent assessor.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.