Home / Financial Firm (Unknown - Insurer) / Determination 501515

Determination 501515

Claim for new structural and water damage declined

FirmFinancial Firm (Unknown - Insurer)
Decided2019-05-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's 2015 claim for further house damage, attributed to a leaking pipe and to inadequate 2004 repairs, was declined by the insurer. AFCA found in favour of the insurer, finding no insured event caused the damage and the 2004 repairs adequate.

The complainant had to establish a prima facie claim that the damage was caused by an insured event or by inadequate repairs, and the engineering level surveys did not support this.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 501515 Page 1 of 20 Determination Case number: 501515 3 May 2019 1 Determination overview 1.1 Complaint In 2004, the complainant lodged a claim with her financial firm (insurer) for damage to her house caused by a leaking pipe. After several assessments, the claim was accepted with the repairs finishing in 2005. In 2007, the complainant advised the insurer of further damages. The insurer reattended and found several items which they attributed to the original claim. Several other areas where identified which were deemed the complainant ’s responsibility. In 2015, the complainant lodged a new claim for new damages which she believed to be due to inadequate repairs conducted in 2004. After assessing the damages, the insurer declined the claim as there was no insured event which caused the damage. 1.2 Issues and key findings Is the insurer entitled to deny the complainant’s claim ? The insurer is entitled to deny the complainant’s claim because the available information does not establish on the balance of probabilities the claimed damage was caused by an insured event or by the repairs. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the complaint or the claims. Determination | Case number: 501515 Page 2 of 20 2 Reasons for determination 2.1 Is the insurer entitled to deny the complainant’s claim Circumstances of the 2004 loss The complainant must establish on the balance of probabilities she has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. In the context of this claim, the complainant must establish the claimed damage was caused by water leaks or by the insurer ’s inadequate repairs. In May 2004, the complainant lodged a claim. She said she had noticed minor cracking when she moved into the house a few years earlier but in the last three weeks the cracking and movement became worse. A plumber told her the main sewer located outside the laund ry was probably cracked. The insurer arranged its adjuster/builder (EA) and builder (AA) to attend the property and assess the damages. Both EA and AA attended the property in June 2004. A summary of all attendances and reports by all experts is provided in supporting section 3 of this determination. AA arranged their own contractor to test the sewer drain system. A leak was located. The major failures were in the general location of the kitchen and laundry. AA recommended the complainant replace the whole external sewer system. EA described the extensive floor damage in the laundry and bathroom and adjacent paving. As for the cracking damage, EA recommended it be repaired after the plumbing was repaired. EA described extensive wall damage to the kitchen, hallway, laundry, bathroom, toilet and dining room. AA provided a quotation to repair this work in the sum of $32,406. It included the cost of exposing the earthenware drain to allow replacement by the complainant and backfill and consolidation of the trench after the new drain was laid. AA also provided a quotation to repair the leaking sewer pipes in the sum of $1,606. The quotation is marked private. EA indicated the complainant accepted the quote for her own costs involved in replacing the leaking sewer. It was agreed the sewer would be replaced first and the repairs to the building would take place at the end of summer to allow settling of the property. In July 2005, EA sent a letter to the complainant advising repairs had been complete . However, EA indicated to the complainant further damage may occur, noting: Determination | Case number: 501515 Page 3 of 20 As you are aware from our several discussions, whilst all repairs related to the defined event are now complete, we anticipate there will be some movement to your dwelling of an environmental nature on an ongoing basis due to – a The type of soil your house is constructed on b Close proximity of council trees and other non-related factors such as weather conditions, drying of soil No available material indicates there were any problems with the repairs at this time. Insurer paid for further repairs in 2009 However, further problems arose in early 2007. During the past summer, the complainant said the house began to move. EA reattended and inspected inside and outside the house. EA described cracking in the hallway, bedroom, lounge, kitchen and entrance. He also referred to reinstatement of brickwork outside the lounge room and the kitchen and laundry. Relevantly EA stated: The dwelling itself has no signs of leaking pipe work. The insured has tested the water meter and confirmed that no mains pressure pipes are leaking. All of the movement is consistent with shrinkage caused by gum trees on the rear and eastern side of the dwelling on council property. Photographs show extremely dry land surrounding the house and mature gum trees on council land at the rear and side of the house. On this basis the claim was denied. The complainant then indicated there was sewage overflows and flooding of the sewer system which had occurred on several occasions over the last five years leading to water flooding underneath the house. The complainant wanted the vanity unit in the bathroom repaired, the repair of areas which were previously repaired and repairs to a new area on the opposite side of the house. In response, a structural engineer was engaged. The appointed engineer (MP) attended in July 2007. He described the damage. He looked through a floor trap in the hallway and he noted no discernible indication of past or present moisture. He undertook a level survey of the building. The building had settled. He said the recent movement was minimal and there was no sign of obvious heave near the replaced sewer. He said the damage could be due to several factors including: Determination | Case number: 501515 Page 4 of 20  long-term movement because of tree and environmental drying of the reactive foundation soils  a recent settlement rebound due to rear tree removal  minor reduction in previous heave due to pipe fracture repair. He thought it was possible the earlier cosmetic repairs may have been undertaken prematurely. Giving the complainant the benefit of the doubt, he said internal crack repair and painting should be allowed for. He recommended reattendance in six months. In March 2008, MP reattended. He undertook a further level survey which indicated minimal change. Cracking had closed. There was no new cracking within the area close to the sewer leakage. He recommended crack repairs could be undertaken. MP confirmed some damages could be claim related and provided a scope of work relating to repairs to the brickwork, some sections of concrete and a timber sill between the toilet and hallway. EA sent several letters to the complainant advising quotes would need to be obtained for these repairs to commence. MP re-attended in February 2009 and provided a list of repairs to rectify damage for which the insurer was responsible. A scope of works was sent to the complainant in April 2009. AA provided a quote in May 2009 in the sum of $7,695.60. Almost all the repairs were completed by November 2009. However, the complainant declined to have a PVC inspection point and a crack in the rear bedroom repaired as she believed further repairs were required outside the scope provided by MP. The complainant advised she would obtain her own report. EA sent two letters to the complainant in early 2010 to follow up on her report. However, as nothing was received, the claim was closed. No further complaint until March 2015 No contact was made by the complainant until 6 March 2015, when she complained of further water damage because of a blocked toilet drain. The complainant said the shower drain blocked sometimes as well. Plumbers and engineers engaged to report on causation The insurer appointed a plumber (LH) who found no issues with the main sewer drain. However, he indicated there were issues with the toilet branch connection and possibly with the bathroom connection. He said the joint between the lead and PVC Determination | Case number: 501515 Page 5 of 20 pipe had either broken down or had not been installed properly. Several tree roots had entered this joint causing blockages. He found no other leaks. He concluded: I do believe the damaged and blocked sewer drains could have contributed to damage within the property as the fittings do leak when in use and especially when blocked and holding water as they have been. He made certain recommendations in relation to further work which he said was required to the drainage system. Another plumber (JH) was engaged in May 2015. JH conducted tests. Most of the plumbing (including sewer drainage) was not leaking. However, there was leakage from the bath waste pipe and the WC branch drain. The insurer engaged an engineer to determine the cause of the recent cracking and the relationship to these leaks. A further level survey was conducted. The engineer concluded the recent leaks had not caused the damage as there was no localised heave around the toilet area. His level survey showed the toilet area had remained in a similar elevation to that in previous surveys. He also considered the leaks were not severe enough to cause the claimed movement. Further meetings were held between EA and the complainant. As a result, the insurer agreed to engage another engineer (GP) who inspected and provided another level survey in May 2016. GP also concluded the water leak was not severe enough to cause the damage which he said was supported by the lack of any localised recent distress near to the leak. GP referred also to the findings from the level survey he undertook and concluded: A general overview of the level plan shows that the movement of the house is consistent with the environmental influence on the property and indicates no localised movement at the location of the water leak which, if influencing the movement in anyway, should be expected. Based on the reports, the insurer declined the claim on 27 June 2016 as no insured event had been established. The complainant disputed the findings and requested a review. EA re-attended the property to discuss the claim further with the complainant. The insurer upheld its decision, which it confirmed in writing on 24 July 2017. Complainant engaged a building surveyor in January 2018 In January 2018, the complainant engaged a building surveyor (DK) to inspect the property and provide a report. He reviewed material provided by the complainant. He recommended a further investigation to determine why there was still movement. Determination | Case number: 501515 Page 6 of 20 He says the repairs conducted in 2004 were insufficient as the footings and foundations in the bathroom and laundry and kitchen were not undertaken. He also says the opinion of a structural engineer should have been obtained in 2004. He criticises the inspections and analysis conducted by the insurer’s engineer. Repairs conducted were not insufficient or inadequate I have carefully considered all the available material. I am not persuaded the repairs conducted in 2004 were insufficient. The 2004 claim was the subject of several inspections and attendances by the insurer and their experts at which time these contentions were not made. Moreover, the available material establishes the damage was inspected in 2004 by two builders (EA and AA) both of whom have the expertise to assess the damage and required repairs. I am not satisfied in these circumstances the opinion of the structural engineer was required. The available material also indicates the 2004 inspection by EA and quotations provided by AA are comprehensive and include all areas which were damaged by water at that time and the work which DK says was not done. Leaking water pipe in 2015 not the proximate cause of the claimed damage DK also says the leaking water pipe in 2015 caused damage. He notes the repair recommendations made by the insurer’s plumber were not undertaken. However, the insurer’s policies clearly provide the insurer is not responsible for damage to pipes which leak. DK also challenges the findings of the insurer’s experts because he says their conclusion that the leaks were too minimal to cause damage was based on the normal use test which does not take into consideration blockages. I am not persuaded by these contentions either. This is because DK does not take into account the expert evidence of the insurer’s engineer in relation to the level survey conducted after the 2015 leak. The expert opinion i n the survey shows there was no localised movement at the location of the water leak. I acknowledge the opinion of the plumber LH. However, I am not sufficiently persuaded by his opinion in view of the expert opinion of the insurer’s engineers and the findings from the level surveys. DK also contends the repairs should have considered further movement caused by removal of trees. However, the insurer acknowledged it may have undertaken repairs prematurely and paid a further $6,966 for repairs in October 2009. Determination | Case number: 501515 Page 7 of 20 Insurer entitled to deny the claim I have carefully considered all the material provided by the parties over the extended history of this matter. I am not persuaded by the complainant’s various contentions. T he insurer’s policies clearly state the insurer does not cover an insured for lo ss or damage to the pipe which causes the damage. On the available material, and for the reasons stated, I am satisfied the repairs which were undertaken and/or paid for in 2004 and 2009 were adequate. Further, I am not satisfied the available material establishes the repairs to the sewer were inadequate. The material provided by EA and AA indicate the connections of the lead waste to the PVC drain were completed adequately and there is no persuasive evidence from the complainant to challenge this. In any event, even if the plumbing repairs were inadequate, the complainant was responsible for the sewer repairs. Finally, while both DK and the complainant say a further investigation is required to determine the cause of further movement, I am not satisfied this is required in view of the substantial investigation which has already been undertaken since 2004. I am satisfied the available information and the substantial investigations over several years do not support the complainant’s contentions. I am not satisfied the complainant has established a prima facie claim or that the claimed damage is caused by the insurer’s repairs. In the circumstances, on the available information, and for the stated reasons, I am satisfied the insurer is not required to take any further action in relation to the complaint or in relation to the complainant’s claims. Determination | Case number: 501515 Page 8 of 20 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. This complaint has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The complainant is represented. References in this determination to the complainant include references to the complainant’s representative. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.3 Proximate cause Case law establishes: Determination | Case number: 501515 Page 9 of 20  the proximate cause of loss is the dominant (or effective or operative) cause of the loss, whether or not the cause is last in time or the sole cause  where several causes operate at the same time, each cause must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action  if one cause results in harm in any case, and the other would not in the absence of the first, the first is the proximate cause  a common-sense approach is taken to determine proximate cause. 3.4 Key policy terms The relevant policy extracts are referred to correspondence between the parties in both claims and in the insurer’s Notice of Response. Both the policy documents and the Notice have been exchanged with the complainant. Extracts from policy applicable to 2004 claim Insured events 7. Bursting, leaking, discharging or overflowing of water or liquid at the insured address from:  drainage and sewerage systems;  pipes or plumbing apparatus fixed to the pipes; ...... and we will not pay for the repair or replacement of the: tank, pipe, part, container or waterbed that cause the damage; Extracts from policy applicable to 2015 claim Insured events These are the following events that lead to loss or damage: 1. Fire (including bushfire) 2. Explosion 3. Burglary, theft or attempted theft 4. Lightning 5. Earthquake or tsunami 6. Storm and rainwater runoff Determination | Case number: 501515 Page 10 of 20 7. Bursting, leaking, discharging or overflowing of water or liquid 8. Malicious damage, intentional damage or damage by vandals 9. Riot or civil commotion 10. Impact 11. Damage by an animal 12. Flood […] 7. Bursting, leaking discharging or overflowing of water or liquid loss or damage as a result of bursting, leaking, discharging or overflowing water or liquid from:  drainage and sewerage systems at the home  fixed baths, sinks, basins and toilets at the home  pipes or plumbing apparatus fixed to pipes ……. Will not cover you for loss or damage:  to a tank, pipe, part, container or waterbed that cause the damage General Exclusions […] Earth Movement We will not cover you for loss, damage or liability caused by or arising out of erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement. But we will cover you for:  explosion – insured event 2  earthquake or tsunami – insured event 5  bursting, leaking, discharging or overflowing of water or liquid – insured event 7  flood – insured event 12. Determination | Case number: 501515 Page 11 of 20 […] What you must do You must: establish that an insured event or incident has occurred 3.5 Expert reports and chronology – First claim Record Key points Insurer’s adjuster (EA) Report 2 June 2004  Inspected and described damage 1 June 2004.  Cracking damage consistent with suspected leaking sewer.  Liaise with plumber. Subject to their findings obtain quotes for reinstatement of wat er damaged surfaces. Insurer’s builder ( A A) Report 2 June 2004  Tested the sewer drain system by video following previous test which located leakage without clear definiti on o f problem or exact location  Major failure points are in the general location of kitchen and laundry  Recommend replacement of t he whole external sewer system  Table attached highlighting many failure points of the pipework. Comments included roots and fi ne roots  Location of the building and paving damage is consistent with soil expansion due to the excessive moisture at a subsurface level causing upheaval and cracking and ot her structural damage  Described scope of works including “expose earthenware drain to allow replacement by owner” Insurer’s builder ( A A) Quote job number 804A 2 June 2004  Endorsed private s cope of works  Remove old drain pipes  Reconnect with new PVC  Connect to existing waste with rubber connectors (endorsed by AA : connection to lead toilet waste to PVC drain done with approved epoxy FerroPRE)  Test drain and protect with suitable backfill material for 300mm  E xtent of the above work may alter once original frameworks is exposed  Total price $1,606 Insurer’s builder ( A A) Quote job number 804 2 June 2004  Scope of works to repair w ater damage to building $32,406 Determination | Case number: 501515 Page 12 of 20 Record Key points Insurer’s adjuster (EA) Report 9 August 2004  Sewer has broken directly und erneath the kitchen and laundry  Caus e of the damage d sewer rela ted and trees or drying of soil  Obtained quotations for replacement of the sewer at complainant’s cost and associated excavations and reinstatement at insurer’s cost  Insuranc e related repairs and excavations $32 ,406 and these works proceeding  Amount quoted to complainant by the c ontractor for her cost involving replacement of th e sewer accepted by complainant  Anticipate repairs to be undertaken for replacement of all the sewer within two weeks  Major repairs to the building will take place at the end of summer to allow settlement o f the b uilding Insurer’s adjuster (EA) Report 9 September 2004  Understand t hat sewer repairs are underway  Property requires time to settle before repairs can start  Repair date set for end of February 2005 Insurer’s adjuster’ s letter to complainant Report 6 July 2005  Repairs in relation to water damage claim complete  Complainant advised of possible future uninsured movement risks caused by the type of soil and proximity of trees and weat her conditions Insurer’s adjuster (EA) Report 1 March 2007  Inspected and photographed inside and outside house  Described cracking damage in various rooms in the house  Photographs show cracking damage and dry land and mature gum trees  During this pa st summer, house began to move  Cracks closed in winter and opened i n summer  No signs of leaking pipes - complainant tested the water meter and confirmed no mains pressure pipes ar e leaking  Damage possibly caused by large trees on Council reserve at the rear and eastern side of the house  Decline recommended Letter from in surer to complainant 8 March 2007  Claim deni ed as no apparent insured event Insurer’s adjuster (EA) Report 30 May 2007  Reattended after new information provided about sewage overflows a nd flooding of the sewer system  This has occurred on several occasions over the last five years leading to wate r flooding underneath the house  Seeking confirmation from SA Wa ter  Photographs were apparently provided of damage to Determination | Case number: 501515 Page 13 of 20 Record Key points bathroom vanity unit and damage to previously repaired areas and new areas on the opposit e side of the building from the sewer  Recommended engineer be appoint ed Insurer’s engineer (MP) Report 9 July 2007  Attended 21 July 2007  Some years ago, Council removed trees to the north of the building. A root barrier was installe d next to the eastern b oundary  Described damage. Some repaired cracking has become wider. Repaired cracking in laundry not reope ned  Through a floor trap inspected soil under the hallway which was not moist  Hous e built on reactive clay soils  Level survey undertaken. Building has settled but no signs of heave near the replaced sewer or past main supply leakage. Areas of the house are high er than those near the leakage  Time lag since the sewer replacement made diagnosis of recent minimal movement difficult  The recent movement could have been contributed to by a reduction in soil heave caused by repairs to sewer fractures  Recommended reattendance after six months Insurer’s engineer (MP) Report 21 July 2008  Reins pected 8 June 2008  Undertook further level survey which shows minimal cha nge since last survey so cra ck repair can now be undertaken  Some cracking closed. No new cracking or movement within the wet areas closest to past leaking  Understand c omplainant cash settled for internal cosmetic repair s and she can repair and paint  Futur e movement inevitable because of highly reactive nature of soil and presence of signifi cant trees Insurer’s adjuster’ s letter to complainant 24 November 2008  “ AA say you have denied access, so they can provide a quote in accordance wit h recommendations of MP.  Please contact MP to discuss concerns so we can arrange appropriate quot ation repairs.  Wrote to you on 29 August 20 08. We have not heard from you.“ Insurer’s engineer (MP) Report 13 March 2008  Attended property wi th complainant 18 February 2009  L isted repairs for which the complainant was responsible and repairs which should be undertaken by the insurer to re ctify damage caus ed by the leak  Insurer’s repairs included “open PVC inspection point adjacent rear gully and ensure correct operation. Adjus t if necessary.” Determination | Case number: 501515 Page 14 of 20 Record Key points Insurer’s adjuster’ s letter to complainant 2 April 2009  Enclosed M P’s scope of works  Insurer to arrange AA to quote on the repairs .  “ AA to contact you shortly to m ake the necessary arrangements.” AA quotation number 5587 1H 22 May 2009  Scope of works to straighten eastern side fence, repair step, open PVC inspection point etc. Total price $7,695 which included an allowance to adjust PVC upon inspection $400 AA tax invoice 22 October 2009  Job summary regarding water damage  Cost to com plete repairs as per quotation number 5587 1H $6,966  Less allowance to open PVC inspection point adjacent rear gully an d ensure correct operation $400  Less allowance to repair crack and paint one wall to back bedroom $273 Insurer’s adjuster (EA) Report 26 November 2009  Repairs completed in accordance with MP specification and AA quo te  Two items unrepaired as complainant believes further work should be undertaken outside the scope provided by the engineer. One ite m was the PVC inspection point  Directed the complai nant to the insurer’s engineer  Complainant indicat ed she would seek an independent inspection and will co mmunicate their findings later Insurer’s adjuster’ s letter to complainant 18 January 2010  Enquired regarding independent inspection for final works so insurer ca n arrange completion of repairs Insurer’s adjuster’ s letter to complainant 23 March 2010  A djuster followed up complainant 3.6 Material from South Australian Water Date Key points Report 8 January 2012 Report 17 April 2012 Report 12 June 2012 Report 18 September 2012 Report 10 June 2013 Report 9 January 2014 Report 3 June 2014  IP partially blocked  Inspection point overflow outside boundary  Inspection point ove rflow outside boundary  Blockage with int ernal plumbing - slow drainag e  IP servic e slow drainage  IP servic e slow drainage  IP servic e slow drainage Determination | Case number: 501515 Page 15 of 20 Date Key points Report 10 December 2014 Report 9 November 2017 Report 22 February 2017  IP servic e slow draina ge cause connection/tree roots  IP servic e slow drainage cause privat e pipework  IP servic e no drain age cause connection/tree roots 3.7 Expert reports and chronology – Second claim Record Key points Insurer’s plumber (LH) Report 13 March 2015  Inspected and photographed property 10 March 2015  Government inspection opening, and main sewer dra in - no major blockages located  Could not unblock the toilet drain because of the previous installation of the main drain connection to the toilet waste pipe consisting of a section of lead  Main sewer drain and toilet branch drain inspected wit h CCTV camera. N o is sues with the main sewer drain  Issues with toilet branch connection. Appears joint bet ween the lead and PVC pipe is either broken down or not installed properly. Roots have entered throu gh this joint causing blockages  Lead pipe was disfigured whi le try ing to unblock the drain  Could not inspect the bathroom drain with the CCTV camera but suspect bathroom connected to the main sewer gully using the same method. Thus, roots entered the joint causing the d rains to block in the bathroom  No other leaks found  Damaged and blocked sewer drains could have contributed to damage as the fittings leak when in use and especially when blocked and h olding water as they have been  All sewer drainage within the toilet and bathroom is to be replaced with PVC pip e. Recommende d and costed works Insurer’s adjuster ( EA ) Report 16 March 2015  Complainant not ed additional movement which is described in the report clai ming relevant to old water leak  Inspected and photographed property 1 1 March 2015  Complainant said tree ro ots got into the sewer system n ow removed.  Toilet blocked. Blockage and roots within the toilet pipe so invasive unable to be removed by plumber (LH) . Anot her plumber (GP) engaged  Issue with piping - new sewer system was of PC V construction and joins up to the original lead pipe coming out from the hom e  W ill refer to original assessor Determination | Case number: 501515 Page 16 of 20 Record Key points Insurer’s adjuster ( EA ) Report 18 March 2015  GP used CCTV equipment. Confirmed crack in the lead pipe under the footin g area where the roots ente red  Damage to the lead joints in the PVC. This occurred during the initial phase of removing the roots  Referring fin dings back to original assessor Insurer’s engineer (MP) Report 28 April 2015  Inspected premises 7 April 2015 to determine the cause of the recent cracking in the eastern and western sides of the house and r elationship to the discovered l eak in the toilet’s waste pipe  Noted cracks and signs of movement throughout the home  External wall cracks wor sened to western external wall  Level survey of the perimet er brickwork undertaken  Nort h - east corner of home settl ed since house was built  Google Eart h shows significant native trees surrounded the home in May 2 003 which were removed in 2004  R emoval of the trees caused a significant change altering the moisture of the soil causing cracking to that part of the hous e  Leakage from the toilet waste pipe leak has not caused damage as there is no localised heave around the toilet area. The survey sh ows the toilet area has remained in a similar elevati on to that in previous surveys  Possible other leaks have contributed to recent movement  Recommend testing the sewer, storm water and mains water supply pip ework to determine if any leaks Insurer’s plum ber (JH) Report 19 May 2015  Waste pipes were noted to be copper, lead and PVC material, the sewer drainage PVC material and all downpipes were n oted to discharge above ground  Undertook testing  Sewer drainage - tests static  Leak of 1 litre per minute from bathroom waste pipe from shower alcove floor bas e  Leak rec orded at 2 litres p er minute from WC branch drain  Plug could not be pushed upstream as the lead waste pipe appeared misaligned where connected to the PVC pipe work  N o other leaks detected Insurer’s engineer (MP) Report 23 June 2015  Leaks are not severe enough to cause upward movement in the building’s nort h - eastern corner  Recent movement damage caused by rebound heave of the previously settled soil beneath the corner because of increase in soil mois t ure caused by 2004 tree removal  Rebound heave in the foundation soil would have occurred regardless of the leaks Determination | Case number: 501515 Page 17 of 20 Record Key points Letter from insurer to complainant 30 June 2015  Relying on reports, and policy terms, claim is denied as no insured event established Insurer claim file note 6 July 2015  Discussio n regarding denial of the claim  Complainant invited to call a djuster  Claim can be escalat ed via the complaints procedure Insurer claim file note 26 April 2016  Discussio n regarding denial of the claim  Complain ant invited to contact adjuster  Advis ed of complaint and IDR process Insurer’s adjuster ( EA ) Report 27 April 2016  Extensive meeting with complainant and her father - in - law whic h involved review of old claims  WC which is connected to sewer which was replaced in 2003 is now leaking  LH plumber re - attended and says there is a lead junction between the old and new pipework which is failing  Complainant could have replac ed in 2003 but d id not due to limited finances  Insurer had agreed to a partial cash settlement of the claim to redecorat e aft er repairs carried out by AA  Cash settlement used by complainant to pay for the pipework and replace the sewer  Insurer not liable to replace the pipework to the WC but recommende d an independent engineer review Insurer’s engineer ( G P) Report 6 June 201 6  Attended , undertook level survey and photographed damage and previous repairs on 9 May 2016  Considered plumber’s reports. Leaks of 4 li t res per minut e or below are not unusual and have little or no effect on the surrounding soils as the leaks are not constant  Even if there was a blockage, as the connection of the lead to the PVC pipes is close to the WC with only a relatively short part length upstream of the blockage the amount of water available to leak from the pipes is small  Survey shows the movement of the home is consistent with the environmental influence on the property with no localised movement at the locat ion of the wat er leak  Concluded water leak is not severe enough to cause localised heave at the leak location which is supported by the lack of any local ised recent distress near to it  Damage caused by environmental conditions (reactive soils and nearby mat ure gum trees) Determination | Case number: 501515 Page 18 of 20 Record Key points Letter from insurer to compla inant 27 June 2016  Relying on recent expert reports, insurer denied the claim on the basis no insured event or incident as occurred. Insurer claim file note 17 May 2017  Complainant’s father telephoned to discuss the claim.  Original work in 2004 was n ot completed correctly because the water pipe was not fixed.  Adjuster will discuss with complainant and father.  If not happy can go to int ernal dispute resolution. Insurer’s adjuster (EA) Report  Re - attended property with complainant’s father who criticised pipes used to replace the sewer and said water gained entry under the hous e from the original leak and subsequent overflows from the external sewer resulting in tree roots following the water under the house.  Complainant indicat ed may seek recov ery from local council for the damage caused by council trees.  Engineer’s reports were provided at the time but would be provided again to assist complainant.  Matter not change in any material way since attendance with GP in 2016. Insurer’s IDR letter 2 4 July 2017  Lengthy exposition of the claims history.  Claim denied as an insured event has not occurred to cause the new damage.  Repairs under 2004 claim are satisfactory.  Damage caused by environmental influenc es. Insurer’s adjuster (EA) email 7 December 2017  Insurer appointed no contractors to affect any repairs .  C laim was cash settled in its entirety.  O nly contractors who affected any work did so on the instruction direct from the member and we understand these were limited to pipe repairs.  Complainant arranged for the pipe repairs to be affected in PVC which we understand is compliant with the required codes.  Referenc e to stainless steel couplings relates to the recommendation that flexible couplings which incorporate stainless steel compone nts which could be installed to minimise the risk of the PVC repairs failing.  Pipe repairs affected by the complainant without the flexible couplings based on previous plumbing reports held. Insurer’s adjuster (EA) letter and photographs U ndated but in r esponse to email 5 February 2018  Could not retrieve all records from 2004 claim but was able to speak with senior adjuster and repairer from AA.  Repairs completed by AA in 2005.  Main sewer replaced at the complainant’s cost.  Addresses criticisms made by complainant’s expert . Determination | Case number: 501515 Page 19 of 20 Record Key points  Concludes since completion of repairs in 2007 no single plumbing leak has been identified as causing damage.  Thrust of enginee rs’ reports is that the home has been subject to adverse environmental influences predominantly due to the position of trees surrounding the property. Complainant ’s builder (DK) Report and photographs Undated  Inspected the property 7 January 2018.  Repairs conducted in 2004 were ins ufficient because footings/foundations were not repaired in the bathroom, laun dry and kitchen.  No guarantee the house would settle in its original position particularly as the house is on a known highly reactive soil .  A structural engineer was not asked to address the problem in a definitive manner in 2004.  Nothing to indicate inter nal footings, surrounding soil, walls, had settled into original position.  Insuranc e engineer did not inspect the internal footings.  Displacement occurred becaus e of misalignment of external footings on western side of building.  Inspected this footing whi ch was not realigned or repaired.  As soil is highly reactive clay and with a high density of large trees close to the house further movement displacement of affected footings was likely.  Continuous moisture from broken pipes would have drawn the tree roots to the footings under the house. Not clear this was checked.  A soil report would have been useful to analyse if the correct flexible pipework needed was to be used.  Reviewed reports fr om engineer, adjuster and plumber. In 2015 the water pipe was the cause of the damage, but r epairs recommended by LH were not undertaken.  C onclusion that leaks were too minimal were bas ed on a normal use test, which does not take into consideration blockages, or full pipes. B elieve water was discounted as a cause, particularly from bat h waste pipe, due to this oversight.  B ath waste pipe is close to the northwest corner and may have contributed to further movement in same. This is certainly a possibility given earlier leak from 2004 was considered a contributor of damage in northwest corner.  Engineer stated between May 2004 to March 2004 several large neighbouring trees had been removed . If repairs are inadequate, and do not consid er soil erosion, or collapse due to root shrinkage, continued movement and damage is inevit able. Further leaking only m ake s matters worse . Determination | Case number: 501515 Page 20 of 20 3.8 Other relevant material considered and relied on  Parties’ submissions, emails , photographs, quotations, invoices and all attachments to all submissions.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.