Home / Financial Firm (Unknown - Insurer) / Determination 501474

Determination 501474

Escape of liquid claim denied as gradual damage, maintenance and general exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2018-09-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$3,500
Non-financial loss$2,000
Amount claimed$38,802
SourceAFCA PDF

Summary

The applicant claimed under home and contents insurance for slab and structural damage from leaking pipes, which the FSP denied under escape of liquid and general exclusions. AFCA found the claim valid, required the FSP to fund a scope of works and repairs, pay $500 for the pipes, contribute up to $3,000 to expert reports, and pay $2,000 non-financial loss.

Once the applicant established a sudden and unexpected escape of liquid, the FSP had to prove an exclusion applied, and it did not show that any exclusion applied.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 501474 Determination Page 1 of 10 Case number: 501474 30 August 2018 1 Overview 1.1 Dispute The applicant lodged a claim on 11 May 2017 on her Home and Contents Insurance Policy held a with the financial services provider (FSP) for damage caused by a leaking pipe. The FSP denied the claim, saying:  the applicant has not established a claim falling within an insured event  the escape of liquid is not sudden and unexpected  specific and general exclusions apply. The applicant disputes this and says several pipes under the home are leaking which have caused the damage. The applicant is also seeking compensation for the timeframe of the claim and the service she received. 1.2 Issues and key findings Has the applicant established a valid claim? The applicant has established a valid claim under the terms of the policy because on balance:  a leaking pipe is the proximate cause of the damage  the leak is sudden and unexpected. Is the FSP entitled to deny the claim? The FSP is not entitled to deny the claim because it has not established that the damage did not occur from a sudden and unexpected escape of liquid, that the damage was gradual or that exclusions relating to lack of maintenance, poor or faulty design. Is the applicant entitled to any compensation? Pursuant to paragraph 9.3 of the Terms of Reference (TOR) the applicant is entitled to $2,000 compensation for non-financial loss. Pursuant to paragraph 9.4 of the TOR, the FSP must contribute up to $3,000 towards the reports obtained by the applicant from DK and MK. Case No: 501474 Determination Page 2 of 10 1.3 Determination This determination is in favour of the applicant. The FSP is liable to meet the applicant’s claim in accordance with the terms and conditions of the policy. W ithin 14 days of the applicant’s acceptance of this claim , the FSP should arrange for a scope of works to be completed as set out under section 2.2 of this determination. The FSP must then arrange to complete the works or, if agreed by the parties, cash settle the claim. Pursuant of paragraph 9.3 the TOR, the FSP must pay the applicant $2,000 compensation for non-financial loss. Pursuant of paragraph 9.4 of the TOR the FSP must contribute up to $3,000 towards the applicant’s professional costs incurred in obtaining the reports from DK and MK subject to the applicant providing the relevant invoices and receipts. Case No: 501474 Determination Page 3 of 10 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. This determination follows consideration of all of the information and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Has the applicant established a valid claim? Applicant has onus to establish a claim within the terms of the policy The applicant’s policy is an Insured Events policy that provides cover for a number of listed events including loss or damage caused by the escape of liquid as set out under section 3.1 of this determination. Cover is subject to a number of specific exclusions and general exclusions as set out under section 3.1 of this determination. The onus is on the applicant to establish a claim that falls within the insured event of escape of liquid. Once established the onus shifts to the FSP to establish the application of an exclusion. Circumstances of the loss According to the applicant, she noticed wet mortar at the slab level around her house in May 2017. She then contacted a plumber. The applicant says that there was no evidence of any escape of liquid until the bricks on the veranda of the property seemed wet. There was no evidence to believe the shower recess was leaking at any stage and there was no way the applicant could have been aware of leaking pipes or the location as it was completely unexpected and unforeseen. The applicant believes that a leaking pipe under the concrete slab has caused movement in the foundation with resultant internal cracking. Expert reports provide conflicting information Both the applicant and the FSP have provided reports to support their positions around the location, and existence, of a leak causing an escape of liquid. The FSP’s expert (PI) has said the damage to the shower could be the result of the floor movement. PI generally seems to be of the view the moveme nt of the foundations is caused by moisture under the slab. The FSP’s engineer (JG) from LMC has listed numerous possible causes of the damage including many related to the composition of the soil. It does not appear any testing of the soil was completed. I am not persuaded by these possible causes. JG has also given the following possible causes: Case No: 501474 Determination Page 4 of 10  location of the services  proximity of plants  fall of the site  expansion joints. JG has not entered into detailed analysis of any of the possible causes he listed but notably concludes: The damage to the building appears to be caused by damaged services underneath the building and poor drainage… The FSP’s experts state that the cause of the damage is one of:  leaking shower recess  poor drainage  damaged services under the home. The applicant has provided reports from a plumber, DK dated 21 March 2018 and MK from US, a person with over 44 years building experience but also an expert in water and reactive soils. MK, whilst agreeing that there was evidence of settlement/subsidence in the concrete slab and evidence of prior repairs of a minor nature , disagreed with the findings by the FSP that there was liquid escaping from the shower recess. MK noted that the report from PI was based on a visual inspection and that the only way to truly determine the source of the leakage was to complete a static leak test. DK completed the static leak test on the shower base and found no leaks. He found the area and soil around the shower base was dry. DK considered that the cause of the damage was multiple leaking and broken pipes under the slab. The applicant has provided photographs that confirm the evidence of broken pipes that were discovered on excavation of the pipes leading to the slab. Proximate cause of the damage is escape of water from a leaking pipe I am satisfied based on the information exchanged that the proximate cause of the damage to the applicant’s property was the leaking pipes under the applicant’s home. I am satisfied that the damage was caused by sudden and unexpected escape of liquid from the pipes. When this first occurred has not been identified but I am satisfied that the applicant did not become aware of this until May 2017 at the earliest. In the circumstances, the applicant has established a claim within the terms of the policy. The onus is therefore on the FSP if it is to establish the application of an exclusion. Case No: 501474 Determination Page 5 of 10 2.2 Has the FSP established it is entitled to deny the claim? FSP has not shown a specific exclusion applies The FSP has relied the following specific exclusions as set out in section 3.1 of this determination. I am not satisfied the FSP has established that any of the specific exclusions under the insured event, water and escape of liquid, apply. Although the applicant lodged a claim in May 2017 the leaking pipes were not identified until the 21 March 2018 by the applicant’s plumber , DK. The applicant notified the FSP as soon as she became aware of the possible escape of liquid. The information available in particular the report from DK confirms the damage was unlikely to be due to water escaping from a shower recess. The damage is more likely due to the sudden and unexpected damage to the pipes than the gradual escape of liquid. It is apparent from the information provided that the applicant was not aware of the escape of liquid until observing the moisture around the slab. The FSP has not responded to the further reports provided by the applicant . In particular, the FSP has not responded to the report by DK with respect to the static leak test. FSP has not established general exclusions apply The FSP has relied on the general exclusions as detailed in 3.1 below. The FSP has submitted the damage was caused by:  poor site drainage which is a design fault  the home possibly being placed poorly on the site  the fill under the building possibly being incorrect  possible shrinkage.  gradual damage and lack of maintenance. I am not satisfied the FSP has established that the general exclusions apply. The FSP has referred to multiple possible causes of the damage but has not provided any information to show they are anything more than possible causes. It has not explained why I should prefer those as a cause over the leaking pipes. There is no evidence of any design fault, soil or earth movement, subsidence or shrinkage being a cause of damage. No relevant soil tests were conducted. The FSP refers to comments from PI in which he says the applicant advised him she carried out repairs to the home three years prior to lodging the claim after she noticed cracking. The FSP says this is evidence of the damage occurring over an extended period of time and therefore it should be considered gradual damage. MK on the other hand notes that the repairs completed 3 years previously were minor repairs. The repairs were consistent with proper maintenance and the cracking identified at that time was consistent with normal wear and tear rather than the movement of the slab. Case No: 501474 Determination Page 6 of 10 I am not satisfied the FSP has established that the damage occurred gradually. I am not satisfied it has established that the maintenance performed 3 years previously, was related to the current damage or that the FSP has established any link between the two events. Having considered all the information, I am not satisfied the FSP has shown an exclusion applies to allow them to deny the claim. FSP to obtain a scope of works Both parties have provided quotes for the repairs. The FSP’s quote is from May 2017 and is for $31,758.60 including GST. The applicant’s quote is dated 22 February 2018 and is for $38,802.10 including GST, however, the applicant’s quote is not complete and excludes ‘Building Work’. The applicant has confirmed that the leaking pipes have been repaired. They were repaired shortly after obtaining the report from DK plumbing in March 2018. The policy provides that the FSP pay $500 to the repair and replacement of the items from which the liquid escaped. The FSP should pay the applicant $500 if it has not already done so for the costs of the repair or replacement of the leaking pipes. The FSP should also pay any exploratory costs incurred as per the terms of the policy. It is likely that some time will be required to allow the slab and the soil under the slab to dry out before any repairs can be commenced. In disputes similar to this, between 12 and 18 months have been allowed for the drying process to occur. In the circumstances, due to the age and incompleteness of the quotes, I consider it appropriate for a full scope of works be obtained. Within 14 d ays of the applicant’s acceptance of this determination, the FSP should make arrangements for a complete scope of works to be prepared. The parties are asked to work together to help develop the scope of works. Once the scope of works has been settled then the FSP should complete the repairs to the applicant’s property in accordance with the terms and conditions of the policy . If agreed between the parties, the FSP can cash settle the claim based on the further scope of works in accordance with the terms of the policy. Should dispute arise as to the cash settlement amount then the parties may refer the matter back to the Service for determination. 2.3 Is the applicant entitled to compensation for non-financial loss and professional costs incurred? FOS may award compensation in certain circumstances Under paragraph 9.3 of the FOS TOR, FOS may award compensation for non- financial loss (capped at $3,000) where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interf erence with the applicant’s expectation of enjoyment or peace of mind. Case No: 501474 Determination Page 7 of 10 FOS takes a conservative approach to compensation and expects an applicant to bear a normal degree of inconvenience during the course of the claim. Under paragraph 9.4 of the TOR, FOS may determine that an FSP contribute up to $3,000 towards the professional costs incurred by an applicant in pursuing a claim. In determining whether an FSP should contribute to those costs, it is appropriate to take into account the complexity of a dispute and whether the applicant genuinely required the expert assistance. FSP has not handled claim proactively Pursuant to paragraph 9.3 of the TOR, I determine the FSP pay compensation for non-financial loss of $2,000. The claim was lodged on 11 May 2017 and the first report from PI is dated 18 May 2018. This report recommends further specialist investigation be done to determine the cause of the damage. The claim notes provided by the FSP have no entries between 11 May 2017 and 13 June 2017. This note is in response to an incoming call from the applicant. The next note is six days later, 19 June 2017, which notes the request for an engineer was sent on 19 June 2017. There are four more claim notes between 19 June 2017 and the date of the engineer’s report (8 August 2017). Three of these notes are in response to contact by the applicant. Despite the uncertainty as to the cause of damage, the FSP did not arrange for a static leak test. It required the applicant, at the applicant’s expense , to have the test completed. It is only when this test has been completed has the true cause of damage been identified. It is not unreasonable to expect in the circumstances that additional damage occurred to the property as the leak would have continued u nchecked but for the applicant’s access. The FSP has not provided any information to dispute the latest findings from either DK or MK. I do not believe the FSP has handled the claim pro-actively. I find the FSP’s handling of the claim has caused an unusual degree of stress and inconvenience to the applicant. FSP is to pay professional costs The FSP must contribute up to $3,000 towards the professional costs incurred in obtaining the reports from MK and DK, subject to the applicant providing the relevant invoices or receipts. Until the applicant arranged for the DK to complete the static leak test, there was no evidence to identify the actual cause of damage. The applicant’s expert , MK identified the need for such tests to be conducted. DK completed those tests. Given the complexity of the dispute I am satisfied the applicant genuinely required the reports to advance her claim. Case No: 501474 Determination Page 8 of 10 3 Supporting information 3.1 Policy Wording Escape of liquid What is covered Your building and/or contents are covered for loss or damage caused by the sudden and unexpected escape of liquid from any: • water main; • fixed water pipe (but not a garden hose); … If we have agreed to cover the loss or damage caused, we will also pay the reasonable cost of locating the source of the damage, where necessary, provided that: • it is at your insured address; and • we have agreed to pay this cost before you make arrangements for any work to commence. You are only covered for up to $500 for the repair or replacement of the item from which the liquid escaped if it formed part of your building or contents. What is not covered You are not covered under this Insured Event for: • loss or damage caused by any escape of liquid of which you were aware and failed to notify us of within a reasonable period; • loss or damage resulting from a leaking or faulty shower recess or shower base; • loss or damage caused by any gradual escape of liquid; … • exploratory or restoration costs if we have not accepted a claim under this Insured Event. Your building and/or contents are not covered under this Insured Event for loss or damage as described in the General Exclusions listed on pages 75 to 78. … General exclusions Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1.defects, structural or design faults, faulty workmanship or faulty design; … 4. wear and tear and lack of maintenance, including rust, corrosion and deterioration (except in some instances relating to the Insured Eve nts ‘Escape of liquid’ and ‘Legal liability’ claims); 5. water, including rainwater, after it has disappeared beneath the surface of the land at your insured address; … 8. subsidence or landslide (except in the case of the Insured Events ‘Earthquake’ and ‘Explosion’ claims); Case No: 501474 Determination Page 9 of 10 9. the vibration, settling, shrinking or expanding of earth or any building, foundation, wall, pavement or path (except in the case of the Insured Events ‘Lightning’ and ‘Earthquake’ claims); We will also not cover: … 35. gradual loss or damage of any kind; 3.2 Expert reports Record Key points FSP’s expert ( PI ) Report 18 May 2017  w e have been advised that approximately 3 years ago [applicant] became aware of movement within the house where by the concrete slab floor appeared to have subsided and there was cracking evident in the plaster wall linings.  the applicant engaged a building consultant who advised to remove a number of large trees on the adjacent nature strip.  the trees were removed and cosmetic repairs were undertak en to repa ir the cracked plaster.  [applicant] advised us that approximately six months ago she noticed the walls had cracked again and damage appeared to be getting worse. A pplic ant engaged a plumber to undertake investigative works to try to identify the cause of d amage.  It is our professional opinion there is liquid escaping from the shower recess every time it is used and this is contributing to the damage now present.  Based on our site inspection and information obtained (PI) cannot confirm cause of the claimed r esult ant damage and we recommend further specialist investigation is undertak en to determine the cause of damage FSP’s expert ( JG ) Report 8 August 2017  The damage to the building appears to be caused by damaged services underneath the building and poor dr ainage. The causes are likely to be a combination of the items listed… FSP’s expert (PI ) Report 16 August 2017 Conclusion:  the engineer has found the damages have been caused by multiple reasons including possible damaged services underneath the building and poor drainage.  We recommend the ins ured undertakes maintenance to identify and repair any leaking pipes that are contributing to the damage. Site drainage also requires improvement to prevent differential moisture content in the founding soils and grou nd surrounding the building.  maintenance issues identified have contributed to the claimed damage present. It is our opinion the damage has been occurring over an extended period of time and the insured was reasonably aware there were maintenance issues present including the leaking shower recess and the failure to investigat e and rectify the issues has led to the damage that now exists. Case No: 501474 Determination Page 10 of 10 FSP’s expert (PI ) Report 28 August 2017 Cause and Circum stance s:  the claimed resultant damage has not been caused by any sudden or unexpected escape of liquid. It has been found the slab has dropped around the bathroom which has compromised the shower base/walls. T he concret e floor dropping over time has contributed to the stresses placed on the house structure therefore affecting the water proofing and tiling. Given the movement of the slab it is possible any escape of liquid from this shower recess now may penetrate through any concrete cracks and contribute to the ongoing issues with the concret e slab subsidence. Concl usion:  it has been found there are no leaking pipes and the sewer and storm water are not damaged. I t is our professional opinion the claimed damage has not been caused by any sudden or unexpected escape of liquid. Damage has been occurring over an extende d period of time and has been exacerbated by liquid escaping from the shower recess. Applicant ’s expert (DK) Report 21 March 2018  I found multiple leaking and broken pi pes  a static leak test was done on the shower and no leaks were found  a rea and soil around shower waste was dry Applicant’s expert (MK) Report 20 March 2018  44 years industry experienc e  E xpert in fiel d of wat er reactive soils and soil stabilization  A g rees - evidence of settlem ent subsidence of concrete slab - e vidence of previous repairs of a minor nat ure - d ampness of external wall of bathroom symptomatic of a sewer issue  Disa grees - liquid escaping from shower recess - o nly way to find out is to conduct stat ic leak test - PI report is visual report only - m aintenance issues - requires nec essary testing of all water pipes before determining damage due to maintenance issues or cause of damage.  A pplicant had completed minor repairs 3 years prior to loss consistent with proper maint enance. Cracking identified at that time as nor mal wear and tear.  PI reports biased as proper testing not conducted.