Home / Financial Firm (Unknown - Insurer) / Determination 500629

Determination 500629

Bathroom and subfloor leak claim declined under defect and renovation exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$187,371
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home was damaged by long-term leaking services, and the FSP declined the claim after partly declining it earlier. AFCA found no policy exclusion was established, ordered cash settlement of $187,371 plus interest, 12 weeks of temporary accommodation, exploratory costs and up to $3,000 towards engineering costs.

The FSP did not establish that a defect, structural fault, or building renovation caused the loss, so the escape of liquid cover applies and the claim must be settled.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 500629 Determination Page 1 of 13 Case number: 500629 28 August 2018 1 Overview 1.1 Dispute The applicant held a Home and Contents Policy with the financial services provider (FSP). On 28 November 2015, she lodged a claim with the FSP after she suspected damage due to a leak in or below her bathroom. After partially declining, then accepting the claim, the FSP eventually declined the claim in its entirety on 14 September 2017, relying on the policy exclusions relating to:  defect, structural fault or design fault; and  building extensions, alterations or renovations. The FSP says the damage is a direct result of the applicant’s poor building practices and faulty works. 1.2 Issues and key findings Has the applicant established a claim within the terms of the policy? The policy provides cover for the insured event ‘escape of liquid’ and accidental damage. The panel is satisfied the loss or damage resulting from the escape of liquid falls within the terms of the policy. Can the FSP rely on the exclusion for defect, structural or design fault? The FSP has not established that the loss or damage was caused by a defect, structural or design fault that the applicant knew about or should reasonably have known about. Can the FSP rely upon the exclusion for building extensions or renovations? The FSP has not established that the building extensions, alterations or renovations caused the loss or damage or caused the leaking pipes. Is the FSP entitled to cash settle the claim? The FSP is to cash settle the claim in accordance with the terms and conditions of the policy for $187,371 plus interest from 14 September 2017. The FSP must also pay temporary accommodation for a period of 12 weeks in accordance with the terms and conditions of the policy. Case No: 500629 Determination Page 2 of 13 1.3 Determination This determination is in favour of the applicant. Within 14 days of the applicant’s acceptance of this determination, the FSP is to pay the applicant $187,371 plus interest from 14 September 2017 to date of payment of the claim, calculated in accordance with section 57 of the Insurance Contracts Act 1984 (the Act) The FSP is to pay the applicant the cost of temporary accommodation for a period of 12 weeks plus the exploratory costs incurred by the applicant in accordance with the terms and conditions of the policy. Pursuant to Paragraph 9.4 of the Terms of Reference, the FSP must also contribute up to $3,000 to the professional costs incurred by the applicant in obtaining the engineering report from ITC subject to the provision of the relevant invoice or receipt. Case No: 500629 Determination Page 3 of 13 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the information exchanged. Due to the complexities involved in this dispute, it has been referred to a panel for determination. The panel has considered all relevant information and has based this determination on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice, including codes of practice and prior determinations where applicable. 2.1 Has the applicant established a claim under the terms of the policy? The applicant has the onus to establish a claim within the terms of the policy The applicant holds a building and contents insurance policy with the FSP. The policy provides cover for loss or damage arising from insured events listed in the policy. Cover is subject to both specific and general exclusions. Relevant to this d ispute, the policy provides cover for damage caused by the ‘escape of liquid’. The applicant has also increased her cover to include coverage for ‘accidental damage’. The policy excludes cover for damage, loss, cost or legal liability that, amongst other things, is caused by, arises from or involves:  building extensions, alterations or renovations to the insured property, or  defect, structural fault or design which the insured knew about and did not fix before the loss or damage occurred. The applicant has established an insured event The applicant has provided her own engineering report from ITC. The report states: ‘ Signs of distress have been observed internally and externally around the North/East corner of the dwelling … Plumbing fault at the bathroom vanity waste pipe previously existed. This fault was the cause of the moisture leaking through bathroom floor and subsequently into the founding soils of the footings below It is our opinion that that the most likely cause of distress to the dwelling can be attributed to localised footing heave (beneath the bathroom wall) due to abnormal moisture conditions, with the previously leaking bathroom vanity waste pipe contributing to the conditions.’ The panel is satisfied the applicant has established o n the balance of probabilities a claim within the terms of the policy for loss or damage arising from the escape of liquid. Case No: 500629 Determination Page 4 of 13 2.2 Can the FSP rely upon the exclusion relating to defects, structural or design faults? FSP has provided a number of conflicting reports and assessments The FSP initially relied on its first engineer’s (FM’s ) report to partially decline the claim. FM said the leak below the bathroom vanity did not cause the structural movement because a ‘nib’ wall under the bathroom was said to have prev ented the leak reaching other areas of the sub floor. FM later redacted its comments about the nib wall but did identify more water coming from the shower. The FSP appointed its builder (IB) to re-inspect the damage. IB identified another leak in the suspended drain from the laundry and that water was also discharging beneath the property from a storm water grate. IB questioned the adequacy of the grate. The applicant raised concerns with inconsistencies in reports and the FSP engaged its second engineer (MC) who stated the proximate cause of the damage was long term moisture exposure due to leaking services. MC also stated the structural movement was due to a combination of the alleged inadequate stormwater drainage system and the leaking services. The FSP then accepted the claim because its assessor (LJ) advised FM ’s reports sho uld be disregarded and MC’s findings should be adopted. A dispute then arose in relation to the quote for cash settlement so the FSP appointed its building co-ordinator (PW). Throughout all of the above assessments and reports it had been identified that building work and extensions had previously been carried out on the property. PW requested the applicant provide council and compliance documentation for the extension works as he identified that the applicant was an owner/builder. FSP has not established the exclusion for defect, structural or design fault The policy excludes damage that is caused by, arises from or involves: ‘ a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e.g. if there are signs that a defect previously caused damage, we will not pay a later claim for further damage from this defect). ’ This means the FSP must establish: 1. there was a defect, structural or design fault; and 2. the applicant knew about it or should reasonably have known about it. The FSP relies upon comments of a builder PW. PW states: ‘the documentation provided by the insured does not comp ly with the building regulations 2006 or the BCA 2009 which was applicable during the build.’ Case No: 500629 Determination Page 5 of 13 PW says that if water was seeping through the bathroom tiles or through the bathroom floor, it shows the building extensions did not meet the BCA. PW also says the BCA specifies that the footings must be designed by an engineer. The applicant has provided a building permit for the extension works as well as a certificate of final inspection from the relevant City Council. The certificate states the strip footings, sub floor and framework were all inspected and approved to be in accordance with the Building Act 1993 and Building Regulations 2006 . This satisfies the panel that the works were compliant. Further, it has been identified that there has been a number of sources of unexpected water ingress from different services. This means the property has been exposed to more actions than what it would reasonab ly be expected to be subjected to. Therefore, the sole fact that water was seeping through the tiles is not indicative of non-compliance with the BCA. The information suggests the defects occurred as a result of the structural movement from unexpected water leakages. This would mean the structural defects are not the causes of damage but the result of the damage. In regard to the footings, the FSP has not established the footings are non-compliant. There is no assessment of the footings at all. MC ’s geotechnical report of 6 September 2017 states: ‘…we could not access the s ubfloor area no comment can be made about the encountered broken pipes and no existing footing depth could be verified. ’ The only identified ‘possible’ defect was the storm water drainage. However, both IB and FM advised the adequacy of the storm water drainage could not be determined without inspection by a suitably qualified hydraulic engineer. IB states it: ‘…could only be fully confirmed using complex calculations as set out in AS/NZS 3500.3 . ’ This has not been done. The FSP has not established the storm water drainage system is defective or non-compliant. The panel is not satisfied that the FSP has established any defect, structural fault or design fault was the cause of the damage nor has it established that the applicant was aware of any defect or structural or design fault. The FSP cannot rely upon this exclusion. The FSP has not satisfied criteria one of the policy exclusion for defect, structural fault or design fault or that the applicant was aware of any defect or design fault. The FSP cannot rely on this exclusion to decline the claim. 2.3 Can the FSP rely on the exclusion for extensions or renovations? The FSP says the damage was caused by the extension and renovation work The FSP also says the cause of the damage occurred during the applicant’s extension works. The policy excludes damage that is caused by, arises from or involves: Case No: 500629 Determination Page 6 of 13 ‘ building extensions, alterations or renovations to your home or unit. Specifically, we do not cover:  damage caused by cracking, collapse, subsidence or damage to your home and contents caused fully or partially by the building work; ’ The FSP has relied on the following statement from MC’s ‘not for construction scope of works’ dated 6 July 2017, to decline the claim: ‘ The property has recently had an extension constructed to the rear of the home, and a leak to the bathroom and laundry waste pipes has allowed water to leak into the subfloor since construction of the extension was completed in 2013. ’ While the leaks may have been occurring for some time the panel does not accept that the extension works caused the leaking services which in turn caused the damage. FSP has not established exclusion for damage caused by building extensions The reports relied on by the FSP were provided more than two years, and in some cases almost four years, after the extension work had been signed off. However, FM’s, MC’s and IB’s reports were all consistent in identifying there had been long term water exposure. MC ’s statement that the water leaks have been present since extension works, appears to be based on the reports identifying long term water damage and the app licant’s statement to FM , that: ‘A musty smell was noticed in the bathroom since the renovations were completed… ’ The fact the leaks had been occurring for a long time does not establish that the extension work was the cause of the damage. A plumber’s report referred to in MC ’s report states: ‘ On investigating the possible water leak at the above property, it was found that a cracked 100mm PVC pipe was cracked………. cause of crack is unknown ….’ While FM, MC and IB all identify long term water damage there is no mention on the actual cause of the leaks from the bathroom and laundry other than defective building work. The above extract from the plumber’s report suggests no cause of the damaged pipes was identified. Based on the available information, the panel is not satisfied that the FSP has established that the damage was caused by building extensions, alterations or renovations. FSP is not entitled to decline the claim The numerous reports provided by the FSP have established the escape of liquid from the:  bathroom vanity  laundry sewer line when the washing machine was in use  shower  overflow from the storm water grate. Case No: 500629 Determination Page 7 of 13 MC ’s report of 21 April 2017 identifies the proximate cause of the damage. MC states: ‘ It is our opinion that the damage is due to long-term moisture exposure due to leaking services. In relation to the cracking of the brickwork and the study wall it is ou r opinion the cracking is the result of foundation movement that has been affected by changes in moisture content due to a combination of possibly an inadequate stormwater drainage system and the fact that services have been leaking over an extended period of time. … Depending on the results of the stormwater assessment the stormwater system may or may not be a pre-existing issue. ’ The cause of the leaking services has not been established to be excluded under the policy. The alleged inadequacy of the storm water drainage has not been established. There is no information to show the damage occurred from any of the excluded causes as outlined above. The FSP has not established that any of the policy exclusions apply or that the claim is not covered. The FSP is not entitled to decline the claim. 2.4 Is the FSP entitled to cash settle the claim? The FSP is to accept the claim in accordance with the terms of the policy The FSP is to accept the claim and determine settlement in accordance with the terms of the policy. The policy provides the FSP with a discretion whether to repair the damage or cash settle the applicant for the cost to repair. The FSP when exercising its discretion whether to cash settle or complete the repairs must do so fairly, reasonably and consistent with the principles of utmost good faith. In exercising a discretion to cash settle the claim, the FSP is transferring the risks associated with the repair process to the applicant. It relieves itself of its undertaking under the policy to provide a life time guarantee for repairs. The FSP has indicated that it will not authorise repairs. The panel accepts given the history of this claim that it is fair in the circumstances that the matter be cash settled to allow the applicant to proceed with the necessary repairs. FSP to cash settle the claim When the FSP was considering a cash settlement, quotes were provided by both the applicant and the FSP. Those quotes were vastly different. T he applicant’s quotes were within a similar range and both quotes are stated to be based on the scope of works provided by the FSP’s engineer MC. The FSP has not indicated why these quotes would not be appropriate. The panel prefers the quotes provided by the applicant as representing a fair and reasonable assessment as to the cost to repair the property. Case No: 500629 Determination Page 8 of 13 The applicant has provided two quotes – one from MB dated 6 August 2017 for $232,400. The second quote has been provided from SL for $218,090. The panel prefers the quote provided by SL as it is more detailed but notes the items listed in the quote only add up to $164,850 including a $10,000 allowance for temporary accommodation. The panel has calculated the correct amount to be $154,850 . The quote also identifies the risk of unforeseen issues arising during the repair process and possible need for variations. The panel recognises that in any cash settlement these risks are transferred to the applicant. In recognition of this the panel believes it is fair in the circumstances to allow a 10% loading on the quote to cover these contingencies. A 10% allowance of $15,485 brings the quote to $170,335. Allowing a further 10% for GST brings the total amount to $187,370.50. This should be rounded up to $187,371. In the circumstances, the panel determines that the FSP is to cash settle the applicant’s claim based on the quote from SL for $ 187,371 and pay interest from the date of declinature on 14 September 2017 to date of payment of the claim in accordance with section 57 of the Act. FSP to pay for temporary accommodation and exploratory costs The policy also provides cover for temporary accommodation costs and exploratory costs. Quotes provided by the applicant indicate the likely repair time to vary between six weeks and 14 weeks. The quote provided by the FSP indicates a likely repair time of eight weeks. In the circumstances and to allow for any delays in the repair process, the panel determines the FSP should pay the applicant temporary accommodation costs for a period of 12 weeks in accordance with the terms of the policy. The applicant has also incurred exploratory costs. The FSP should pay the exploratory costs incurred by the applicant in accordance with the terms and conditions of the policy, subject to the applicant providing any relevant receipts. FSP to contribute to professional costs incurred Paragraph 9.4 of the Terms of Reference that FOS operates under provides that FOS may determine an FSP contribute up to $3 ,000 towards professional costs incurred by an applicant in pursuing a claim. The applicant obtained an engineering report from ITC. The report has assisted in identifying the cause of damage. Given the nature of the dispute and the complexity of the issues, it was, in the panel’s view, reasonable for the applicant to obtain the report to support the claim. In the circumstances, the panel determines that the FSP must contribute up to $3,000 towards the applicant’s costs of obtaining the engineering report, subject to the applicant providing the relevant invoices. Case No: 500629 Determination Page 9 of 13 3 Supporting information 3.1 Relevant terms of the policy Page and section Extract What you are covered for – Insured Events Page 26 We Cover Loss or damage caused by liquid leaking, overflowing or bursting from any of the following:  refrigerators, freezers, dishwas hers and washing machines  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, and sewage systems;  …  baths, sinks, toilets and basins;  … Exploratory costs We will pay the reasonable cost of locating, at the insured address, the source of the escaped liquid and to repair and re store the damage to your home and cont ents caused by our exploratory work but only if the escape of liquid is covered under this insured event. If the leak is not covered under this insured event, we provide some limited cover for exploratory costs under a dditional cover ‘Exploratory costs where a leak is not covered under insured event ‘Escape of liquid’’. See page 50. Additional Features Temporary accommodation when you have home cover Page 32 We Cover When an ins ured event damages your home to the extent you cannot live there, and we agree, we will pay for your reasonable temporary accommodation costs for the time it will take to repair or rebuild your home to a liveable condition. We will also pay for temporary accommodation for your domestic pets in a commercial boarding establishment for t he same period that we pay for your temporary accommodation. … Optional covers Accidental damage at the home Page 58 We Cover When you have home insurance, we cover your home for accidental loss (e.g. losing so mething) and accidental damage ( e.g. breaking or damaging something) at the insured address during the period of insurance. When you have contents insurance, we cover your contents for accidental loss (e.g. losing something) and accidental damage (e.g. b reaking or damaging something) at the insured address during the period of insurance General Exclusions Pages 73 - 79 You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Building extensions, alterations or renovations Case No: 500629 Determination Page 10 of 13 building extensions, alterations or renovations to your home or unit. Specifically, we do not cover:  damage caus ed by cracking, collapse, subsidence or damage to your home and contents caused fully or partially by the building work;  damage caus ed by storm, flood or wat er entering your home or unit through openings in the walls or roof or other unfinished parts of your home or unit whether or not they are temporarily covered at the time of the damage;  damage caus ed by storm or flood to any part that is not fully built;  theft or damage by someone who enters or leaves through an unlockable part of your home or unit;  malicious damage or vandalism to unfinished parts of your home. … Defect, structural faul t or design fault a defect, structural fault or desig n fault that you knew about (or should reasonably have known ab out) and did not fix before the loss or damage occurred (e. g. if there are signs that a defect previously caused damage, we will not pay a l ater claim for further damage from this defect). 3.2 Expert reports Re port  Key Points Leak test Report 30 November 2015  Leak was detected at sewer pipe between vanity kickers and subfl oor.  Leak is the cause of the res ultant damage. Applicant’ s Engineer’s report 22 December 2015  Signs of distress observed internally and externally around the North/East corner of the dwelling  Plumbing fault at the bathroom vanity waste pipe was said to be the cause of the moisture leaking through bathroom floor into the fo unding soils of the footings below  T he most likely cause of distress to the dwelling can be attributed to l ocalised footing heave (beneath the bathroom wall) due to abnormal moisture conditions, with the previously leaking bathroom vanity waste pipe contri buting to the conditions. FSP’s first engineer’s (FM’ s) report 18 March 2016  O bserved an int ernal masonry nib wall in the subfloor space below the northern end of the Bathroom, located between the leak and the northern perimeter wall of the house.  Does not consider it plausible that water from the leak could penetrate through/below this wall and reach the foundation soils at the northern end of the Laundry  Of opinion that the subject leak did cause the observed water damage to localised areas of the Bath room vanity cabinetry Case No: 500629 Determination Page 11 of 13  Of opinion that the subject leak did not cause the observed building movement related damage to the hous e  Of opinion that the observed building movement related damage has been caused by on - going long - term differential movements of th e footings due to differential changes in the moisture contents of th e reactive clay foundation soils. FSP’s Builder ( IB ) report 23 F ebruary 2017  Identified w ater discharging beneath dwelling from storm water grate  Identified that the suspended drain from the laundry had a leak  It appears the storm wat er drain has overflowed beneath the house through the grate located beneath the central heating unit.  The drain at the bottom of the grate holds half a pipe of water, during heavy rainfal l it is likely that this overflows.  The ground of the subfloor was very damp and wet underneat h the laundry to the shower.  Mould was found underneath the floor in shower where the wall meets the hall way, water damage to the yellow tongue and floor joists were found.  The timber sumps to this area revealed water related damages from long term water exposure FM’s supplementary report 20 March 2017  The nib wall is located in the vicinity of the south side of the Bathroom and not to the north of the Bathroom vanity, as previously understood and described in Report 1.  The p aragraphs which relate to the subject nib wall and are now redundant.  After the leak in the sewer waste water pipe servicing the Laundry was discovered the Owner engaged a Plumber who found that water would escape from this damaged section of pipe when the washing machine discharged water to the pipe.  Observed additional damage during the subsequent subfloor inspection carried out on 22 February 2017, including:  Damage to localised areas of the particleboard flooring in the vicinity of the west side of the shower in the Bathroom  Damage to localised areas of the floor joists in the vicinity of the west sid e of the shower in the Bathroom  Elevated moisture meter readings to the base of the timbe r stump in the vicinity of the shower in the Bathroom.  Crack damage to the tile unit located between the southwest corner of the shower and the northern end of the door entry to the Bathroom.  O bserved gaps within the flexible joint filler located bet ween t he junction of the wall and floor at the west side of the shower in the Bathroom not es that the damage discussed in paragraph 3.4 is located in the vicinity of this area. As such this damage has been caus ed by on - going long - term moisture ingress from the j unction between the wall and floor along the west side of the shower in the Bathroom, during shower operation. Case No: 500629 Determination Page 12 of 13  Of opinion that the damp subfloor soil conditions in the vicinity of the northeast corner of the house have been caused by the overflow of storm water from the drainage grate within the concrete pavement located immediately adjacent to the east side of the Bathroom. This is expected to occur during times of significant rainfall.  a suitably qualified and experienced civil engineer would be able to i nspect the ‘as constructed’ storm wat er system at the subject property for compliance with Australian Standard AS3500. 3:2003 Plumbing and drainage Part 3: Stormwater drainage . FSP’s second engineer’s (MC’ s) Report 21 April 2017  D ue to restricted access t he undersigned was not able to inspect the underfloor space. This report relies on the findings noted in the [IB and Plumbing] reports.  In relation to the adequacy of the pump out system we note that is outside the expertise of the undersigned. This matte r should be investigated by an experienced Hydraulic Engineer  The insured has emailed a photo showing the condition of the particleboard flooring in the bat hroom area. This shows the flooring is significantly affected by moisture and would be unsound. We n ote that yellow tongue flooring can with stand short period of wetting and drying. It will not tolerate extended periods of saturation.  It is our opinion that the flooring and associated finishes to the bathroom and laundry require demolition and replacem ent.  It is our opinion that the damage is due to long term moisture exposure due to leaking services.  In relation to the cracking of the brickwork and the study wall it is our opinion the cracking is the result of foundation movement that has been affected by changes in moisture content due to a combination of possibly an inadequate stormwat er drainage system and the fact that services have been leaking over an extended period of time. FSP’s a sse ssor’ s Report LJ 1 June 2017  Decided to disregard FM ’s report only for the fact that it provides a conclusion that has been challenged and that at their own admission there a re references in the report that provide incorrect statements reg a rding location of damage.  For this reas on and without prejudi ce ass es sor has adopt ed MC’s report as it provides recommendations that would provide an eventual outcome for the claim that is consistent with the damage identified and the proposed causation.  Request MC provide not for construction sow based upon identified da mage. Obtain 2 x panel builder quotes for the purpose of cash settlement. Case No: 500629 Determination Page 13 of 13 3.3 Other relevant information relied upon  The parties’ submissions .  The applicant’s c ouncil approved building permit.  The applicant’s extension plans submitted to c ouncil and the council approved certificate of final inspection.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.