Text of the determination
Determination
Case No: 500629 Determination Page 1 of 13
Case number: 500629 28 August 2018
1 Overview
1.1 Dispute
The applicant held a Home and Contents Policy with the financial services provider
(FSP). On 28 November 2015, she lodged a claim with the FSP after she suspected
damage due to a leak in or below her bathroom.
After partially declining, then accepting the claim, the FSP eventually declined the
claim in its entirety on 14 September 2017, relying on the policy exclusions relating
to:
defect, structural fault or design fault; and
building extensions, alterations or renovations.
The FSP says the damage is a direct result of the applicant’s poor building practices
and faulty works.
1.2 Issues and key findings
Has the applicant established a claim within the terms of the policy?
The policy provides cover for the insured event ‘escape of liquid’ and accidental
damage. The panel is satisfied the loss or damage resulting from the escape of liquid
falls within the terms of the policy.
Can the FSP rely on the exclusion for defect, structural or design fault?
The FSP has not established that the loss or damage was caused by a defect,
structural or design fault that the applicant knew about or should reasonably have
known about.
Can the FSP rely upon the exclusion for building extensions or renovations?
The FSP has not established that the building extensions, alterations or renovations
caused the loss or damage or caused the leaking pipes.
Is the FSP entitled to cash settle the claim?
The FSP is to cash settle the claim in accordance with the terms and conditions of
the policy for $187,371 plus interest from 14 September 2017. The FSP must also
pay temporary accommodation for a period of 12 weeks in accordance with the terms
and conditions of the policy.
Case No: 500629 Determination Page 2 of 13
1.3 Determination
This determination is in favour of the applicant.
Within 14 days of the applicant’s acceptance of this determination, the FSP is to pay
the applicant $187,371 plus interest from 14 September 2017 to date of payment of
the claim, calculated in accordance with section 57 of the Insurance Contracts Act
1984 (the Act)
The FSP is to pay the applicant the cost of temporary accommodation for a period of
12 weeks plus the exploratory costs incurred by the applicant in accordance with the
terms and conditions of the policy.
Pursuant to Paragraph 9.4 of the Terms of Reference, the FSP must also contribute
up to $3,000 to the professional costs incurred by the applicant in obtaining the
engineering report from ITC subject to the provision of the relevant invoice or receipt.
Case No: 500629 Determination Page 3 of 13
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities involved in this dispute, it has been referred to a panel for
determination.
The panel has considered all relevant information and has based this determination
on what is fair in all the circumstances, having regard to the relevant legal principles,
terms of the policy, good industry practice, including codes of practice and prior
determinations where applicable.
2.1 Has the applicant established a claim under the terms of the policy?
The applicant has the onus to establish a claim within the terms of the policy
The applicant holds a building and contents insurance policy with the FSP. The policy
provides cover for loss or damage arising from insured events listed in the policy.
Cover is subject to both specific and general exclusions.
Relevant to this d ispute, the policy provides cover for damage caused by the ‘escape
of liquid’. The applicant has also increased her cover to include coverage for
‘accidental damage’.
The policy excludes cover for damage, loss, cost or legal liability that, amongst other
things, is caused by, arises from or involves:
building extensions, alterations or renovations to the insured property, or
defect, structural fault or design which the insured knew about and did not fix
before the loss or damage occurred.
The applicant has established an insured event
The applicant has provided her own engineering report from ITC. The report states:
‘ Signs of distress have been observed internally and externally around the North/East
corner of the dwelling
…
Plumbing fault at the bathroom vanity waste pipe previously existed. This fault was the
cause of the moisture leaking through bathroom floor and subsequently into the founding
soils of the footings below
It is our opinion that that the most likely cause of distress to the dwelling can be attributed
to localised footing heave (beneath the bathroom wall) due to abnormal moisture
conditions, with the previously leaking bathroom vanity waste pipe contributing to the
conditions.’
The panel is satisfied the applicant has established o n the balance of probabilities a
claim within the terms of the policy for loss or damage arising from the escape of
liquid.
Case No: 500629 Determination Page 4 of 13
2.2 Can the FSP rely upon the exclusion relating to defects, structural or
design faults?
FSP has provided a number of conflicting reports and assessments
The FSP initially relied on its first engineer’s (FM’s ) report to partially decline the
claim. FM said the leak below the bathroom vanity did not cause the structural
movement because a ‘nib’ wall under the bathroom was said to have prev ented the
leak reaching other areas of the sub floor.
FM later redacted its comments about the nib wall but did identify more water coming
from the shower.
The FSP appointed its builder (IB) to re-inspect the damage. IB identified another
leak in the suspended drain from the laundry and that water was also discharging
beneath the property from a storm water grate. IB questioned the adequacy of the
grate.
The applicant raised concerns with inconsistencies in reports and the FSP engaged
its second engineer (MC) who stated the proximate cause of the damage was long
term moisture exposure due to leaking services. MC also stated the structural
movement was due to a combination of the alleged inadequate stormwater drainage
system and the leaking services.
The FSP then accepted the claim because its assessor (LJ) advised FM ’s reports
sho uld be disregarded and MC’s findings should be adopted.
A dispute then arose in relation to the quote for cash settlement so the FSP
appointed its building co-ordinator (PW).
Throughout all of the above assessments and reports it had been identified that
building work and extensions had previously been carried out on the property. PW
requested the applicant provide council and compliance documentation for the
extension works as he identified that the applicant was an owner/builder.
FSP has not established the exclusion for defect, structural or design fault
The policy excludes damage that is caused by, arises from or involves:
‘ a defect, structural fault or design fault that you knew about (or should reasonably have
known about) and did not fix before the loss or damage occurred (e.g. if there are signs that
a defect previously caused damage, we will not pay a later claim for further damage from
this defect). ’
This means the FSP must establish:
1. there was a defect, structural or design fault; and
2. the applicant knew about it or should reasonably have known about it.
The FSP relies upon comments of a builder PW. PW states:
‘the documentation provided by the insured does not comp ly with the building regulations
2006 or the BCA 2009 which was applicable during the build.’
Case No: 500629 Determination Page 5 of 13
PW says that if water was seeping through the bathroom tiles or through the
bathroom floor, it shows the building extensions did not meet the BCA. PW also says
the BCA specifies that the footings must be designed by an engineer.
The applicant has provided a building permit for the extension works as well as a
certificate of final inspection from the relevant City Council.
The certificate states the strip footings, sub floor and framework were all inspected
and approved to be in accordance with the Building Act 1993 and Building
Regulations 2006 . This satisfies the panel that the works were compliant.
Further, it has been identified that there has been a number of sources of
unexpected water ingress from different services. This means the property has been
exposed to more actions than what it would reasonab ly be expected to be subjected
to. Therefore, the sole fact that water was seeping through the tiles is not indicative
of non-compliance with the BCA.
The information suggests the defects occurred as a result of the structural movement
from unexpected water leakages. This would mean the structural defects are not the
causes of damage but the result of the damage.
In regard to the footings, the FSP has not established the footings are non-compliant.
There is no assessment of the footings at all. MC ’s geotechnical report of 6
September 2017 states:
‘…we could not access the s ubfloor area no comment can be made about the encountered
broken pipes and no existing footing depth could be verified. ’
The only identified ‘possible’ defect was the storm water drainage. However, both IB
and FM advised the adequacy of the storm water drainage could not be determined
without inspection by a suitably qualified hydraulic engineer. IB states it:
‘…could only be fully confirmed using complex calculations as set out in AS/NZS 3500.3 . ’
This has not been done. The FSP has not established the storm water drainage
system is defective or non-compliant.
The panel is not satisfied that the FSP has established any defect, structural fault or
design fault was the cause of the damage nor has it established that the applicant
was aware of any defect or structural or design fault. The FSP cannot rely upon this
exclusion.
The FSP has not satisfied criteria one of the policy exclusion for defect, structural
fault or design fault or that the applicant was aware of any defect or design fault. The
FSP cannot rely on this exclusion to decline the claim.
2.3 Can the FSP rely on the exclusion for extensions or renovations?
The FSP says the damage was caused by the extension and renovation work
The FSP also says the cause of the damage occurred during the applicant’s
extension works. The policy excludes damage that is caused by, arises from or
involves:
Case No: 500629 Determination Page 6 of 13
‘ building extensions, alterations or renovations to your home or unit. Specifically, we do not
cover:
damage caused by cracking, collapse, subsidence or damage to your home and
contents caused fully or partially by the building work; ’
The FSP has relied on the following statement from MC’s ‘not for construction scope
of works’ dated 6 July 2017, to decline the claim:
‘ The property has recently had an extension constructed to the rear of the home, and a leak
to the bathroom and laundry waste pipes has allowed water to leak into the subfloor since
construction of the extension was completed in 2013. ’
While the leaks may have been occurring for some time the panel does not accept
that the extension works caused the leaking services which in turn caused the
damage.
FSP has not established exclusion for damage caused by building extensions
The reports relied on by the FSP were provided more than two years, and in some
cases almost four years, after the extension work had been signed off. However,
FM’s, MC’s and IB’s reports were all consistent in identifying there had been long
term water exposure.
MC ’s statement that the water leaks have been present since extension works,
appears to be based on the reports identifying long term water damage and the
app licant’s statement to FM , that:
‘A musty smell was noticed in the bathroom since the renovations were completed… ’
The fact the leaks had been occurring for a long time does not establish that the
extension work was the cause of the damage. A plumber’s report referred to in MC ’s
report states:
‘ On investigating the possible water leak at the above property, it was found that a cracked
100mm PVC pipe was cracked………. cause of crack is unknown ….’
While FM, MC and IB all identify long term water damage there is no mention on the
actual cause of the leaks from the bathroom and laundry other than defective building
work. The above extract from the plumber’s report suggests no cause of the
damaged pipes was identified.
Based on the available information, the panel is not satisfied that the FSP has
established that the damage was caused by building extensions, alterations or
renovations.
FSP is not entitled to decline the claim
The numerous reports provided by the FSP have established the escape of liquid
from the:
bathroom vanity
laundry sewer line when the washing machine was in use
shower
overflow from the storm water grate.
Case No: 500629 Determination Page 7 of 13
MC ’s report of 21 April 2017 identifies the proximate cause of the damage. MC
states:
‘ It is our opinion that the damage is due to long-term moisture exposure due to leaking
services.
In relation to the cracking of the brickwork and the study wall it is ou r opinion the cracking is
the result of foundation movement that has been affected by changes in moisture content
due to a combination of possibly an inadequate stormwater drainage system and the fact
that services have been leaking over an extended period of time.
…
Depending on the results of the stormwater assessment the stormwater system may or
may not be a pre-existing issue. ’
The cause of the leaking services has not been established to be excluded under the
policy. The alleged inadequacy of the storm water drainage has not been
established. There is no information to show the damage occurred from any of the
excluded causes as outlined above.
The FSP has not established that any of the policy exclusions apply or that the claim
is not covered. The FSP is not entitled to decline the claim.
2.4 Is the FSP entitled to cash settle the claim?
The FSP is to accept the claim in accordance with the terms of the policy
The FSP is to accept the claim and determine settlement in accordance with the
terms of the policy.
The policy provides the FSP with a discretion whether to repair the damage or cash
settle the applicant for the cost to repair. The FSP when exercising its discretion
whether to cash settle or complete the repairs must do so fairly, reasonably and
consistent with the principles of utmost good faith.
In exercising a discretion to cash settle the claim, the FSP is transferring the risks
associated with the repair process to the applicant. It relieves itself of its undertaking
under the policy to provide a life time guarantee for repairs.
The FSP has indicated that it will not authorise repairs. The panel accepts given the
history of this claim that it is fair in the circumstances that the matter be cash settled
to allow the applicant to proceed with the necessary repairs.
FSP to cash settle the claim
When the FSP was considering a cash settlement, quotes were provided by both the
applicant and the FSP. Those quotes were vastly different.
T he applicant’s quotes were within a similar range and both quotes are stated to be
based on the scope of works provided by the FSP’s engineer MC. The FSP has not
indicated why these quotes would not be appropriate.
The panel prefers the quotes provided by the applicant as representing a fair and
reasonable assessment as to the cost to repair the property.
Case No: 500629 Determination Page 8 of 13
The applicant has provided two quotes – one from MB dated 6 August 2017 for
$232,400. The second quote has been provided from SL for $218,090. The panel
prefers the quote provided by SL as it is more detailed but notes the items listed in
the quote only add up to $164,850 including a $10,000 allowance for temporary
accommodation. The panel has calculated the correct amount to be $154,850 . The
quote also identifies the risk of unforeseen issues arising during the repair process
and possible need for variations. The panel recognises that in any cash settlement
these risks are transferred to the applicant. In recognition of this the panel believes it
is fair in the circumstances to allow a 10% loading on the quote to cover these
contingencies. A 10% allowance of $15,485 brings the quote to $170,335. Allowing a
further 10% for GST brings the total amount to $187,370.50. This should be rounded
up to $187,371.
In the circumstances, the panel determines that the FSP is to cash settle the
applicant’s claim based on the quote from SL for $ 187,371 and pay interest from the
date of declinature on 14 September 2017 to date of payment of the claim in
accordance with section 57 of the Act.
FSP to pay for temporary accommodation and exploratory costs
The policy also provides cover for temporary accommodation costs and exploratory
costs.
Quotes provided by the applicant indicate the likely repair time to vary between six
weeks and 14 weeks. The quote provided by the FSP indicates a likely repair time of
eight weeks.
In the circumstances and to allow for any delays in the repair process, the panel
determines the FSP should pay the applicant temporary accommodation costs for a
period of 12 weeks in accordance with the terms of the policy.
The applicant has also incurred exploratory costs. The FSP should pay the
exploratory costs incurred by the applicant in accordance with the terms and
conditions of the policy, subject to the applicant providing any relevant receipts.
FSP to contribute to professional costs incurred
Paragraph 9.4 of the Terms of Reference that FOS operates under provides that
FOS may determine an FSP contribute up to $3 ,000 towards professional costs
incurred by an applicant in pursuing a claim.
The applicant obtained an engineering report from ITC. The report has assisted in
identifying the cause of damage. Given the nature of the dispute and the complexity
of the issues, it was, in the panel’s view, reasonable for the applicant to obtain the
report to support the claim.
In the circumstances, the panel determines that the FSP must contribute up to
$3,000 towards the applicant’s costs of obtaining the engineering report, subject to
the applicant providing the relevant invoices.
Case No: 500629 Determination Page 9 of 13
3 Supporting information
3.1 Relevant terms of the policy
Page and section Extract
What you are covered for
– Insured Events
Page 26
We Cover
Loss or damage caused by liquid leaking, overflowing or
bursting from any of the following:
refrigerators, freezers, dishwas hers and washing machines
any drain, fixed pipes, roof gutters or guttering and rainwater
downpipes, and sewage systems;
…
baths, sinks, toilets and basins;
…
Exploratory costs
We will pay the reasonable cost of locating, at the insured
address, the source of the escaped liquid and to repair and
re store the damage to your home and cont ents caused by our
exploratory work but only if the escape of liquid is covered under
this insured event. If the leak is not covered under this insured
event, we provide some limited cover for exploratory costs
under a dditional cover ‘Exploratory costs where a leak is not
covered under insured event ‘Escape of liquid’’. See page 50.
Additional Features
Temporary
accommodation when
you have home cover
Page 32
We Cover
When an ins ured event damages your home to the extent you
cannot live there, and we agree, we will pay for your reasonable
temporary accommodation costs for the time it will take to repair
or rebuild your home to a liveable condition. We will also pay for
temporary accommodation for your domestic pets in a
commercial boarding establishment for t he same period that we
pay for your temporary accommodation.
…
Optional covers
Accidental damage at the
home
Page 58
We Cover
When you have home insurance, we cover your home for
accidental loss (e.g. losing so mething) and accidental damage
( e.g. breaking or damaging something) at the insured address
during the period of insurance.
When you have contents insurance, we cover your contents for
accidental loss (e.g. losing something) and accidental damage
(e.g. b reaking or damaging something) at the insured address
during the period of insurance
General Exclusions
Pages 73 - 79
You are not covered under any section of this policy for
damage, loss, cost or legal liability that is caused by, arises from
or involves:
Building extensions, alterations or renovations
Case No: 500629 Determination Page 10 of 13
building extensions, alterations or renovations to your home or
unit. Specifically, we do not cover:
damage caus ed by cracking, collapse, subsidence or damage
to your home and contents caused fully or partially by the
building work;
damage caus ed by storm, flood or wat er entering your home
or unit through openings in the walls or roof or other
unfinished parts of your home or unit whether or not they are
temporarily covered at the time of the damage;
damage caus ed by storm or flood to any part that is not fully
built;
theft or damage by someone who enters or leaves through an
unlockable part of your home or unit;
malicious damage or vandalism to unfinished parts of your
home.
…
Defect, structural faul t or design fault
a defect, structural fault or desig n fault that you knew about (or
should reasonably have known ab out) and did not fix before the
loss or damage occurred (e. g. if there are signs that a defect
previously caused damage, we will not pay a l ater claim for
further damage from this defect).
3.2 Expert reports
Re port Key Points
Leak test Report
30 November 2015
Leak was detected at sewer pipe between vanity kickers and
subfl oor.
Leak is the cause of the res ultant damage.
Applicant’ s Engineer’s
report
22 December 2015
Signs of distress observed internally and externally around
the North/East corner of the dwelling
Plumbing fault at the bathroom vanity waste pipe was said to
be the cause of the moisture leaking through bathroom floor
into the fo unding soils of the footings below
T he most likely cause of distress to the dwelling can be
attributed to l ocalised footing heave (beneath the bathroom
wall) due to abnormal moisture conditions, with the previously
leaking bathroom vanity waste pipe contri buting to the
conditions.
FSP’s first engineer’s
(FM’ s) report
18 March 2016
O bserved an int ernal masonry nib wall in the subfloor space
below the northern end of the Bathroom, located between the
leak and the northern perimeter wall of the house.
Does not consider it plausible that water from the leak could
penetrate through/below this wall and reach the foundation
soils at the northern end of the Laundry
Of opinion that the subject leak did cause the observed water
damage to localised areas of the Bath room vanity cabinetry
Case No: 500629 Determination Page 11 of 13
Of opinion that the subject leak did not cause the observed
building movement related damage to the hous e
Of opinion that the observed building movement related
damage has been caused by on - going long - term differential
movements of th e footings due to differential changes in the
moisture contents of th e reactive clay foundation soils.
FSP’s Builder ( IB ) report
23 F ebruary 2017
Identified w ater discharging beneath dwelling from storm
water grate
Identified that the suspended drain from the laundry had a
leak
It appears the storm wat er drain has overflowed beneath the
house through the grate located beneath the central heating
unit.
The drain at the bottom of the grate holds half a pipe of water,
during heavy rainfal l it is likely that this overflows.
The ground of the subfloor was very damp and wet
underneat h the laundry to the shower.
Mould was found underneath the floor in shower where the
wall meets the hall way, water damage to the yellow tongue
and floor joists were found.
The timber sumps to this area revealed water related
damages from long term water exposure
FM’s supplementary
report
20 March 2017
The nib wall is located in the vicinity of the south side of the
Bathroom and not to the north of the Bathroom vanity, as
previously understood and described in Report 1.
The p aragraphs which relate to the subject nib wall and are
now redundant.
After the leak in the sewer waste water pipe servicing the
Laundry was discovered the Owner engaged a Plumber who
found that water would escape from this damaged section of
pipe when the washing machine discharged water to the pipe.
Observed additional damage during the subsequent subfloor
inspection carried out on 22 February 2017, including:
Damage to localised areas of the particleboard flooring in the
vicinity of the west side of the shower in the Bathroom
Damage to localised areas of the floor joists in the vicinity of
the west sid e of the shower in the Bathroom
Elevated moisture meter readings to the base of the timbe r
stump in the vicinity of the shower in the Bathroom.
Crack damage to the tile unit located between the southwest
corner of the shower and the northern end of the door entry to
the Bathroom.
O bserved gaps within the flexible joint filler located bet ween
t he junction of the wall and floor at the west side of the
shower in the Bathroom not es that the damage discussed in
paragraph 3.4 is located in the vicinity of this area. As such
this damage has been caus ed by on - going long - term
moisture ingress from the j unction between the wall and floor
along the west side of the shower in the Bathroom, during
shower operation.
Case No: 500629 Determination Page 12 of 13
Of opinion that the damp subfloor soil conditions in the vicinity
of the northeast corner of the house have been caused by the
overflow of storm water from the drainage grate within the
concrete pavement located immediately adjacent to the east
side of the Bathroom. This is expected to occur during times
of significant rainfall.
a suitably qualified and experienced civil engineer would be
able to i nspect the ‘as constructed’ storm wat er system at the
subject property for compliance with Australian Standard
AS3500. 3:2003 Plumbing and drainage Part 3: Stormwater
drainage .
FSP’s second engineer’s
(MC’ s) Report
21 April 2017
D ue to restricted access t he undersigned was not able to
inspect the underfloor space. This report relies on the findings
noted in the [IB and Plumbing] reports.
In relation to the adequacy of the pump out system we note
that is outside the expertise of the undersigned. This matte r
should be investigated by an experienced Hydraulic Engineer
The insured has emailed a photo showing the condition of the
particleboard flooring in the bat hroom area. This shows the
flooring is significantly affected by moisture and would be
unsound. We n ote that yellow tongue flooring can with stand
short period of wetting and drying. It will not tolerate extended
periods of saturation.
It is our opinion that the flooring and associated finishes to
the bathroom and laundry require demolition and
replacem ent.
It is our opinion that the damage is due to long term moisture
exposure due to leaking services.
In relation to the cracking of the brickwork and the study wall
it is our opinion the cracking is the result of foundation
movement that has been affected by changes in moisture
content due to a combination of possibly an inadequate
stormwat er drainage system and the fact that services have
been leaking over an extended period of time.
FSP’s a sse ssor’ s Report
LJ
1 June 2017
Decided to disregard FM ’s report only for the fact that it
provides a conclusion that has been challenged and that at
their own admission there a re references in the report that
provide incorrect statements reg a rding location of damage.
For this reas on and without prejudi ce ass es sor has adopt ed
MC’s report as it provides recommendations that would
provide an eventual outcome for the claim that is consistent
with the damage identified and the proposed causation.
Request MC provide not for construction sow based upon
identified da mage. Obtain 2 x panel builder quotes for the
purpose of cash settlement.
Case No: 500629 Determination Page 13 of 13
3.3 Other relevant information relied upon
The parties’ submissions .
The applicant’s c ouncil approved building permit.
The applicant’s extension plans submitted to c ouncil and the council approved
certificate of final inspection.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.