Determination 500617
Bathroom reinstatement after leaking sewer pipe
Summary
The insured claimed about $19,759 to reinstate an entire bathroom after a leaking sewer pipe was found under the slab. AFCA limited reinstatement to the floor and found the insurer's settlement arithmetic wrong, so the insurer must pay a total of $14,142.83, less the $3,146 already paid.
The exploration cost benefit extends only to reinstating the area disturbed by the leak search, which is the floor, not the whole bathroom.
Issues
- Claim amount dispute primary · upheld
“The FSP's total liability for the claim is for the amount of $14,142.83”
- Administrative error secondary · upheld
“the FSP has made an arithmetic error in its calculations”
- Claim denial secondary · not upheld
“I agree with the FSP's position. ... the floor only, being the area that was affected”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination
Case No: 500617 Determination Page 1 of 4
Case number: 500617 6 April 2018
1 Overview
1.1 Dispute
The applicant holds a home building and contents policy underwritten by the financial
services provider (FSP) covering her home address. On 11 May 2017, a claim was
lodged under the policy when a leaking sewerage pipe was discovered.
There was minimal resultant damage to the property as a result of the leak. However
due to the sewerage lines being imbedded in the concrete slab, the bathroom was
completely stripped out to access and repair the leak. A dispute has arisen between
the parties as to the FSP‟s liability for the bathroom reinstatement.
1.2 Issue and key findings
Has the FSP fulfilled its obligations under the policy terms?
The FSP has not fulfilled its obligations under the policy terms because:
the FSP‟s offer to reinstate the affected area is generous and fulfils its policy
obligations to the applicant; however
the FSP has made an arithmetic error in its calculations and is required to remit
the amount of $14,142.83 in total in settlement of the claim.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP‟s total liability for the claim is for the amount of $14,142.83. It is to remit the
balance to the applicant within 14 days of the date of acceptance of this
determination. However, it has no other liability for the applicant‟s claim.
Case No: 500617 Determination Page 2 of 4
2 Reasons for determination
2.1 Has the FSP fulfilled its obligations under the policy terms?
Onus rests with the applicant to establish she is entitled to claim additional
benefits
There is no dispute the applicant suffered a loss from a risk insured against or the
FSP accepted the claim and agreed to reimburse the applicant for the costs incurred
in locating the leak and reinstating the area. However, a dispute has arisen between
the parties over the FSP‟s settlement offer.
The applicant says the FSP‟s offer for the reinstatement of the area is inadequate.
Policy provides additional benefit for exploration costs
The policy provides a number of benefits in addition to the cover for the insured
events. One of these is for exploratory costs. The policy states that following damage
insured by this policy (ie resultant damage from the leak), the FSP will also pay the
reasonable costs incurred in locating the cause of the damage and reinstating the
affected area.
Accordingly, this benefit provides cover for exploratory costs incurred in locating the
leak and reinstating the affected area. The applicant has taken the reference to the
„area‟ to mean the entire bathroom.
‘Area’ for reinstatement is the floor only
The applicant claims a total of $19,759.21 for the costs incurred in locating the leak
and reinstating the „area‟, being the entire bathroom. The applicant accepts th e costs
of repairing the leaking sewer pipe (and other associated plumbing costs to re-route
the piping) are not covered by the policy terms.
The FSP argues its liability is to reinstate the floor only, being the „area‟ that was
affected by the exploratory works.
I agree with the FSP‟s position.
The additional benefit is for exploration costs to locate a leak. That is its primary
function. The benefit then extends to the reinstatement of „the area‟ affected by the
exploration works. That is, in the circumstances of this dispute, the floor itself which
was dug up to expose the pipes.
I do not accept that the additional benefit of exploration costs (even with its extension
of cover) could reasonably be considered to extend to the entire bathroom.
Construing the benefit this way would effectively see the FSP cover a claim which
does not exist.
FSP has made an offer of settlement for floor reinstatement
The FSP has offered settlement of its liability for the floor in the amount of
$10,188.33 in total. This was limited to the cost of pouring a new slab, retiling the
Case No: 500617 Determination Page 3 of 4
floor (materials and labour) and a new toilet suite. The FSP says it considers this is
the extent of its liability for the claim. It has included the toilet suite in the settlement
as this was most likely cemented to the original floor.
The breakdown is as follows:
E xpense Amount
Labour to retile bathroom $8,198
Tiles (materials) $ 893.43
Toilet suite $299.90
Plumber (labour) $797
Total $10,188.33
FSP has incorrectly calculated its liability
Whilst I consider the FSP‟s offer generous in the circumstances, including items
which could not reasonably be considered to relate to the reinstatement of the floor,
the FSP has made an arithmetic error in its calculations .
From the amount of $10,188.33, it has deducted the previously paid amount of
$3,146 for the reinstalment of the concrete slab, to arrive at the balance payable of
$7,042.33.
However, in my view this is incorrect. The invoice and scope of works for $8,198 from
builder “KB” shows that KB did not undertake either the removal or replacement of
the concrete slab. That work was undertaken by plumber “FP”.
There is nothing in the material before me to suggest the FSP is not accepting KB‟s
invoice in full. Accordingly, the amount of $3,146 should have been added, not
subtracted, to the settlement.
The FSP also previously agreed to accept the cost of the CCTV investigation
undertaken to locate the source of the leak, being $176, and the cost for the alleged
resultant damage to the external wall of $632.50.
These amounts do not appear to have been included in the FSP‟s settlement offer.
Accordingly, I find the FSP‟s total liability, including all of the above, to be
$14,142.83.
I consider this to be a more than adequate settlement to reinstate the floor area and
cover the resultant damage.
The FSP is to remit any balance owing to the applicant within 14 days of the date of
this determination being accepted by the applicant, if it has not already done so. In
the circumstances, an award of interest is not payable.
Case No: 500617 Determination Page 4 of 4
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to the Service. However, commentary in
this determination is restricted only to those issues considered relevant to the
outcome.