Home / Financial Firm (Unknown - Insurer) / Determination 500398

Determination 500398

Storm damage claim: liability for pergola and swimming pool damage declined

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for pergola and swimming pool damage after a March 2013 storm and boundary fence repairs. AFCA found the pergola damage was caused by a bobcat driver and the pool cracking was not established as storm-caused, so the FSP is not liable.

The insurer is not liable for damage not proximately caused by an insured event, and is not liable for errors made by a policyholder during cash-settled repairs.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 500398 Determination Page 1 of 7 Case number: 500398 31 July 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) for damage to his home and contents caused by a storm in March 2013. The FSP accepted the applicant’s claim and cash settled him for the cost of repairing the damage. In July 2014, the applicant notified the FSP that the rear boundary fence at the property had been damaged during the storm. The FSP assessed the damage and cash settled the applicant for the cost of the repairs. In February 2017, the applicant notified the FSP of damage to his pergola and swimming pool. The applicant says this damage was caused by the storm in March 2013 and/or the actions of the FSP’s engineer during the claim process. The FSP denied liability for the damage to the pergola and swimming pool. The FSP says this damage was not caused by the storm (or the actions of its engineer), but by factors which are excluded from cover under the polic y. 1.2 Issues and key findings Is the FSP liable for the damage to the pergola? The FSP is not liable for the damage to the pergola as this damage was caused by the actions of the bobcat driver and was not due to the scope of works prepared by the FSP’s engin eer. Is the FSP liable for the damage to the swimming pool? The available information does not establish that the cracking damage to the pool was caused by the storm in March 2013. Accordingly, the FSP is not liable for this damage. 1.3 Determination This determination is in favour of the FSP. The FSP is not liable for the damage to the pergola and swimming pool. Case No: 500398 Determination Page 2 of 7 2 Reasons for determination 2.1 Is the FSP liable for the damage to the pergola? Applicant says damage to pergola was caused by incorrect advice As outlined above, the applicant first notified the FSP of damage to the pergola in February 2017. The FSP was unable to assess the damage to the pergola as the applicant had arranged for it to be demolished in early 2016, due to safety concerns. The applicant provided a report from his builder (CR) which stated that the pergola had been damaged by falling tree branches in August 2014, as well as pressure from an adjacent pine tree. However, the applicant subsequently clarified that the trees had caused mi nor damage only. This is consistent with aerial photographs which show little or no damage to the pergola in August 2015. The applicant says the major damage to the pergola (which required it to be demolished) occurred when his son (JK) accidentally reversed a bobcat into the pergola while attempting to carry out repairs to the boundary fence. The applic ant says the FSP’s engineer (JH ) provided incorrect advice about how the boundary fence should be repaired, when the damage to the fence was assessed in July 2014. The applicant considers that, as the damage to the pergola occurred while JK was attempting to follow JH’s advice, the FSP should be liable for the cost of rebuilding the pergola. FSP cash settled applicant for damage to boundary fence As outlined above, the applicant first notified the FSP of damage to the boundary fence in July 2014. The boundary fence comprised isolated brick piers with steel panels in between, built on top of a retaining wall. The applicant advised that strong winds experienced during the storm in March 2013 had blown down trees, impacting the steel panels and damaging some of the brick piers. The FSP’s engineer (JH ) re-attended the property in mid-2014 to inspect the brick piers. He reported that, while the applicant had reattached the piers to the retaining wall following the storm, their structural integrity had been compromised because the concrete core filling inside had cracked. Based on JHA’s report, the FSP accepted liability for the repair of the brick piers and cash settled the applicant for the cost of these repairs in August 2014. The cash settlement amount was based on a quotation provided by the applicant’s repairer (CR) for the repairs outlined in a proposed scope of works included in JH ’s report. Case No: 500398 Determination Page 3 of 7 The scope of works provided for steel posts to be installed to the inside face of each brick pier to secure the piers to the top of the retaining wall, in order to provide greater structural support. The applicant says he attempted to carry out the repairs to the boundary fence in accordance with the scope of work prepared by JH. However, while JK was digging holes to install the steel posts, he reversed the bobcat into the pergola. In June 2017, the FSP agreed to increase the cash settlement amount for the fence repa irs, after the applicant’s builder (CR) advised that the repairs could not be carried out in the manner originally intended because the reinforcement bars within the piers were broken and the core lacked sufficient strength. JH ’s initial scope of works had foreshadowed that the piers may need to be replaced, if the damage was so excessive that it could not be addressed by the installation of support posts. While little detail has been provided, it appears the FSP cash settled the applicant for the entire cost of replacing the fence panels and the brick piers in the damaged area. Damage to pergola was not caused by engineer’s actions As outlined above, the repairs required to the boundary fence were more extensive than initially provided for in JH ’s scope of works. However, this does not mean that the FSP is liable for any damage which occurred during the initial works. The FSP cash settled the applicant for the damage to the boundary fence. Accordingly, he was responsible for engaging appropriately qualified contractors to carry out the works. An insurer is not liable for errors made by a policyholder or their agents while carrying out repairs following a cash settlement. The applicant says the damage to the pergola occurred when JK accidentally ran into it with the bobcat. In these circumstances, I consider that the proximate cause of the damage to the pergola was the actions of JK, rather than any deficiency in the scope of works prepared by JH. If the works specified by JH (when carried out correctly) had resulted in further damage to the applicant’s property, the situation may have been different . However, in the present case, I am satisfied that JH ’s actions did not cause the damage to the pergola. FSP is not liable for damage to pergola For the reasons outlined above, the FSP is not liable for the damage to the pergola under the 2013 storm claim. The applicant’s policy provides cover for damage to his property caused by the impact of a motor vehicle (including a bobcat). However, the applicant is unable to lodge a separate claim for the pergola damage because cover under his policy ceased on 9 June 2015 (well before the damage occurred). Further, the applicant’s delay in notifying the FSP of the damage until after the pergola had b een demolished has prejudiced the FSP’s ability to assess its liability . Case No: 500398 Determination Page 4 of 7 Accordingly, the FSP is not liable for the damage to the pergola. 2.2 Is the FSP liable for the damage to the swimming pool? Applicant says damage was caused by storm in March 2013 The reports and photographs provided confirm there is a vertical crack in the side of the in ground concrete swimming pool in the applicant’s rear yard. The crack runs through the full thickness of the in ground coping beam and the pool wall. A second vertical crack has developed in the same wall at a distance approximately 3 metres from the first crack. The applicant says that:  the first crack was caused by the impact of the top section of a nearby brick pier, which was detached from the retaini ng wall by the strong winds experienced during the storm and fell into the pool  the second crack was caused by vibrations from a jackhammer used during the repair of the boundary fence. It is not clear exactly when the cracking damage to the pool wall occ urred. The applicant did not notify the FSP of the cracking damage until February 2017. This damage was not raised during the FSP’s initial assessment of the storm damage to the house in 2013 or its subsequent assessment of the damage to the boundary fence in July 2014. However, the applicant’s builder (CR) has provided a photograph showing the first crack (at that time more narrow), which he says was taken some time in 2014. The applicant says that he and his family noticed that the water level in the pool seemed to be constantly dropping over a period of several years. However, they did not notify the FSP because they were preoccupied with the applicant’s medical issues. Contractors have provided conflicting opinions about cause of damage The FSP’ s engineer (JH) inspected the cracking damage to the pool in June 2017. JH concluded that the damage had been caused by differential movement of the concrete pool shell, due to consolidation of the underlying fill material over time due to the weight of the pool. JH advised that:  hydraulic surveys had identified differential movement of 10 millimetres along the length of the pool and 5 millimetres along its width  differential movement would create stress along the top coping beam of the pool shell, causing the cracks observed, and  there was no evidence of damage to the coping pavers or the marble sheen coating of the pool in the area around the crack (as would be expected if the brick pier had impacted the pool wall with sufficient force to cause it to crack). Case No: 500398 Determination Page 5 of 7 The first engineer (N) engaged by the applicant noted that there was a crack in the pool in the area near the damaged brick pier. However, N’s report does not provide any detailed analysis regarding the cause of the damage. The applicant’s second engineer (N J) disagreed with JH’s view that the cracking damage had been caused by differential movement, as he considered that the pool was (at least partially) founded on rock. Both NJ and JH have relied on differing interpretations of independent soil testing carried out in 2014 in support of their views. NJ advised that:  it was likely that tree roots from the large trees at the side of the pool had infiltrated the drainage layer of the pool, resulting in the pool resting unevenly on the rock underneath  the cracks in the pool shell may have occurred as a result of significant stresses in the concrete pool shell as a result of the combined weight of the pool shell and the pool water ‘and potentially in conjunction with additional impact loading such as that which could be expected to have occurred from the fallen brickwork pillar’. Available information does not establish damage was caused by storm As outlined above, t he FSP’s engineer (JH) and the applicant’s engineer (NJ) have provided differing opinions about the cause of the initial cracking damage to the pool. However, neither engineer identified the falling pillar (caused by the storm) as the primary cause of the damage. JH considered that the damage had been caused by differential movement, while NJ identified tree roots and the weight of the pool as the predominant cause (with the additional impact of the pillar described as no more than a potentially contributing factor). I accept that the applicant’s delay in notifying the FSP of the damage to the pool may have been due to his health issues. However, the extent of the delay has made it more difficult to accurately determine the cause of the damage. Having carefully reviewed the photographs provided, I consider it is unlikely that the falling pillar impacted the pool wall with sufficient force to cause the initial crack, given the absence of other damage to the surrounding area. The applicant says the top section of the pillar swung into the pool in a circular arc while remaining attached to the fence, thereby impacting the wall of the pool without causing any other damage. However, no photographs have been provided showing the pillar (and the pool) immediately after the storm. Given the varying opinions expressed by JH and NJ, I do not consider that the available information establishes that, on the balance of probabilities, the cracking damage to the pool was caused by the storm in March 2013. Not do I consider that there is sufficient information to establish that the works to the boundary fence exacerbated the existing cracking or caused the second crack. In Case No: 500398 Determination Page 6 of 7 any event, the FSP would not be liable as these works were carried out by the applicant following a cash settlement. FSP is not liable for damage to pool The applicant’s policy only provides cover where the proximate cause of the damage (that is the real, effective or dominant cause) is one of the specific events listed in the policy. For the reasons outlined above, I am not satisfied that the damage to the pool was caused by the storm in March 2013 (or by any other insured event). The policy does not provide cover for damage which is caused by:  subsidence, shrinkage or any other earth movement (other than subsidence which occurs within 72 hours of a storm)  tree roots (except where the roots damage pipes). Accordingly, the FSP is not liable for this damage. Case No: 500398 Determination Page 7 of 7 3 Supporting information 3.1 FOS approach to this dispute This dispute was the subject of a recommendation issued on behalf of the Financial Ombudsman Service (FOS) Australia on 21 March 2018. The recommendation was rejected by the applicant. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.