Home / Financial Firm (Unknown - Insurer) / Determination 500398
Determination 500398
Storm damage claim: liability for pergola and swimming pool damage declined
Summary
The applicant claimed for pergola and swimming pool damage after a March 2013 storm and boundary fence repairs. AFCA found the pergola damage was caused by a bobcat driver and the pool cracking was not established as storm-caused, so the FSP is not liable.
The insurer is not liable for damage not proximately caused by an insured event, and is not liable for errors made by a policyholder during cash-settled repairs.
Issues
- Claim denial primary · not upheld
“The FSP is not liable for the damage to the pergola and swimming pool.”
- Repairs or contractors secondary · not upheld
“An insurer is not liable for errors made by a policyholder or their agents while carrying out repairs following a cash settlement.”
Subjects and remedies
no remedy
Text of the determination
Determination
Case No: 500398 Determination Page 1 of 7
Case number: 500398 31 July 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for damage to
his home and contents caused by a storm in March 2013. The FSP accepted the
applicant’s claim and cash settled him for the cost of repairing the damage.
In July 2014, the applicant notified the FSP that the rear boundary fence at the
property had been damaged during the storm. The FSP assessed the damage and
cash settled the applicant for the cost of the repairs.
In February 2017, the applicant notified the FSP of damage to his pergola and
swimming pool. The applicant says this damage was caused by the storm in March
2013 and/or the actions of the FSP’s engineer during the claim process.
The FSP denied liability for the damage to the pergola and swimming pool. The FSP
says this damage was not caused by the storm (or the actions of its engineer), but by
factors which are excluded from cover under the polic y.
1.2 Issues and key findings
Is the FSP liable for the damage to the pergola?
The FSP is not liable for the damage to the pergola as this damage was caused by
the actions of the bobcat driver and was not due to the scope of works prepared by
the FSP’s engin eer.
Is the FSP liable for the damage to the swimming pool?
The available information does not establish that the cracking damage to the pool
was caused by the storm in March 2013. Accordingly, the FSP is not liable for this
damage.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not liable for the damage to the pergola and swimming pool.
Case No: 500398 Determination Page 2 of 7
2 Reasons for determination
2.1 Is the FSP liable for the damage to the pergola?
Applicant says damage to pergola was caused by incorrect advice
As outlined above, the applicant first notified the FSP of damage to the pergola in
February 2017.
The FSP was unable to assess the damage to the pergola as the applicant had
arranged for it to be demolished in early 2016, due to safety concerns.
The applicant provided a report from his builder (CR) which stated that the pergola
had been damaged by falling tree branches in August 2014, as well as pressure from
an adjacent pine tree.
However, the applicant subsequently clarified that the trees had caused mi nor
damage only. This is consistent with aerial photographs which show little or no
damage to the pergola in August 2015.
The applicant says the major damage to the pergola (which required it to be
demolished) occurred when his son (JK) accidentally reversed a bobcat into the
pergola while attempting to carry out repairs to the boundary fence.
The applic ant says the FSP’s engineer (JH ) provided incorrect advice about how the
boundary fence should be repaired, when the damage to the fence was assessed in
July 2014.
The applicant considers that, as the damage to the pergola occurred while JK was
attempting to follow JH’s advice, the FSP should be liable for the cost of rebuilding
the pergola.
FSP cash settled applicant for damage to boundary fence
As outlined above, the applicant first notified the FSP of damage to the boundary
fence in July 2014. The boundary fence comprised isolated brick piers with steel
panels in between, built on top of a retaining wall.
The applicant advised that strong winds experienced during the storm in March 2013
had blown down trees, impacting the steel panels and damaging some of the brick
piers.
The FSP’s engineer (JH ) re-attended the property in mid-2014 to inspect the brick
piers. He reported that, while the applicant had reattached the piers to the retaining
wall following the storm, their structural integrity had been compromised because the
concrete core filling inside had cracked.
Based on JHA’s report, the FSP accepted liability for the repair of the brick piers and
cash settled the applicant for the cost of these repairs in August 2014.
The cash settlement amount was based on a quotation provided by the applicant’s
repairer (CR) for the repairs outlined in a proposed scope of works included in JH ’s
report.
Case No: 500398 Determination Page 3 of 7
The scope of works provided for steel posts to be installed to the inside face of each
brick pier to secure the piers to the top of the retaining wall, in order to provide
greater structural support.
The applicant says he attempted to carry out the repairs to the boundary fence in
accordance with the scope of work prepared by JH. However, while JK was digging
holes to install the steel posts, he reversed the bobcat into the pergola.
In June 2017, the FSP agreed to increase the cash settlement amount for the fence
repa irs, after the applicant’s builder (CR) advised that the repairs could not be carried
out in the manner originally intended because the reinforcement bars within the piers
were broken and the core lacked sufficient strength.
JH ’s initial scope of works had foreshadowed that the piers may need to be replaced,
if the damage was so excessive that it could not be addressed by the installation of
support posts.
While little detail has been provided, it appears the FSP cash settled the applicant for
the entire cost of replacing the fence panels and the brick piers in the damaged area.
Damage to pergola was not caused by engineer’s actions
As outlined above, the repairs required to the boundary fence were more extensive
than initially provided for in JH ’s scope of works. However, this does not mean that
the FSP is liable for any damage which occurred during the initial works.
The FSP cash settled the applicant for the damage to the boundary fence.
Accordingly, he was responsible for engaging appropriately qualified contractors to
carry out the works. An insurer is not liable for errors made by a policyholder or their
agents while carrying out repairs following a cash settlement.
The applicant says the damage to the pergola occurred when JK accidentally ran into
it with the bobcat. In these circumstances, I consider that the proximate cause of the
damage to the pergola was the actions of JK, rather than any deficiency in the scope
of works prepared by JH.
If the works specified by JH (when carried out correctly) had resulted in further
damage to the applicant’s property, the situation may have been different . However,
in the present case, I am satisfied that JH ’s actions did not cause the damage to the
pergola.
FSP is not liable for damage to pergola
For the reasons outlined above, the FSP is not liable for the damage to the pergola
under the 2013 storm claim.
The applicant’s policy provides cover for damage to his property caused by the
impact of a motor vehicle (including a bobcat). However, the applicant is unable to
lodge a separate claim for the pergola damage because cover under his policy
ceased on 9 June 2015 (well before the damage occurred).
Further, the applicant’s delay in notifying the FSP of the damage until after the
pergola had b een demolished has prejudiced the FSP’s ability to assess its liability .
Case No: 500398 Determination Page 4 of 7
Accordingly, the FSP is not liable for the damage to the pergola.
2.2 Is the FSP liable for the damage to the swimming pool?
Applicant says damage was caused by storm in March 2013
The reports and photographs provided confirm there is a vertical crack in the side of
the in ground concrete swimming pool in the applicant’s rear yard. The crack runs
through the full thickness of the in ground coping beam and the pool wall.
A second vertical crack has developed in the same wall at a distance approximately
3 metres from the first crack.
The applicant says that:
the first crack was caused by the impact of the top section of a nearby brick
pier, which was detached from the retaini ng wall by the strong winds
experienced during the storm and fell into the pool
the second crack was caused by vibrations from a jackhammer used during the
repair of the boundary fence.
It is not clear exactly when the cracking damage to the pool wall occ urred.
The applicant did not notify the FSP of the cracking damage until February 2017.
This damage was not raised during the FSP’s initial assessment of the storm
damage to the house in 2013 or its subsequent assessment of the damage to the
boundary fence in July 2014.
However, the applicant’s builder (CR) has provided a photograph showing the first
crack (at that time more narrow), which he says was taken some time in 2014.
The applicant says that he and his family noticed that the water level in the pool
seemed to be constantly dropping over a period of several years. However, they did
not notify the FSP because they were preoccupied with the applicant’s medical
issues.
Contractors have provided conflicting opinions about cause of damage
The FSP’ s engineer (JH) inspected the cracking damage to the pool in June 2017.
JH concluded that the damage had been caused by differential movement of the
concrete pool shell, due to consolidation of the underlying fill material over time due
to the weight of the pool.
JH advised that:
hydraulic surveys had identified differential movement of 10 millimetres along
the length of the pool and 5 millimetres along its width
differential movement would create stress along the top coping beam of the
pool shell, causing the cracks observed, and
there was no evidence of damage to the coping pavers or the marble sheen
coating of the pool in the area around the crack (as would be expected if the
brick pier had impacted the pool wall with sufficient force to cause it to crack).
Case No: 500398 Determination Page 5 of 7
The first engineer (N) engaged by the applicant noted that there was a crack in the
pool in the area near the damaged brick pier. However, N’s report does not provide
any detailed analysis regarding the cause of the damage.
The applicant’s second engineer (N J) disagreed with JH’s view that the cracking
damage had been caused by differential movement, as he considered that the pool
was (at least partially) founded on rock. Both NJ and JH have relied on differing
interpretations of independent soil testing carried out in 2014 in support of their
views.
NJ advised that:
it was likely that tree roots from the large trees at the side of the pool had
infiltrated the drainage layer of the pool, resulting in the pool resting unevenly
on the rock underneath
the cracks in the pool shell may have occurred as a result of significant stresses
in the concrete pool shell as a result of the combined weight of the pool shell
and the pool water ‘and potentially in conjunction with additional impact loading
such as that which could be expected to have occurred from the fallen
brickwork pillar’.
Available information does not establish damage was caused by storm
As outlined above, t he FSP’s engineer (JH) and the applicant’s engineer (NJ) have
provided differing opinions about the cause of the initial cracking damage to the pool.
However, neither engineer identified the falling pillar (caused by the storm) as the
primary cause of the damage.
JH considered that the damage had been caused by differential movement, while NJ
identified tree roots and the weight of the pool as the predominant cause (with the
additional impact of the pillar described as no more than a potentially contributing
factor).
I accept that the applicant’s delay in notifying the FSP of the damage to the pool may
have been due to his health issues. However, the extent of the delay has made it
more difficult to accurately determine the cause of the damage.
Having carefully reviewed the photographs provided, I consider it is unlikely that the
falling pillar impacted the pool wall with sufficient force to cause the initial crack,
given the absence of other damage to the surrounding area.
The applicant says the top section of the pillar swung into the pool in a circular arc
while remaining attached to the fence, thereby impacting the wall of the pool without
causing any other damage. However, no photographs have been provided showing
the pillar (and the pool) immediately after the storm.
Given the varying opinions expressed by JH and NJ, I do not consider that the
available information establishes that, on the balance of probabilities, the cracking
damage to the pool was caused by the storm in March 2013.
Not do I consider that there is sufficient information to establish that the works to the
boundary fence exacerbated the existing cracking or caused the second crack. In
Case No: 500398 Determination Page 6 of 7
any event, the FSP would not be liable as these works were carried out by the
applicant following a cash settlement.
FSP is not liable for damage to pool
The applicant’s policy only provides cover where the proximate cause of the damage
(that is the real, effective or dominant cause) is one of the specific events listed in the
policy.
For the reasons outlined above, I am not satisfied that the damage to the pool was
caused by the storm in March 2013 (or by any other insured event).
The policy does not provide cover for damage which is caused by:
subsidence, shrinkage or any other earth movement (other than subsidence
which occurs within 72 hours of a storm)
tree roots (except where the roots damage pipes).
Accordingly, the FSP is not liable for this damage.
Case No: 500398 Determination Page 7 of 7
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) Australia on 21 March 2018. The recommendation was
rejected by the applicant.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.