Text of the determination
Determination
Case No: 499213 Determination Page 1 of 8
Case number: 499213 27 September 2018
1 Overview
1.1 Dispute
This dispute concerns a claim lodged by the applicants in November 2016 after their
property was damaged by sewerage ingress. During the assessment of the claim, the
FSP noted further damage caused by water coming from the roof.
The FSP accepted the claims. Trades were appointed to strip the property and
remediate contamination. The FSP elected to cash settle the repair portion of the
claims due to the ongoing nature of the sewerage issues.
The FSP required five attempts to obtain a clearance certificate from its hygienist.
The applicants dispute the remediation was successful.
The FSP says the claims are appropriate for cash settlement and maintains its offer
is fair in the circumstances. The applicants say the amount offered is inadequate to
repair the granny flat. They require to be indemnified for the loss of the value of the
property or the cost to demolish and rebuild the granny flat.
1.2 Issues and key findings
What is the FSP’s liability for the claim ?
The available information establishes the FSP is entitled to cash settle the claims for
damage to the granny flat. Further, the available information establishes the offer
made by the FSP is inadequate. It is fair in the circumstances the FSP pay the
applicants $40,000 for repairs.
Are the applicants entitled to compensation?
The events and circumstances of the claim were demanding on the applicants who
remain without the use of their granny flat. While some of the delays and
complications experienced were outside of the FSP’s control, the available
information establishes it is fair the FSP pay to the applicants $3,000 compensation.
Case No: 499213 Determination Page 2 of 8
1.3 Determination
This determination is partly in favour of the applicants.
Within 14 days of the applicants accepting this determination, the FSP is to pay to
the applicants:
$40,000 to settle its liability for the claims
$3,000 compensation
Once these payments are made, the FSP is not required to take any further action in
relation to the claims or the dispute.
Case No: 499213 Determination Page 3 of 8
2 Reasons for determination
2.1 What is the FSP’s liability for the claim?
Cover held subject to terms and condition as set out in policy documents
The applicants claim under a home building and contents policy provided by the FSP.
The policy is a defined events policy which responds to loss or damage caused by
the events listed in the policy documents. Cover was held subject to terms and
conditions including the way the claim is settled.
The available material shows a claim for contents damage as well. This
determination deals with the claim for damage to the granny flat only whether caused
by ingress of sewerage or ingress of water.
When making a claim it is an accepted principle of insurance law the initial burden of
proof is with the applicants to show, on the balance of probabilities, a covered event
caused the claimed loss. This is called a prima facie or valid claim. If the applicants
can establish a valid claim, the burden of proof shifts to the FSP to show, on the
balance of probabilities, the policy does not cover, or otherwise excludes, the claim.
The applicants ’ initial burden extends to showing the full extent of the claimed loss
and linking it to the event or events giving rise to claim. It is only after the applicants
have done so, the burden shifts to the FSP after which it must show its proposed
offer is fair in the circumstances and accords with policy obligations.
Circumstances of the claim
The applicants lodged their claim for damage to the granny flat caused by the ingress
of sewerage with the FSP in November 2016.
The granny flat is at the rear of their property. It is a single level construction with four
rooms. Following heavy downpour, raw sewerage discharged from the shower
recess, toilet pan etc and flooded the flat.
Ongoing issues were found with Sydney Water’s sewer lines. Sydney Water
considered installing a reflex valve as a short-term solution but concluded this was
not possible given the location of the granny flat relative to the line. Sydney Water
indicates it cannot remedy these issues in the short term. In September 2017,
Sydney Water said it would take 12-18 months to provide a permanent solution.
The ongoing nature of these problems meant further sewerage reflux events
occurred while the FSP assessed the claim and attempted to remediate. The FSP
says these problems mean its builders cannot warrant repairs and so it opts to cash
settle the claim.
The FSP’s assessors also noted signs of water ingress coming through the
property’s roof and guttering. The applicants have since attended to these issues.
The FSP says the water ingress is a separate event and warrants a second excess.
The parties disagree over the extent and method of repairs. The applicants say the
granny flat is beyond repair. They also assert the FSP has not returned the flat to a
Case No: 499213 Determination Page 4 of 8
hygienic state. The applicants require the granny flat be demolished and rebuilt. In
the alternative, the applicants say they would accept compensation for the loss in the
property’s value arising from the events of the claim.
The FSP has made an offer to cash settle the damage for $25,905.69. The FSP
submits it appropriately assessed and costed all the damage attributable to the
sewerage ingress and water ingress from the roof.
The applicants say the offer is inadequate. They have not obtained a quotation to
repair the granny flat but have obtained a quotation to demolish and rebuild the
granny flat in the sum of $134,200.
FSP entitled to cash settle the claim for the cost of repairs
The FSP accepts the applicants have a valid claim for damages caused by ingress of
sewerage, and a second valid claim for damage caused by water ingress through the
ceiling and window.
The FSP’s policy provides the FSP can choose how it will settle home claims. The
FSP can decide whether it will repair the damage or pay what it would cost the FSP
to repair the damage.
The applicants do not want a cash settlement. The applicants want the FSP to
undertake the repairs, or, preferably, to demolish and rebuild the granny flat.
I acknowledge the FSP is entitled to choose how it will settle home claims. However,
the FSP must exercise this discretion fairly.
The FSP says a cash settlement is appropriate in circumstances where there is no
certainty as to when the underlying issues with the sewerage line will be remedied.
Further, in the circumstances, the FSP says no builder could provide a warranty in
relation to repairs.
If the FSP will not repair the granny flat, the applicants submit the claims be cash
settled based on the expected loss in property value arising from the present
condition of the granny flat. This is because the applicants would prefer to sell the
property and move on, rather than wait for the Sydney Water issues to be resolved,
arrange repairs themselves and only then commence selling.
Information provided says the remediation was successful
I note the FSP’s sev eral attempts to remediate the property and receive a clearance
certificate from its hygienist (VA). After each unsuccessful attempt, the FSP further
assessed and approved further remediation.
A clearance certificate for bacteria was issued on 14 August 2017 and a clearance
certificate for mould was issued on 23 November 2017. The FSP says these
certificates mean remediation was successful and it may proceed to cash settle the
applicants for outstanding repairs.
The applicants say they are not satisfied the property was properly remediated, given
the porous nature of the exposed timber beams and flooring, as well as the many
Case No: 499213 Determination Page 5 of 8
failed previous attempts. The applicants are concerned the granny flat may not be
safe.
Although requested, the applicants have not provided an expert report to challenge
the FSP’s position.
I acknowledge the applicants’ concerns but I am satisfied the available material
establishes the property is remediated and can now be safely repaired.
In the circumstances, I am satisfied it is fair the claim is cash settled. This is because
the available evidence shows the granny flat has now been successfully remediated.
Further, I accept it is not reasonable for the FSP to wait until the Sydney Water
issues are remediated by Sydney Water. Additi onally, I accept the FSP’s builders
would not provide a warranty in the circumstances of the ongoing Sydney Water
issues.
Scope of works plus variations address most damage
The policy is clear and unambiguous and says the FSP will pay the applicants what it
would cost the FSP to provide repairs.
An initial building assessment conducted in November 2016 found damage in the
kitchen, bathroom/ensuite, bedroom/study and laundry. Repairs involved removing
and replacing affected wall and ceiling sections, replacing skirting boards as
required, sanding and painting. The kitchen door, bathroom door and bathroom
vanity were to be replaced.
However, in December 2016 a further assessment was undertaken. Damage was
noted consistent with water entry from the roof. Wall linings required removal
because of damage caused by removing skirting boards and walls in the laundry
properly contained asbestos. Accordingly, these walls needed to be completely
replaced. Ceiling cornices needed to be replaced and ceilings repainted.
In January 2017, it was agreed there was further damage to the cavity wall door area
in the bedroom and to the wall lining and framing.
To assist with remediation, the rooms were stripped out. Later, insulation was
removed as well.
In October 2017, while attempting remediation, there was reports of glue dags on
exposed timbers, excessive dirt and other associated debris at the base of the wall
frames and timber cladding. It was noted the moisture impacted timber bottom plates
and studs were not appropriately cleaned and required paint re-sealing.
The FSP’s assessor said some of this damage was excluded from cover or was not
caused by sewerage ingress. Nonetheless, certain recommendations were made and
further cleaning was undertaken.
The applicants identified sections of the wall between the bedroom and bathroom
and insulation throughout the property required replacing due to contamination. The
FSP accepted it was liable to replace the same.
Case No: 499213 Determination Page 6 of 8
Once the hygienist clearance certificate was obtained in November 2017, and having
regard to the identified damage and scopes of works and quotations earlier obtained,
the FSP calculated an offer providing:
$16,303 to repair the damage identified (from a quote prepared in March 2017)
$1,929 to repair further damaged identified (from a second quote prepared in
March 2017)
$1,719.14 to replace the laundry tub and bath
$5,654.55 for replacing insulation ($300), replacing plasterboard wall linings in
the bathroom and bedroom ($450), replacing skirting boards in the bedroom
and living room ($360 and $480 respectively), painting the bedroom and lounge
room on account on containment line tape ($1,170 and $1,410 respectively and
supplying and installing a new cavity sliding door ($300). The FSP further
allowed a 15% builder’s margin and 10% GST on top of these sums.
The FSP offered a final cash settlement of $25,605.69.
The applicants say this amount is too low because the March 2017 scopes of work
were prepared prior to successful remediation. The applicants also say the FSP
intends to re-use the bathtub and shower recess, through which sewerage
overflowed.
Fair in all the circumstances the FSP pay $40,000 to settle the claims
Given the circumstances, events and age of the claims, I am satisfied an award of a
single sum to cover all repairs is appropriate.
Although the policy allows the FSP to pay what it would cost it to provide the repairs,
any decision to cash settle and the amount of the cash settlement must be exercised
fairly. Once a cash settlement is made, the risk in relation to repairs and unforeseen
consequences of repairs are transferred from the FSP to the insured.
Further, if the determination is accepted by the applicants, the determination finalises
these claims for damage to the granny flat whether caused by sewerage ingress or
water ingress. As the applicants are bearing all the risk in relation to repairs, I am
satisfied it is fair a cash settlement includes p rovisional sums sufficient to account for
unknown contingencies and variations once repairs commence.
In the circumstances, I am not satisfied the final figure offered is fair in all the
circumstances. Relevantly, I also note:
the FSP’s final offer provi des for removal and replacement of the bathroom
vanity basin, laundry tub and bath but not the shower base save for a sma ll
allowance for waterproofing
the two main quotes relied on by the FSP were prepared in March 2017 and so
are now out of date
other material relied on by the FSP was prepared in November 2017 and is now
out of date also
the granny flat was substantially stripped and photographs show the need for a
complete internal rebuild.
Aside from a quotation to demolish and rebuild the granny flat, the applicants have
not provided their own quotes.
Case No: 499213 Determination Page 7 of 8
Nonetheless, having regard to all the available material, and for the reasons stated, I
am satisfied it is fair in all the circumstances the FSP pay the applicants the amount
of $40,000 in full and final settlement of all issues and liability arising out of the
claims and dispute.
I am also satisfied it is fair in the circumstances no excess is payable by the
applicants on the water ingress claim.
2.2 Are the applicants entitled to compensation?
Fair in all the circumstances the FSP pay the applicants $3,000 compensation
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the a pplicant’s expectation of
enjoyment or peace of mind.
The claim was lodged in November 2016 but the final clearance certificate was not
obtained until November 2017. Remediation failed on four occasions prior to final
approval.
However, I accept there were complicating issues with Sydney Water’s sewer line
which are outside the capacity of the FSP to address. The ongoing nature of these
is sues complicated the FSP’s claim investigation and the remediation process. Full
responsibility for the poor claims experience cannot be attributed to the FSP.
The contact notes indicate the claim was managed relatively well overall. The
applicants’ concer ns were attended to and they were regularly updated. I also note
the FSP did not impose any excess on its final settlement offer.
The circumstances and events of the claim remain stressful and demanding for the
applicants who are still without the use of their granny flat. The level of involvement
required of the applicants to facilitate the FSP’s investigations and assessments
exceeded what I would expect during an ordinary claim.
The FSP acknowledges the difficult circumstances of the claim and apologises to the
applicants for the inconvenience caused. It said it was open to discussing
compensation with the applicants in line with the FOS approach.
Having carefully considered all the available information, I am satisfied it is fair in the
circumstances the FSP pay to the applicants a total of $3,000 compensation.
Case No: 499213 Determination Page 8 of 8
3 Supporting information
3.1 FOS Approach
As advised to the parties, FOS has considered it appropriate to expedite this dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference, due
to the nature of the dispute. Accordingly, this dispute has not been the subject of a
FOS recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bear the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
T he relevant policy extracts are referred to in the FSP’s Notice of Response dated
6 November 2017. Both the policy document and the Notice have been exchanged
with the applicants.
3.3 Other relevant material considered and relied on
Parties’ submissions and emails.
Correspondence between the parties.
Correspondence between the applicants and Sydney Water.
Applicants’ quote dated 21 June 2018.
FSP’s claim notes, photographs, assessors’ reports , scopes of works, restorers’
and hygienists’ reports.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.