Home / Financial Firm (Unknown - Insurer) / Determination 498684
Determination 498684
Extent of mould damage and remediation following burst pipe water escape; temporary accommodation and cash settlement
Summary
Home and contents applicants disputed the extent of mould damage after a burst pipe and the FSP's clearance and cash settlement. AFCA ordered further independent mould testing and remediation, continued temporary accommodation, $1,500 non-financial loss, and up to $3,000 towards professional report costs.
The FSP must properly establish that remediation is complete, and a clearance certificate that does not cover the whole property and relies on no further testing is inadequate.
Issues
- Repairs or contractors primary · upheld
“The FSP should arrange for further mould tests to be conducted throughout the house by an independent specialist and complete any required remediation.”
- Claim amount dispute secondary · not upheld
“The FSP is entitled to cash settle the applicants' claim based on the quotation from JPF.”
- Poor communication secondary · upheld
“The FSP's conduct caused the applicants unnecessary stress and frustration, and its failure to respond to the applicants' concerns added to this frustration.”
Subjects and remedies
home or building damagepay claimpay compensationpay non financial lossprovide documentsrepair or rectify
Text of the determination
Determination
Case No: 498684 Determination Page 1 of 9
Case number: 498684 9 August 2018
1 Overview
1.1 Dispute
On 1 July 2017 the applicants lodged a claim on their Home and Contents Policy
held with the financial services provider (FSP) after a water pipe burst in their roof.
The FSP has accepted liability for the damage arising from the leaking pipe. A
dispute has arisen as to the extent of the damage, in particular with respect to the
presence of mould and mould remediation.
The dispute was the subject of a recommendation which was substantially in favour
of the applicants. The applicants have rejected the recommendation.
1.2 Issues and key findings
Is the FSP liable to complete the mould remediation?
Yes, the FSP should arrange for further mould tests to be conducted throughout the
house by an independent specialist and complete any required remediation. Upon
completion of the remediation, the FSP must provide the applicants with a clearance
certificate from the independent specialist.
Is the FSP liable for temporary accommodation?
Yes, the FSP is liable to pay the applicants ’ temporary accommodation costs until the
remediation is completed and for a period of 30 days after the provision of the
clearance certificate to allow for the completion of any necessary repairs.
Is the FSP entitled to cash settle the applicants’ claim?
Yes, the FSP is entitled to cash settle the applicants’ claim for the cost of repairs in
accordance with the scope of works identified by the FSP’s repairer.
Are the applicants entitled to compensation?
The applicants are entitled to compensation for non-financial loss of $1,500 pursuant
to paragraph 9.3 of the Terms of Reference (TOR).
Is the FSP liable to contribute to the applicants’ costs?
The FSP is liable to contribute up to $3, 000 to the applicants’ professional costs in
obtaining reports from ML pursuant to paragraph 9.4 of the TOR.
Case No: 498684 Determination Page 2 of 9
1.3 Determination
This determination is substantially in favour of the applicants.
Within 14 days of acceptance of this determination, the FSP mus t arrange for further
mould testing to be conducted by an independent specialist as set out under
paragraph 2.1 of this determination.
Within 14 days of the test results, the FSP must complete any relevant remediation
required and upon completion provide the applicants with a relevant clearance
certificate from the independent specialist.
The FSP must pay the applicants’ temporary accommodation costs until the
remediation is completed and for a further period of 30 days from receipt of the
clearance certificate to allow for the completion of the remaining repairs.
The FSP is otherwise entitled to cash settle the applicants’ claim for the cost of the
repairs as set out in the body of the determination.
The FSP is to pay the applicants $1,500 compensation for non-financial loss
pursuant to paragraph 9.3 of the TOR. The FSP must also contribute up to $3000
pursuant to paragraph 9.4 of the TOR toward the applicants’ professional costs in
obtaining reports from ML subject to the applicants providing the relevant invoicing or
receipts.
Case No: 498684 Determination Page 3 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity to address the issues arising from the information exchanged.
Following the recommendation issued in this matter on 8 February 2018, the
applicants have made a number of further submissions and in particular state:
the clearance certificate provided by VAS is based on tests conducted prior to
the work being completed
the clearance certificate relates only to bedroom 3 and does not include the
kitchen, hallway or dining room or other rooms in the house
the FSP should be responsible for cleaning the premises
the allowance to fix the wall in the bathroom identified by JPF for the FSP is
substantially less than the quote obtained by the applicants from MIA of $4,700.
The FSP says that the clearance certificate relates to bedroom 3 but does not relate
to the bathroom as the damage to the bathroom was unrelated to the incident. The
FSP maintains it is not liable for the mould remediation in the bathroom and/or the
related repairs.
The FSP has settled the applicants’ claim for the bu ilding repairs on 5 April 2018 as
the applicants are not willing to allow its builder JPF to complete the required repairs.
The FSP notes the estimation to complete the repairs is 10 days and have extended
the temporary accommodation until 28 August 2018.
This determination follows consideration of all of the information provided and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Is the FSP liable for the mould remediation?
I am satisfied based on the available information that the FSP should conduct further
mould tests of the applicants’ property including all bedrooms, kitchen, hallway and
dining room to determine the extent of any ongoing mould infestation.
I acknowledge the assessment by VAS undertaken in December 2017 is thorough
and identified excessive mould concentrations in the bathroom, kitchen, dining and
bedroom 3. I acknowledge that remediation works were carried out on 16 February
2018 with photographs provided by the FSP’s builder , JPF after that date.
I am concerned that VAS provided a clearance certificate at that time. It is unclear
from the report of 19 February 2018 what, if any, fungal tests or other tests were
conducted by VAS to conclude that the mould remediation had been successful. The
report states that the assessment pre-supposes that the root cause of the issues that
have caused the microbial contamination problem within the nominated areas had
been resolved.
The certificate refers to verification of successful remediation at the test locations
nominated within the site at the time the assessment was conducted. It does not refer
to any further tests. Presumably, the test locations are those referred to in December
Case No: 498684 Determination Page 4 of 9
2017 that revealed the mould infestations in bedroom 3, bathroom and kitchen dining
areas.
I also note the report certificate does not provide a clearance for the whole building
but only the nominated remediation areas.
The applicants provided a report from ML dated 12 June 2018. That report notes the
results of the airborne mould test found elevated levels in bedrooms 2 and 3 of the
property. It recommended a further assessment of the premises to determine
whether further remediation was required.
The FSP provided a response from VAS however this was not based on a further
inspection of the property nor any further tests.
It is not unreasonable to accept that there are ongoing issues with mould in the
property. Although there may be other factors that have influenced this, it appears to
be largely related to the original issues stemming from the burst pipe in the ceiling. It
is well-known that mould is able to spread quite quickly and I accept that if an area
had been left untreated, that this could lead to infestation throughout the home.
FSP should conduct further tests
I am persuaded by the report from ML and accept that further tests should be
conducted o f the applicants’ home to determine the extent of mould infestation and if
necessary further remediation.
In my view, the tests should be conducted by an independent specialist other than
VAS. The tests should be conducted of each room in the home to determine the level
of mould infestation and include an assessment of the ceiling insulation. Such tests
should be conducted within 14 days of the applicants’ acceptance of this
determination.
Upon completion of the tests, the FSP should arrange for any remediation to be
completed and upon completion of the remediation, provide the applicants with a
clearance certificate certified by the independent specialist.
It is also unclear whether further tests have been conducted to ensure that no further
mould exists in the furniture, carpets, toys and other personal items. The FSP should
conduct further tests and provide appropriate clearance certificates for the furniture,
carpets, toys and any personal items that are to be returned to the applicants’
property.
2.2 Is the FSP liable for temporary accommodation?
The FSP paid the applicants ’ temporary accommodation and agreed to continue to
pay temporary accommodation to 28 August 2018.
The FSP’s policy clearly says that the FSP is liable for temporary accommodation if
the property cannot be lived in and the applicants need to move out so it can be
repaired.
Case No: 498684 Determination Page 5 of 9
I accept that the property cannot be lived in at the current time and I accept that it
would be unfair to expect the applicants to return to the property until such time as a
final mould clearance certificate is provided and the repairs are completed.
The FSP has provided advice from its builder JPF that to complete the repairs to the
applicants’ property following mould remediation would take approximately 10 days.
The applicants have said they do not want JPF to complete the repairs but will
arrange for the repairs to be completed by their builder.
I accept in these circumstances that the FSP should continue to pay the applicants ’
temporary accommodation costs until such time as the mould remediation has been
completed and a clearance certificate provided. The FSP should continue to pay
temporary accommodation for a period of up to one month following the provision of
the clearance certificate to allow the applicants sufficient time to complete the
required repairs.
2.3 Is the FSP entitled to cash settle the applicants’ claim?
The FSP is entitled to cash settle the applicants’ claim as the applicants have
declined the FSP’s offer to complete the repairs through its builder, JPF.
Normally, when cash settling a claim, the FSP must do so on the basis of the cost to
reinstate the applicants to the position the applicants would have been in prior to the
loss. When cash settling, it is necessary to provide a sufficient amount to cover the
possible contingencies that occurred during a repair process.
I accept however that by offering to complete the repairs, the FSP would have
provided the applicants with a life time guarantee and covered the costs of any
contingencies.
Given the FSP offered to have JPF repair the property, I accept that it is fair in those
circumstances that they be entitled to cash settle the claim based on the quotation
from JPF.
2.4 Are the applicants entitled to compensation for non-financial loss?
Under paragraph 9.3 of the Terms of Reference, FOS can award up to $3,000
compensation for non-financial loss where applicants incur an unusual degree of
inconvenience or time taken in resolving a dispute.
The case manager in the recommendation determined that the FSP be liable to pay
$1,500 by way of compensation for non-financial loss given the delays incurred in
remediating the property.
I have considered the issues raised by the applicants and I agree with the findings
contained in the recommendation. I accept that not all of the delays are the fault of
the FSP, however, I am concerned about the FSP’s response to the applicants with
respect to the mould remediation.
I accept that the FSP’s conduct during the claims process has caused the applicants
unnecessary stress and frustration and its failure to respond to the applicants’
Case No: 498684 Determination Page 6 of 9
concerns has added to this frustration. In the circumstances, it is fair that the FSP
pay the applicants $1,500 by way of compensation for non-financial loss.
2.5 Are the applicants entitled to compensation towards professional
costs incurred?
Under paragraph 9.4 of the Terms of Reference, the Service may have determined
that an FSP contribute up to $3,000 towards professional costs incurred in the claims
process by an applicant.
The applicants provided a number of reports from ML providing various results from
the mould testing. Those reports have been necessarily obtained by the applicants in
view of the nature of the issues raised by the FSP and concerns with the FSP’s
process.
The reports have been relied upon and have assisted in the determination being
reached.
I consider it fair that the FSP contribute up to $3,000 for the professional costs
incurred subject to the applicants providing relevant invoices and receipts for the cost
of the reports from ML.
Case No: 498684 Determination Page 7 of 9
3 Supporting information
3.1 Chronology of events
Date Action
01 - 07 - 2017 Applicants lodge claim
06 - 07 - 2017 FSP assessor ( AJG) attends and inspects property
13 - 07 - 2017 JPF attends and inspects property with applicants
27 - 07 - 2017 reinspection by JPF wit h app licants
03 - 08 - 2018 FSP conclude s it would only cover damage to roof cavity ( not wall cavity
and bathroom floor )
14 - 08 - 2017 Applicants’ expert mould report (MD)
12 - 09 - 2017 FSP final decision letter, in which FSP agreed to cover wall cavity
15 - 09 - 2017 FSP hygienist (E) attends for mould inspection and assessment –
additional mould testing and sampling (by ML)
10 - 10 - 17 and 23 - 10 - 2017 E attends site again to undertake limited microbial sampling (report
3/11/17)
11 - 10 - 2017 FSP mould remediator (SM) attends site to compile scope of works for
remediation works on behalf of JPF
28 - 11 - 2017 FSP initial key dates and action plan
06 - 12 - 2017 FSP hygienist (VAS) assessment date
03 - 01 - 2018 FSP second key dates and action plan
30 - 0 1 - 2018 FSP advises FOS all mould remediation works have been completed
3.2 Expert reports
Expert reports
Report Key points
FSP asse ssor (AJG)
Report
06 - 07 - 2017
Resultant damage – bedroom 3 water stains to the walls x 2 and
the plasterboard lined ceiling
Roof cavity – wet insulation batts and one water pipe has been
capped off
FSP expert builder (JPF)
Undated report
inspection 13 - 07 - 2017
Observed damage to the tiled flooring and one associated wall
consistent with that of a leaking pipe
We believe the claim to be an insurable event due to water escape
from a leaking pipe.
FSP expert builder (JPF) We believe the claim to be an insurable event due to water escape
Case No: 498684 Determination Page 8 of 9
Undated report
27 - 07 - 2017
from a leaking pipe causing damage to the bedroom ceiling.
Resulta nt damage – bedroom ceiling requires additional screw
fixing, trowelling and painting, including the cornice.
We believe the damage to the bathroom is due to long term
leakage from the shower recess and is not related to the leaking
pipe in the roof cavity .
App s mould remediator
(MD)
Report
14 - 08 - 2017
Visible mould infestation in bat hroom and bedroom 2
Infestation on wall and in wall cavity near shower base due to a
potential leaking pipe in the ceiling in bathroom.
Visual inspection indicates water damag e has occurred to the
ceiling from leaking pine in bedroom 2.
remove and dispose of mould infested plasterboard in bedroom 2.
New plasterboard to be installed by others.
FSP mould investigator (E)
Report
21 - 09 - 2017
The results from mould sampling conducted indicate that at the
time of the sampling, the airborne mould levels within A 's Room
were " very high", "high" in the kitchen and slightly elevated in the
hallway.
From the ins pection conducted and report from the insured, there
was reportedly a plumbing leak from a copper pipe located in the
ceiling above the wall bet ween the affected room and the
bathroom.
The mould in the ceiling as well as the wall cavity is consistent with
a top down water leak and there is evidence of a plumbing repair to
th e copper pipe.
There may be some pre - existing water damage to the bottom plate
of the affected wall due to minor leak from the shower
base however this is completely unrelated to the water damage
and mould higher up in the wall cavity and ceiling space.
A pps builder, MPR
Inspection report
07 - 01 - 2018
As a result of the leak, the floor tiling located in the bathroom has
become loose, drummy and detached and the floor has become
soft and spongy.
It is evident the leaking hot water service plumbing pipe locat ed in
the roof spac e above the bat hroom area and in the wall between
bedroom No. 3 and bathroom has been the likely cause of the
damage to the bathroom floor, wat er damaged and decayed
subfloor members/timbers and loose, drummy and detached floor
tiles in t he bathroom…
As a result of the hot water service being de - commissioned by a
licensed plumber, the leak stopped immediately and the moisture
levels in the walls and floors of the affected areas have returned
back to normal.
FSP builder (JPF)
Report
23 - 01 - 2018
We then arranged to reattend the property on the 19 th of January
2018, with the findings of the leak detection and can that the
damages to the bathroom are consistent with the above around
long - term water damage unrelated to a burst pipe.
FSP plumber (PBPS)
Leak det ection report
Visual inspection wit hin these areas found water damages
affecting the tiled floor and all of bedroom 2.
Damages are indicative of long term water exposure, and in our
Case No: 498684 Determination Page 9 of 9
22 - 01 - 2018 professional opinion are approximately 1 – 3 years old
We do not believe damages to the tiled floor servicing the
bathroom are a result of the burst pipe. Spray testing to the
junction of the shower base and shower wall tile, as well as the
junction of the shower screen and the w all tiles found water ingress
into the wall cavity, allowing water to travel underneat h the affected
bathroom floor tiles. This leads us to believe this is the primary
cause of the damages to this area. Staining to the sub - floor
underneat h the shower is in dicative of long term water exposure.
Applicants’ report ML
12 June 2018
With reference to the types and levels of moulds detected in the
samples submitted from within the above site, genera of mould
were det ected which include species which, as reported by
references 1, 3, 5, 7 have been shown to be eit her:
immuno – compromising: and/or
allergenic and/or
myocoxin produces
based on the sample submitted for analysis, further
assessment of samples 4 & 5 is warranted to determine the
source and extent of mo uld contamination and amplification
within the premis es
following remediation, retesting to confirm post remediation
verification should be performed in accordanc e with reference
8.