Text of the determination
Determination
Case No: 498528 Determination Page 1 of 10
Case number: 498528 5 July 2018
1 Overview
1.1 Dispute
The applicant‟s vessel sank and a claim was lodged with the financial services
provider (FSP). The FSP denied the applicant‟s claim due to wear and tear, the
condition of the vessel, delamination, deterioration, and the applicant‟s failure to
safeguard the vessel. This is based on its assertion the sinking was due to a leaking
planking issue.
The applicant disputes this decision and says all possible care and repairs were
performed. The applicant also says the loss does not fall within a policy exclusion.
1.2 Issues and key findings
Can the FSP deny the claim?
The FSP cannot deny the claim because the evidence does not show the loss was
caused by a leaking planking issue.
1.3 Determination
This determination is in favour of the applicant.
The FSP is required to pay the applicant the sum of $146,746.92 minus any premium
adjustment for increasing the sum insured to $130,000. The FSP is also to pay
interest on the relevant amount payable in accordance with section 57 of the
Insurance Contracts Act 1984 (the Act).
In addition, the FSP is to reimburse the applicant‟s expert report cost totalling $2,250.
Case No: 498528 Determination Page 2 of 10
2 Reasons for determination
2.1 Can the FSP deny the claim?
Applicant has shown loss was unintended and unexpected
These relevant facts are not in dispute:
the vessel is a 1962 Walshirt timber boat
the applicant purchased the vessel on 10 April 2015 for $70,000
the applicant conducted extensive works to the vessel throughout his ownership
– this included installing new engines, updating the bilge system, replacing the
bilge monitoring system and installing thrusters
the vessel sank on 20 April 2017
The FSP says the loss falls within a number of policy exclusions. This includes wear
and tear or lack of repair.
The FSP has the onus of proving these exclusions apply. The standard of proof is the
balance of probabilities.
Marine surveyors’ evidence
The FSP is relying upon a marine surveyor‟s (DH) opinion regardin g the cause of
damage. DH said the primary cause of damage was the leaking planking which is
wear and tear. His report included photographs of the leaking planking seams.
DH also said that a secondary cause was the battery failure operating the bilges.
D H‟s evidence is set out in two reports. The second report took into account the
extensive works undertaken by the applicant during his ownership and the possibility
of the sinking occurring due to rain. DH did not accept these factors were sufficient to
alter his conclusion.
The applicant engaged marine surveyor DB to provide an opinion. DB was consistent
with DH in concluding the failure of the bilge pump had a causal link to the sinking.
Regarding how the water entered the vessel, DB identified a number o f possible
causes. These included:
damage to the hull‟s planking due to bad weather
small cockpit drains becoming blocked with debris and resulting in the bilge
pumps being inoperative
primary bilge pumps becoming blocked with debris
marina electrical failure
DB also noted that given the amount of water in the hull and the loads incurred
during the salvage process, it is difficult to determine how many planks (if any) failed
prior to the salvage operation. DH‟s first report accepted this possibility.
Evidence does not show loss was caused by the deteriorated planking
Having carefully considered the available expert evidence, I note the following.
Case No: 498528 Determination Page 3 of 10
DH‟s opinion is based on his assumption that the planking had a known leaking issue
and this resulted in the water entry. However, the applicant has provided persuasive
evidence to show the hull was in a reasonable condition. This included the following:
marine surveyor RL who said in a survey report in March 2015 that for the
“Structural/Bulkhead/Frames” - “All appear secure with no movement detected”
marine surveyor AF who said in April 2015 that “Hull structure OK”, “Bilge pump
did not activate during 7 hours on board – Good”
RS, who installed the thrusters, said by way of email dated 19 October 2016:
“Everything just added up, but you now have a boat you will be more than comfortable to
use, and it has been done to the highest standards, with no more leaking rudder seals, no
more leaking shaft seals, brand new shaft couplings, new skeg /cutlass bearings, etc – you
name it!”
RS followed up this email in a letter dated 19 June 2017 where he said:
“… we carried out the annual maintenance services … that when it was launched back into
the water the works carried out were checked over and there was no sign of water ing ress
or any sign of leaks at this time. The boat was thought to be in good condition being a
timber vessel of its age.”
Shipwright TW who said in an email dated 9 October 2017:
“I was asked by [RS] to fit a bow and stern thruster in October 2016 … I did no t notice any
problem with the planking at this time. Also the forward bilge was dry. … After the thrusters
were fitted and the vessel was launched it was checked for leaks and found dry.”
marina manager, MT, who said in an email dated 2 November 2017:
“… boats on the marina are checked regularly and at no time did your boat show any signs
of wear, water leakage or other sing that it needed any attention.”
This all refutes DH‟s assumption that the vessel had a leaking issue prior to the
event.
DB also provided a number of other possibilities about how the water entry could
have occurred. The only one addressed by DH was whether the water entry could
have been from the rain. He does not comment on the other possibilities.
DB‟s possibilities explain how the wa ter entry could have occurred.
Further, it is plain that the planking was affected by the vessel‟s recovery. Both DH
and DB acknowledge this in their reports. Therefore, the planking‟s condition at the
time of DH‟s inspection does not reflect their conditi on prior to the sinking.
The FSP has referred to a photograph of the vessel taken in 2016 which it says
shows the leaking planking issue. The applicant said this is cracked paint above the
waterline. The applicant refutes this shows a leaking issue at the time of the vessel
sinking. The applicant‟s position is persuasive given it appears to be above the
waterline and is consistent with the evidence of the contractors set out above who
inspected the vessel.
Given all this, I am not satisfied the FSP has shown on the balance of probabilities
that the vessel sank due to the deterioration of the planking.
It follows from this, the FSP cannot rely on the other provisions on the policy. This is
because its reliance on these policy exclusions was based on establis hing the loss
was caused by the deteriorated planking.
Case No: 498528 Determination Page 4 of 10
Accordingly, the applicant has made out a prima facie claim, and the FSP has not
established the application of a policy exclusion or condition. The FSP is therefore
required to indemnify the applicant for the claim.
The sum insured should increase to $130,000
Prior to the relevant renewal, the applicant em ailed the FSP‟s agent to request an
increase to the sum insured. This email, sent in March 2017, was accompanied by
proof of costs spent towards the vessel amounting to more than $35,000.
The FSP‟s agent failed to activate the renewal of the policy and in crease the sum
insured at renewal 2017. The FSP acknowledged this error after the claim was
lodged and reinstated the policy. The FSP did not adjust the sum insured though.
The FSP now says there is no evidence to support an increase in the sum insured.
T he FSP‟s position is difficult to accept. The applicant undertook substantive works to
the vessel. This included the installation of thrusters. It is reasonable to accept this
would have improved the market value of the vessel.
However, I do not accept the vessel‟s market value would have increased
corresponding with the amount spent on improvements. This is reflected when he
first adjusted his sum insured. This followed $70,000 in works but the sum insured
only increased by $50,000.
There is no evidence setting out the likely valuation that would have been provided
had the FSP‟s agent effected the renewal.
Having carefully reviewed the expenses incurred by the applicant, I have allowed an
additional $10,000 for the market value. This is predominantly based on the cost of
the thrusters. They would have likely added to the capital value of the vessel.
I do not accept the other costs would have increased the capital value by any
material degree. This is because they mainly included the installations costs of the
thrusters or maintenance issues (e.g. faulty bilge pump, leaking rudder or shaft seals,
replacing battery).
Given this, I consider it is fair in all the circumstances:
the sum insured be based on $130,000
the FSP deduct from any amount payable under this determination the premium
that would have been charged to effect this increase to the sum insured for the
relevant policy period
Amounts that should be allowed by the FSP
The vessel accrued berthing fees while the dispute was ongoing. The FSP says thi s
is not payable as they are the normal costs of owning the vessel. The applicant says
he should not be liable for these costs when the vessel was unable to be used
because the FSP refused his valid claim.
I prefer the FSP‟s position. These costs would hav e been incurred regardless if the
claim was accepted or not. I am not satisfied they are a loss caused by the FSP‟s
failure to accept his claim. There is no benefit under the policy that would respond to
these costs.
Case No: 498528 Determination Page 5 of 10
Due to the ongoing nature of the dispute, the applicant sold the damaged vessel to
mitigate his circumstances. He did so for a total of $13,510.35. DH estimated the cost
of repair to be between $100,000 and $120,000. There is nothing to indicate this is
unreasonable.
Given this, it is fair in all the circumstances for the vessel to be considered a total
loss under the policy. Whilst the policy is a market value one, I accept the sum
insured of $130,000 should be allowed given:
the vessel was valued at $120,000 at the previous renewal
I accept a valuation prior to the current renewal would have been $130,000
the loss occurred shortly after the policy would have been renewed
The FSP did not assist the applicant with the salvage process due to the policy error.
Therefore, all salvage costs were borne by the applicant. The FSP acknowledged the
costs of salvage appear reasonable but said some of the work did not seem relevant.
The FSP did not specify which works it was questioning.
The applicant‟s claim is supported by invoices. They were all incur red after the claim.
They plainly included costs associated with the vessel‟s recovery and emergency
repairs immediately after the loss. These total $31,257.27.
It is fair in all the circumstances that this amount be allowed. This is payable in
addition to the sum insured given the policy allows this.
Taking into account all of the above, the FSP should pay $146,746.92 ($130,000 +
$31,257.27 - $13,510.35 - $1,000) minus any adjustment for the increased sum
insured in settlement of this claim. Further, the FSP should pay interest on the
relevant amount payable pursuant to section 57 of the Insurance Contracts Act 1984
(the Act). Interest is payable from 21 June 2017, being the date the FSP denied the
claim, until payment is made.
In addition, the FSP should reimburse the costs incurred by the applicant in obtaining
DB‟s report ($2,250). This was reasonably incurred given the technical nature of the
issue in dispute and it substantively assisted the applicant‟s position.
The applicant has also requested reimbursement for legal costs associated with
obtaining advice on the dispute. However, this expense did not impact the outcome
of the dispute. The FSP is not required to reimburse the applicant for these costs.
Case No: 498528 Determination Page 6 of 10
3 Supporting information
3.1 Key references
Record K ey points
FSP’s expert ( H )
Report
05 May 2017
Damage / Loss
- A number of planking seams below the waterline were open
and planking appeared loose (dis - lodged), at the time of the
inspection the open caulking seams had been caulked
(Sikaflex ).
- The planking above the waterline has moved and a large
portion of seams are open or have cracked.
Additional Relevant Detail
1. The vessel was purchased in April 2015, following the
p urchase significant works have been carried out, including
but not limited t o.
• Replacement of both main engines.
• Fitting of bow and stern thrusters.
• Replacement of numerous electronics and wiring.
• Replacement of bilge pumps and fitting "back to base" high
water alarm.
2. It is evident from the vessels static waterline that the vessel
is trimmed aft, being that the antifoul line is near to or at the
actual waterline at the trans om and at the bow has
approximately 200mm of exposed antifouling. The likely
cause for the waterline trim is due to:
• The engines being fitted furth er aft and being significantly
lighter than the original engines.
• Additional batteries and stern thruster fitting.
3. There is a variation between the static waterline and the
cockpit floor and hatch coaming of approximat ely 80mm, per
the attached diagra m.
4. The vessels bilge pumping system has the outlet(s)
approximately on the static waterline.
5. There are no loops or siphon breakers fitted in the bilge
pumping systems.
6. The survey report of the 18 th March 2015 confirms the lead
acid batteries in th e vessel are the same batteries in the
vessel when it was surveyed in 2015, as such at least two (2)
years old (date stamps had not been removed, hence age
cannot be confirmed).
7. The shore power and battery charger were reportedly on,
however this cannot be substantiated.
8. Due to the known planking seams leaking the high water
"back to base" (mobile phone activation) alarm was fitted.
9. On inspection of the vessels structure internally, numerous
broken ribs were identified, many which had sister frames
fitted.
Case No: 498528 Determination Page 7 of 10
10. It was identified that several areas of hull planking were
leaking, given the visible staining the leaking pre - existed the
submersion.
11. The survey inspection of the v essel was carried out on
the 18 th March 2015, notably the inspection was carried out
"out of water" only, furthermore, the writ er made no reference
to the fact that there are numerous structural deficiencies
(broken timbers) wit h the vessel.
12. Based off the images of the vessel during the salvage and
from discussions with [TW] (who attended the salvage
operation), it appears that the manner in which the vessel
was lifted (bow heavy) has been the cause of or contributed
to the hull planking dislodgement below the waterline and the
movement of the seams above the wat erline.
Liability
From the information we have received, the following has
been concluded to be the mo st plausible cause of the loss.
- The vessel was laying at is usual marina berth.
- The vessel was last attended approximately three (3) weeks
prior to the loss.
- Water has ent ered the vessel through the known planking
leaking.
- The bilge pumps have maintained the wat er ingress and
periodically pumped the water overboard.
- The batteries have become wasted, likely due to their age
(despite continual charging bat teries have a serviceable life).
Confirmation of this is due to the fact the "back to base"
system requires 12 - volt ships battery power for the high - water
alarm to be raised, which was not raised, reportedly.
- As the bilge pumps were no longer active wate r has entered
the vessel through the planking, until such time as.
1. The bilge pump outlet skin - fittings were below the
waterline and siphoned water back into the vessel.
2. The aft static waterline was rais ed to the point of being
above the cockpit floor and able to drain over the cockpit
hatch coamings.
- Either point 1) or 2) would cause the vessel to rapidly sink.
With the above considered it has been concluded that,
1. The primary cause of the vessels submersion was due
to the planking leaking, due t o wear and tear and
d eterioration.
2. The secondary cause being the battery failure, however
it cannot be determined factually why the batteries failed.
Applicant’s expert
( DB )
Report
04 October 2017
4 - What caused the vessel to sink?
It has been stated by [FSP] that the claim has been rejected
due to “Fair wear and Tear”
Given the history already outlined, covering the buying
process and subsequent repairs, upgrades and maint enance,
Case No: 498528 Determination Page 8 of 10
it can only be concluded that [applicant] did all and everything
that was in his power to ensure the vessel was properly
looked after.
That said, there are two parts to this question of “caus e”. The
first is to pinpoint the reason the boat sank at this time and
the second is to determine what led to this ev ent.
This first question can be answered simply in that the bilge
pump system failed for some reason and was not able to
keep the vessel afloat as it had done for some time before the
sinking event. For some reason the remot e high water alarm
system did no t register an event even though it was on a
separate battery circuit to the bilge pump itself.
To answer the second part of the question as to what led to
the event, there are a number of factors that singly or
combined could have preceded the sinking.
As stated in the original [FSP] appoint ed assessors report it is
difficult to determine ex actly what led to or caused the
flooding event.
There are a number of possibilities, however given the
condition of the boat once it was salvaged there was no clear
indi cation of the primary cause that led to the event.
Amongst the likely causes are
• Damage to hull planking due to bad weat her – given the
large rain and high wind events in the month before the
sinking, it may be the case that flotsam may have struck the
h ull or been stuck between the hull and the marina berth,
perhaps unsettling a plank. It could also be that the high
winds could have forced the hull to bang heavily against the
dock causing damage to the planking. This cannot be
confirmed due to the extens ive damage to the hull from
the sinking and salvage.
• Travel lift damage – it is possible the lifting slings used to
haul the boat in and out of the water for service may have
overloaded a plank somewhere which then may have worked
loose over time.
• Cockpit flooding – again as a result of the previous
extremely heavy rain and high winds it may be the case that
the small cockpit drains became blocked with debris and the
water in the cockpit drained below decks and flooded the
battery system making th e bilge pumps inoperative
• Bilge pump failure – it may be the case that the primary
bilge pumps bec ame blocked with debris that was stirred up
by the buffeting of the high winds experienced earlier
• Marina Electrical failure – due to the reliance on the battery
system to run the bilge pumps if the circuit breaker on the
marina dock tripped or was faulty, the battery charger would
have failed and batteries would deplete, also the separate
solar charging input would not be able to help at night.
Case No: 498528 Determination Page 9 of 10
5 - Regarding the denial of claim by [FSP]
The original letter from [FSP] dated 21st June 2017 and
supported by 2 reports from the assessor, stated that the
grounds for denial of the claim were
• Wear and tear “any claim in respect of loss or damage
caused by wear or tear, mould, deterioration, vermin,
corrosion, electrolysis or inherent vice”
• Boat condition “any claim caused by or arising as a result of
the unseaworthiness, lack of repair or maintenance of your
boat or any boat covered by this policy”
• Safeguard “any claim caused by or arising as a result of the
lack of reasonable care, protection and/or security of your
boat or any boat covered by this policy or other ins ured
property”
DB - The initial assessors report is based on an inspection
made aft er the salvage process and comments on the extent
of damage to the planking.
Given the amount of water in the hull and the loads incurred
in the salvage process it is difficult to determine how many
planks, if any had failed prior to the salvage operation. A
number of planks and seams had been dislodged in the
salvage process and temporary repairs were made
in order to refloat the vessel.
There is comment referring to “known leaking planks” that led
to the water ingress and subsequent inundation due to the
possible combination of issues relating to
• Battery system failure
• Bilge pump outlet low on wat erline without siphon break
• Stern down trim of the vessel leading to inundation through
the deck drains
DB - RH and various trades involved in servicing this vessel,
state that they were not aware at any time of leaking or
dislodged planks prior to the sinking.
It is possible that the evidence referred to may be from
previous leaks that have been fixed over the years or caused
by the weather conditions in March and early April
The mechanical survey at the time of purchas e which was
just after the boat had been relaunched, mentioned (page6/9)
“small water leaks at the stbd. side planking.........keep
checking” These were monitored and not reported furt her, s o
it likely these plank seams had closed up once the boat had
spent some time back in the water.
This mechanical survey also mentioned (page 3/9) “crack
paint joints mostly in forward sections of topsides ” Expert
opinion suggests the polyurethane paint use d was not flexible
enough to accommodate the typical plank movement found in
timber vessels
There is comment about the weather conditions stating they
excluded the chance of fres h water inundation.
The report states that the
Case No: 498528 Determination Page 10 of 10
• Maximum wind gust recorded i n April was 33km/h.
• Wind directions were West to South West
• Maximum rainfall for April was 19mm.
DB - The following spreads heet from BOM for April 2017
shows this is not correct
• Maximum wind gust recorded on April 9 was 67 km/h and
over 40km/h for fo llowing 3 days
• Wind directions from all points of the compass
• Maximum rainfall was 3 April 33.8mm
Boat Policy
PDS
Page 14
„Salvage Charges/Precautionary Measures/Emergency
Assistance‟ means reasonable charges and expenses
incurred by You in preventing or minimising any loss or
damage covered by Section 1 of Your Policy. Such charges
are paid in excess of any payment for the loss or damage to
Your Boat and are not limited by the sum insured.
Page 32
Wear and Tear
Any claim in respect of loss or damage caused by wear and
tear which would be expected given the age, storage and/ or
use of the applicable item.
Delamination, deterioration, corrosion and electrolysis
Any claim in respect of loss or damage caused by
delamination, deterioration, corrosion or el ectrolysis which
would be expected given the age, storage and/or use of the
applicable item
Page 33
Boat condition
Any claim caused by or arising as a result of the
unseaworthiness, lack of repair or maintenanc e of Your
Boat or any Boat covered by this Policy.
Safeguard
Any claim for loss or damage caused by or arising as a result
of the lack of reasonable care, protection and/or security of
Your Boat or any Boat covered by this Policy or other insured
property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.