Determination 498039
Home repair completion disputed; ducting defect and utility reimbursement
Summary
The applicant disputed the insurer's completion of home repairs after a ducting smell emerged, and sought consequential and non-financial loss. AFCA ordered $1,995 for ducting rectification and $1,219.79 for utilities used by the repairers, but found no non-financial or consequential loss payable.
The insurer must pay the quoted cost of the unresolved ducting defect and reimburse utilities its repairers used, while the policy and terms of reference exclude consequential and non-financial loss.
Issues
- Repairs or contractors primary · upheld
“The ducting now emits a smell which has not been investigated by the FSP... it is fair and reasonable that the FSP reimburse the applicant for this sum.”
- Claim amount dispute secondary · upheld
“I determine that the FSP should refund this sum [$1219.79] to the applicant.”
- Poor claim handling secondary · not upheld
“As the applicant chose to complete these works, the FSP have acted fairly in this instance.”
- Delay secondary · not upheld
“I do not find that the period of time taken by the FSP to complete the repairs is excessive.”
Subjects and remedies
home or building damagepay claimpay compensation
Text of the determination
Determination
Case No: 498039 Determination Page 1 of 4
Case number: 498039 6 June 2018
1 Overview
1.1 Dispute
The applicant lodged a claim for damage to his home with the financial service
provider (FSP), on 31 May 2016.
The FSP accepted liability and completed repairs to the property. The applicant
seeks:
compensation for consequential loss
compensation for non-financial loss
additional/rectification works to be carried out to the ducted heating unit.
This matter has been the subject of a recommendation. The recommendation was
substantially in favour of the FSP. A copy of the recommendation is attached.
1.2 Issues and key findings
Has the FSP completed their repair obligations under the policy?
The FSP are required to pay the applicant $1,995 to complete the repair and
planning of the ducting.
Is the FSP required to pay for the electricity and gas supplies?
The applicant left the electricity and gas connected at the request of the FSP. The
FSP’s repairers used these services and it is fair and reasona ble that the FSP
reimburse the applicant for the usage.
Is the applicant entitled to compensation for non-financial or consequential
loss?
The applicant is not entitled to consequential and non-financial loss.
1.3 Determination
This determination is partially in favour of the applicant. Within 14 days of acceptance
of this determination, by the applicant, the FSP is required to pay $1,995.00 for
repairs to the ducting and $1219.79 for the electricity and gas usage.
The FSP is not required to take any further action.
Case No: 498039 Determination Page 2 of 4
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material supplied by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the Case Manager’s recommendation contains an accurate summary
of the dispute, the issues to be determined, any applicable paragraphs of the terms
of reference or any law.
I have attached the recommendation to this determination.
2.1 Have the FSP met their repair obligations under the policy ?
The FSP have accepted this claim and have undertaken repairs to the applicant’s
property.
Subsequent to the completion of repairs the applicant advised the FSP that the
ducting emitted a smell which has not been investigated by the FSP.
The applicant has obtained a quotation from O to rectify the condition of the ducting
in the sum of $1,995.
In the circumstances it is fair and reasonable that the FSP reimburse the applicant for
this sum.
2.2 Is the applicant entitled to be compensated for the cost of gas usage
and electrical usage when they were absent from the premises?
The FSP arranged and paid for the applicant to vacate the premises, whilst work was
being carried out, and live in alternative accommodation.
The applicant contacted the FSP and was informed any usage of gas or electricity in
their absence would be reimbursed by the FSP.
The repairers used the services to assist in drying and repairing the property and in
these circumstances it is fair and reasonable that they are responsible for the usage
charges for these services. The applicant has provided accounts to show that
electricity and gas totalling $1219.79 was consumed in their absence.
I determine that the FSP should refund this sum to the applicant.
2.3 Is the applicant entitled to compensation for non-financial or
consequential loss?
Policy excludes compensation for non-financial loss
The policy excludes ‘compensation for distress, inconvenience or other non -financial
loss, except if covered under liability cover’ and also ‘consequential loss’ . This
Case No: 498039 Determination Page 3 of 4
exclusion is in respect of consequential loss or inconvenience which flows from the
original loss.
The applicant has claimed extra childcare expenses, which he says are as a result of
having to vacate the property.
I am not satisfied that the policy provides cover for this expense.
FOS may award compensation in certain circumstances
FOS may award an applicant for non-financial loss in certain limited situations. FOS
may decide an FSP should compensate an applicant for such loss, only where there
has been an unusual amount of physical inconvenience, time taken to resolve a
situation or interference with the applicant’s expectation or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss. It is
unlikely to decide a substantial amount of monetary compensation that should be
paid. The maximum amount that FOS may award is $3,000.
FOS considers compensation should not be provided where an applicant suffers
inconvenience that is a normal part of doing business. FOS expects an applicant to
be moderately robust and bare the normal degree of inconvenience experienced
when a problem occurs and take reasonable steps to reduce inconvenience. The
applicant seeks compensation for expenses which the family accrued as a result of
delay in repair of the house, including pre and post school care for children for the
period of time which he was not able to live in the house.
The applicant also seeks compensation for delay in the completion of the repairs.
The FSP denies that there was any unnecessary delay in the completion of the
authorised repairs. The FSP further has stated that the requirement to undertake
repairs at the front of the property prior to the repairs commencing was appropriate
given the poor drainage at the front of the property which was continuing to
contribute to high sub-floor moisture and mould levels.
The applicant has obtained a report from O in relation to assessing the sub-floor
ventilation of the existing dwelling. The report of 8 August 2016 said ‘ it can be stated
that the existing sub-floor ventilation system satisfied the performance requirements
Part 3.4.1 sub-floor ve ntilation of the current National Construction Code.’
The FSP obtained a report from I on 19 October 2016 which provided the following
recommendations:
‘install concrete paving to the front south east elevation of the dwelling
ensure paving is installed below the sub-floor vents in the wall and is graded
away from the dwelling
surface water from this new pavement is to be directed into a new storm-water
pit that is connected to the existing below ground storm-water drainage system
on site
unblock all current sub-floor vents and provide new vents to the side of the
timber decking to allow for cross ventilation as set out in the BCA
Case No: 498039 Determination Page 4 of 4
engage a timber flooring specialist to confirm an appropriate acclimatisation
period for the new timber flooring, taking into account the elevated moisture of
the ground in the sub- floor.’
I find the report from I extensive and compelling and in view of this I do not determine
that the period of time taken by the FSP to complete the repairs is excessive.
The FSP required the work to be completed as specified by I, prior to the completion
of the repairs. I find that this was a reasonable requirement.
In view of this I do not find that the applicant is entitled to an award for compensation
in these circumstances.
Recommendation
Case No: 498039 Recommendation Page 1 of 6
Case number: 498039 16 January 2018
3 Overview
3.1 Dispute
The applicant has a claim with the financial services provider (FSP) for damage to his
home. He says that some of the works have not been completed correctly and need
to be rectified.
The FSP required the applicant complete drainage works to the property before it
commenced repairs for the internal damage due to their inability to guarantee the
works. The applicant says that this is unfair as the drainage was already sufficient.
The applicant also says that he has suffered a consequential financial loss and non-
financial l oss due to the FSP’s repair process .
3.2 Issues and key findings
Have the FSP met their repair obligations under the policy?
The FSP have repaired the ducting, however it now emits a smell which has not been
investigated by the FSP. The FSP are required to pay the applicant $1,950 in
settlement of the required ducting repair as per the provided quote.
Did the FSP act fairly in requiring the applicant to conduct drainage repairs
before completing the claim works?
The FSP’s builder would not guarantee the works d ue to drainage issues identified at
the site. The FSP offered the applicant a cash settlement to complete the required
repairs if he was unwilling to complete the recommended drainage works. As the
applicant chose to complete these works, the FSP have acted fairly in this instance.
Is the applicant entitled to compensation for non-financial or consequential
loss?
The policy specifically excludes cover for consequential and non-financial loss.
Further the evidence shows that the delays in repair are due to the extent of the
repair process, changes proposed by the applicant, and time taken to exchange
relevant paperwork and decisions relating to the changes requested by the applicant.
Due to this there is no basis for the award of non-financial loss compensation. The
FSP have maintained an offer of $500 in settlement of the applicant’s losses , and it is
fair that this offer be maintained.
3.3 Recommendation
This recommendation is substantially in favour of the FSP.
Case No: 498039 Recommendation Page 2 of 6
The FSP are required to settle the applicant for repairs to the ducting as per the
supplied quote and provide the applicant a $500 payment for losses.
Case No: 498039 Recommendation Page 3 of 6
4 Reasons for recommendation
4.1 Have the FSP met their repair obligations under the policy ?
Report shows ducting requires repair
The FSP’s initial scope ind icated that the ducting in the home required replacement
to rectify the damage as a result of the insured event. During the repair process the
FSP’s repairer deemed that the ducting could be repaired in parts and the remaining
areas cleaned.
The FSP repair ed and cleaned the ducting as per the repairer’s advice.
Since the incident, the applicant has gathered a report which shows that the ducting
is now producing a foul smell. The FSP offered to reinspect the property to engage
repair on the ducting but have not contacted the applicant to arrange this repair.
The applicant has provided a quote to repair the ducting and remove the smell. As
this invoice is the only available quantification of the required repair, the FSP are
required to reimburse the applicant the costs of the provided quote to remove the
smell.
4.2 Did the FSP act fairly in requiring the applicant to conduct drainage
repairs before completing the claim works?
FSP repairer would not guarantee repairs without drainage works
On inspection of the property, the repairer identified issues with drainage. After they
engaged an engineer to report on this, the repairer advised that they could not
guarantee works until the identified drainage issues were rectified.
The applicant disputed this finding and engaged an engineer to report on the
drainage.
Applicant’s engineer found ventilation adequate
The applicant’s engineer inspected the property and advised in his report that the
ventilation on the property met the relevant standards
The applicant put this report to the FSP for consideration. The FSP responded with
an offer to cash settle the repair costs due to the repairer’s continued inability to
guarantee repairs. The applicant rejected this offer and proceeded with the drainage
works in order to allow the FSP repairer to proceed with the repairs.
FSP acted fairly
On this basis the FSP has acted fairly in the circumstances by presenting the
applicant with the opportunity to engage his own repairer. The applicant had the
opportunity to proceed on the basis of his own engineers report while still receiving
settlement for the quoted damages.
Case No: 498039 Recommendation Page 4 of 6
4.3 Is the applicant entitled to compensation for non-financial or
consequential loss?
Policy specifically excludes cover for non-financial or consequential loss
The applicant seeks compensation for non-financial loss as a result of the time taken
to complete repairs to the home.
The applicant also seeks compensation for losses including power and water bills for
the home while repairs were underway, and before and after school costs for his
children during repairs, both costs incurred while the applicant was in temporary
accommodation.
The contract of insurance between the parties specifically excludes award for both
non-financial and consequential loss.
Under section 9.3(c) of the FOS terms of reference we are unable to provide
compensation for consequential or non-financial loss where a contract of insurance
specifically excludes such compensation.
Delay in repair process not due to FSP error
The claim and repair notes show that the repairs were actioned in a reasonable
timeframe after the loss. The delays in repair completion were contributed to by the
scope of the repair required, and the need to complete the drainage works by the
applicant before work could begin.
The applicant also requested changes to the repair works at their own cost. The
changes and related correspondence and approval has further contributed to the
delay in the repair process.
On this basis I am satisfied that the actions of the FSP have not contributed to the
delays in repair, and are not required to provide compensation for non-financial loss.
It is noted however that the FSP have continued to offer the applicant $500 in
compensation for losses claimed. As this offer has not been withdrawn, it is fair that
the FSP pay the applicant $500 in this regard.
Case No: 498039 Recommendation Page 5 of 6
5 Supporting information
5.1 Summarise the key references
Record Key points
Applicant ’s expert ( O )
Report
08 Aug 2016
Our commission was to carry out a visual inspection and to
prepare a brief report on our findings. No destructive testing was
commissioned or carried out.
To put all into perspective it can be stated that the existing subfloor
ventilation system satisfies the performance requirements
Part3.4.1 subfloor ventilation of the current National Construction
Code.
FSP’ s expert ( I )
Report
19 October 201 6
As part of our investigation this office engaged a geotechnical
expert to carry out a footing exposure of the existing foundations,
moisture tests and determine the site classification
Water ingress to the south - east side of the swelling sub - floor is a
r esult of the combined effects of the natural slope of the property
directing surface runoff towards the south - east elevation, coupled
with the external pavement been poured across the sub - floor vents
allowing surface wat er to enter the sub - floor.
Is there adequate sub - floor ventilation?
No. The enclosed deck has prevented any cross ventilation.
Can timber floor finish be re - installed to the ground floor?
Yes, provided:
Works are finished to the front south - east elevation to prevent
future surfac e water ingr ess to the sub - floor vents along the nort h -
west elevation are un - blocked and vents are installed in the now
currently enclosed deck
Recommendations
Install concrete paving to the front south east elevation for the
dwelling. Ensure paving is installed below the sub - floor vents in the
wall and is graded way from the dwelling. Surface water from this
new pavement is to be directed into a new storm - water pit that is
connected to the existing below ground storm - water drainage
system on site.
Claim Notes
Notes
New Assessment Details
***TECHNICAL SPECIALIST UPDATE*** ** Claim Progression – I
have re attend 26th July meeting OI and [UB] onsite Sub Floor
mould report was inconclusive due to saw dust covering mould but
mould is present...The mould presence is not from the claim as
little if no wat er from the leak passed through to the sub floor...A
steep slope from the front gate to the front wall wit h no drainage
and a complete lack of sub floor ventilation is the cause. This has
been pointed out to the owner. Als o leak detection has reveal no
leaks...It is suspected that water works in the street cause an
interruption in water supply to the street and OI may have left a tap
on...this is the most likely cause consistent with the damage
seen...Water has clearly come from upstairs and through the down
Case No: 498039 Recommendation Page 6 of 6
stairs ceiling REPAIRS ARE NOT ABLE TO BE CARRIED OUT BY
[UB] UNTILL THESE ISSUES AND THE MOULD ARE DEALT
WITH BY OI AT THEIR COST. A cash settlement to OI for
$45,279.34 for scoped works (F&R) +allow to replace floor ti les to
en suite as a tile has come loos e since initial inspection damage
consistent with claim $2296.80 .... Total $47,576. 14 **
Recommendations ... wait OI response to recommended cash
settlement offer (28/07/ 2016 02: 17 PM)
***TECHNICAL SPECIALIST UPDATE *** ** Claim Progression
...OI has committed to improving the drainage to the front of the
buildings **Recommendations. [UB] authorised as per scope of
works based on OI completing the drainage upgrades ASAP
(15/08/2016 11:04 AM)
Home Insurance
PDS
Page 46
What we don’t cover
- compensation for distress, inconvenience or other non - financial
loss, except if covered under liability cover
- consequential financial loss - for example, loss of profits, except if
covered under liability cover.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.