Determination 498039

Home repair completion disputed; ducting defect and utility reimbursement

FirmFinancial Firm (Unknown - Insurer)
Decided2018-06-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,215
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant disputed the insurer's completion of home repairs after a ducting smell emerged, and sought consequential and non-financial loss. AFCA ordered $1,995 for ducting rectification and $1,219.79 for utilities used by the repairers, but found no non-financial or consequential loss payable.

The insurer must pay the quoted cost of the unresolved ducting defect and reimburse utilities its repairers used, while the policy and terms of reference exclude consequential and non-financial loss.

Issues

Subjects and remedies

home or building damagepay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 498039 Determination Page 1 of 4 Case number: 498039 6 June 2018 1 Overview 1.1 Dispute The applicant lodged a claim for damage to his home with the financial service provider (FSP), on 31 May 2016. The FSP accepted liability and completed repairs to the property. The applicant seeks:  compensation for consequential loss  compensation for non-financial loss  additional/rectification works to be carried out to the ducted heating unit. This matter has been the subject of a recommendation. The recommendation was substantially in favour of the FSP. A copy of the recommendation is attached. 1.2 Issues and key findings Has the FSP completed their repair obligations under the policy? The FSP are required to pay the applicant $1,995 to complete the repair and planning of the ducting. Is the FSP required to pay for the electricity and gas supplies? The applicant left the electricity and gas connected at the request of the FSP. The FSP’s repairers used these services and it is fair and reasona ble that the FSP reimburse the applicant for the usage. Is the applicant entitled to compensation for non-financial or consequential loss? The applicant is not entitled to consequential and non-financial loss. 1.3 Determination This determination is partially in favour of the applicant. Within 14 days of acceptance of this determination, by the applicant, the FSP is required to pay $1,995.00 for repairs to the ducting and $1219.79 for the electricity and gas usage. The FSP is not required to take any further action. Case No: 498039 Determination Page 2 of 4 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material supplied by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the Case Manager’s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the terms of reference or any law. I have attached the recommendation to this determination. 2.1 Have the FSP met their repair obligations under the policy ? The FSP have accepted this claim and have undertaken repairs to the applicant’s property. Subsequent to the completion of repairs the applicant advised the FSP that the ducting emitted a smell which has not been investigated by the FSP. The applicant has obtained a quotation from O to rectify the condition of the ducting in the sum of $1,995. In the circumstances it is fair and reasonable that the FSP reimburse the applicant for this sum. 2.2 Is the applicant entitled to be compensated for the cost of gas usage and electrical usage when they were absent from the premises? The FSP arranged and paid for the applicant to vacate the premises, whilst work was being carried out, and live in alternative accommodation. The applicant contacted the FSP and was informed any usage of gas or electricity in their absence would be reimbursed by the FSP. The repairers used the services to assist in drying and repairing the property and in these circumstances it is fair and reasonable that they are responsible for the usage charges for these services. The applicant has provided accounts to show that electricity and gas totalling $1219.79 was consumed in their absence. I determine that the FSP should refund this sum to the applicant. 2.3 Is the applicant entitled to compensation for non-financial or consequential loss? Policy excludes compensation for non-financial loss The policy excludes ‘compensation for distress, inconvenience or other non -financial loss, except if covered under liability cover’ and also ‘consequential loss’ . This Case No: 498039 Determination Page 3 of 4 exclusion is in respect of consequential loss or inconvenience which flows from the original loss. The applicant has claimed extra childcare expenses, which he says are as a result of having to vacate the property. I am not satisfied that the policy provides cover for this expense. FOS may award compensation in certain circumstances FOS may award an applicant for non-financial loss in certain limited situations. FOS may decide an FSP should compensate an applicant for such loss, only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation or interference with the applicant’s expectation or peace of mind. FOS takes a conservative approach to compensation for non-financial loss. It is unlikely to decide a substantial amount of monetary compensation that should be paid. The maximum amount that FOS may award is $3,000. FOS considers compensation should not be provided where an applicant suffers inconvenience that is a normal part of doing business. FOS expects an applicant to be moderately robust and bare the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to reduce inconvenience. The applicant seeks compensation for expenses which the family accrued as a result of delay in repair of the house, including pre and post school care for children for the period of time which he was not able to live in the house. The applicant also seeks compensation for delay in the completion of the repairs. The FSP denies that there was any unnecessary delay in the completion of the authorised repairs. The FSP further has stated that the requirement to undertake repairs at the front of the property prior to the repairs commencing was appropriate given the poor drainage at the front of the property which was continuing to contribute to high sub-floor moisture and mould levels. The applicant has obtained a report from O in relation to assessing the sub-floor ventilation of the existing dwelling. The report of 8 August 2016 said ‘ it can be stated that the existing sub-floor ventilation system satisfied the performance requirements Part 3.4.1 sub-floor ve ntilation of the current National Construction Code.’ The FSP obtained a report from I on 19 October 2016 which provided the following recommendations:  ‘install concrete paving to the front south east elevation of the dwelling  ensure paving is installed below the sub-floor vents in the wall and is graded away from the dwelling  surface water from this new pavement is to be directed into a new storm-water pit that is connected to the existing below ground storm-water drainage system on site  unblock all current sub-floor vents and provide new vents to the side of the timber decking to allow for cross ventilation as set out in the BCA Case No: 498039 Determination Page 4 of 4  engage a timber flooring specialist to confirm an appropriate acclimatisation period for the new timber flooring, taking into account the elevated moisture of the ground in the sub- floor.’ I find the report from I extensive and compelling and in view of this I do not determine that the period of time taken by the FSP to complete the repairs is excessive. The FSP required the work to be completed as specified by I, prior to the completion of the repairs. I find that this was a reasonable requirement. In view of this I do not find that the applicant is entitled to an award for compensation in these circumstances. Recommendation Case No: 498039 Recommendation Page 1 of 6 Case number: 498039 16 January 2018 3 Overview 3.1 Dispute The applicant has a claim with the financial services provider (FSP) for damage to his home. He says that some of the works have not been completed correctly and need to be rectified. The FSP required the applicant complete drainage works to the property before it commenced repairs for the internal damage due to their inability to guarantee the works. The applicant says that this is unfair as the drainage was already sufficient. The applicant also says that he has suffered a consequential financial loss and non- financial l oss due to the FSP’s repair process . 3.2 Issues and key findings Have the FSP met their repair obligations under the policy? The FSP have repaired the ducting, however it now emits a smell which has not been investigated by the FSP. The FSP are required to pay the applicant $1,950 in settlement of the required ducting repair as per the provided quote. Did the FSP act fairly in requiring the applicant to conduct drainage repairs before completing the claim works? The FSP’s builder would not guarantee the works d ue to drainage issues identified at the site. The FSP offered the applicant a cash settlement to complete the required repairs if he was unwilling to complete the recommended drainage works. As the applicant chose to complete these works, the FSP have acted fairly in this instance. Is the applicant entitled to compensation for non-financial or consequential loss? The policy specifically excludes cover for consequential and non-financial loss. Further the evidence shows that the delays in repair are due to the extent of the repair process, changes proposed by the applicant, and time taken to exchange relevant paperwork and decisions relating to the changes requested by the applicant. Due to this there is no basis for the award of non-financial loss compensation. The FSP have maintained an offer of $500 in settlement of the applicant’s losses , and it is fair that this offer be maintained. 3.3 Recommendation This recommendation is substantially in favour of the FSP. Case No: 498039 Recommendation Page 2 of 6 The FSP are required to settle the applicant for repairs to the ducting as per the supplied quote and provide the applicant a $500 payment for losses. Case No: 498039 Recommendation Page 3 of 6 4 Reasons for recommendation 4.1 Have the FSP met their repair obligations under the policy ? Report shows ducting requires repair The FSP’s initial scope ind icated that the ducting in the home required replacement to rectify the damage as a result of the insured event. During the repair process the FSP’s repairer deemed that the ducting could be repaired in parts and the remaining areas cleaned. The FSP repair ed and cleaned the ducting as per the repairer’s advice. Since the incident, the applicant has gathered a report which shows that the ducting is now producing a foul smell. The FSP offered to reinspect the property to engage repair on the ducting but have not contacted the applicant to arrange this repair. The applicant has provided a quote to repair the ducting and remove the smell. As this invoice is the only available quantification of the required repair, the FSP are required to reimburse the applicant the costs of the provided quote to remove the smell. 4.2 Did the FSP act fairly in requiring the applicant to conduct drainage repairs before completing the claim works? FSP repairer would not guarantee repairs without drainage works On inspection of the property, the repairer identified issues with drainage. After they engaged an engineer to report on this, the repairer advised that they could not guarantee works until the identified drainage issues were rectified. The applicant disputed this finding and engaged an engineer to report on the drainage. Applicant’s engineer found ventilation adequate The applicant’s engineer inspected the property and advised in his report that the ventilation on the property met the relevant standards The applicant put this report to the FSP for consideration. The FSP responded with an offer to cash settle the repair costs due to the repairer’s continued inability to guarantee repairs. The applicant rejected this offer and proceeded with the drainage works in order to allow the FSP repairer to proceed with the repairs. FSP acted fairly On this basis the FSP has acted fairly in the circumstances by presenting the applicant with the opportunity to engage his own repairer. The applicant had the opportunity to proceed on the basis of his own engineers report while still receiving settlement for the quoted damages. Case No: 498039 Recommendation Page 4 of 6 4.3 Is the applicant entitled to compensation for non-financial or consequential loss? Policy specifically excludes cover for non-financial or consequential loss The applicant seeks compensation for non-financial loss as a result of the time taken to complete repairs to the home. The applicant also seeks compensation for losses including power and water bills for the home while repairs were underway, and before and after school costs for his children during repairs, both costs incurred while the applicant was in temporary accommodation. The contract of insurance between the parties specifically excludes award for both non-financial and consequential loss. Under section 9.3(c) of the FOS terms of reference we are unable to provide compensation for consequential or non-financial loss where a contract of insurance specifically excludes such compensation. Delay in repair process not due to FSP error The claim and repair notes show that the repairs were actioned in a reasonable timeframe after the loss. The delays in repair completion were contributed to by the scope of the repair required, and the need to complete the drainage works by the applicant before work could begin. The applicant also requested changes to the repair works at their own cost. The changes and related correspondence and approval has further contributed to the delay in the repair process. On this basis I am satisfied that the actions of the FSP have not contributed to the delays in repair, and are not required to provide compensation for non-financial loss. It is noted however that the FSP have continued to offer the applicant $500 in compensation for losses claimed. As this offer has not been withdrawn, it is fair that the FSP pay the applicant $500 in this regard. Case No: 498039 Recommendation Page 5 of 6 5 Supporting information 5.1 Summarise the key references Record Key points Applicant ’s expert ( O ) Report 08 Aug 2016  Our commission was to carry out a visual inspection and to prepare a brief report on our findings. No destructive testing was commissioned or carried out.  To put all into perspective it can be stated that the existing subfloor ventilation system satisfies the performance requirements Part3.4.1 subfloor ventilation of the current National Construction Code. FSP’ s expert ( I ) Report 19 October 201 6  As part of our investigation this office engaged a geotechnical expert to carry out a footing exposure of the existing foundations, moisture tests and determine the site classification  Water ingress to the south - east side of the swelling sub - floor is a r esult of the combined effects of the natural slope of the property directing surface runoff towards the south - east elevation, coupled with the external pavement been poured across the sub - floor vents allowing surface wat er to enter the sub - floor.  Is there adequate sub - floor ventilation? No. The enclosed deck has prevented any cross ventilation.  Can timber floor finish be re - installed to the ground floor? Yes, provided: Works are finished to the front south - east elevation to prevent future surfac e water ingr ess to the sub - floor vents along the nort h - west elevation are un - blocked and vents are installed in the now currently enclosed deck  Recommendations Install concrete paving to the front south east elevation for the dwelling. Ensure paving is installed below the sub - floor vents in the wall and is graded way from the dwelling. Surface water from this new pavement is to be directed into a new storm - water pit that is connected to the existing below ground storm - water drainage system on site. Claim Notes Notes  New Assessment Details ***TECHNICAL SPECIALIST UPDATE*** ** Claim Progression – I have re attend 26th July meeting OI and [UB] onsite Sub Floor mould report was inconclusive due to saw dust covering mould but mould is present...The mould presence is not from the claim as little if no wat er from the leak passed through to the sub floor...A steep slope from the front gate to the front wall wit h no drainage and a complete lack of sub floor ventilation is the cause. This has been pointed out to the owner. Als o leak detection has reveal no leaks...It is suspected that water works in the street cause an interruption in water supply to the street and OI may have left a tap on...this is the most likely cause consistent with the damage seen...Water has clearly come from upstairs and through the down Case No: 498039 Recommendation Page 6 of 6 stairs ceiling REPAIRS ARE NOT ABLE TO BE CARRIED OUT BY [UB] UNTILL THESE ISSUES AND THE MOULD ARE DEALT WITH BY OI AT THEIR COST. A cash settlement to OI for $45,279.34 for scoped works (F&R) +allow to replace floor ti les to en suite as a tile has come loos e since initial inspection damage consistent with claim $2296.80 .... Total $47,576. 14 ** Recommendations ... wait OI response to recommended cash settlement offer (28/07/ 2016 02: 17 PM)  ***TECHNICAL SPECIALIST UPDATE *** ** Claim Progression ...OI has committed to improving the drainage to the front of the buildings **Recommendations. [UB] authorised as per scope of works based on OI completing the drainage upgrades ASAP (15/08/2016 11:04 AM) Home Insurance PDS  Page 46 What we don’t cover - compensation for distress, inconvenience or other non - financial loss, except if covered under liability cover - consequential financial loss - for example, loss of profits, except if covered under liability cover.