Home / Financial Firm (Unknown - Insurer) / Determination 497928

Determination 497928

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-09-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The applicant's home insurance claim for storm-related cracking and mould was denied as ground movement. AFCA upheld the denial but found the FSP unreasonably delayed the claim and ordered $2,000 non-financial loss.

Engineering evidence that the damage was caused by reactive soil movement and not a single storm or escape of liquid established the ground movement exclusion, while the FSP's unnecessary delay warranted compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 497928 Determination Page 1 of 8 Case number: 497928 17 August 2018 1 Overview 1.1 Dispute The applicant lodged a claim in May 2016 on his Home Insurance Policy held with the financial services provider (FSP) for storm related damage. Mould and other factors rendered the house unliveable and the FSP agreed to cover temporary accommodation whilst assessing the claim. The FSP later denied the claim, finding the damage was caused by ground movement, which is excluded under the policy. The applicant says that he has held insurance with the FSP for over 10 years and wants the FSP to accept his claim for damage to the property. He says he was instructed to take up a lease agreement for a rental property. He also notes significant delays with the processing of his claim. 1.2 Issues and key findings Has the applicant have a valid claim under the policy? The applicant has not established that the damage was caused by an insured event. I am not satisfied the applicant has established that the damage was either storm damage or caused by the escape of liquid under the terms of the policy. Is the FSP entitled to refuse payment of the claim? The FSP can refuse payment of the claim as the applicant has not established a valid claim. Further, the FSP has established that most likely the damage was caused by ground movement which is excluded from cover under the policy. Is the applicant entitled to compensation for non-financial loss? The FSP unreasonably delayed the processing of the claim and in the circumstances, the FSP should pay the applicant $2,000 compensation by way of non-financial loss. 1.3 Determination This determination is substantially in favour of the FSP. The FSP is entitled to refuse payment of the applicant’s claim in accordance with the terms and conditions of the policy. The FSP must pay the applicant $2,000 by way of compensation for non-financial loss, pursuant to paragraph 9.3 of the Terms of Reference. Case No: 497928 Determination Page 2 of 8 2 Reasons for determination 2.1 Has the applicant established a valid claim under the terms of the policy? Applicant bears onus to show loss falls within coverage of policy The applicant’s policy is an insured events policy that provides cover for a number of listed events, including loss or damage caused by storm and escape of liquid. ‘Storm’ is defined as ‘ a storm, cyclone or severe atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. ’ ‘Escape of liquid’ is defined as loss or damage caused by liquid leaking, overflowing or bursting from an y of the following, including ‘ any drain, fixed pipes, roof gutters or guttering and rainwater downpip es, drainage and sewage systems’ and ‘ water main, fi re hydrant or water supply pipe’. The applicant claims to have noticed extensive cracking to the exte rnal brick walls and corresponding internal plaster walls of his home as well as mould damage which he attributes to heavy rain and recent storms in the area. The applicant did not provide any information to FOS to show the cracking to the home was caused by storm. Damage was most likely not caused by storm or escape of liquid The FSP appointed an assessor to inspect the applicant’s property. According to the assessor’s report, the applicant claims to have notice d that hairline cracks around the home had opened up after recent heavy rains. The applicant considered the heavy rain had caused the concrete stumps to move, opening the cracks all around the house. The FSP had an engineer (E) examine the property. E concluded that the home had moved and cracked throughout its life due to volumetric fluctuations in the reactive clay foundation soil as a result of moisture variations caused by seasonal and environmental factors. Whilst E acknowledged the applicant’s view that dam age to the home had been contributed to by recent rainfall events, he noted that there had been many more significant rainfall events over the life of the home. He did not consider the loss or damage was caused by a single rainfall event. No other evidence has been provided by the applicant to dispute these findings. The applicant did not respond to requests by FOS for information in relation to the damage, nor did the applicant attend a scheduled telephone conciliation conference to help clarify the issues in dispute. No information has been provided by the applicant in response to the engineer ’ s or plumber ’ s reports provided by the FSP. In the circumstances, I am not satisfied the applicant has established a valid claim within the terms of the policy. Case No: 497928 Determination Page 3 of 8 2.2 Is the FSP entitled to refuse payment of the claim? The FSP also relies upon exclusions contained in the policy to refuse payment of the claim. The policy provides a general exclusion for loss or damage caused by ground movement and a specific exclusion related to storm damage. Plumber’s report identifies leaking pipes The leak report obtained by the FSP from plumber P dated 6 September 2016 notes ‘a leaking water main and blocked stormwater and bathroom drains that were causing some leaks’. The leak report obtained from plumber J dated 17 July 2017 found broken sewer drains and blocked stormwater drains. I accept that if the damage could be associated with water leaking or overflowing from the drains or sewerage systems, then this would fall within the insured event of escape of liquid. The FSP’s first plumber (P) found a blocked and overflowing bathroom drain towards the rear of the property. E had said that the [2016] level survey had shown some elevated levels in the vicinity of this area, which could demonstrate that the leak had caused heaving. T he FSP’s second plumber (J) found a damaged/defective drain in the vicinity of the bathroom, and the 2017 level survey showed heave on the south side. I note from the level surveys that the greatest difference in movement was to the south- eastern corner of the property. J’s plumbing report does not show any pipe leaks in the south-east corner of the property. E observed some compression in previously repaired wall cracks, and noted that a pipe leak could be contributing to the some of the observed compression damage. Compression was observed in the lounge (north) and bedroom 3 (south). Importantly, I note that the lounge is located on the right of the north side of the property, and J’s report found a damaged/defective drain along this side. However, both the 2016 and 2017 level surveys found settlement on the right north side of the property, rather than an expected finding of heave. Engineer reports show cracking caused by ground movement due to moisture variations in soil The FSP has provided three reports from its engineer E and in addition, E has provided a response to enquiries made by the Service. E concluded that on completing a level survey, there was no consistent pattern of localised heave in the vicinity of the pipe leaks. The survey showed a general pattern of settlement resulting from drying shrinkage of the foundation soils. E confirmed that mould and water damage was the direct result of the roof gutters not being adequately maintained. Case No: 497928 Determination Page 4 of 8 I accept the engineer ’ s findings that the cracking and water damage to the property is not consistent with a single storm or escape of liquid event. I also accept the findings that the building had been subject to long term differential footing movement, as evidenced by previous restumping, relevelling work, vegetation growth within some perimeter wall cracks and dirt and silt deposits within some cracks. Based on the available information, the FSP has established relevant exclusions relating to ground movement. I accept that most likely the damage was caused by earth movement. I am not satisfied that the evidence is sufficient to establish that that damage occurred within 72 hours of a storm and therefore I am not satisfied that the loss or damage was covered under the insured event of storm. I am satisfied in the circumstances that the FSP is entitled to refuse payment of the claim and the FSP is not liable to meet the applicant’s claim for temporary accommodation. 2.3 Is the applicant entitled to compensation for non-financial loss? The FSP has acknowledged unnecessary delay in processing claim FOS has the power to award compensation of up to $3,000 for non-financial loss, which includes claims for stress or inconvenience caused by the unnecessary delay in the processing of a claim by the FSP. We will only award compensation for non- financial loss if there has been an unusual degree or extent of inconvenience and significant stress. The applicant said that he was instructed it would take 8-10 months to process his claim, however after a year and 4 months, the FSP denied the claim. The applicant lodged the claim on 23 May 2016 and the FSP initially denied the claim on 13 September 2017. I note that 6 months of this timeframe can be accounted for due to the recommendation of E, who recommended in its 2 nd report that the property be re- inspected for heave 6 months after the completion of repairs to pipe leaks. The FSP has also acknowledged that the timeframe taken to make a decision on this claim was not acceptable or consistent with its normal procedures, and noted that its claims manager had failed to take appropriate steps to move the claim forward, resulting in unnecessary delay. The FSP noted it was open to considering compensation for non-financial loss regarding time taken and inconvenience of being placed in and now ceasing temporary accommodation, although it argued that the applicant had not incurred any financial prejudice in relation to the timeframe in which the FSP had made its decision. The applicant did not present any further evidence to FOS in relation to delays experienced. It also appears that the applicant did not suffer prejudice. This is because his home is not fit to live in, and therefore he would have had to move out to another property anyway, regardless of whether or not it was reimbursed by the FSP. Case No: 497928 Determination Page 5 of 8 I accept however that the applicant has been inconvenienced by the extended delay. I consider it fair that the FSP compensate the applicant $2,000 for the delays and inconvenience experienced as a result of placing the applicant in, and then ceasing, the temporary rental accommodation. Case No: 497928 Determination Page 6 of 8 3 Supporting information 3.1 Policy documents Product Disclosure Statement Record Provision Product Disclosure Statement (PDS) 19 October 2012 Pages 18 - 23 What you are covered for - Insured events Storm We cover Loss or damage caused by a storm. We do not cover  loss or damage caus ed by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we wil l cover loss or damage caused by a landslide or subsidence that occurs within 72 hours of, and directly because of, a storm and not because of erosion over time, structural fault or design fault; Escape of liquid We cover Loss or damage caused by liquid l eaking, overflowing or bursting from any of the following:  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  water main, fire hydrant or water supply pipe; Page 74 Storm means a storm, cyclone or se vere atmospheric disturbance. It can be accompanied by strong winds, rain, lightning, hail, snow or dust. Page 73 Incident or event means a single event, accident or occurrence which you did not intend or expect to happen. Page s 50 - 53 General exclusions (cont.) You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  ‘Storm’ (see page 20); Roots of tre e s, shrubs and plants the roots of trees, shrubs or plants, but we will cover damage to your home and cont ents caused by:  liquid leaking or overflowing from pipes or drains that are blocked or damaged by these roots to the extent it is covered under insu red event ‘Escape of liquid’ (see page 23) … Pages 27 - 33 Additional features Temporary accommodation when you have home cover We cover Case No: 497928 Determination Page 7 of 8 When an ins ured event damages your home to the extent you cannot live there, and we agree, we will pay for your reas ona ble temporary accommodation costs for the time it will take to repair or rebuild you r home to a liveable condition… Storage of undamaged contents We cover If you make a claim for loss or damage to your contents due to an insured event and we agree that the undamaged contents cannot be kept at the insured address, we will also pay the reasonable cost to store the undamaged contents until the contents can be kept at the insured address … 3.2 Expert evidence Engineering and plumbing reports Record Key points E ’s 1 st report 01 - 07 - 2016 (FSP’s expert) Date of inspection: 15 - 06 - 2016  Provided the 2016 brick level survey, which showed a generalised pattern of settlement (associated with drying/shrinkage of foundation soils), especially towards the northern end  Found that the house footings were located within the ‘zone of influence’ of some trees located at the northern side that had been removed in 2012, which may have caused shrinkage and thus settlement of the foundation soils  Observed an absenc e of impervious pavi ng and areas of poor surface water drainage  Observed some compression in previously repaired wall cracks  Recommended plumbing report  Concluded that ‘the home has moved and cracked throughout its life due to volumetric fluctuations in the reactive clay foun dation soil beneath the home as a result of moisture variations caused by seasonal and environmental factors’. P’s leak report 06 - 09 - 2016 Date of inspection: 06 - 09 - 2016  Noted leak on water mains.  Noted that storm water was blocked in some areas.  Noted th at one of the drains from the bathroom was blocked and overflowing. E’s 2 nd report 06 - 10 - 2016  Noted that plumber A had suspected a leak at the property, as a pressure loss was detected. However, the plumbing report did not indicate the exact location of the piper leak(s).  Recommended engaging a plumber to det ermine exact location of water supply pipe leak(s).  Noted that the plumbing report also indicated several blockages in the storm water system, however it had not indicated the loc ation of these.  Noted one of the drains from the bathroom was blocked and overflowing towards the rear of the property, and that the level survey showed some elevated levels in the vicinity of this area. Not ed that the heave could be due to the pipe leak, or due to long term d ifferential footing movement.  Recommended that the property be re - inspected in 6 months’ time, following repair works to the pipe leaks. Noted that they would expect some reversal of any leak - induced heave. Case No: 497928 Determination Page 8 of 8 E’s 3 rd report (comprising also J’s leak report) 07 - 08 - 2017 Date of inspection: 11 - 07 - 2017  Noted that some shrubs located adjacent to the SW corner and along the southern side of the house had been removed since the last inspection.  Provided the 2017 level survey, overlayed onto the 2016 level survey  No ted that the 2017 survey did not show a significant variation compared to the 2016 survey, although an upward movement was obs erved in some areas.  Provided J’s sketch plan of the location of the pipe leaks.  Noted that the foundation soils in the vicinity o f the site were classified as H2 in accordance with AS 2870 – Residential Slabs and Footings, and include reactive clay horizons, which will expand if their moisture content increases, and shrink if their moisture content reduces.  Noted that building was h ighly susceptible to ground movement due to several trees of the property, no impervious paving around the house, and poor storm water disposal and surface drainage.  Noted the building was in poor condition.  Noted the pot ential impact of the trees that had been removed in 2012.  Noted that the level survey did not identify a pattern of localized heave in the vicinity of the discovered pipe leaks.  Noted that water ingress to the SW corner had primarily occurred due to overflowing gutters, as a result of settl ement caused by tree drying influences, and the inadequate maintenance of the roof gutter and storm water drainage systems. J’s leak report 18 - 07 - 2017 Date of inspection: 17 - 07 - 2017  Found broken sewer drains  Found blocked storm water drains E’s response to FOS’s additional information request 21 - 03 - 2018  Provided research source for soil foundation footings  Provided locations of compression damage  Clarified why the 2016 level survey showed no points of heave but had been described to show elevated levels (pot entially due to footing movement reversal)  Noted that the cause of the heave to the S and E sides could be due to poor surface drainage, no impervious paving and rainfall/roof gutter overflow during winter of 2017. Noted that the plumbing report did no t show any pipe leaks in the SE corner, so pipe leak age was not a cont ributor to movement in that location.  Provided a floor plan.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.