Determination 497913

Storm damage claims: cash settlement and remaining amounts disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2018-02-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$183,205
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

Following two storm damage claims, the FSP sought to cash settle the remaining obligations because repairs could not continue. AFCA accepted cash settlement, ordered payments totalling $183,205.21 for the 2012 and 2015 claims plus three months temporary accommodation, interest, and $3,000 non-financial loss.

An insurer that has elected to repair may cash settle where performance is no longer possible; the panel found the builder relationship had broken down and non-claim defects had to be fixed first.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 497913 Determination Page 1 of 7 Case number: 497913 9 February 2018 1 Overview 1.1 Dispute This dispute concerns two separate claims (2012 and 2015) lodged by the applicant with the financial services provider (FSP). In both claims, a tree fell and damaged the applicant’s property. The FSP accepted both claims and authorised repairs to the property. For both claims, the applicant raises concerns regarding the quality of repairs. Ultimately, repairs have not yet been completed, due to ongoing disagreements about the scope of works, the method of settlement and a breakdown in the relationship between the builder and the applicant. To finalise the claims, the FSP seeks to cash settle the applicant for what it says is its remaining liability for the 2015 claim. The applicant disputes the cash settlement figure offered and would prefer the FSP to complete the repairs with a different builder. 1.2 Issues and key findings Is the FSP entitled to cash settle the claims? In the circumstances of these claims and this dispute, the FSP is entitled to cash settle the two claims. What is the FSP’s liability for the remainder of the 2012 claim? The FSP is required to pay the applicant the total amount of $48,764 for the building and contents in respect to the 2012 claim, in accordance with the terms of this determination. What is the FSP’s liability for the remainder of the 2015 claim? The FSP is to pay the applicant the sum of $134,441.21 in accordance with the terms of this determination. The FSP is to pay interest on this amount, in accordance with the Insurance Contracts Act 1984 (the Act), from 20 July 2017, until the date the amount is paid. Temporary accommodation The FSP is required to pay the applicant an additional amount representing three months temporary accommodation. Case No: 497913 Determination Page 2 of 7 Is the FSP required to pay the applicant compensation? The FSP is required to pay the applicant the amount of $3,000 compensation, in accordance with the terms of this determination. 1.3 Determination This determination is partially in favour of the applicant. The FSP is required to meet the applicant’s claims under the terms of the policy and in accordance with this determination. The FSP is entitled to deny all other claims. Case No: 497913 Determination Page 3 of 7 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise from the material exchanged. This determination is made by a Panel consisting of the Panel Chair Ombudsman, a representative with extensive experience in the insurance industry and a representative with extensive experience in consumer claims. Whilst all of the information exchanged has been considered, only that information relevant to the final outcome will be referred to within this determination. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, pri or determinations. 2.1 Is the FSP entitled to cash settle the claim? An insurer is generally bound by election to repair Under the terms of the policy, the FSP may settle a claim for damage to the applicant’s home or contents caused by an insured event by:  arranging for repairers, builders or suppliers to repair or rebuild the home; or  paying the insured the reasonable cost to repair or rebuild the home; or  paying the building sum insured. It is clear from the terms of the policy, the FSP has the discretion to decide which settlement method to adopt. However, the Service expects an insurer to act reasonably in exercising its discretion, having regard to the circumstances of the claim. Once an insurer makes an election to repair the insured property (rather than to cash settle the policy holder for the cost of the repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. However, the Panel accepts that particular circumstances may arise which make the conduct of repairs by an insurer untenable. In such cases, it is reasonable for the insurer to seek to settle the claim by way of a cash settlement. The FSP must demonstrate performance is no longer possible The FSP says that due to the applicant’s actions over a long peri od of time, it cannot guarantee the builder (PP), a safe, uncluttered and unthreatening worksite. Specifically the FSP:  says the applicant continuously tried to inflate the agreed scope of works with items which were not covered by the policy and was threa tening and condescending towards PP  expressed concerns regarding constructions of parts of the property without the proper council approvals and structural integrity issues of the site. Case No: 497913 Determination Page 4 of 7 The FSP says that these issues make cash settling the remaining repairs appropriate, so the applicant can decide what is best for her in the circumstances. The FSP also says cash settling appropriate due to non-claim related issues When repairs commenced in March 2016, the FSP noted termite damage and non- compliant construction of the property. The FSP was first concerned renovations previously carried out at the property (23 years prior) were carried out without a relevant permit and possibly by an unregistered builder. The applicant was able to provide copies of relevant plans and permits from the local council. A building consultant (instructed by PP) issued a building defect notice relating to the front of the applicant’s property, finding the build of the property was not to the relevant building codes. This prevented repairs to the front of the property from continuing. In response, the applicant instructed her own engineer (JGA) to comment on the issues in the building defect notice. JGA did not identify any structural issues which would prevent repairs occurring but did observe substantial termite damage to the east wall stud. The Panel is satisfied that this is not claim related and the applicant must address it before the insurance work can continue. The FSP then obtained two reports from its own engineer (CS), who identified:  moisture and mould issues in the property are not claim related  the entire timber stud wall frame to the eastern side of the master bedroom must be removed and replaced (as well as the adjacent door). The Panel accepts that these two issues do not relate to either claim and so the applicant must remedy both before repairs can continue. The relationship between the parties The Panel has reviewed the available material and accepts that the relationship between PP and the applicant has broken down. As stated, the applicant says that she does not wish PP to continue as the builder and the FSP says that because of the applicant’s actions, it cannot guarantee PP a safe, uncluttered and unthreatening worksite. Having reviewed all of the exchanged material, the Panel is satisfied that any ongoing relationship between the applicant and PP, or any other builder engaged by the FSP, would be fraught with difficulty. In the circumstances of these claims and this dispute, the Panel is satisfied that it is appropriate that the FSP cash settle for its remaining obligations under the two claims, in accordance with the terms of the policy. Case No: 497913 Determination Page 5 of 7 2.2 What is the FSP’s liability for the remainder of the 2012 claim? The applicant has made a claim for a number of items she says are outstanding in respect to the 2012 claim. The shed Having reviewed all of the exchanged material, the Panel accepts the FSP’s position that the material provided by the applicant in respect to the initial 2012 claim, did not include damage to the shed. On this basis, the Panel is satisfied that the FSP is entitled to deny this aspect of the applicant’s claim. Powerlines The Panel accepts that the expense claimed by the applicant in relation to the powerlines is covered under the 2012 claim and notes the quotation dated 3 July 2013, in the amount of $14,456.20. The quotation is clearly out of date and in an effort to bring this matter to a final conclusion, the Panel is satisfied it would be fair for the FSP to pay the applicant an amount of $18,000, in respect to this item. Interest is not payable in respect to this item. Plumbing invoice, broken glass and removal fees It is accepted insurance law that the insured carries the onus to establish the loss for which she claims. On the basis of the exchanged material, the Panel is not satisfied that the applicant has presented sufficient evidence to establish her claim in respect to these items. The FSP is entitled to deny the claim insofar as it relates to these items. Fixtures and fittings The applicant has claimed for fixtures and fittings in the amount of $1,539, based on what she says is an invoice from (F), which the applicant says the FSP asked her to pay and which have not been reimbursed. The applicant is to provide the FSP with a copy of the receipt for payment made in the amount of $1,539 within 30 days of accepting the determination and the FSP is then to reimburse the applicant for this amount, if it has not already done so. Interest is not payable on this amount. Roof replacement On the basis of the exchanged material, the Panel is not satisfied that the roof requires replacement. Case No: 497913 Determination Page 6 of 7 Further, the Panel is satisfied that the roof repairs are already provided for within the cash settlement offer made by the FSP. The FSP is not required to pay an additional amount in respect to this item. Contents The Case Manager of the Service has kept records of a phone conversation held with the applicant on 21 December 2017. Within the records, it confirms that the applicant has accepted the FSP’s offer for contents in the amount of $29,225. The FSP should pay to the applicant, if it has not already done so, the amount of $29,225 for the contents. Interest is not payable on this amount. Driveway On the basis of the exchanged material, the Panel is not satisfied the applicant has provided sufficient evidence to establish the FSP is responsible for the damage to the driveway as claimed by the applicant. The FSP is entitled t o deny this aspect of the applicant’s claim. Upon acceptance of this determination by the applicant, the FSP is to pay the applicant the amount of $48,764 (which includes an amount of $29,225 for contents, which may already have been paid by the FSP) to fi nalise the FSP’s obligations to the applicant under the 2012 claim. The FSP is entitled to deny the balance of the applicant’s 2012 claim. 2.3 What is the FSP’s liability for the remainder of the 2015 claim? The Panel notes that the Certificate of Insurance co nfirms that sum insured for the buildings is $224,625. The exchanged material confirms the FSP has already completed work in the amount of $90,183.79. On the basis of the exchanged material, the Panel is satisfied that given the amount of work that remains to be completed and any allowance which must be made by the FSP for a cash settlement, the balance of the FSP’s obligation to the applicant is likely to exceed the sum insured. In those circumstances, the Panel is satisfied that the FSP is entitled to finalise its obligations to the applicant in respect to the building aspect of the 2015 claim, by payment to the applicant of the sum of $134,441.21, being the difference between the cost of repairs already completed and the sum insured. Upon acceptance of the determination by the applicant, the FSP is to pay the applicant the sum of $134,441.21. The FSP is to pay interest on this amount, in accordance with the Act, from the date of the IDR letter, 20 July 2017, to the date the amount is paid. Case No: 497913 Determination Page 7 of 7 Payment of this amount finalises the FSP’s obligations to the applicant under the terms of the policy and in respect to the 2015 claim. Within 30 days of the acceptance of the determination, the applicant is to provide access to PP and SP (FSP surveyor) for them to document the works completed and finalise their building permit. 2.4 Temporary accommodation The exchanged material confirms that the FSP has paid and continues to pay the applicant in respect to temporary accommodation. The Panel understands that the FSP’s obligations in respect to temporary accommodation under the policy concludes on 18 February 2018. Noting that there is work still to be completed at the property, the Panel is satisfied that it is fair in all the circumstances that upon acceptance of this determination by the applicant, the FSP is to pay the applicant an additional amount representing three months temporary accommodation. Interest is not payable on this amount. 2.5 Is the FSP required to pay the applicant compensation? The Terms of Reference of the Service provide: 9.3 Other compensation . . . b) Subject to paragraph 9.3 c) and paragraph 9.7, FOS may decide that the Financial Services Provider compensate the Applicant for non -financial loss but only where: (i) an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the Applicant’s expectation of enjoyment or peace of mind has occurred; or . . . The maximum amount of compensation for non-financial loss will be $3,000 per claim made in the Dispute. . . . Having reviewed all of the exchanged material, the Panel is satisfied the FSP did take a long time to address issues at the outset of the claims and this was significant given the number of family members involved within the applicant’s situ ation. In the circumstances, the Panel is satisfied that it is fair that the FSP pay the applicant the additional amount of $3,000 for non-financial loss compensation. Interest is not payable on this amount. The FSP is entitled to deny the balance of the applicant’s claims.