Claim declined for ceiling collapse not caused by an insured event
Summary
An individual's home insurance claim for collapsed ceilings was declined because the policy is a defined events policy and no storm or other insured event was shown. AFCA accepted expert evidence that adhesive failure caused the damage and ordered nothing.
Under a defined events policy the applicant must first establish a prima facie claim that an listed insured event caused the loss, and that was not shown.
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination
Case No: 497466 Determination Page 1 of 3
Case number: 497466 7 February 2018
1 Overview
1.1 Dispute
The applicant holds a home building and contents policy with the financial services
provider (FSP) covering his home address.
On 26 July 2016, a claim was lodged under the policy after the applicant returned
home and found ceilings in the entry way and games room had collapsed. The
applicant believed this was as a result of storms in the days beforehand.
After considering the claim, the FSP declined it on the basis the loss had not arisen
as a result of any insured event covered by the policy.
1.2 Issue and key findings
Was the FSP entitled to decline the claim?
The FSP was entitled to decline the claim because:
the policy is a defined events policy, which only covers loss or damage from an
insured event
the damage did not arise as a result of an insured event.
1.3 Determination
This determination is in favour of the FSP.
The FSP was entitled to decline the claim and is not required to take any further
action.
Case No: 497466 Determination Page 2 of 3
2 Reasons for determination
2.1 Was the FSP entitled to decline the claim?
Applicant has the onus to establish a prima facie claim
It is established insurance law the applicant carries the initial onus to show that the
terms and conditions of the relevant insurance policy covers the loss. This is known
as a prima facie claim.
Once the applicant establishes a prima facie claim, the onus then shifts to the FSP to
demonstrate the loss is not covered, either by way of one of the policy exclusions or
on some other basis.
The FSP’s policy is a defined events policy. Therefore, the policy only responds
where an incident caused by one or more of the listed events results in loss or
damage, subject to any exclusions. Two of the listed events are storm, rain or flood
and water or other liquid.
No evidence of storm
The insured event of storm is defined as violent weather and high winds, sometimes
accompanied by rain, hail or snow including a cyclone or tornado .
Accordingly, for the applicant to establish a valid claim under this event, he is
required to show one or more of the above weather phenomena occurred.
Weather data provided by the FSP from the Bureau of Meteorology shows no
evidence of storm as defined recorded at the closest weather station to the applicant.
There is no suggestion that rain entered the ceiling or roof cavity to cause the
damage. Wind data shows the maximum speed of wind gust in the days before the
loss was 59kph, which is insufficient to cause structural damage to homes, according
to the Beaufort wind scale.
Therefore, there is insufficient evidence to show a storm, as defined, occurred.
For the sake of completeness I have considered whether the insured event of water
or other liquid has any application in the circumstances. However, there is no sign of
any water damage to the property. Therefore, this event will not be triggered.
Expert evidence shows damage caused by failure of fixings
The FSP appointed building firm "PI" to inspect the property and comment on the
cause of the loss. PI considered the cause of the ceiling collapse was due to a
building fault, where the glue holding the ceiling in place has not adhered as
intended. The roof was inspected which was in good condition, as was the guttering
and drainage. No signs of water ingress were visible, eliminating this as a cause of
the loss.
The FSP also appointed engineering firm “IC” to ins pect the property. IC considered
the cause of the failure was not due to storm or any wind event. Rather, the ceilings
Case No: 497466 Determination Page 3 of 3
had collapsed due to the failure of the adhesive. IC considered this most likely due to
incorrect application of the fixings (nails and/or adhesive).
I accept both PI and IC are suitably qualified and experienced to comment in this
matter. In the absence of any contradictory information, the FSP is entitled to rely on
their findings.
Applicant has not presented any expert evidence
The applicant was invited to provide information in support of his position that the
property suffered storm damage, such as a report from a suitably qualified person.
However, he did not do so. He maintains that because the FSP is alleging glue or
fixing failure then the FSP must show this by way of chemical tests of the glue.
However, there is no onus on the FSP to do so. It is not required to definitively
determine what the cause of the loss was in the absence of a prima facie claim being
established.
Accordingly, the FSP's evidence is unchallenged.
No valid claim established
In the absence of conflicting information, I accept the FSP is entitled to rely on the
expert findings from PI and IC that the damage arose as a result of the failure of the
ceiling fixtures, rather than a storm or any other event which would be covered by the
policy.
Therefore, I do not accept the applicant has discharged the onus on him to establish
the policy responds to the loss. On this basis, the FSP was entitled to decline the
claim.
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to the Service. However, commentary in
this determination is restricted only to those issues considered relevant to the
outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.