Text of the determination
Determination
Case No: 497389 Determination Page 1 of 13
Case number: 497389 22 August 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his landlord insurance policy with the financial
services provider (FSP) for cracking and movement damage to his tenanted property,
caused by a leaking pipe.
The FSP initially accepted the claim and offered to cash settle the applicant for
$12,349.92, being the estimated cost of repairs based on a quotation provided by its
builder (AJ).
The applicant disputed the settlement amount as his builders had quoted
approximately $30,000 for the repairs. After carrying out a further review, the FSP
changed its position and denied the applicant’s claim in its entirety.
The FSP says it is entitled to deny the claim because the leak commenced before the
policy was incepted in March 2016. The FSP also says the cracking and movement
damage was caused by factors which are excluded under the policy (such as faulty
workmanship and/or earth movement).
1.2 Issues and key findings
Is the FSP liable for the damage to the property?
The applicants have established a prima facie claim for damage caused by the
escape of water from the cracked shower waste pipe.
The FSP has not shown that, on the balance of probabilities, the leak commenced
before the policy was incepted or the cracking and movement damage was caused
by anything other than the insured event.
Accordingly, the FSP is liable for the damage to the property.
How should this dispute be settled?
Given the history of long-term differential movement at the property, it is reasonable
that the claim be cash settled. The FSP is required to cash settle the claim for
$35,208, reflecting the estimated cost of repairing the damage caused by the water
leak.
Case No: 497389 Determination Page 2 of 13
1.3 Determination
This determination is substantially in favour of the applicant.
The FSP is to pay the applicant the amount of $35,208 in full and final settlement of
the claim. The FSP is not required to pay interest on this amount.
Case No: 497389 Determination Page 3 of 13
2 Reasons for determination
2.1 Is the FSP liable for the damage to the property?
Policy provides cover for escape of liquid subject to exclusions
The applicant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie (or valid) claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The applicant’s policy provides cover for damage caused by the insured events listed
in the policy, subject to the conditions and exclusions set out in the policy.
The insured events include the accidental escape of liquid from a fixed pipe.
However, cover is only provided for an insured event which occurs during the policy
period.
The policy contains general exclusions for damage caused by:
defects in design, structure, materials, workmanship or construction
failure to keep the property well maintained and structurally sound
earth or soil movement (including landslide, subsidence or erosion), and
settling, shrinkage and expansion.
Applicant has established a valid ( prima facie ) claim
The applicant incepted his policy with the FSP on 15 March 2016. He had previously
insured the property with another insurer but transferred his cover to the FSP when
he refinanced his loan with its related bank.
The applicant lodged the claim on 26 February 2017, after becoming aware of
significant cracking and movement damage to the property. The applicant advised
that the damage had been caused by a leaking pipe.
The plumber (TL) engaged by the FSP confirmed that water from a broken shower
waste pipe was leaking into the earth under the sub-floor.
The FSP’s builder (AJ) observed a large leak when the shower was turned on. He
considered that, as the ground under the rear section of the house was saturated , the
leak had been occurring for some time . AJ confirmed there was significant cracking
and movement damage to the property.
The FSP appointed an engineer (XP) to attend the property and determine the cause
of the cracking and movement damage.
In his report dated 21 April 2017, XP advised that:
the leak from the shower waste pipe had caused saturation of the sub-floor soil,
extending under the main living areas
Case No: 497389 Determination Page 4 of 13
the leaking water had caused swelling of the reactive clay soils resulting in
cracking throughout the building
while there was some pre-existing cracking to the walls, most of the cracking
was new (or the reopening of existing cracks), and
most of the recent movement to the building was related to the leak.
The applicant became aware of the cracking and movement damage to the property
during the policy period, after being advised of the damage by his tenants . The FSP’s
engineer (XP) confirmed that the bulk of the damage was recent and had been
caused by the leaking pipe.
On this basis, I am satisfied that the applicant has established a prima facie claim
under the policy for damage caused by the accidental escape of liquid from a leaking
pipe.
FSP relies on multiple grounds to deny the claim
As the applicant has established a prima facie claim, the FSP bears the onus of
showing that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
During the course of this dispute, the FSP has identified several alte rnative grounds
on which it seeks to rely, in order to deny the applicant’s claim (in its entirety).
Among other things, the FSP says that:
a significant proportion of the damage was caused by naturally occurring earth
movement (and therefore the exclusion for earth movement applies)
the leak from the broken shower waste pipe commenced before the inception of
the policy in March 2016 (and therefore the resulting damage is not subject to
cover)
the damage to the shower waste pipe occurred as a result of previous re-
levelling of the property being carried out incorrectly (and therefore the
exclusion for faulty workmanship applies), and
it has been prejudic ed by the applicant’s delay in repairing the shower waste,
which has contributed to the additional damage that occurred.
FSP has not shown bulk of damage was caused by earth movement
In order to be entitled to rely on the relevant policy exclusion, the FSP must show
that earth movement was the proximate cause of the damage (that is, the real,
effective, or dominant cause).
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances.
If there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active cause that
set the relevant train of events in motion.
The available information establishes that the applicant’s property had a history of
long-term differential movement . The FSP’s engineer (XP) noted that such
Case No: 497389 Determination Page 5 of 13
movement was typical of properties founded on reactive clay foundation soils (which
react to seasonal variations in moisture conditions).
The r eports and photographs provided by the FSP’s contractors confirm there were
cracks in the external brickwork which had previously been repaired, i ndicating a
history of differential movement.
Re-levelling works had also been undertaken by a previous owner to address
movement issues, as shown by the significant amount of packing visible between the
stumps and the bearers.
However, the applicant says that significant cracking and movement damage to the
property did not become apparent until early 2017.
The applicant’s position is consistent with the inspection report prepared by the
property manager in February 2017. The reports states that the tenants had advised
that significant damage had occurred since the previous Christmas.
As outlined above, i n his initial report, the FSP’s engineer (XP) clearly identified the
bulk of the damage to the property as having been caused by the water leak. He
noted that, given the reactive nature of the soils, any leaks can have a significant
effect.
While XP noted evidence of prior cracking and movement damage, he concluded
that most of the current damage was recent and was directly related to the leak. XP
prepared a scope of works for the repair of the damage caused by the water leak.
The FSP says that much of the damage to the building occurred outside the ‘zone of
influence’ and therefore cannot have been caused by the leaki ng pipe. However, this
appears to contradict the findings in XP’s original report.
Based on XP’s conclusions following his inspection , I am satisfied that the bulk of the
cracking and movement damage was caused by the leaking shower waste pipe (and
not by long-term differential earth movement).
The FSP also notes that the property continued to suffer cracking and movement
damage after the pipe was repaired (which suggests that the damage was not
caused by the leaking pipe).
However, XP advised that further damage following was to be expected (at least for a
six month period following repairs), as the moisture levels in the previously saturated
foundation soils returned to equilibrium.
For the reasons outlined above, I am satisfied that the leaking pipe is the proximate
cause of the loss. The effects of the leaking water triggered the earth movement that
subsequently occurred.
Accordingly, the FSP is unable to rely on the policy exclusion for damage caused by
earth movement to deny the applicant’s claim .
Case No: 497389 Determination Page 6 of 13
There is conflicting information about when the leak commenced
The FSP says it is entitled to deny the claim on the basis that the leak from the
shower waste pipe commenced before the applicant incepted the policy in March
2016.
As noted above, w hen the FSP’s builder (AJ) atte nded the property in March 2017,
he reported that water appeared to have been leaking for some time, as a large area
of the soil under the building was saturated.
The FSP’s engineer (XP) also noted ‘evidence of long - term leakage’ during his
inspection in April 2017 (namely, efflorescence on the lower section of the external
brickwork in the bathroom area).
T he FSP initially accepted the applicant’s claim based on the report and scope of
works prepared by XP following his inspection.
However, after the app licant disputed the cash settlement, the FSP’s internal building
consultant (AS) reviewed the claim and sought further information to confirm when
the leak had commenced.
In response AS’s enquiries, the FSP’s plumber (TL) advised that, due to the large
amount of water under the house, he considered the leak had been occurring for at
least 18 months. TL noted that the waste pipe only leaked when the shower was in
use and even then the majority of water would run down the drain (and not onto the
ground).
When asked for his view, t he FSP’s engineer (XP) agreed with TL’s conclusion that
the leak had been occurring for at least 18 months. XP noted that the staining to the
brickwork indicated the leak was likely to have been occurring for several years.
The FSP’s building consultant (AS) also considered that the leak had been occurring
for more than 18 months. AS is a qualified plumber but did not personally inspect the
property. AS based his view on the extent of saturation to the soil, having regard to
factors including the site topography and recent weather conditions.
The FSP then advised the applicant that his claim was denied as the leak had
commenced before the policy was incepted.
However, the FSP’s plumber ( TL) subsequently retracted his earlier opinion, after
being provided with additional information about the number of people living in the
property (and therefore the extent to which the shower was in use).
In a statutory declaration provided in November 2017, TL stated that, due to the
amount of showers undertaken (and his first-hand observations), he considered that
the leak had only been occurring for six months when it was discovered in February
2016.
FSP has not shown leak commenced prior to policy inception
As outlined above, the FSP’s contractors initially advised that the leak had been
occurring for at least 18 months by the time it was discovered in February 2017.
Case No: 497389 Determination Page 7 of 13
However, the contractor (TL) who most closely inspected the source of the leak has
subsequently revised his estimate, after being provided with further information.
The applicant’s policy commenced approximately 12 months before the leak was
discovered. Accordingly, the estimates provided by the FSP’s contractors provide
only 6 months leeway (either way) from this date.
Given the various factors involved, I am not satisfied that it is possible to determine
the time at which the leak from the shower waste pipe commenced, to this level of
accuracy. In this context, I note that:
TL revised his estimate considerably based on the number of residents at the
property
while the FSP says the leak was relatively minor (only a few drips), its builder
(AJ) observed ‘a large leak’ when the shower was running , and
AS considered that factors such as the external weather conditions would have
an impact on the speed with which the soil became saturated.
In these circumstances, I am not satisfied that the FSP has established that, on the
balance of probabilities, the leak commenced before the inception of the policy on 15
March 2016.
In this regard, I note that:
the applicant and his tenants have advised that the damage did not became
apparent until late 2016 or early 2017, and
photographs included in the property inspection report indicate that at least
some of the damage to Bedroom 2 occurred since that room was last painted in
March 2016.
The FSP says the evidence of previously repaired cracks establishes that the pipe
had been leaking for a significant period of time.
Ho wever, it is not clear that the ‘old’ cracking was necessarily caused by the current
leak. Given the age of the house, it is possible that it has been exposed to previous
leaks (as well as long-term differential settlement due to seasonal factors , as
identified by XP).
Further, the terms of the policy state that it provides cover for damage caused by the
insured event of ‘escape of liquid’ , if that event occurs during the period of insurance.
Even if the leak commenced prior to policy inception, the ‘escape of liquid’ continued
during the period the FSP was on risk. Accordingly, the terms of the policy suggest
that the FSP should be liable for the proportion of the damage that occurred during
this period.
For the reasons outlined above, the FSP is not entitled to deny the claim on the basis
that the leak commenced prior to the inception of the policy.
FSP has not established damage was caused by faulty workmanship
The FSP says it is entitled to deny the claim because the crack in the shower waste
pipe which allowed the leak to occur was caused by defective workmanship.
Case No: 497389 Determination Page 8 of 13
Specifically, the FSP says that the manner in which the re-levelling of the floors was
carried out placed excessive stress on the pipe, causing it to crack.
As outlined above, the floors at the property were re-levelled to address previously
movement damage. This was done by jacking the floors and inserting packing
between the top of the stumps and the bearers.
The information provided by the FSP indicates that the re-levelling was not carried
out in accordance with applicable standards, In particular, the extent of the packing
(and the nature of the materials used) appears to be non-compliant.
However, I am not satisfied that, on the balance of probabilities, the damage to the
pipe was caused by the non-compliant packing of the stumps.
Among other things, it is not clear when the re-levelling was carried out, other than
that it occurred prior to the applicant purchasing the property in 2014. The applicant
has suggested the property was renovated around eight to ten years earlier, although
the source of this information is unclear.
In these circumstances, there is no evidence of any correlation between the timing of
the re-levelling and the damage to the pipe.
The FSP states that the excessive packing of the stumps is the only plausible reason
why the pipe could have cracked. However, this was not identified by the FSP’s
engineer (XP) in his initial causation report.
While XP subsequently confirmed it was possible the damage could have occurred in
this manner, he did so only after this theory was specifically raised by the FSP.
In these circumstances, I am not satisfied that the FSP has established that the
damage to the shower waste pipe was caused by the defects observed. Given the
limited information available, this theory is speculative at best.
Accordingly, the FSP is not entitled to rely on the policy exclusion for defects in
design, materials or workmanship in order to deny the applicant’s claim.
Delay by applicant does not allow FSP to deny claim
The FSP says it has been prejudiced by the applicant’s delay in lodging a claim and
repairing the leaking pipe. The FSP says the applicant failed to take reasonable
steps to mitigate his loss.
However, I am satisfied that the applicant lodged his claim as soon as possible after
becoming aware of the damage, after it was notified to his property manager by the
tenants in February 2017.
While the tenants advised that significant damage had occurred in the period since
Christmas 2016, it is not clear when during this period the bulk of the damage
occurred. Accordingly, I do not consider there was any significant delay in notifying
the FSP, for which the applicant should be held responsible.
It appears that the applicant did not make arrangements to have the pipe repaired
until 23 April 2017, approximately two months after the leak was first identified. The
applicant has not provided any explanation for this delay.
Case No: 497389 Determination Page 9 of 13
I accept that the applicant’s del ay in fixing the pipe may have contributed to any
additional damage that occurred in the relevant two month period.
However, although this delay may be relevant in assessing the extent of the FSP’s
liability, it does not entitle the FSP to deny the claim.
FSP is not otherwise entitled to deny claim
In its submissions, the FSP has raised issues regarding the applicant’s alleged
‘failure’ to obtain an inspection report before purchase and his alleged non-disclosure
of the long-term movement issues affecting the property.
However, the FSP has not identified any obligation under the policy (or at law) that
requires the applicant to obtain a pre-purchase inspection report.
Further, the FSP has not provided any of the information which is required to support
its contention that the applicant breached his duty of disclosure under the Insurance
Contracts Act 1984 (Cth).
Such information would include, for example, details of the questions asked during
the policy inception process and a copy of the underwriting guidelines.
Accordingly, the FSP has not identified any other basis on which it is entitled to deny
the applicant’s claim.
FSP is liable for claim
For the reasons outlined above, the FSP has not established any basis on which it is
entitled to deny the applicant’s claim . Accordingly, the FSP is required to settle the
claim in accordance with the terms of the policy.
2.2 How should this dispute be settled?
Policy sets out how claims will be settled
Under the terms of the applicant’s policy, the FSP may settle a claim for damage to
his property by:
repairing the damage, or
paying the applicant the amount the reasonable cost of repairs (less a
reasonable deduction of depreciation due to the wear and tear and age of the
property).
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt.
However, FOS expects an insurer to act reasonably in exercising its discretion to
decide which settlement method to adopt.
Claim should be cash settled
As outlined above, the FSP initially accepted liability for the damage to the property
caused by the leaking pipe and offered to cash settle the applicant for $12,349.92.
Case No: 497389 Determination Page 10 of 13
The cash settlement amount was based on a quotation provided by the FSP’s builder
(AJ) for the repairs set out in the scope of works prepared by its engineer (XP).
The FSP decided to cash settle the claim (rather than undertaking repairs) after AJ
advised that he was unable to warrant the works due to the potential for ongoing
differential movement at the property.
Under the terms of the policy, the FSP provides a life time guarantee for repairs
undertaken by its authorised contractors.
The available information establishes that the property was subject to ongoing earth
movement (in addition to the damage caused by the leaking pipe).
In these circumstances, it is not reasonable to expect the FSP to provide the life time
guarantee for repairs undertaken by its authorised contractors.
Accordingly, I consider the claim should be cash settled.
However, the cash settlement amount should be sufficient to ensure that the
applicant is able to carry out the necessary repairs to the property.
FSP is required to cash settle claim for $35,208
The applicant says the cash settlement amount of $12,349.92 initially offered by the
FSP does not reflect the cost of repairing all of the damage to the property caused by
the leaking pipe.
The applicant has provided quotations from two local builders for $29,340 (LM) and
$30,760 (GC) for the repairs set out in th e scope of works prepared by the FSP’s
engineer (XP).
Having carefully reviewed the quotations provided, I am not satisfied that the cash
settlement amount determined by the FSP reflects the repairs set out in the scope of
works.
The itemised quotation pro vided by the FSP’s builder (AJ) includes a number of
items (with a total cost exceeding $15,000) which have not been included in the
quoted cost.
While some of these items are not related to the water leak, others are expressly
included in XP’s scope of w orks (for example, repairs to the external brick walls, the
toy room, bathroom, kitchen and Bedroom 2).
In these circumstances, I consider that the quotation provided by the applicant’s
builder (LC) more accurately reflects the repairs set out in XP’s scop e of works.
However, I consider that the amount quoted by LC should be increased to reflect:
the possibility that further cracking may occur as part of the re-levelling process
included in the repairs (as expressly foreshadowed in the scope of works)
the additional risk assumed by the applicant due to the absence of the lifetime
guarantee, and
the passage of time (including any increase in costs since LC’s quotation was
provided in May 2016).
Case No: 497389 Determination Page 11 of 13
I have had regard to the concerns raised by the applicant that the damage to the
property has worsened since the scope of works was prepared (as XP indicated may
occur).
Having said that, I have also taken into consideration the applicant’s delay in
completing the pipe repairs, as well as XP’s advice that any worsenin g of the
damage due to the drying out of the soil during this period was unlikely to have a
significant impact on the scope of works required.
Having regard to all of the factors outlined above, I consider it is fair in the
circumstances that LC’ s quotation be increased by 20%. Accordingly, the FSP is
required to cash settle the applicant for a total of $35,208.
In arriving at this amount, I have taken into account the delays experienced during
the course of the claim. Accordingly, the FSP is not required to pay interest on the
settlement amount.
Case No: 497389 Determination Page 12 of 13
3 Supporting information
3.1 FOS approach to this dispute
This dispute was the subject of a recommendation issued on behalf of the Financial
Ombudsman Service (FOS) Australia on 9 February 2018. The recommendation was
rejected by the FSP.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination).
3.2 Terms of policy
Subject Terms
Period of
cover
When does cover start?
If we accept your application for insurance, your cover commences at the start of
the period of insurance shown in your policy schedule, subject to us receiving the
required premium payments.
Cover for
escape of
liquid
Depending on whether you have Building or Contents cover, we will insure your
building and/or contents at the site against loss or damage caused by the
following e vents if they occur during your period of insurance …
Escape of liquid
Covered
Loss or damage caused by accidental escape of liquid from any fixed pipe …
General
exclusions
Your policy does not cover any loss or damage that is caused by or arises from:...
Maintenance and building
defects in design, structure, materials, workmans hip or construction
failure to keep the property insured watertight, well maintained, structurally
sound and secure …
Wear and tear, and environmental conditions …
earth or soil movement (other than earthquake) including l andslide,
subsidence, or erosion
settling, shrinkage, expansion or vibration …
Settlement of
claims
When we agree to pay a claim for loss or damage:
We may choose to pay:
the reasonable cost of repair, or …
a cash amount, If we agree to pay cash, we’ll pay the amount it would
reasonably cost to repair or replace the property. Where the building is not
being replaced the amount we’ll pay will be less a reasonable deduction for
Case No: 497389 Determination Page 13 of 13
Subject Terms
depreciation due to wear and tear and age of the property ..
We may refuse or reduce a claim if::
… you do not take reasonable case to prevent further loss or damage to your
property or the property of others once an event has occurred …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.