Text of the determination
Determination
Case No: 496817 Determination Page 1 of 11
Case number: 496817 23 May 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under her landlord insurance policy with the financial
services provider (FSP) for damage to her property caused by a storm in January
2016. The FSP cash settled the applicant for the cost of repairing damage to the
driveway and a ceiling at the property
In mid-2017, the applicant contacted the FSP to advise of cracking and movement
damage to her property. The applicant says this damage was caused by the effects
of rainwater run-off during the storm in January 2016.
The FSP denied the applicant’s claim for cracking and movement damage on the
basis that this damage was not caused by the storm, but by ongoing earth movement
due to the manner in which the property was constructed .
The applicant disputes the FSP’s decision and seeks cover for the cost of repairing
the damage, together with payment for loss of rent. She also disputes the FSP’s
decision to deny cover for a second, unrelated claim relating to a leaking pipe in
October 2016.
1.2 Issues and key findings
Is the FSP liable for the cracking and movement damage?
The available information establishes that there was pre-existing cracking and
movement damage to the property, which had occurred over an extended period of
time.
However, the severe storm in January 2016 also caused additional damage to the
concrete slab and surrounding areas. The FSP has not shown that this damage was
caused by excluded factors. Accordingly, the FSP is liable for this damage.
The estimate provided by the FSP ’s engineer (MC) that the storm caused 50% of the
damage is reasonable in the circumstances. On this basis, the FSP is liable for 50%
of the cost of repairing the cracking and movement damage to the property.
Is the applicant entitled to any other amounts for the storm claim?
The applicant is entitled to:
payment for 50% of the loss of rent incurred while the repairs are carried out
compensation of $5,500 for financial and non-financial losses suffered due to the
manner in which the FSP handled her claim
Case No: 496817 Determination Page 2 of 11
reimbursement of fees paid to her engineer.
Is the FSP liable for the claim for the leaking pipe?
The available information does not establish that the leak caused any resultant
damage to the property. Accordingly, the FSP is not liable for the claim.
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to settle the applicant’s claim for cracking and movement
damage to the property by:
engaging an appropriately qualified builder (who is prepared to undertake the
work) to provide a quotation for the repair of the damage on the basis outlined in
section 2.1 below
cash settling the applicant for 50% of the amount of the quotation, plus 50% of
the loss of rent for the period required to complete the repairs, as estimated by
the builder (based on a weekly rental of $420).
The FSP is required to pay the applicant an additional amount of $6,820 (comprising
$1,320 as reimbursement of her engineer’s fees and $5,500 as compensation for
financial and non-financial loss).
Case No: 496817 Determination Page 3 of 11
2 Reasons for determination
2.1 Is the FSP liable for the cracking and movement damage?
Policy provides cover for storm damage subject to exclusions
The applicant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the applicant is able to establish a prima facie claim, then the onus shifts to the
FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion
under the policy or is otherwise entitled to deny the claim.
The a pplicant’ s policy provides cover for damage caused by the events listed in the
policy, including the insured event of storm. The policy states that an event means a
single event or occurrence.
The policy does not cover damage caused by a storm where the damage results
from subsidence, landslide or any other earth movement. However, there is an
exception for damage caused by subsidence or landslide which occurs within 72
hours of a storm. Such damage is covered, provided it is caused directly by the storm
and not by a structural or design fault.
The policy also contains general exclusions for naturally occurring earth movement
(other than landslide or subsidence which occurs in circumstances which are
specifically covered under the policy).
FSP’s liability depends on cause of damage
The available information confirms that there is a large crack in the concrete slab of
the property. The crack is located in the master bedroom at the north east corner of
the property and extends up the side dwarf wall.
The engineers who inspected the damage confirmed that the slab had dropped
significantly in this area, resulting in the crack observed. The engineers also
observed associated movement damage to nearby areas, including gaps around the
timber window framing.
The applicant discovered the damage in mid-2017, when she inspected the property
after it was vacated by her tenants. The crack in the slab had previously been
covered by carpet.
The applicant says the damage was caused by the effects of rainwater run-off during
the storm in January 2016.
The FSP accepts that the property was affected by a severe storm in 2016. However,
the FSP says the cracking damage to the slab pre-existed the storm and was caused
by gradual earth movement over time (exacerbated by the manner in which the
property was constructed).
Case No: 496817 Determination Page 4 of 11
Accordingly, in order to determine the FSP’s liability, it is necessary to identify the
proximate cause of the damage.
It is well established at law that the proximate cause of a loss is not necessarily the
first (or the last) or the sole cause of the loss. It is the effective or dominant or
operative cause.
In any particular case, the proximate cause of the loss is a question of fact to be
determined based on the surrounding circumstances. Where there are several
causes operating, each must be examined for the qualities of predominance and
efficacy in relation to the resultant damage.
Engineers have provided conflicting views about how damage occurred
The applicant’s property has been built alongside a reasonably steep hill (or cliff).
The property is constructed on a flat plate concrete slab , which has been laid on fill
material retained by a stone retaining wall below the front (east) side of the building.
Both the applicant’s engineer (CE) and the FSP’s engineer (MC) agree that the crack
in the north-east corner of the concrete slab (and the related movement damage)
was caused by the settlement (downwards movement) of the slab in this area.
However, the engineers disagree about how and when this movement occurred.
In his report prepared in November 2017, t he applicant’s engineer (CE) concluded
that the damage to the slab occurred due to movement of the northern section of the
retaining wall caused by the effects of stormwater run-off.
CE noted that this section of the retaining wall was built of small, loose stones laid on
top of each other with no bonding mortar in between. He advised that:
during heavy storms, rainwater would fall at high speed from the cliff behind the
building, run across a horizontal rock terrace at the rear of the buildi ng and
overflow over the retaining wall to discharge on the dirt road at the front of the
property
the force produced by the stormwater running down the cliff had moved the small
stones making up the retaining wall fro m their original position (and possibly also
undermined the corner of the retaining wall at its base).
CE advised that the north eastern corner of the retaining wall supported the concrete
floor slab. Accordingly, he concluded that the movement of the retaining wall had
caused the floor slab to settle, resulting in the cracking damage observed. CE
considered that all of the damage to the property in this area was attributable to the
storm in January 2016.
The FSP disputes CE’s conclusion that all of the damage to the property was caused
by the storm in January 2016. The FSP also says that, regardless of the mechanism
by which the damage occurred, the proximate cause of the damage was the manner
in which the property was constructed.
In his initial report dated 16 August 2017, the FSP’s en gineer (MC) advised that a
substantial proportion of the cracking and movement damage had occurred before
the storm in January 2016.
Case No: 496817 Determination Page 5 of 11
MC concluded that the proximate cause of the damage was the manner in which the
house was constructed, which made it vulne rable to settlement of the concrete slab
over time.
In particular, MC noted that the floor slab was not particularly strong or rigid and the
retaining wall was prone to losing backfill as stormwater washes through the soil and
out of the gaps between the rocks.
In his supplementary report prepared in November 2017, MC acknowledged that it
was likely that at least some of the cracking and movement damage had occurred
during the storm in January 2016 (although he disagreed with CE’s conclusion that
the retaining wall itself had moved).
However, MC reiterated his conclusion that the proximate cause of the damage was
the manner in which the house was constructed. He advised that, had the property
been constructed correctly, the damage would not have occurred.
Some of damage pre-existed storm in January 2016
Having carefully reviewed the available information, I am satisfied that some of the
cracking and movement damage to the north-east corner of the property pre-existed
the storm in January 2016.
The repo rt prepared by the FSP’s engineer (MC) includes a close -up, colour
photographs which clearly shows paint inside the crack in the stone dwarf wall. On
this basis, MC concluded that the damage had commenced before the property was
painted prior to it being tenanted in 2013.
The applicant has provided photographs of the property at that time, which appear to
show it freshly painted.
The applicant says that none of the cracking and movement damage was present in
2013. She says paint could have infiltrated the crack in the dwarf wall following the
storm in January 2016.
However, I do not agree this is the case. In my view, the photograph included in MC’s
report clearly establishes that some of the damage occurred prior to the storm. The
photographs provided by the applicant do not establish that there was no pre-existing
damage in 2013, as the relevant areas are obscured by the soft furnishings.
Applicant has established a prima facie claim for additional damage
The existence of prior damage tends to support the FSP’s position that at least some
of the damage was caused by ongoing issues affecting the property, rather than by
the effects of a single storm.
However, the FSP’s engineer (MC) acknowledged that additional damage was likely
to have occurred during the storm in January 2016. MC estimated the proportion of
the total damage caused by the storm at 50%.
Where additional damage is caused by an insured event (such as a storm), the FSP
will be liable for this damage unless it can show that, on the balance of probabilities,
Case No: 496817 Determination Page 6 of 11
an exclusion applies. The fact that there may be pre-existing damage does not
preclude the applicant from being entitled to cover in these circumstances.
On this basis, I am satisfied that the applicant has established a prima facie claim for
the additional damage caused during the storm in January 2016. Accordingly, the
FSP is required to show that it is entitled to rely on a policy exclusion to deny cover
for this damage.
FSP is unable to rely on policy exclusions
As outlined above, the FSP’s engineer (MC) says that any additional damage which
occurred during the storm was due to the way in which the property was constructed.
The policy does not provide cover for settlement damage which occurs during a
storm because of a structural or design fault affecting the property.
In his report, MC identified certain features of the property which he considered made
it particularly vulnerable to settlement damage over time (including the use of fill
material and the nature of the slab). The applicant’s engineer (CE) also noted that
the property is susceptible to the effects of rainwater run-off due to its location
alongside a steep cliff.
However, there is no information which establishes that the manner in which the
property was constructed failed to comply with the building requirements in force at
the time. To the contrary, MC noted that the method of construction was consistent
with that commonly used at the time.
In these circumstances, I am not satisfied that the FSP has s hown that the property
had a ‘structural or design fault’, such as would entitle it to deny cover for the
additional damage caused by the storm in January 2016.
The FSP also says it is entitled to rely on the policy exclusion for storm damage to
retaining walls. However, this exclusion only applies to damage to the retaining wall
itself.
The applicant’ s current claim relates to damage to the concrete slab and surrounding
parts of the property (and not to the retaining wall). Accordingly, the FSP is not
entitled to rely on the exclusion for retaining walls to deny cover for the additional
damage caused by the storm.
FSP is required to cash settle applicant for 50% of repair costs
For the reasons outlined above, I am satisfied that there was already some cracking
damage to the property prior to the storm in January 2016. The FSP is not liable for
the pre-existing damage to the property, which was not caused by the one-off effects
of a single storm.
T he findings of the applicant’s engi neer (CE) suggests that the property would have
been exposed to the gradual effects of rainwater run-off from the cliff and rock
terrace on an ongoing basis, during periods of heavy rainfall. The applicant has
confirmed that water regularly runs off the cliff during storms.
It is not possible to determine with certainty the proportion of the current damage
which occurred prior to the storm in January 2016.
Case No: 496817 Determination Page 7 of 11
Given the property’s long-term exposure to rainwater run-off, it is possible that a
substantial proportion of the damage had already occurred prior to the storm.
However, it is also clear that the storm in January 2016 was severe, as shown by the
extent of the damage to the applicant’s driveway caused by rainwater run-off.
T he FSP’ s engineer (MC) has advised it is likely that approximately 50% of the
existing damage occurred during the single storm in January 2016.
Having regard to the factors outlined above, I consider MC’s estimate represents a
fair and reasonable assessment of the proportion of the damage caused by the one-
off effects of the storm in January 2016.
Accordingly, I consider it is fair in the circumstances that the FSP indemnify the
applicant for this portion of the damage. Given the FSP is liable for 50% of the
damage only, it is appropriate that the claim be cash settled.
The FSP’s engineer (MC) prepared a scope of works for the repair of the damage
dated 16 August 2017. The scope of works provides for repair by way of traditional
underpinning, although MC notes that this approach is not a guara nteed success and
may result in additional damage during the repair process.
In the circumstances, I consider that the FSP should be required to:
obtain a quotation from an appropriately qualified builder (who is prepared to
undertake the work) for the r epair of the damage set out in MC’ s scope of works.
The quotation should include appropriate provision for the repair of any additional
damage which may occur during the repair process
cash settle the applicant for 50% of the amount of the quotation.
2.2 Is the applicant entitled to any other amounts for the storm claim?
Applicant is entitled to payment for loss of rent during repairs
The applicant’s policy provides cover for loss of rent where the property is unable to
be lived in due to damage caused by an insured event.
For the reasons outlined above, I am satisfied that the storm in January 2016 caused
additional damage to the property (although this damage was not discovered until
May 2017, when the tenants moved out).
The applicant’s tenants continued t o live in the property for approximately fourteen
months following the storm. Given this, I am not satisfied that the damage caused by
the storm made the property unliveable.
However, given the nature of the repairs set out in MC’s scope of works, I am
satisfied that the property will be unable to be lived in while the repairs are carried
out.
On this basis, the FSP is required to pay the applicant an amount equal to 50% of the
rent for the period while the repairs are completed. This amount is to be deter mined
based on:
the current weekly rental of $420 (which reflects the loss suffered by the
applicant);
Case No: 496817 Determination Page 8 of 11
the estimated repair period (as advised by the builder who provides the quotation
referred to in section 2.1 above).
Applicant is entitled to compensation
FOS may award compensation for non-financial loss (capped at $3,000) where an
applicant has suffered an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with their expectation of enjoyment or
peace of mind.
FOS may also award an additional amount of compensation (capped at $3,300) for
consequential financial loss suffered by an applicant in connection with their claim.
In the present case, I am satisfied that the applicant has suffered additional stress
and inconvenience, as a result of the FSP’s denial of her claim. The FSP denied the
claim despite a report from its own engineer (MC) estimating that 50% of the damage
had been caused by the storm in January 2016.
I also consider that the FSP’s denial of the applicant’s claim (and her resulting lack of
funds) has contributed to the delay in the applicant arranging for the property to be
re-tenanted.
While the property remained habitable, it was reasonable for the applicant to seek to
undertake repairs while it was vacant, in order to minimise future disruption to her
new tenants.
However, I acknowledge that not all of the repairs required to the property were
related to the storm in January 2016. In addition to the pre-existing damage, there
was also other, unrelated damage (for example, damage caused by termites).
Further, the applicant’s loss of rent has to some extent been mitigated by amounts
paid by her new insurer under a rental default claim lodged after her tenants vacated
the property in May 2017. The available information indicates the new insurer paid
loss of rent benefits for at least three months during this period.
Having regard to the factors outlined above, I consider it is fair in all the
circumstances that the FSP pay the applicant total compensation of $5,500 for
financial and non-financial losses caused by the manner in which it handled her
claim.
The FSP is also required to reimburse the applicant for fees of $1,320. In
circumstances where the FSP had denied the claim based on MC’s report, it was
reasonable for the applicant to engage her own engineer.
2.3 Is the FSP liable for the claim for the leaking pipe?
Policy provides limited cover for escape of water
The applicant’s policy provides cover for damage to the property caused by liquid
leaking, overflowing or bursting from a fixed pipe or a water supply pipe.
The policy states that the FSP will also pay the reasonable cost of locating the
source of the leak and repairing any damage caused by the exploratory works.
Case No: 496817 Determination Page 9 of 11
However, exploratory costs are only covered where the FSP has accepted a claim for
damage caused by the leak.
The policy does not provide cover for the costs of repairing the item from which the
liquid escaped.
FSP says leak did not cause any resultant damage
In October 2016, the applicant lodged a claim for the escape of water from a pipe
leading to the hot water service in the laundry of the property. The applicant advised
she had arranged for her plumber to repair the pipe.
The FSP’s assessor (DG) attended the property in mid -December 2016. DG reported
that the pipe was located inside a concrete wall at the property, which the plumber
had cut into in order to repair the pipe.
DG’s report states that the applicant confirmed that:
the leaking water had not caused any damage to the property because the
laundry floor was tiled and the walls were concrete
the only damage she was claiming for was the damage caused by the plumber in
locating the source of the leak.
Based on DG’s report, the FSP denied the applicant’s claim, on the basis that the
policy does not provide cover for exploratory costs where the leak has not caused
any resultant damage to the property.
FSP is not liable for claim
The applicant says the leaking water caused a black mark on the concrete wall
behind the laundry tub. She has provided a photograph of the wall in this area.
The FSP says that any marks visible on the wall were caused by temporary water
staining, which would have disappeared as the water dried.
The report prepared by the FSP’s assessor following her inspection in mid -December
2016 did not identify any damage to the wall.
Further, the FSP’s claim notes indicate that, during a telephone call on 20 D ecember
2016, the applicant declined the FSP’s offer to arrange a further assessment on the
basis that the water had already dried out and therefore there was no damage to see.
I have carefully reviewed the photograph of the concrete wall provided by the
applicant. However, I am not satisfied it establishes that there is any permanent
damage to the wall caused by the water leak.
On this basis, the FSP is not liable for the applicant’s claim.
Case No: 496817 Determination Page 10 of 11
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute, it has been referred directly to a panel for determination, in line with
the Operational Guidelines to the FOS Terms of Reference. The panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
3.2 Terms of policy
Subject Terms
Cover for
insured
events
If you have a home insurance policy, we cover your home for loss or damage at
the insured address caused by an insured event during the period of insurance
…
Event means a single event, accident or occurrence which you did not intend or
expect to happen.
Insured event
- storm
We cover
Loss or damage caused by a storm …
We do not cover …
loss or damage caus ed by erosion, vibration, subsidence, landslide, mudslide,
collapse, shrinkage or any other earth movement, but we will cover loss or
damage caus ed by a landslide or subsidence that occurs within 72 hours of,
and directly because of, a s torm and not because of erosion over time,
structural fault or design fault …
loss or damage to retaining walls, sea walls, garden borders and free standing
outdoor walls …
General
exclusions
You are not covered under any section of this policy for damage, loss, cost or
legal liability that is caused by, arises or involves: …
Ground movement
erosion, vibration, subsidence, landslide, mudslide, collapse, shrinkage or any
other eart h movement, but we will cover landslide or subsidence that is
specifically covered under the following ins ured events:
- ‘Storm’ …
Case No: 496817 Determination Page 11 of 11
Subject Terms
Loss of rent If we accept your claim for loss of damage to your home and we agree it cannot
be lived in, we will pay the weekly rental amount for the reas o nable amount of
time we decide it should take to repair or rebuild your home so it can be lived in
again.
The most we will pay for any one event is 52 weeks or 20% of your home sum
insured, whichever is less.
We do not cover …
Loss of rent:
if your tenant still has an obligation to pay the rent …
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.