Text of the determination
Determination | Case number: 496692 Page 1 of 17
Case number: 496692 29 November 2018
1 Determination overview
1.1 Complaint
The complainants lodged a claim on 10 June 2017 for both building and contents
damage after water inundated their home following a storm.
The financial firm (the insurer) accepted the complainants‟ claim. However, the
complainants dispute the extent of the insurer‟s obligations and its claims handling.
1.2 Issues and key findings
How sho uld the complainants’ building claim be settled?
The insurer should pay $73,002 in full and final settlement of this. This takes into
account the following:
the allowance for mould remediation already paid
the scope of works and quote provided by the insur er‟s builder (RC)
deducting works that are either not payable or have been settled
allowing a 20% increase.
How should the complainants’ contents claim be settled?
The insurer is not required to pay any further amount for contents. This is because the
information does not show any contents not settled by the insurer were damaged by
the claimed event or the insurer‟s conduct.
Are the complainants entitled to compensation for other costs?
If it has not done so already, the insurer is only required to reimburse the cost of the
report from mould expert (MR) report given this assisted the complainants.
Should the insurer pay non-financial loss?
The insurer should pay the complainants $1,500 for non-financial losses.
Determination | Case number: 496692 Page 2 of 17
1.3 Determination
This determination is partly in favour of the complainants.
Within 21 days of the complainants accepting this determination, the insurer is to
settle this complaint by paying the following to the complainants:
$73,002 for the building and contents claim
reimbursing MR‟s report cost if it has not done so already
$1,500 in non-financial loss.
Determination | Case number: 496692 Page 3 of 17
2 Reasons for determination
2.1 How should the complainant s’ building claim be settled?
Parties dispute the extent of the insurer’s obligations
The complainants are required to show that, on the balance of probabilities, they
suffered a loss caused by an event they are insured for under the policy.
This is known as a prima facie claim.
The complainants‟ policy is a home building and contents insurance policy that
provides cover for a number of listed eve nts, including storm. There is no dispute the
complainants‟ property and contents suffered damage as a result of a listed event and
the insurer has accepted the claim for damage.
However, the parties dispute the extent of the insurer‟s obligations under t he terms
and conditions of the policy.
The insurer has paid the following amounts associated with the building claim:
Basi s Amount
Flooring repairs $11,990
Mould remediation $75,922
Removal of kitchen, transit and storage $17,775
Plumbing works $1,793
Cabinet removal costs and disposables $1,221
Electrical works $3,564
These payments were based on quotes provided by the complainants.
Background to the mould remediation
The insurer based its settlement on MR‟s quote. MR was engaged by the
complainants. The insurer paid this to the complainants on or around 28 November
2017.
The insurer accepted an allowance needed to be added for the removal and storage
of the kitchen as well as plumbing and electrical works. The insurer paid for the costs
to remove the kitchen on 13 December 2017.
Quotes for the plumbing, cabinet and electrical were all paid by 7 February 2018. This
was after quotes were obtained by the complainants.
Determination | Case number: 496692 Page 4 of 17
The complainants have raised concerns that the scope of works for the mould
remediation was insufficient. In support they provided a report from WEC dated 6 May
2018. This noted the following:
mould growth has been found higher than the 600mm allowed in MR‟s report for
the plasterboard as well as on timber framing
the pattern higher up was consistent with an extended period of high humidity
all of these issues are consistent with a building that was not dried fast enough in
the first few weeks
full remediation would require demolition of the bathroom to access hidden mould
in the wall cavity.
The insurer disputes WEC‟s report. The insurer says that any additional mould
remediation required is due to the complainants failing to mitigate their circumstances.
The complainants say they did commence remediation once all the settlement monies
were received. However, this has yet to be completed given the additional issues
found. Further, the issues they have identified were associated with the claim, not any
delay in completing the mould remediation.
Mould remediation provided is sufficient
Having carefully considered the available information, the panel accepts the insurer‟s
settlement for the mould remediation is sufficient.
The insurer‟s settlement was based on MR‟s report. MR was commissioned by the
complainants. MR did not accept there was any requirement to demolish the
bathroom. MR allowed for 600mm of plasterboard to be removed as part of the works.
The panel is not satisfied the complainants have acted reasonably in mitigating their
loss. Mould was clearly an issue and a risk to the property. Settlement for this was
received on 28 November 2017.
MR provided an email dated 26 March 2018 saying they could have proceeded even
without the kitchen and cabinet removal. MR said the complainants did not contact
them to begin works.
Instead, it appears the complainants have used other people to do the mould
remediation. It is unclear if the amounts paid for the mould remediation is exhausted.
Whilst the complainants say they could not engage anyone to begin the works due to
upcoming Christmas and New Year, no evidence was provided of this.
Given MR‟s email, it appears works could have begun before Christmas. Therefore,
the panel accepts the complainants ought to have been in a position to begin mould
remediation shortly after receiving settlement. Further, there is nothing to say they
could not commission other contractors to do the other works, particularly given they
Determination | Case number: 496692 Page 5 of 17
had received cash settlement for other aspects of the claim that remained unused
(e.g. $11,990 for flooring).
The panel does not accept WEC‟s opinion that the extent of remediation has
increased due to the claim. This is substantively due to the fact the panel does not
accept WEC‟s comment that additiona l mould growth would not occur due to any
delays in beginning mould remediation.
This seems implausible. Mould has remained on the property for a fair period of time.
It is difficult to accept this would not spread if left untreated and unmitigated.
Particularly given that part of the increased works is due to the plasterboard removal
having increased from 600mm to 1,200mm.
Therefore, the panel does not accept the insurer is liable for this increased scope of
works. Further, for reasons set out later, the panel also does not accept WEC‟s
conclusion that the bathroom and toilet need to be completely stripped.
Accordingly, after careful consideration of all the available information, the panel
accepts the insurer‟s settlement for the mould remediation is fair in all the
circumstances.
Building repairs
The insurer obtained a scope of works from RC. This included all the complainants‟
claimed damages with the provision that mould remediation would be expected to be
completed.
This scope of works was exchanged with the complainants. The complainants have
not objected to the scope of works being incomplete. The complainants instead
challenge the insurer‟s submissions that it is not liable for various parts of RC‟s scope
of works.
Therefore, the panel accepts RC‟s s cope of works represents the extent of the
building works being claimed by the complainants.
In reviewing the scope of works, the insurer removed numerous items. These
included items it believed it had already settled (electrical, carpet, plumbing and
kitchen quotes it paid) as well as the following damage it did not accept was caused
by the claimed event:
ceiling
bathroom and toilet
tiles in bedroom 3 and 4
The complainants said the tiles in the fourth bedroom are not part of the claim. The
complainants also said they ordered new carpets for the bedrooms which was
supposed to be laid two weeks after the flood occurred.
Determination | Case number: 496692 Page 6 of 17
This is consistent with the fact the complainants‟ quotations did not discuss removing
or replacing tiles in the third and fourth bedroom.
Therefore, the panel accepts the insurer‟s position to remove these items from the
scope of works is reasonable.
In terms of the items the insurer says it has already settled, the complainants dispute
the electrical ones. The complainants did not comment on the carpet, plumbing or
kitchen aspects. The panel therefore accepts the insurer‟s position on those items to
be appropriate.
Ceiling damage
The ceiling damage appears to be due to cracking identified.
The complainants provided a report of 1 November 2017 from an engineer (PD). PD
confirmed the internal plasterboard and joinery showed some hairline to fine cracks
and there were no characteristic signs of building movement externally.
PD says the complainants‟ home is prone to the movement related crack ing because
of the light footing system with this age and type of building combined with square set
ceilings. PD explains such ceilings are less tolerant of movement than when ceiling
cornices are adopted. PD considered the evident cracking was inevitably going to
occur for these reasons.
PD was of the opinion the cracking manifested now simply because of the closeness
in time to the recent renovations, as opposed to the water ingress. However, PD
advises the recent water issue had the potential to cause cracking.
Ultimately, PD concluded there was insufficient evidence to discriminate between the
two causes of normal building movement or recent water inundation.
PD, who is an appropriately qualified expert, is uncertain whether the water
inundation caused the cracking. Given this, the panel has insufficient basis to
conclude the ceiling damage was caused by the claimed event.
Therefore, the insurer is entitled to remove these items from the scope of works.
Bathroom and toilet
The complainants say this was affected by mould contaminating the flooring in the
hallway. The complainants have maintained from early in the claim that the bathroom
was affected by the insur er‟s failure to address the moisture in the floor.
MR, who was engaged by the complainants to review the mould issue, did not include
in their scope of works anything to do with the bathroom.
Determination | Case number: 496692 Page 7 of 17
WEC‟s report found evidence of mould in a bathroom wall cavity. This appears to be
adjacent to the hallway.
WEC‟s report does not appear to say the whole bathroom needs to be stripped
because of this mould found. In their report, they say “mould growth is expected in the
wall cavity between bathroom and exterior brick wall”. After this, WEC then say full
remediation would require demolition of the bathroom.
Given this, it appears WEC says the bathroom should be stripped because of the
possibility of mould growing in the wall cavity between the bathroom and exterior bri ck
wall.
There is no evidence to support this. The only area of mould found was in the cavity
adjacent to the hallway. This is on the other side of the bathroom. It is not clear how
this could have spread to the other wall yet leave no visible evidence.
MR , who attended the property at the complainants‟ request, provides no support for
this possibility. Neither does the insurer‟s mould expert (A). RC, who completed the
scope of works, found no evidence of water damage to the bathroom.
Given this, the panel does not accept there is sufficient basis to say the whole
bathroom needs to be stripped out.
In the alternative, if the argument is that the bathroom needs to be stripped because
of the mould found in the wall cavity, the panel is not persuaded by this for the
following.
First, it is not clear whether the presence of the mould in the wall cavity cannot be
treated. WEC‟s report provides no comment on this factor alone.
Second, even if this plasterboard needed to be replaced, it is not clear why the whole
bathroom and toilet need to be stripped. This appears excessive.
Third, it is not clear if this evidence of mould was due to the insurer‟s failure to remove
the moisture in the floor or the delay in arranging mould remediation. The
identification of this mould was following a sample taken on 24 April 2018. This would
have been about five months after the insurer provided the complainants with the
funds to attend to the mould remediation.
Electrical works
The electrical works paid for by the insurer was based on a quote from EES. This
allowed for the disconnection and reconnection of 17 power points, one oven and one
cooktop.
Determination | Case number: 496692 Page 8 of 17
The complainants say EES‟s quote was for the mould remediation. The power points
were removed when the plasterboard was being stripped and then reinstated to
ensure there were no live wires.
The panel does not accept this. If the power points were disconnected, it is not clear
what safety issue was being addressed by reconnecting them after the plasterboard
was removed but before building repairs were completed. It appears to be duplicating
these works.
Given this, the panel does not agree the insurer is required to pay for these power
points to be disconnected and reconnected again.
The panel does note EES‟s quote makes no reference to light switches. Therefore,
these should be included in the insurer‟s quote.
How the building claim should be settled
The complainants provided four quotes. However, it is clear they are out of date given
the following:
they contain works that have been se ttled (e.g. electrical works, mould
remediation)
they include works that have not been allowed for (e.g. bathroom)
RC‟s quote is the only one available that is based on a current scope of works and
has individually priced the relevant items. However, it is not clear if RC are prepared
to do the works for the complainants or that the rates and amounts specifically
allowed can be matched in the market.
Given the history of this complaint and the fact the relationship between the parties
have broken down, the panel considers it is fair in all the circumstances to provide a
cash settlement figure to resolve this complaint.
The panel proposes the insurer should pay $73,002 in settlement of the building
claim. This is based on the following:
RC‟s quote, after removing the items that the panel accepts are not covered, totals
$60,835
an additional 20% to account for possible variations that may occur during the
building process and the fact the complainants may not be able to match RC‟s
rates and amounts
The panel notes that the amount it allowed for RC is slightly higher than the insurer‟s
estimate. This is mainly to do with facilitating an allowance for light switches.
The insurer is not required to pay interest on this amount. This is because it is based
on an estimate and an extra allowance of 20% has been factored in the final payment.
Determination | Case number: 496692 Page 9 of 17
2.2 How should the complainant s’ contents claim be settled?
Insurer is not liable for any additional payment
The insurer has made part payments throughout the claim for contents. This included
numerous furniture items (chester drawers, oak dining table), miscellaneous contents
items and electrical items. This totals $18,056.
The complainants sought $48,000 for the replacement of mattresses, lounge chairs,
linen, clothing and rugs.
No evidence has been provided to show these require replacement due to the water
inundation or the mould.
MR‟s report says that remediation will be attempted on large pieces of furniture. This
would not include small contents and clothi ng. MR‟s report makes no reference to
finding items non-restorable due to the mould.
WEC‟s report simply says “The building & contents require mould cleaning to remove
dust & settled spores”. WEC makes no mention of identifying any items that are non -
restorable.
Given the delay in arranging mould remediation, it will likely be difficult to determine if
any items now deemed to be non-restorable was due to the delay in arranging mould
remediation or the claimed event.
Therefore, the panel does not accept there is sufficient basis to conclude the
complainants are entitled to any additional payment for contents
2.3 Are the complainants entitled to compensation for other costs?
Complainants seek compensation for a number of financial expenses
The complainants have sought compensation for the following:
$1,595 (electrical services), $1,190 (skip bin hire), $1,860.98 (various furniture)
cost of reports from MR and WEC
alternative accommodation, new utility connections, electricity and phone line
rental at their property for the period they are in alternative accommodation
loss of wages, income or leave balances for days taken off to deal with their claim
loss of work due to cancellations for the female complainant‟s cleaning jobs .
Electrical services, skip bin hire and various furniture
The complainants provided a receipt for electrical services totalling $1,595.
It is unclear if the complainants are seeking payment for this. The ABN associated
with the receipt matches EES‟s. The insurer already paid $3,564 towards EES‟s
Determination | Case number: 496692 Page 10 of 17
quote. No explanation was provided that this receipt represents additional works or
part paymen t for EES‟s quote.
Therefore, the insurer is not liable for this.
The complainants are also seeking $1,190 for a skip bin hire. In a document attached
to an email the complainants sent on 20 April 2018, they indicated this was for
flooring.
MR‟s scope of works allowed $5,500 for a skip. It is unclear why another cost is
necessary, particularly when there is no evidence the complainants incurred this cost.
The insurer is not liable for this.
The complainants sought reimbursement for replaceme nt furniture. The items being
replaced did not include items settled by the insurer. As the panel does not accept the
insurer is liable for any additional contents, this is not payable.
MR and WEC report fees
We may require the insurer to contribute to the professional costs incurred by a
complainant. This normally occurs when the professional costs assisted the
complainant‟s position.
MR‟s report substantively assisted the complainants‟ position. Therefore, the insurer
should pay for this cost if it has not done so already.
The panel does not accept WEC‟s report assisted the complainants‟ position for
reasons outlined. The insurer is not liable to reimburse this cost.
Temporary accommodation, new services, utilities
The insurer has paid $36,120 for alternative accommodation. This was based on a
weekly rental of $1,400 for a period of six months.
The policy says the following regarding this:
When an insured event damages the building to the extent you cannot live there,
and we agree, we will pay for your reasonable temporary accommodation costs
for the time it will take to repair or rebuild the building to a liveable condition.
MR‟s scope of works estimated the works to take about 23 days. The insurer says to
complete the remaining building works would take about 8 weeks.
The complainants have not provided any information to show the works would exceed
six months.
Determination | Case number: 496692 Page 11 of 17
Therefore, the insurer‟s allowance for temporary accommodation is fair in all the
circumstances.
This benefit also says the insurer will pay for the reasonable and necessary costs for
mail redirection, utility connection costs and assistance with bond payment if required.
The insurer allowed $500 for these costs. This also included power and water use by
contractors. There is nothing to suggest this is insufficient. Even if it arguably is, the
insurer has allowed six months temporary accommodation. This appears more than
necessary to allow the property to be restored to a liveable condition and to account
for these other expenses.
Therefore, no further payment is required for these items.
Lost wages and lost work
These appear to be based on the insurer‟s handling of the claim. In summary, some
of the main issues raised by the complainants are as follows:
the insurer‟s authorised service providers/cont ractors acting inappropriately and
causing further damage
the effects (or lack thereof) of the drying equipment used
the insurer‟s refusal to provide temporary accommodation during the period the
restorers used drying equipment
the accuracy of information and descriptions in the insurer‟s reports
health issues experienced due to the mould that occurred.
We may compensate complainants for consequential losses that arise from the
insurer‟s conduct.
No evidence has been provided the cancelled jobs were lost because of the insurer‟s
handling of the claim rather than other factors. Therefore, this is not payable.
The loss of leave balances claimed by the complainants is also not compensable.
This is because the evidence does not show they were caused by the ins urer‟s poor
handling of the claim. For instance:
the male complainants‟ annual leave in July was to deal with the insurance claim –
this would be a loss caused by the claimed event rather than the insurer‟s poor
handling of the claim
no evidence to show the sick leave days was due to the house – the medical
certificates do not explain why they were taken.
Determination | Case number: 496692 Page 12 of 17
2.4 Should the insurer pay non-financial loss?
Compensation is awarded conservatively
We may decide the insurer compensate the complainants when the insurer caused
them to suffer an unreasonable degree of physical inconvenience, time taken to
resolve a situation, interference with their peace of mind or loss of enjoyment of an
asset.
Compensation is awarded conservatively.
Compensation is not awarded for the normal degree of inconvenience a person would
expect to suffer when lodging this type of claim or having a problem with the insurer.
Compensation can be awarded though if the insurer‟s handling of the claim was
unreasonable.
Insurer to pay $1,500 in non-financial loss
There were aspects of the claim handled poorly. Particularly with the failure to
mitigate the presence of mould and attempting to source temporary accommodation
in a quick manner at certain times.
The panel accepts this caused substantive inconvenience to the complainants.
However, the inconveniences have not all been caused by the insurer.
The complainants restricted access to the insurer‟s authorised representatives to
continue to attend and inspect their property from at least September 2017. This
significantly added to the difficulty for the insurer to adequately address the
complainants‟ concerns.
The insurer also settled aspects of the complainants‟ claim generously. The policy
allows the insurer to arrange for experts to assess the damage. The complainants
would often not agree to this. Despite this, the insurer agreed to settle amounts based
on quotes the complainants provided which the insurer was not able to assess.
Further, the information exchanged shows the insurer changed claim managers and
appointed new assessors and builders in response to the issues raised by the
complainants.
The panel considers these factors mitigated the insurer‟s poor handling of the claim.
Given this, and taking into account our conservative approach, the pa nel considers it
fair in all the circumstances for the insurer to pay $1,500 for non-financial loss.
Determination | Case number: 496692 Page 13 of 17
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
3.2 FOS approach
This dispute has not been the subject of a FOS recommendation. In view of the
complexity of the issues in dispute, this matter has been referred to a panel for
determination. The panel consists of an Ombudsman and two representatives with
consumer and insurance experience.
The panel has based this determination on what is fair in all the circumstances having
considered all of the information exchanged, the relevant legal principles, terms of the
policy, good industry practice, including relevant codes of practice and prior
determinations where applicable.
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
Any reference in this determination to the complainants includes reference to both the
female and male complainant. Submissions made by the female complainant are
taken to have been made on behalf of both the complainants.
Determination | Case number: 496692 Page 14 of 17
3.3 Policy terms
Section Terms
Complete
Replacemen t Cover
[ Insurer ] Home Building Insurance with the Complete Replacement
Cover option covers insured damage or loss to your home building for
the total amount it would cost to us repair or rebuild it. When you have
selected the Complete Replacement Cover option, we repair or rebuild
insured damage or loss to your home or pay the cost of repairing or
rebuilding to the same size and standard of your current home. Some
exclusions apply. Please read this Product Disclosure Statement for
full details.
We cover
Loss or damage to the building due to an insured event during the
period of insurance up to what it costs us to repair or rebuild the
damaged parts of the building on a „new for old‟ basis unless provided
otherwise in your policy.
Limit
Up to what it costs us to repair or rebuild the building on a „new for old‟
basis unless provided ot herwise in your policy.
We do not cover
any loss, damage, item, cost or expense that is not covered under
the insured event for which you are claiming
upgrading undamaged parts of the building to comply with the
current home building regulations and laws
Insured event s cover We cover the building for loss or damage at the insured address
caused by an ins ured event during the period of insurance.
We cover loss or damage t o the building caused by a storm.
We do not cover …loss or damage caused by erosion, vibration,
subsidence, landslip, landslide, mudslide, collapse, shrinkage or any
other eart h movement, but we will cover loss or damage to the
building caused by a landslid e or subsidence proved to have occurred
within 72 hours of, and directly because of, a storm and not because
of erosion over time, structural fault or design fault .
Additional features If we accept your claim for loss or damage to the building due to an
insured event, we will also provide the following additional features.
The additional features and their limits are paid in addition to the cover
provided under the building insurance.
Temporary accommodation
When an ins ured event damages the building to t he extent you cannot
live there, and we agree, we will pay for your reasonable temporary
accommodation costs for the time it will take to repair or rebuild the
building to a liveable condition.
We will also pay the reasonable and necessary costs for:
redi rection of mail from the insured address for up to 52 weeks;
Determination | Case number: 496692 Page 15 of 17
Section Terms
utility connection costs at the temporary accommodation residence;
assistance with bond payment if required, however any amount we
pay in bond is recoverable from you by us. We may deduct this
am ount from any amount payable to you.
[If your] certificate of insurance shows that you have Complete
Replacement Cover option we pay the reasonable and necessary
costs.
General exclusions You are not covered under any section of your policy for damage,
lo ss, cost or legal liability that is cau sed by, arises from or involves:
deliberat e actions by you
an act or omission by you, your family, anyone living at the building
or any owner or part owner of the building, or anyone acting with
your consent, which:
o is deliberate;
o is a deliberate lack of action;
o demonstrates a reckless disregard for the consequences of
that action or omission.
failing to take care of the building or contents your failure to:
o take reasonable care of the building and contents;
o keep the buildings and contents well maintained and in
good condition
o fix faults and defects as soon as you become aware of
them.
wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to:
o tiles and their adhesive or grouting breaking down;
o weat hering of roof tiles or roof ridge capping;
o gradual weathering and breakdown of bricks, mortar or
concrete.
consequential loss (financial and non - financial loss) or extra costs
following an incident covered by your policy, such as:
o loss of income or wages;
o loss or costs, including the cost of your time (e.g.
inconvenience), to prove your loss or to help us with your
claim (e. g. telephone calls, postage);
o professional, expert, legal, consulting or valuation costs
unless you obtained our prior written authority to incur
these costs;
o cleaning costs;
o any costs related to stress or anxiety;
o any costs not covered by your policy.
Determination | Case number: 496692 Page 16 of 17
Section Terms
Claims proce ss What you must do
Try to prevent further loss or damage.
If possible take reasonable steps to prevent further loss, damage or
liability (e.g. if there is a hole in the roof, arrange for it to be covered to
prevent further water damage from t he rain).
To proce ss the claim, you must
allow us to inspect the damaged building;
allow us to arrange for experts to assess the damaged building and
to quote on repair or replacement;
provide us with a quote for repair or replacement if we ask for thi s. If
you choose to use our recommended repairers (when available),
there is no need to obtain your own quotes;
when requested, provide us with all proofs of ownership and value,
information, co - operation and assistance in relation to a claim
(including a ttending an interview or giving evidence in court if
required) as we may reasonably require;
allow us, or a person nominated by us, to recover, salvage or take
possession of the building. When we ask, you must send any items
to us, or cooperate in our col lection or retrieval of such items;
consult an expert if we ask for this.
If you do not comply
If you do not comply with „What you must do‟ and „What you must not
do‟ we can reduce or refuse your claim and/or recover from you any
costs and/or any monies we have paid and/or cancel your policy.
Describe your loss or damage
You must also give us accurate and full details of what was lost, stolen
or damaged and give us proof of value and ownership for items
claimed if we request it.
When the building is damaged
Allowing us, a repairer or an expert appointed by us, to look at what is
damaged is usually all that is needed to prove your loss. Sometimes
though we might ask you to produce a copy of the most recent plans
and drawings for the building, photograp hs of the building or other
evidence that supports the extent of the loss you have suffered.
If we decide that you are unable to reasonably substantiat e your
claim, we might reduce or refuse your claim.
Salvaged building items
If we replace or compensat e y ou for an item, we then own the
damaged or recovered item. If we agree you can keep an item we will
determine the salvage value and we can deduct this amount from any
payment we make to you.
Determination | Case number: 496692 Page 17 of 17
Section Terms
How claims are
settled
Depending on the circumstances we will de cide to repair, rebuild or
pay you what it would cost us to repair or rebuild.
We will not pay extra to repair or rebuild the building to a better
standard, specification or quality than it was before the loss or
damage occurred except as stated in the meaning of „new for old‟.
‘New for old’ means:
New materials , new items
we rebuild or repair with new items or new materials that are available
at the time of replac ement or repair from Australian suppliers.
New for old, regardless of age
we rebuild or rep air regardless of age, with no allowance for
depreciation.
Same type, standard and specification as when new
we replac e or repair to the same type, standard and specification (but
not brand) as when new. If the same is not available, it means of a
similar type, standard and specification (but not brand) when new. We
can replace with a different brand.
„New for old‟ does not mean of a better standard, specification or
quality than when new.
Repairing or rebuilding damaged parts
We will only repair or rebuild the parts that are damaged in the
incident covered by your policy. You cannot claim to replace
undamaged parts of the building to create a uniform appearance.
Definitions Loss or damage
means physical loss or physical damage.
Storm
means a storm, cyclon e or severe atmospheric disturbance. It can be
accompanied by strong winds, rain, lightning, hail, snow or dust.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.