Text of the determination
Determination
Case No: 496510 Determination Page 1 of 11
Case number: 496510 11 September 2018
1 Overview
1.1 Dispute
The applicants lodged a claim on their Home, Building and Contents Policy held with
the financial services provider (FSP) after the property was damaged during a storm
on or about 4 October 2013.
The FSP accepted liability however issues arose due to delays in the repair process
and the failure to complete repairs to the applicants‟ shed. This resulted in a further
claim in October 2014 for damage sustained to 14 boring rods that had been affected
by rust used in a vintage automotive line boring machine.
The FSP initially offered to cover the cost of restoring the rods but now denies liability
and says:
the applicants failed to mitigate their loss
the boring rods are tools of trade not covered under the terms of the policy
the rust or loss was not caused by the FSP‟s conduct
it has been prejudiced by the applicants‟ conduct .
1.2 Issues and key findings
Is the FSP liable for the damage to the boring rods?
The FSP is liable for the damage sustained to the boring rods as, on the balance of
probabilities, the damage arose as a result of the FSP‟s failure to complete the storm
damage repairs in a timely manner.
Has the FSP been prejudiced by the applicant s’ conduct ?
The panel is not satisfied that there is evidence to establish prejudice as a result of
the applicants‟ conduct.
Are the applicants entitled to compensation for professional costs incurred
and non-financial loss?
The applicants are entitled to compensation for non-financial loss pursuant to
paragraph 9.3 of the Terms of Reference for $3,000 and for professional costs
incurred of up to $3,000.
Case No: 496510 Determination Page 2 of 11
1.3 Determination
This determination is in favour of the applicants.
Within 14 days of the applicants‟ acceptance of this determination, the FSP is to
appoint an independent expert toolmaker/metallurgist to determine the extent of
damage to the boring rods. Within 14 days of receiving the report, the FSP is to cash
settle the claim for the cost to repair or replace the boring rods as determined by the
independent expert.
The FSP is to pay the applicants $3,000 compensation for non-financial loss
pursuant to paragraph 9.3 of the Terms of Reference.
The FSP is to contribute up to $3,000 towards the professional costs incurred by the
applicants in obtaining reports in support of the claim.
Case No: 496510 Determination Page 3 of 11
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities involved in this determination it has been referred to a panel
for decision.
This determination is based on what is fair in all the circumstances, having regard to
the relevant legal principles, terms of the policy, good industry practice including
codes of practice and prior determinations where applicable.
2.1 Is the FSP liable for the damage sustained to the boring rods?
FSP accepted liability for storm related damage
There is no dispute that the FSP accepted liability for the damage sustained to the
applicants‟ property during a storm in October 2013.
According to the information exchanged the roof of the applicants‟ shed was
significantly damaged when a tree fell during the course of the storm, breaking the
applicants‟ fence and hitting the shed.
The FSP accepted liability for the storm claim, however the repair process was
repeatedly delayed, with the final repairs not being completed until approximately 13
months later, on 14 November 2014.
Although these repairs were said to have been completed by 14 November 2014 it is
apparent further rectification work was required.
The panel is satisfied that the delay in repairs is unreasonable and the FSP‟s failure
to complete the repairs in the timely ma nner has led to further inundation of the shed.
FSP aware the applicants had precision engineering tools in the shed
On 31 October 2013 the FSP‟s repairer AM highlighted to the FSP the shed
contained:
extremely expensive precision engineering tools that need to be stored at the appropriate
humidity to prevent corrosion [because] dehumidifier installed in the shed cannot keep up
with extracting the moisture.
The FSP decided not to offer any storage. It based this decision (the first storage
decision) on the high cost s it anticipated due to the equipment‟s weight and delicacy.
The FSP noted it should advise the applicants of its decision. The claim records do
not note any subsequent notification occurred.
FSP failed to arrange off site storage for the equipment
The FSP says the applicants accepted responsibility for storing the boring rods. The
FSP says the applicants:
refused its offers (before and on 15 July 2014) to move the boring rods off-site
Case No: 496510 Determination Page 4 of 11
were told (on 15 and 21 July 2014) they were responsible for storing the boring
rods.
The Panel carefully reviewed the FSP‟s claims records and the FSP‟s reports.
On 30 April 2014, the FSP‟s builder (P P) told the FSP the applicants requested it
store the shed ‟s equipment off-site. The FSP arranged for a claim assessor and PP
to attend the property to assess the storage request.
On 13 May 2014, the FSP cancelled the assessment (the second storage decision)
meeting based on its decision that:
storage was a claims management (and not assessing or building) decision
the FSP was unable to contact the applicants, so it was unable „to confirm if
there are any other issues‟ to justify an assessment meeting.
On 18 June 2014 PP again notified the FSP that the applicants had made „several
requests‟ for off-site equipment storage. The applicants and FSP then agreed the
FSP would provide a sea container at the site, for equipment storage. The FSP
requested PP submit a quote for this container.
On 1 July 2014, the FSP again requested a quote from PP for a sea container, a
req uest it repeated the next day. It also noted to „follow up if insured tools have been
stored in shipping container to be provided by [PP]‟.
On 2 July 2014, the FSP spoke with the applicants. They agreed to a site
assessment with PP and the repair contract or‟s claim assessor (LD) to address the
applicants‟ concerns about repairs and storage on 15 July 2014. The FSP reviewed
LD‟s report on 18 July 2014. This (third storage decision) noted:
Insured is happy if all equipment in repair can moved back to area in shed to allow repairs.
PP have allowed to move equipment & partition area items from repair area. Assessor has
determined that items don‟t have to be stored outside or in a container.
Applicants did not accept responsibility for storing the boring rods
Th e panel does not accept the FSP‟s suggestions that the applica nts accepted
responsibility for storing the equipment or storing the boring rods.
The sequence of events highlights that the FSP received numerous requests for safe
storage. The requests were made by its own contractors for the applicants.
The FSP was alerted (on 14 October 2013) the damaged shed contained „some quite
exotic and expensive tools … which the insured is quite concerned about‟. On at
least two different occasions afterwards, the FSP decided it would not provide
storage. A third refusal of appropriate storage occurred when its agent decided no
sea container storage would be needed during repairs.
Whilst the panel acknowledges the applicants‟ agreement with the FSP‟s assessor
from 15 July 2014, the panel accepts that such agreement was reached under
pressure to have the repairs completed and under the understanding of the build er‟s
proposal to „move equipment and partition the area.‟
The panel is satisfied that the FSP is responsible in these circumstances for the
arrangements made for the storage of the equipment.
Case No: 496510 Determination Page 5 of 11
FSP liable for the damage to the boring rods
The applicants say that the FSP‟s failure to complete the repairs to the storm
damaged shed, the repeated delays and inadequate claims handling has allowed
water to enter the shed. The boring rods had been stored wrapped in cloth in a metal
tool box. Access to that box had been blocked resulting in the boring rods rusting.
To support this claim the applican ts‟ provided:
machine balancing and calibration expert reports
annotated photographs of the boring rods
detailed submissions on machines, boring rods, restoration and rust
correspondence from the claim and their attempts to seek replacement parts
quotes and products specifications
working solutions for suggested replacement equipment.
The FSP has suggested that the bars were already rusted but offered no information
to dispute the applicants ‟ expert reports.
Photographs support damage likely occurred after storm claim
T he FSP relies on a claim assessor‟s (PC‟s) report (29 January 2015). This stated:
I could not guarantee the condition when these bars arrived nor the condition when they
were damaged. As they were stored out of site, on the concrete floor, and under a cabinet
by the external door there is a chance they were damaged prior to the event. [sic]
However, the p anel is not persuaded by PC‟s suggestion, which is refuted by a
substantial amount of the materials provided.
Photographs show vari ous machines and work stations inside the applicants‟ shed.
These are taken from numerous different angles and work stations. All equipment is,
without exception, very neatly organised and stored.
Additionally, the applicants kept the boring rods wrapped in cloth, inside a metal box.
As identified by AM, the applicants advised of their concerns that humidity might
damage the vintage, precision instruments in October 2013.
AM assessed the contents in October 2013 and found four other vintage machines
and their parts damaged. AM did not refer to the boring rods being damaged.
The applicants intend to continue using the machine with the six undamaged boring
rods. PC‟s report confirms „some‟ bars do remain usable. The applicants claim only
relates to the 14 damaged rods which they seek to have repaired or replaced.
The p anel is satisfied all these factors refute the FSP‟s suggestion the bars were
already rusted. Instead, they support the applicants‟ assertion they paid close
attention to, and regularly used, their equipment and precision parts.
For these reasons the panel is satisfied the applicants have, on balance, established
the damage occurred after they lodged the storm claim.
The panel is satisfied that the FSP‟s handling of the claim, its failure to complete the
repairs in a timely manner and arrange appropriate storage has resulted in the
damage to the boring rods.
Case No: 496510 Determination Page 6 of 11
2.2 Has the FSP been prejudiced by the applicants ’ conduct?
The FSP says it has been prejudiced by the applicants ‟ conduct, in particular:
the applicants delayed the repair process
the applicants acted without its approval in having the boring rods ice blasted
that the applicants have failed to provide the FSP access to the boring rods to
properly assess the damage.
The applicants did not cause a delay in the repairs
The parties give different accounts for why the (first) repairs were completed over 13
months after the claim date.
The panel has reviewed the relevant information. The panel is satisfied the FSP ‟s (or
its agents ‟ ) inadequate claims handling, or repairs, on repeated occasions delayed
the repair process. In particular:
the applicants were correct to seek storage before repairs commenced
make safe works were inadequate and finished repairs required rectification
the FSP erred in its three refusals to provide appropriate storage
regularly, weeks and on repeated occasions months, elapsed before the FSP
acted on internal requests, if at all
the applicants were substantially left to progress the claim.
On review of the claim actions, the applicants usually returned the FSP‟s contact that
day, or within four days.
The Panel accepts that on two occasions, the applicants did not respond to the
FSP‟s requests for contact. On two further occasions, the FSP contacted the
applicants, but they indicated they were busy.
The FSP did not clarify whether messages it (and PP) sent to the applicants were by
text message (which the applicants advised they could not receive), email, or post.
The claim records show:
the applicants advised the FSP their local mobile coverage was very limited
they requested contact by landline instead
there were message facilities on at least one landline
PP appears to have contacted the applicants primarily by mobile
PP used at least one incorrect mobile number, which the FSP later corrected.
The panel does not accept the FSP‟s suggestion that it has been prejudiced in any
way by the applicants ‟ conduct. The panel is satisfied that the applicants have acted
fairly and reasonably.
Applicants did not breach policy conditions
The FSP says the applicants breached policy conditions by authorising repairs and
not cooperating with the FSP‟s claim assessment. It asserts these actions prejudiced
the FSP‟s ability to fairly consider the claim.
Case No: 496510 Determination Page 7 of 11
The FSP also says due to the applicants‟ restoration works, the bars are now in a
different condition to when they were damaged.
The panel accepts the applicants refused to give up all of the boring rods for
assessment by the FSP and:
had BS, a machine balancing and calibration expert, ice blast the boring rods to
clean off the rust to assess the damage
then sought restoration alternatives including heat treatment
authorised heat treatment, which bent one bar.
The panel does not consider however, it plausible that further assessments would
have concluded any differently to BS. The Panel accepts BS‟s conclusion that bars
become irreparable once rusting occurred.
The FSP‟s assessor PC viewed the rods . The applicants‟ annotated photograph
supports PC‟s report comments that the applicants had „saved some‟ (six), but that
others were „pitted with rust‟ (fourteen).
It is unlikely the applicants‟ refusal to provide the bars had any effect on the outcome
of damage assessments, which the FSP says it would have carried out.
Additionally, the applicants had provided one of the damaged bars to the FSP. The
FSP had many opportunities to assess damage. The applicants say:
As the line-boring bar given to [the FSP] was provided willingly, without restrictions or
caveats, they have had every opportunity to collect data about the line-boring bar. They
must have information about the exact methodology used b y the „ice - blasting‟ company.
[The FSP] had unimpeded access to make measurement of size, concentricity, condition of
surface and surface hardness at all times. [The FSP was] never denied access to view,
photograph or measure the bearings or design of the line-boring machine. Any requests for
access were granted from the time immediately after the flooding and during the
subsequent meetings. Access was available, although never requested, until the time of the
email communication 19/04/2016 stating “this matter is not one for [FSP] to further
address”.
On balance, the panel considers the applicants have established:
no other assessment as to the extent of damage was required
the FSP had reasonable assessment opportunities.
Further, the panel notes the disputed damage occurred over four years ago. Since
then, the FSP has not obtained expert information either confirming or refuting any
technical comments made by the applicants (or their experts).
2.3 FSP is liable to meet the applicants’ claim
Boring bars are vintage parts from vintage machine
The damaged boring bars were used in the applicants‟ precision engineering
machine. The applicants say that the line boring machine was „ used for boring main
tunnels on engine cases‟.
The applicants obtained a history of the machine, based on information produced by
a [state] museum, and an incorporated motor enthusiasts‟ association (for the
relevant vehicle manufacturer). Based on this history, the applicants say it:
Case No: 496510 Determination Page 8 of 11
is a specialised, vintage machine and … was used in the vehicle manufacturer‟s former
factory between 1959 and 1968 … although 1960 vintage has been restored by [them] and
[so] is accurate to 0.0002" of an inch over the boring distance with repeatability.
The FSP does not dispute the applicants‟ claim the rods and machine are specialist,
original, vintage, vehicle manufacturer‟s engineering equipment.
Applicants have quantified their loss to the best of their ability
The applicants have tried to find replacement parts and machines. They provided
three potential solutions to the FSP. In support, the applicants provided their own
submissions, and:
manufacturers' contact details and some partial quote estimates
correspondence to and from manufacturers
related advertisements and product specifications
correspondence to the FSP (detailing replacement attempts and options)
BS‟s reports (regarding the bars‟ potential for repairs)
photographs of their line boring machine.
The FSP says the applicants have still not furnished verifiable costings for it to give
consideration to in order to resolve the matter.
The FSP says that regardless, indemnity is limited to the monetary cost of „rust
restoration‟ by PP. The FSP says it may on this basis pay the applicants $1,900,
being:
the restoration of the rust to the maximum value it would have cost the FSP to restore the
rods [after the] … applicant[s] refused its restoration offer.
The panel is satisfied that the applicants have taken all reasonable steps to source,
quote and identify any possible available repairs and replacements. The panel
accepts the applicants have done this at their cost, without assistance from the FSP.
The FSP has failed to obtain any expert information to either confirm or review the
technical comments made by the applicants or their experts.
The panel is satisfied that the applicants have sought competitive quotes for
replacement machines and have provided detailed explanations about the technical
requirements of any replacement boring rods. The applicants have also provided
information to indicate that it may be possible to have replacement boring bars
manufactured in Europe or in the USA. The FSP has not provided any information
about the availability or feasibility of manufacturing replacement boring rods in
Europe or the USA.
Independent expert toolmaker and metallurgist to be appointed
It is difficult to identify the costs to repair or replace the boring rods or to quantify the
appli cants‟ claim.
In the circumstances the panel considers it fair that an independent expert toolmaker
and metallurgist be appointed to determine whether the boring rods can be repaired
and if so, the cost to repair the boring rods in accordance with the manufacturing
specifications. If the boring rods can be repaired or replaced the FSP is to cash settle
Case No: 496510 Determination Page 9 of 11
the claim for the cost to repair or replace the boring rods as assessed by the
independent expert.
In the event that the boring rods cannot be repaired or replaced then the independent
expert is to identify suitable replacement machine and subject to agreement between
the parties, the FSP may either purchase the machine for the applicant or cash settle
the applicant for the costs of the replacement machine.
The panel is further satisfied that as the damage arises from identified deficiencies in
the FSP‟s claims handling process, the settlement figure is not subject to any
monetary limits.
2.4 Are the applicants entitled to compensation?
Applicants are entitled to compensation for non-financial loss
Under the Terms of Reference, FOS may require an insurer pay compensation for
non-financial loss suffered by the applicants. This may apply in circumstances where
FOS considers an unusual degree or extent of physical inconvenience, time taken to
resolve the situation or interference with the insured‟s expectation of enjoyment or
peace of mind occurred.
The panel is satisfied the available materials establish the applicants experienced an
unusual degree of stress and inconvenience.
The stress experienced by the applicants was exacerbated by:
the FSP‟s continued failures to respond to the applicants‟ request s for storage
the vintage and unique nature of the damaged equipment
the applicants‟ understanding of the damage, and appropriate testing methods
the FSP‟s continued failures to accept the applicants‟ advice in this regard
the FSP‟s erroneous attribution of responsibility for storage decisions, rust
damage and delays to the applicants
that these errors occurred despite the applicants ‟ attempts to mitigate losses
and replacement costs (taking significant time, expense and expertise).
Accordingly, in line with paragraph 9.3(b) of this Service‟s Terms of Reference, the
FSP is to pay the applicants $3,000 compensation for non-financial loss.
Applicants are entitled to professional costs
The applicants have incurred professional costs in providing information fro m their
experts to the FSP to assist in the determination of this dispute.
Under paragraph 9.4 of the Terms of Reference, FOS can determine that an FSP
contribute up to $3,000 towards professional costs incurred in the course of a
dispute.
The panel is satisfied that the applicant has necessarily incurred the professional
costs, given the complexity of the issues involved and genuinely require the expert
assistance. In the circumstances the panel is satisfied that the FSP should contribute
up to $3,000 towards the professional costs incurred , subject to the applicant
providing relevant receipts or invoices.
Case No: 496510 Determination Page 10 of 11
3 Supporting information
3.1 Reports
Record Key points
FSP’s expert (A M )
Restoration cont ractor
Assessment of (other)
machines damaged in
insured event
14 - 11 - 2013
I nsured has provided [AM] quotes for replacement and though this
is not the normal process, due to the complex nature of the items,
[they] appear to be the nearest equivalent to what the insured has
and in our opinion, this is the most economica l method of
settlement for these particular contents loss .
I nsured‟s equipment is used to work on machinery, engines and
car parts which are no longer manufactured, so a lot of what he
provided quotes on are seconds but this is because the second
hand part s are all that can be utilized today for him to be able to
carry on doing the same work that he does .
[Machine 1:] The quote is actually for a second - hand machine
which is all the insured wants as the newer machines will not serve
the same purpose that he uses them for. This has reduced costs
by approx. $20,000.00.
[Machine 2:] The quote from [an industrial supplier] the nearest
equivalent as far as we have been able to ascertain.
[Machine 3:] The current equivalent replac ement only provides
output in digit al and the cheapest we were able to find was the
US$3,169 +GST + freight + the shops necessary margin. The
insured prefers an analogue output and in imperial . measurements
based on today‟s current supply. He would have to buy two
separate gauges to fulfil this need which the insured is content
with.
[Machine 4:] This item requires replacement. The insured has the
tools to remake one if he is able to get the materials needed at little
or no cost he will not bother claiming for it, however if costs are
high he will provide a receipt and request reimburs ement for the
materials to recreat e the tightener and not charge for his labour.
We believe this is reasonable.
T his report is the only assistance that [AM] can provide on this
contents loss.
FSP’s expert (PP)
Building contractor
Assessment report
12 - 10 - 2014
Length of time of repairs are due to multiple issues not wit hin PP
control ...PP have only been approved since February in this time
we have had to obtain plans/permits, have trades attend measure
up, access difficulties due to the insured being away multi ple times,
difficulty in contacting the insured, and issues with storage as
advis ed by insurer.
After demolition of damaged garage section, the garage had a
temporary frame installed to help tarp up to limit exposure to the
weat her and elements.
The insu red advised that excessive rain hit the property and run
down the tarps onto the concrete slab and flooded the insureds
garage.
He spent up to 30 hours trying to limit damage from the water
Case No: 496510 Determination Page 11 of 11
ingress. When asked if the insured contacted PP or their insurer
during the high rain flood event, they were unsure and believed
they had trouble as it was after hours. PP and the insurer have
afterhours contact and when we were made first aware (17/08) PP
attended that day to res eal and prevent furt her water entry.
Th e shed was repaired and wat ertight 2 days later. Rust to the
insureds machinery and products, we believe cannot be directly
related to the one flood event .
FSP’s expert (PC )
Claim assessor
Reins pection report
12 - 02 - 2015
Machine rods:
the machine rods were removed from the stand after the tree
impact, wrapped in a towel and put in the bottom cabinet
the cabinet then flooded with water but the insured's machinery
was put in front of the cabinet so he was unable to get to the rods
when the work was completed and the machinery moved the
insured then discovered the rods were sitting in water and had
become damaged
this would make sense as it was described
I originally believed the rods were always stored there and thus
could have been damaged outside the claim but I was wrong
there are 14 rods, 3 are not being claimed f or so there are 11 rods
damaged
the insured has found a place in America t o fix these but at a huge
cost
t he insured is trying to find a way of doing this locally
e ither way, this could cost anywh ere between $6k - $15k depending
on the insured's investigations .
3.2 Repairs and replacements
Applicants’ summaries – sourcing attempts
The applicants provided detailed information of attempts to source the replacement
parts through the original vehicle manufacturer through local contacts who may have
been able to repair or replace the boring rods, through international enquiries and
various recreation attempts.