Home / Financial Firm (Unknown - Insurer) / Determination 496039

Determination 496039

Claim denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed for cracking damage to his units, attributed to tree roots and leaking pipes, and for loss of rent. AFCA found the damage was excluded and ordered nothing, noting the FSP's earlier goodwill offer could be revisited.

The proximate cause of the damage was long-term ground movement and tree roots, which the policy excludes, so the claim and the loss of rent benefit fail.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 496039 Determination Page 1 of 14 Case number: 496039 25 July 2018 1 Overview 1.1 Dispute On 2 March 2016, the applicant lodged a claim under his policy with the financial service provider (FSP). The applicant claimed for structural damage to his property because of tree roots. He also claims the damage was caused by storm, rainwater or run-off and water or other liquid damage. The FSP denied the claim relying on its engineer who attributed the bulk of the damage to differential ground movement over time. The engineer also said leaking pipes contributed to 20% of the damage. As a gesture of goodwill, the FSP offered the applicant $26,621.47 which is 20% of the claimed damage attributable to the leaking pipes less the $500 policy excess. The applicant disagrees and seeks 80% of the cost of the total scope of works (which he also disputes) and $8,580 for loss of rent. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The FSP is entitled to deny the claim because the available information establishes on the balance of probabilities, the proximate cause of the claimed damage is long- term differential ground movement. The available information establishes the leaking pipes were a minor contributor only to the claimed damage. As damage caused by ground movement and tree roots is excluded from cover, the FSP is entitled to deny the claim. Is the applicant entitled to loss of rent? In this dispute, the proximate cause of the claimed damage is a policy exclusion rather than a defined event. Given the policy excludes the claimed physical damage, the applicant has not established an entitlement for the „loss of rent‟ benefit. 1.3 Determination This determination is in favour of the FSP. The FSP is not obliged to take any further action in relation to the claim or the dispute. Case No: 496039 Determination Page 2 of 14 2 Reasons for determination 2.1 Is the FSP entitled to deny the claim? Applicant may establish a valid claim if accidental damage occurred after 2012 The applicant carries the initial onus to establish the terms and conditions of the policy cover the claimed loss or damage. This is known as a valid (prima facie) claim. The applicant‟s policy covers for accidental loss or damage, subject to various conditions and exclusions. The policy define the expression „accidental damage‟ as means damage to, loss or destruction of your buildings or contents caused by an unintentional act, or an unforseen or uncontrollable incident. It is not in dispute there is cracking damage to the wa lls of the units. The applicant attributes the damage to tree roots, storm, rainwater or run-off and water or other liquid damage after discovering leaking pipes. Given the broad scope of the accidental damage cover, I am satisfied the applicant may establish a valid claim for the cracking damage subject to proving the damage occurred during the period of insurance. The FSP says the applicant‟s cover with the FSP commenced on 23 January 2012. The applicant says the policy commenced in 2009. He says he was insured since he purchased the property in 1984. Whilst I accept the property may have been insured since 1984, the applicant must establish the property was insured with the FSP. In the absence of evidence to the contrary, I accept the FSP‟s policy with the applicant commenced on 23 January 2012. If the applicant can establish accidental damage occurred after the policy commenced, it then falls to the FSP to establish, on balance, the cause of the damage was a policy exclusion or it is otherwise entitled to deny the claim. Relying on its engineer‟s report, the FSP says the cracking damage occurred due to several factors the policy excludes. Accordingly, it falls to the FSP to demonstrate:  the cause of the disputed damage was a policy exclusion or  it is otherwise entitled to deny the claim. Property has been subject to movement and cracking over years The applicant‟s broker contacted the FSP and lodged a claim on 2 March 2016 for building damage. In lodging the claim, the broker said: Our insured has had structural damage to his building which may have been caused by tree roots. The relevant city council officer served a „building order‟ on the applicant following their engineer (KA)‟s recommendation. In his report, KA says:  cracks indicate rotation and settlement in the footings  trees along the southern, western and eastern walls are the main contributor Case No: 496039 Determination Page 3 of 14  moisture variation attributes to the movement and rotation of the walls  the soil shrinks from the tree roots and dry weather which causes settlement of the foundations and building distress. The FSP engaged a plumber (AD) who reported:  the stormwater pipes were in good order save for one area where roots had entered the pipe on the right-hand side front corner of the building  three cracks were found in the sewer lines servicing units one and two and at the boundary shaft. The applicant attributed at least 80%, if not all, of the damage to the leaking pipes which AD detected. He also argues the damage is caused by a combination of the leaking pipes, the tree roots, and stormwater run-off. FSP’s engineer established tree roots as the main cause of earth movement After AD‟s inspection, the FSP engaged an engineer (CD) to report on cause of the damage. In his report, CD says:  the paving along south elevation is in a poor state  several rooms in unit one displayed cracking and moisture ingress  previous repairs attempts are evident  there are issues with storm water drainage adding to the cracks. The applicant says the guttering and plumbing to the property were in poor condition since 2010. On or around 2014, the applicant engaged a plumber to replace the guttering, the drainage system and down pipes to the property. CD says these recent repairs to the plumbing were insufficient. Further if such repairs met the current repair standard, it could have prevented the extent of damages noted to the bricks. In his report, CD noted:  valley gutter in between units 1 and 2 is in breach of the code which was applicable at the time of the service  the roof guttering to unit one contained no device to accommodate the overflow  the vertical gutter in the north end of the internal wall was not allowing storm water to flow through the guttering system indicating inadequate fall and subsequently retaining water. CD attributed the foundation movement to differential ground movement caused by variation in moisture content of the reactive clay soil. CD attributed the variation in moisture contents to drainage conditions, trees and shrubs and defective plumbing. CD says the concrete paving around the building line allows water to migrate into foundation soil. The trees and shrubs adversely affect the performance of the footing on reactive soil. CD noted:  trees were located at the southern end of the property; several trees were approximately 10 meters high  review of Nearmap imaging data, revealed tall trees were planted along the western property boundary but removed in January 2012 Case No: 496039 Determination Page 4 of 14  Google Streetview images data revealed a large tree present at the south east corner prior to November 2007. CD provided Google images from 2009 and 2014 showing the distress cracking to the brickwork of the units. No attempts to address these cracks were noted. CD noted the downpipes were draining over the driveway around the building, rather than connecting to the underground drainage system. This meant the water subsequently migrated into foundation soil as noted above. CD concluded that the cracking damage is because of differential ground movement caused by long-term and ongoing cyclical moisture change of reactive clay soil. He identified several influences on moisture variation. CD apportioned the overall damage to the property as:  60% due to tree effects  20% due to drainage and plumbing issues and poor workmanship  20% because of the leaking pipes which AD detected. It is important to establish the proximate cause of damage In order to determine whether the applicant‟s claim falls within scope of cover, it is necessary to determine the proximate cause of the loss. What is the proximate cause of the loss is the question of fact depending upon the circumstances of each case. It is well established that a proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Leaking pipes are not the proximate cause The question of fact in the current dispute is whether the leaking pipes are the dominant and operative cause for the claimed damage. The available information notes previous repairs to the internal walls. This suggests the cracking is a reoccurrence and the movement issues are of an ongoing nature. The photographs supplied by CD shows the cracking damage was present prior to policy inception in 2012. According to the applicant, cracking has been occurring for 10 years and there were visual cracks in the property in 1984. Further at the time of the claim lodgement, the applicant and his broker attributed the damaged to the tree roots. This is consistent with KA‟s findings the trees were the main contributing factor of the cracking damage. As outlined above, the proximate cause is effective or dominant or operative cause of the loss. Having considered all the available information, I am not satisfied on the Case No: 496039 Determination Page 5 of 14 balance of probabilities, the leaking pipes were the proximate cause of the damage. At best, the available material establishes the leaking pipes were a small contributor. The FSP is entitled to deny the claim The FSP relies upon policy exclusions contained within the policy to deny the claim. If further relies on an engineer report (CD), which report is consistent about the cause of damage with the applicant‟s engineer (AK). The FSP‟s p olicy is clear and unambiguous. Although the policy covers earth movement in certain circumstances, it is not applicable to this dispute. The policy expressly excludes any damage caused by tree roots. Further, the available information establishes some damage had occurred as far back as December 2009 whereas the applicant incepted the policy on 23 January 2012. In these circumstances, applying relevant legal principles, earth movement would have occurred in the absence of the leaking pipes. Additionally, the available information supports a conclusion the drying effect of the tree roots was the cause of the earth movement. Although the policy covers damage for accidental damage and storm, rainwater or run-off, cover is subject to the policy exclusions. Policy exclusions include soil movement and damage caused by tree roots. Based on the above, the FSP is entitled to deny the claim. Applicant should consider the FSP’s good will gesture if made again Notwithstanding its position outlined above, the FSP offered the applicant $26,621.47 as a goodwill gesture. The FSP bases the sum on 20% of the repair quote, less a $500 policy excess. It remains up to the FSP as to whether it wishes to put the offer again and whether the applicant wishes to accept this settlement offer as a way of resolving the claim and the dispute in its entirety. 2.2 Is the applicant entitled to loss of rent? Policy provides loss of rent following an insured event The applicant is claiming loss of rent totalling $8,580 . Relevantly, the policy says: If the buildings are damaged by an insured event covered by your policy, to such an extent that your tenant cannot live in them, or we agree access to or use of th e buildings was not possible if any of the insured events covered by this policy occur during the period of insurance. In short, this means loss of rent only applies where:  the building is damaged by an insured event, and  the property cannot be lived in consequently. Case No: 496039 Determination Page 6 of 14 Applicant not entitled to loss of rent Upon review of the policy wording and considering my findings above, I am not satisfied the FSP is liable for any loss of rent payments. This is because, for the reasons set out above, I do not accept the proximate cause of the building damage was an insured event. Case No: 496039 Determination Page 7 of 14 3 Supporting information 3.1 FOS Approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their s ubmissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the FSP‟s Notice of Response dated 3 October 2017. Both the policy document and the Notice have been exchanged with the applicant. 2. Accidental loss or damage (Applicable whether you have buildings and/or contents cover) We will pay for accident al loss or damage, unless it is caused by: d. roots from trees, shrubs or grass; or … 3.3 Key Documents Record Key points Quote to underpin 26 February 2016  17 underpinning $20,000  19 underpinning $22,000 Engineer report (KA) 20 - 02 - 2016  Visual inspection of external brick wall indicates that rotation of footings and settlement has taken place.  South Western brick wall has rotated an d settled, cracks in the range of 25mm are present due to movement.  South Eastern brick wall has rotated and settled, cracks in the range of 50mm are present due to movement.  Trees located at approximately 2m of the wall and are 4 - 6 m high.  Trees located a long the western, southern and eastern wall is Case No: 496039 Determination Page 8 of 14 the main cont ribution to the problem.  Movement/rotation of the wall can be attributed to moisture variation - differential shrinking of reactive „Basaltic‟ clay from the tree roots and abnormal season being very dry.  This causes settlement of foundation and is large enough to cause building distressing.  Trees should be located no closer than 1x the mature height away from footing.  Trees wit hin close proximity of walls are to be removed as soon as possible.  Em ploy a plumber to test for any leaks from the storm water, sewerage of wat er supply system.  If any leaks or damage pipes are found, they are to be rectified reducing the moisture under the footings.  Employ a registered underpinnar to underpin and jack footings to its original position and repair brick work.  Seal repair concrete slab around effected area to reduce the surface water from entering the footings after repairs have taken place. FSP’s loss adjuster report 1 (CF) 18 - 05 - 20 16  Applicant advised that he noticed cracking occurring to the external brickwork of the main house over the last 10 years and throughout these years he advised that the cracking has wors ened  T o determine the cause of the cracking applicant arranged for KA , an engineering company to attend to inspect the cracking. The investigation by the attending engineer revealed that a section of the brick wall has rotated and settlement has occurred which has caused the cracking. It is believed that the cracking may ha ve been caus ed by tree roots from large trees that are planted 2m from the affected wall.  O nly able to access the Unit 2 which is currently vacant and noticed some minor cracking to the internal plaster. Applicant says that this cracking has been ongoing f or a number of years and is not concerned with the cracking.  Applicant has obtained a quote for the underpinning works required, according to applicant an additional two pins are required at the front of the property to ensure that it complies with current building standards. The quote for the underpinning works is for $22,000. FSP’s plumber report (AD) 02 - 06 - 2016  CCTV camera inspection to sewer line – FAILED  CCTV camera inspection to storm water line – FAILED  Storm water was found to be a mix of PVC and clay pipes. O nly one area where roots were found to be entering the storm water pipe which is down the right - hand side near the front corner of the building. Rest of the storm water pipes were found to be in goo d order.  Sewer lines were made of cast iron above the ground and clay below and three cracks were found. One to Unit 2 toilet branch line where the elbow was found to have a crack Case No: 496039 Determination Page 9 of 14 around it before it connects to the junctions into the mainline.  S econd cr ack is to Unit 1 where the sewer junction was found to have a crack to it just into the main line.  Third crack is at the boundary shaft where the sewer pipe was found to have a crack just before the shaft.  Pressure test to the main domestic water supply line before any gate valves, and it was found to hold pressure. FSP’s engineer report ( CD ) and Scope 13 - 07 - 2016  I nsured advised that the guttering and plumbing to the property were in very poor condition since 2010 (or thereabouts), until the Insured ga thered enough funds to engage a plumber approximately 2 years ago, to replace the guttering and plumbing (ie. drainage system, downpipes) to the property (Unit residences).  Unit 1 – renovat ed approximately 1.5 years prior to our inspection. No Tenant at th e time of our inspection. Access was provided.  Unit 2 – renovat ed approximately 6 to 9 mont hs prior to our inspection. Tenanted at the time of our inspection. No Access was provided.  Unit 3 – un - renovated for a very long time. Tenanted at the time of our i nspection. No Access was provided.  Unit 4 – renovat ed approximately 2 years prior to our inspection. Tenanted at the time of our inspection. No Access was provided.  Unit 5 – renovat ed approximately 3 years prior to our inspection. Tenanted at the time of our inspection. No Access was provided.  Local c ouncil ordered a building notice to the property in respect to the cracking to the brick work which prompted the Insured to make a claim.  Unit 1 Interior:  Although the unit was recently renovat ed, with clear p atch and paint marks and maint enance works carried out at the unit, there were still signs of distress;  Several rooms in the unit displayed the plasterboard lining to the walls compromised to cracking and moisture ingress.  P revious attempts to the full and paint several cracking to the living room. The northern plasterboard lining, was observed to be have failed and bulging outward, vertically in line with the valley / box gutter above the internal wall in the living room.  Ceiling plasterboard lining in the kitchen adjacent to skylight displayed cracking.  Issue s with the roof structure / plumbing.  Based on comments by the Ins ured and observations we understand that there may have been considerable issues with stormwater drainage with the property contributin g to the distresses noted to the building, thus the Insured decision to upgrade the plumbing system to the property. We are in the opinion of the Insured measured approach to replacing the Case No: 496039 Determination Page 10 of 14 stormwat er system to the properties could have prevented the extent of damages noted to the building brick work.  During our inspection of the roof, particularly over Unit 1, we noted that the valley gutter in - between unit 1 and 2, which would have been applicable at the time of upgrading the roof guttering is in breach of the National Construction Code – 2015, 3.5.2.4 Installation of Gutters (c); “Valley gutters on a roof with a pitch - more than 12.5 degrees – must have width of not less than 400mm and be wide enough to allow the roof covering to overhang not less than 15 0mm each side of the gutter”  R oof guttering to unit 1 at each elevation were two roof lines meet and form a valley gutter (along the east elevation), which flows into a rain head, contained no device to accommodate overflow, which is also in contravention to AS3500. 3, which requires that box gutter systems must include overflow which discharge clear of the building footprint in the case of outlet blockage, and have equivalent capacity to the outlet.  Bo x gutter had a side outlet, which created a change in di rection of the flow of the box gutter. This is in contravention to AS3500.3 – Plumbing and Drainage - Stormwater, Section 3.7.4 (g); Box gutters shall … (iv) discharge at the downstream end without change of direction (i.e. not to the side).  F urther noted at the time of our inspection, the box gutter approximately vertically in - line with the north end internal plasterboard wall in living room, was not allowing the storm water to flow through the guttering system, indicating inadequate fall and subsequently retaining water, this is in contradiction of VBA Guide to Standards and Toleranc es 2015 – 7.03 – Water ret ention in gutters – “Gutters are defective if they retain a depth of more than 10mm of water.”  Foundation movement:  Although the soil at the subject p roperty was not formally tested at the time of our inspection, the soil profile in the vicinity of subject property is known to comprise of reactive clay as described within AS2870:2011 - Residential Slabs and Footings.  Buildings founded on reactive clays will experience differential movement as a consequenc e of change in the moisture condition of the founding soils across the building envelope. Reactive clays volumetrically decrease (i.e. shrink) with drying, which can cause settlement of the affected foot ing. Convers ely, reactive clays volumetrically increase (i.e. swell) with wetting, which may cause heave of affected footing.  Abnormal moisture conditions (as described within AS 2870) have pot ential to cause movement and building distress which exceeds no rmal cosmetic distress.  Furthe r, cyclical wetting and drying from abnormal moisture Case No: 496039 Determination Page 11 of 14 conditions over a prolonged period can cause increased differential settlement of footings on reactive clays due to the accumulation of ground movement through each cycle.  D istress to the footings was consistent with differential ground movement caused by variation in moisture content of reactive clay soil. The distress was closely spread to the south end property,  Soil moisture influences:  Factors which are considered to be signific ant in change to moisture conditions of foundation soil in the affected area of the residence is as follows:  Drainage conditions ; which allow water migrate int o foundation soil. The majority of the property building line is covered in hard surfaci ng concrete paving and shared driveway to the western side of the property.  Trees and shrubs; which adversely affect the performance of footings on reactive clay over time due to the effects of localised tree - root drying. The zone of influence of a tree is equivalent to up to 1.5 x mature height, dependent on the reactivity of the clay foundation soil and the species / spacing of trees (AS2870:2011 – Residential slabs and footings).  Several trees were locat ed at the Sout hern end of the property boundary, ap proximately 3.0m high and 2 meters from the building line. With several taller trees approximately 10.0m high and 8.0m from the building line.  Review of Nearmap imaging data, revealed tall trees were planted along the Western property boundary, ranging fro m approximately 8m high and 4.0m from the building footprint along the west elevation which had been removed sometime in January 2012.  Google Street view images data revealed that a large tree approximately 8m high and 5.0m from the sout h - east corner of the building (ie. Unit 1 electricity meter box) was present at the property sometime prior to November 2007, which was later removed. Furthermore, the street view image for June 2014, clearly showed the distress at the south - east corner of the building from th e elevation view – see photo 2.  Defective plumbing ; which allows water migrate into foundation soil.  AD was requested and attended the subject site on 02 June 2016 to identify defects to the plumbing systems;  The report failed the camera inspection of both the sewer and storm water drain lines and noted the following considered significant to our report;  F ront corner of the building (south - east corner) was discovered to have root intrusion.  Do wnpipes were not connected to the underground drainage system and allowed to drain over the paved surface (driveway ) around the building, allow storm water run - off from the roof to the neighbouring property and / or natural surface adjacent to the subject building footings, subsequently in Case No: 496039 Determination Page 12 of 14 breach of National Constructio n Code - 2015, P2.2.1 - Surface Water (a) “Surface water, resulting from a storm having an average recurrence interval of 20 years and which is collected or concentrated by a building or site work, must be dispos ed of in a way that avoids the likelihood of damage or nuisance to any other property.  T oilet sewer line was discovered to have cracks at the east elevation behind Unit 1 & 2.  Ongoing seasonal moisture variation ; due to rainwat er permeation through unpaved surfaces, seasonal variation in precipitation and long term climatic shift is considered a factor to the cracking of brickwork at the south - east corner (unit 1).  CONCLUSIONS  Based on comments by the Ins ured and observations we understand that the Insured was aware of issues to the brickw ork prior to the loss date, it is further noted the Google Street view imagery from June 2014 and December 2009, also clear identifies the distress to the brickwork at the south - east corner of the building (unit 1). The Insured advised that the storm water guttering system was is a poor state and was aware of the issues, but was unable to replace/update the guttering system until enough funds were available to undertake works.  D istress to the brick wall is related to differential ground movement caused by lo ng term and ongoing cyclical moisture change of reactive clay soil from the following influencing factors:  Influences on moi sture variation include the following:  D istresses noted to the brick work is ranges to all elevations of the building (unit 1 and 2 ), primarily influenced by defective plumbing and dry - root effect of trees removed and on - going from present trees.  R esults recorded from our inspection indic ated separation/ cracking along the sout h - east corner of the brick wall, however review of the Goo gle “Street view” elevation imagery, suggest cracking on the brick wall was evident prior to the inspection date  M ovement of the brick wall, is a result of the removal of the large mature tree (removed approximately sometime after 2007), which encourages se ttlement beneath the brick wall footing and resultant cracking observed in the “Street view” imagery and periodically worsened, ie. continued to widen the cracking.  Upon reviewing dat a from Nearmap aerial images and Google Street view images, there appeared to be substantial number of trees along the western property boundary and large mature tree at the south - east corner of the property prior to January 2012, to which the distresses to the building (at both the east and west elevations) became more prominent , upon the removal of the tree, to which we consider to be a primary factor in the footing movement due to Case No: 496039 Determination Page 13 of 14 settlement contributing approximately 60% of the resultant damage to the building.  P lumbing works undertaken by the plumber commissioned by the Insur ed to the replace the existing roof guttering and associated plumbing works was completed poorly and in some areas incomplete due to the lack of downpipes connected to the underground drainage system and valley / box guttering to the building considered de fective due to inadequate fall and retention of storm water. In our opinion we consider the internal building / failure of plasterboard lining to Unit 1 living room a direct result of inadequate fall from the box gutter vertically in - line over the wall, al lowing water backflow into the building due to failed flashing. We consider that poor workmanship is considered to be contributing up to 20% of resultant damaged.  Defective plumbing identified by A D on 02 June 2016 to the sewer and storm water indicat ed se veral issues to the cracked pipes, root intrusion and misalignments of pipes which in our opinion have caused on - going distress to the building and leaking pipe from defective plumbing all considered to be contributing 20% of the result ant damage. (ie. uni t 1 and 2.). FSP’s building Validator report (CF) 18 - 10 - 2016 CS $ 135,607.35 (GST Inc) TCB JKG $ 197,119.00 $ 192,126.00 (GST Inc) (GST Inc)  It is worth noting the attending builders have included Prime Cost/Provisional Sums in their submitted quot ations. The nominated sums are as follows: CS $52,670.00 TCB $12,000.00 JKG $55,200.00  Works proposed in C D report do reflect the required repairs however the extent needs to be detailed by either a structural or civil enginee r therefore the supplied quotations are subject to variation.  Based on the content of the proposed scope of works with accompanying site referenc e photographs possible variations to proposed scope of works may apply. The identified possible variation to th e proposed scope of works is as follow: Possible damage to brickwork/footings. Possible damage to sounding surfaces. FSP’s engineer supplementary report ( CD ) 19 - 06 - 2017  S cope provided should be considered in its entirety in relation to the 20% of damages associated with the plumbing at this property. Case No: 496039 Determination Page 14 of 14 3.4 Other relevant material considered and relied on  Parties‟ submissions, emails, photographs, reports, scope of works, material from the local Council, Google map images and all attachments to all submissions.  Correspondence between the parties and the applicant‟s broker.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.