Home / Financial Firm (Unknown - Insurer) / Determination 496039
Determination 496039
Claim denial
Summary
The applicant claimed for cracking damage to his units, attributed to tree roots and leaking pipes, and for loss of rent. AFCA found the damage was excluded and ordered nothing, noting the FSP's earlier goodwill offer could be revisited.
The proximate cause of the damage was long-term ground movement and tree roots, which the policy excludes, so the claim and the loss of rent benefit fail.
Issues
- Claim denial primary · not upheld“the proximate cause of the claimed damage is long-term differential ground movement, and the policy expressly excludes damage caused by tree roots.”
- Product terms interpretation secondary · not upheld“Although the policy covers earth movement in certain circumstances, it is not applicable to this dispute.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 496039 Determination Page 1 of 14
Case number: 496039 25 July 2018
1 Overview
1.1 Dispute
On 2 March 2016, the applicant lodged a claim under his policy with the financial
service provider (FSP). The applicant claimed for structural damage to his property
because of tree roots. He also claims the damage was caused by storm, rainwater or
run-off and water or other liquid damage.
The FSP denied the claim relying on its engineer who attributed the bulk of the
damage to differential ground movement over time. The engineer also said leaking
pipes contributed to 20% of the damage.
As a gesture of goodwill, the FSP offered the applicant $26,621.47 which is 20% of
the claimed damage attributable to the leaking pipes less the $500 policy excess.
The applicant disagrees and seeks 80% of the cost of the total scope of works (which
he also disputes) and $8,580 for loss of rent.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim because the available information establishes
on the balance of probabilities, the proximate cause of the claimed damage is long-
term differential ground movement. The available information establishes the leaking
pipes were a minor contributor only to the claimed damage. As damage caused by
ground movement and tree roots is excluded from cover, the FSP is entitled to deny
the claim.
Is the applicant entitled to loss of rent?
In this dispute, the proximate cause of the claimed damage is a policy exclusion
rather than a defined event. Given the policy excludes the claimed physical damage,
the applicant has not established an entitlement for the „loss of rent‟ benefit.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not obliged to take any further action in relation to the claim or the
dispute.
Case No: 496039 Determination Page 2 of 14
2 Reasons for determination
2.1 Is the FSP entitled to deny the claim?
Applicant may establish a valid claim if accidental damage occurred after 2012
The applicant carries the initial onus to establish the terms and conditions of the
policy cover the claimed loss or damage. This is known as a valid (prima facie) claim.
The applicant‟s policy covers for accidental loss or damage, subject to various
conditions and exclusions.
The policy define the expression „accidental damage‟ as
means damage to, loss or destruction of your buildings or contents caused by an
unintentional act, or an unforseen or uncontrollable incident.
It is not in dispute there is cracking damage to the wa lls of the units. The applicant
attributes the damage to tree roots, storm, rainwater or run-off and water or other
liquid damage after discovering leaking pipes.
Given the broad scope of the accidental damage cover, I am satisfied the applicant
may establish a valid claim for the cracking damage subject to proving the damage
occurred during the period of insurance.
The FSP says the applicant‟s cover with the FSP commenced on 23 January 2012.
The applicant says the policy commenced in 2009. He says he was insured since he
purchased the property in 1984. Whilst I accept the property may have been insured
since 1984, the applicant must establish the property was insured with the FSP.
In the absence of evidence to the contrary, I accept the FSP‟s policy with the
applicant commenced on 23 January 2012.
If the applicant can establish accidental damage occurred after the policy
commenced, it then falls to the FSP to establish, on balance, the cause of the
damage was a policy exclusion or it is otherwise entitled to deny the claim.
Relying on its engineer‟s report, the FSP says the cracking damage occurred due to
several factors the policy excludes. Accordingly, it falls to the FSP to demonstrate:
the cause of the disputed damage was a policy exclusion or
it is otherwise entitled to deny the claim.
Property has been subject to movement and cracking over years
The applicant‟s broker contacted the FSP and lodged a claim on 2 March 2016 for
building damage. In lodging the claim, the broker said:
Our insured has had structural damage to his building which may have been caused by
tree roots.
The relevant city council officer served a „building order‟ on the applicant following
their engineer (KA)‟s recommendation. In his report, KA says:
cracks indicate rotation and settlement in the footings
trees along the southern, western and eastern walls are the main contributor
Case No: 496039 Determination Page 3 of 14
moisture variation attributes to the movement and rotation of the walls
the soil shrinks from the tree roots and dry weather which causes settlement of
the foundations and building distress.
The FSP engaged a plumber (AD) who reported:
the stormwater pipes were in good order save for one area where roots had
entered the pipe on the right-hand side front corner of the building
three cracks were found in the sewer lines servicing units one and two and at
the boundary shaft.
The applicant attributed at least 80%, if not all, of the damage to the leaking pipes
which AD detected. He also argues the damage is caused by a combination of the
leaking pipes, the tree roots, and stormwater run-off.
FSP’s engineer established tree roots as the main cause of earth movement
After AD‟s inspection, the FSP engaged an engineer (CD) to report on cause of the
damage.
In his report, CD says:
the paving along south elevation is in a poor state
several rooms in unit one displayed cracking and moisture ingress
previous repairs attempts are evident
there are issues with storm water drainage adding to the cracks.
The applicant says the guttering and plumbing to the property were in poor condition
since 2010. On or around 2014, the applicant engaged a plumber to replace the
guttering, the drainage system and down pipes to the property.
CD says these recent repairs to the plumbing were insufficient. Further if such repairs
met the current repair standard, it could have prevented the extent of damages noted
to the bricks. In his report, CD noted:
valley gutter in between units 1 and 2 is in breach of the code which was
applicable at the time of the service
the roof guttering to unit one contained no device to accommodate the overflow
the vertical gutter in the north end of the internal wall was not allowing storm
water to flow through the guttering system indicating inadequate fall and
subsequently retaining water.
CD attributed the foundation movement to differential ground movement caused by
variation in moisture content of the reactive clay soil. CD attributed the variation in
moisture contents to drainage conditions, trees and shrubs and defective plumbing.
CD says the concrete paving around the building line allows water to migrate into
foundation soil. The trees and shrubs adversely affect the performance of the footing
on reactive soil. CD noted:
trees were located at the southern end of the property; several trees were
approximately 10 meters high
review of Nearmap imaging data, revealed tall trees were planted along the
western property boundary but removed in January 2012
Case No: 496039 Determination Page 4 of 14
Google Streetview images data revealed a large tree present at the south east
corner prior to November 2007.
CD provided Google images from 2009 and 2014 showing the distress cracking to
the brickwork of the units. No attempts to address these cracks were noted.
CD noted the downpipes were draining over the driveway around the building, rather
than connecting to the underground drainage system. This meant the water
subsequently migrated into foundation soil as noted above.
CD concluded that the cracking damage is because of differential ground movement
caused by long-term and ongoing cyclical moisture change of reactive clay soil. He
identified several influences on moisture variation.
CD apportioned the overall damage to the property as:
60% due to tree effects
20% due to drainage and plumbing issues and poor workmanship
20% because of the leaking pipes which AD detected.
It is important to establish the proximate cause of damage
In order to determine whether the applicant‟s claim falls within scope of cover, it is
necessary to determine the proximate cause of the loss. What is the proximate cause
of the loss is the question of fact depending upon the circumstances of each case.
It is well established that a proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Leaking pipes are not the proximate cause
The question of fact in the current dispute is whether the leaking pipes are the
dominant and operative cause for the claimed damage. The available information
notes previous repairs to the internal walls. This suggests the cracking is a
reoccurrence and the movement issues are of an ongoing nature.
The photographs supplied by CD shows the cracking damage was present prior to
policy inception in 2012. According to the applicant, cracking has been occurring for
10 years and there were visual cracks in the property in 1984.
Further at the time of the claim lodgement, the applicant and his broker attributed the
damaged to the tree roots. This is consistent with KA‟s findings the trees were the
main contributing factor of the cracking damage.
As outlined above, the proximate cause is effective or dominant or operative cause of
the loss. Having considered all the available information, I am not satisfied on the
Case No: 496039 Determination Page 5 of 14
balance of probabilities, the leaking pipes were the proximate cause of the damage.
At best, the available material establishes the leaking pipes were a small contributor.
The FSP is entitled to deny the claim
The FSP relies upon policy exclusions contained within the policy to deny the claim.
If further relies on an engineer report (CD), which report is consistent about the
cause of damage with the applicant‟s engineer (AK).
The FSP‟s p olicy is clear and unambiguous. Although the policy covers earth
movement in certain circumstances, it is not applicable to this dispute. The policy
expressly excludes any damage caused by tree roots. Further, the available
information establishes some damage had occurred as far back as December 2009
whereas the applicant incepted the policy on 23 January 2012.
In these circumstances, applying relevant legal principles, earth movement would
have occurred in the absence of the leaking pipes. Additionally, the available
information supports a conclusion the drying effect of the tree roots was the cause of
the earth movement.
Although the policy covers damage for accidental damage and storm, rainwater or
run-off, cover is subject to the policy exclusions. Policy exclusions include soil
movement and damage caused by tree roots.
Based on the above, the FSP is entitled to deny the claim.
Applicant should consider the FSP’s good will gesture if made again
Notwithstanding its position outlined above, the FSP offered the applicant $26,621.47
as a goodwill gesture. The FSP bases the sum on 20% of the repair quote, less a
$500 policy excess.
It remains up to the FSP as to whether it wishes to put the offer again and whether
the applicant wishes to accept this settlement offer as a way of resolving the claim
and the dispute in its entirety.
2.2 Is the applicant entitled to loss of rent?
Policy provides loss of rent following an insured event
The applicant is claiming loss of rent totalling $8,580 .
Relevantly, the policy says:
If the buildings are damaged by an insured event covered by your policy, to such an extent
that your tenant cannot live in them, or we agree access to or use of th e buildings was not
possible if any of the insured events covered by this policy occur during the period of
insurance.
In short, this means loss of rent only applies where:
the building is damaged by an insured event, and
the property cannot be lived in consequently.
Case No: 496039 Determination Page 6 of 14
Applicant not entitled to loss of rent
Upon review of the policy wording and considering my findings above, I am not
satisfied the FSP is liable for any loss of rent payments. This is because, for the
reasons set out above, I do not accept the proximate cause of the building damage
was an insured event.
Case No: 496039 Determination Page 7 of 14
3 Supporting information
3.1 FOS Approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions.
While the parties have raised numerous issues in their s ubmissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the FSP‟s Notice of Response dated 3
October 2017. Both the policy document and the Notice have been exchanged with
the applicant.
2. Accidental loss or damage
(Applicable whether you have buildings and/or contents cover)
We will pay for accident al loss or damage, unless it is caused by:
d. roots from trees, shrubs or grass; or
…
3.3 Key Documents
Record Key points
Quote to underpin
26 February 2016
17 underpinning $20,000
19 underpinning $22,000
Engineer report (KA)
20 - 02 - 2016
Visual inspection of external brick wall indicates that rotation
of footings and settlement has taken place.
South Western brick wall has rotated an d settled, cracks in
the range of 25mm are present due to movement.
South Eastern brick wall has rotated and settled, cracks in the
range of 50mm are present due to movement.
Trees located at approximately 2m of the wall and are 4 - 6 m
high.
Trees located a long the western, southern and eastern wall is
Case No: 496039 Determination Page 8 of 14
the main cont ribution to the problem.
Movement/rotation of the wall can be attributed to moisture
variation - differential shrinking of reactive „Basaltic‟ clay from
the tree roots and abnormal season being very dry.
This causes settlement of foundation and is large enough to
cause building distressing.
Trees should be located no closer than 1x the mature height
away from footing.
Trees wit hin close proximity of walls are to be removed as
soon as possible.
Em ploy a plumber to test for any leaks from the storm water,
sewerage of wat er supply system.
If any leaks or damage pipes are found, they are to be
rectified reducing the moisture under the footings.
Employ a registered underpinnar to underpin and jack
footings to its original position and repair brick work.
Seal repair concrete slab around effected area to reduce the
surface water from entering the footings after repairs have
taken place.
FSP’s loss adjuster
report 1 (CF)
18 - 05 - 20 16
Applicant advised that he noticed cracking occurring to the
external brickwork of the main house over the last 10 years
and throughout these years he advised that the cracking has
wors ened
T o determine the cause of the cracking applicant arranged for
KA , an engineering company to attend to inspect the
cracking. The investigation by the attending engineer
revealed that a section of the brick wall has rotated and
settlement has occurred which has caused the cracking. It is
believed that the cracking may ha ve been caus ed by tree
roots from large trees that are planted 2m from the affected
wall.
O nly able to access the Unit 2 which is currently vacant and
noticed some minor cracking to the internal plaster. Applicant
says that this cracking has been ongoing f or a number of
years and is not concerned with the cracking.
Applicant has obtained a quote for the underpinning works
required, according to applicant an additional two pins are
required at the front of the property to ensure that it complies
with current building standards. The quote for the
underpinning works is for $22,000.
FSP’s plumber report
(AD)
02 - 06 - 2016
CCTV camera inspection to sewer line – FAILED
CCTV camera inspection to storm water line – FAILED
Storm water was found to be a mix of PVC and clay pipes.
O nly one area where roots were found to be entering the
storm water pipe which is down the right - hand side near the
front corner of the building. Rest of the storm water pipes
were found to be in goo d order.
Sewer lines were made of cast iron above the ground and
clay below and three cracks were found. One to Unit 2 toilet
branch line where the elbow was found to have a crack
Case No: 496039 Determination Page 9 of 14
around it before it connects to the junctions into the mainline.
S econd cr ack is to Unit 1 where the sewer junction was found
to have a crack to it just into the main line.
Third crack is at the boundary shaft where the sewer pipe
was found to have a crack just before the shaft.
Pressure test to the main domestic water supply line before
any gate valves, and it was found to hold pressure.
FSP’s engineer report
( CD ) and Scope
13 - 07 - 2016
I nsured advised that the guttering and plumbing to the
property were in very poor condition since 2010 (or
thereabouts), until the Insured ga thered enough funds to
engage a plumber approximately 2 years ago, to replace the
guttering and plumbing (ie. drainage system, downpipes) to
the property (Unit residences).
Unit 1 – renovat ed approximately 1.5 years prior to our
inspection. No Tenant at th e time of our inspection. Access
was provided.
Unit 2 – renovat ed approximately 6 to 9 mont hs prior to our
inspection. Tenanted at the time of our inspection. No Access
was provided.
Unit 3 – un - renovated for a very long time. Tenanted at the
time of our i nspection. No Access was provided.
Unit 4 – renovat ed approximately 2 years prior to our
inspection. Tenanted at the time of our inspection. No Access
was provided.
Unit 5 – renovat ed approximately 3 years prior to our
inspection. Tenanted at the time of our inspection. No Access
was provided.
Local c ouncil ordered a building notice to the property in
respect to the cracking to the brick work which prompted the
Insured to make a claim.
Unit 1 Interior:
Although the unit was recently renovat ed, with clear p atch
and paint marks and maint enance works carried out at the
unit, there were still signs of distress;
Several rooms in the unit displayed the plasterboard lining to
the walls compromised to cracking and moisture ingress.
P revious attempts to the full and paint several cracking to the
living room. The northern plasterboard lining, was observed
to be have failed and bulging outward, vertically in line with
the valley / box gutter above the internal wall in the living
room.
Ceiling plasterboard lining in the kitchen adjacent to skylight
displayed cracking.
Issue s with the roof structure / plumbing.
Based on comments by the Ins ured and observations we
understand that there may have been considerable issues
with stormwater drainage with the property contributin g to the
distresses noted to the building, thus the Insured decision to
upgrade the plumbing system to the property. We are in the
opinion of the Insured measured approach to replacing the
Case No: 496039 Determination Page 10 of 14
stormwat er system to the properties could have prevented
the extent of damages noted to the building brick work.
During our inspection of the roof, particularly over Unit 1, we
noted that the valley gutter in - between unit 1 and 2, which
would have been applicable at the time of upgrading the roof
guttering is in breach of the National Construction Code –
2015, 3.5.2.4 Installation of Gutters (c); “Valley gutters on a
roof with a pitch - more than 12.5 degrees – must have width
of not less than 400mm and be wide enough to allow the roof
covering to overhang not less than 15 0mm each side of the
gutter”
R oof guttering to unit 1 at each elevation were two roof lines
meet and form a valley gutter (along the east elevation),
which flows into a rain head, contained no device to
accommodate overflow, which is also in contravention to
AS3500. 3, which requires that box gutter systems must
include overflow which discharge clear of the building
footprint in the case of outlet blockage, and have equivalent
capacity to the outlet.
Bo x gutter had a side outlet, which created a change in
di rection of the flow of the box gutter. This is in contravention
to AS3500.3 – Plumbing and Drainage - Stormwater, Section
3.7.4 (g); Box gutters shall … (iv) discharge at the
downstream end without change of direction (i.e. not to the
side).
F urther noted at the time of our inspection, the box gutter
approximately vertically in - line with the north end internal
plasterboard wall in living room, was not allowing the storm
water to flow through the guttering system, indicating
inadequate fall and subsequently retaining water, this is in
contradiction of VBA Guide to Standards and Toleranc es
2015 – 7.03 – Water ret ention in gutters – “Gutters are
defective if they retain a depth of more than 10mm of water.”
Foundation movement:
Although the soil at the subject p roperty was not formally
tested at the time of our inspection, the soil profile in the
vicinity of subject property is known to comprise of reactive
clay as described within AS2870:2011 - Residential Slabs
and Footings.
Buildings founded on reactive clays will experience
differential movement as a consequenc e of change in the
moisture condition of the founding soils across the building
envelope. Reactive clays volumetrically decrease (i.e. shrink)
with drying, which can cause settlement of the affected
foot ing. Convers ely, reactive clays volumetrically increase
(i.e. swell) with wetting, which may cause heave of affected
footing.
Abnormal moisture conditions (as described within AS 2870)
have pot ential to cause movement and building distress
which exceeds no rmal cosmetic distress.
Furthe r, cyclical wetting and drying from abnormal moisture
Case No: 496039 Determination Page 11 of 14
conditions over a prolonged period can cause increased
differential settlement of footings on reactive clays due to the
accumulation of ground movement through each cycle.
D istress to the footings was consistent with differential ground
movement caused by variation in moisture content of reactive
clay soil. The distress was closely spread to the south end
property,
Soil moisture influences:
Factors which are considered to be signific ant in change to
moisture conditions of foundation soil in the affected area of
the residence is as follows:
Drainage conditions ; which allow water migrate int o
foundation soil. The majority of the property building line is
covered in hard surfaci ng concrete paving and shared
driveway to the western side of the property.
Trees and shrubs; which adversely affect the performance
of footings on reactive clay over time due to the effects of
localised tree - root drying. The zone of influence of a tree is
equivalent to up to 1.5 x mature height, dependent on the
reactivity of the clay foundation soil and the species / spacing
of trees (AS2870:2011 – Residential slabs and footings).
Several trees were locat ed at the Sout hern end of the
property boundary, ap proximately 3.0m high and 2 meters
from the building line. With several taller trees approximately
10.0m high and 8.0m from the building line.
Review of Nearmap imaging data, revealed tall trees were
planted along the Western property boundary, ranging fro m
approximately 8m high and 4.0m from the building footprint
along the west elevation which had been removed sometime
in January 2012.
Google Street view images data revealed that a large tree
approximately 8m high and 5.0m from the sout h - east corner
of the building (ie. Unit 1 electricity meter box) was present at
the property sometime prior to November 2007, which was
later removed. Furthermore, the street view image for June
2014, clearly showed the distress at the south - east corner of
the building from th e elevation view – see photo 2.
Defective plumbing ; which allows water migrate into
foundation soil.
AD was requested and attended the subject site on 02 June
2016 to identify defects to the plumbing systems;
The report failed the camera inspection of both the sewer and
storm water drain lines and noted the following considered
significant to our report;
F ront corner of the building (south - east corner) was
discovered to have root intrusion.
Do wnpipes were not connected to the underground drainage
system and allowed to drain over the paved surface
(driveway ) around the building, allow storm water run - off from
the roof to the neighbouring property and / or natural surface
adjacent to the subject building footings, subsequently in
Case No: 496039 Determination Page 12 of 14
breach of National Constructio n Code - 2015, P2.2.1 -
Surface Water (a) “Surface water, resulting from a storm
having an average recurrence interval of 20 years and which
is collected or concentrated by a building or site work, must
be dispos ed of in a way that avoids the likelihood of damage
or nuisance to any other property.
T oilet sewer line was discovered to have cracks at the east
elevation behind Unit 1 & 2.
Ongoing seasonal moisture variation ; due to rainwat er
permeation through unpaved surfaces, seasonal variation in
precipitation and long term climatic shift is considered a factor
to the cracking of brickwork at the south - east corner (unit 1).
CONCLUSIONS
Based on comments by the Ins ured and observations we
understand that the Insured was aware of issues to the
brickw ork prior to the loss date, it is further noted the Google
Street view imagery from June 2014 and December 2009,
also clear identifies the distress to the brickwork at the south -
east corner of the building (unit 1). The Insured advised that
the storm water guttering system was is a poor state and was
aware of the issues, but was unable to replace/update the
guttering system until enough funds were available to
undertake works.
D istress to the brick wall is related to differential ground
movement caused by lo ng term and ongoing cyclical moisture
change of reactive clay soil from the following influencing
factors:
Influences on moi sture variation include the following:
D istresses noted to the brick work is ranges to all elevations
of the building (unit 1 and 2 ), primarily influenced by defective
plumbing and dry - root effect of trees removed and on - going
from present trees.
R esults recorded from our inspection indic ated separation/
cracking along the sout h - east corner of the brick wall,
however review of the Goo gle “Street view” elevation imagery,
suggest cracking on the brick wall was evident prior to the
inspection date
M ovement of the brick wall, is a result of the removal of the
large mature tree (removed approximately sometime after
2007), which encourages se ttlement beneath the brick wall
footing and resultant cracking observed in the “Street view”
imagery and periodically worsened, ie. continued to widen the
cracking.
Upon reviewing dat a from Nearmap aerial images and
Google Street view images, there appeared to be substantial
number of trees along the western property boundary and
large mature tree at the south - east corner of the property
prior to January 2012, to which the distresses to the building
(at both the east and west elevations) became more
prominent , upon the removal of the tree, to which we consider
to be a primary factor in the footing movement due to
Case No: 496039 Determination Page 13 of 14
settlement contributing approximately 60% of the resultant
damage to the building.
P lumbing works undertaken by the plumber commissioned by
the Insur ed to the replace the existing roof guttering and
associated plumbing works was completed poorly and in
some areas incomplete due to the lack of downpipes
connected to the underground drainage system and valley /
box guttering to the building considered de fective due to
inadequate fall and retention of storm water. In our opinion
we consider the internal building / failure of plasterboard
lining to Unit 1 living room a direct result of inadequate fall
from the box gutter vertically in - line over the wall, al lowing
water backflow into the building due to failed flashing. We
consider that poor workmanship is considered to be
contributing up to 20% of resultant damaged.
Defective plumbing identified by A D on 02 June 2016 to the
sewer and storm water indicat ed se veral issues to the
cracked pipes, root intrusion and misalignments of pipes
which in our opinion have caused on - going distress to the
building and leaking pipe from defective plumbing all
considered to be contributing 20% of the result ant damage.
(ie. uni t 1 and 2.).
FSP’s building
Validator report (CF)
18 - 10 - 2016
CS $ 135,607.35 (GST Inc)
TCB
JKG
$ 197,119.00
$ 192,126.00
(GST Inc)
(GST Inc)
It is worth noting the attending builders have included Prime
Cost/Provisional Sums in their submitted quot ations. The
nominated sums are as follows:
CS $52,670.00
TCB $12,000.00
JKG $55,200.00
Works proposed in C D report do reflect the required repairs
however the extent needs to be detailed by either a structural
or civil enginee r therefore the supplied quotations are subject
to variation.
Based on the content of the proposed scope of works with
accompanying site referenc e photographs possible variations
to proposed scope of works may apply. The identified
possible variation to th e proposed scope of works is as follow:
Possible damage to brickwork/footings.
Possible damage to sounding surfaces.
FSP’s engineer
supplementary report
( CD )
19 - 06 - 2017
S cope provided should be considered in its entirety in relation
to the 20% of damages associated with the plumbing at this
property.
Case No: 496039 Determination Page 14 of 14
3.4 Other relevant material considered and relied on
Parties‟ submissions, emails, photographs, reports, scope of works, material
from the local Council, Google map images and all attachments to all
submissions.
Correspondence between the parties and the applicant‟s broker.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.