Determination 496005

Storm damage claim for retaining wall declined

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$8,380
SourceAFCA PDF

Summary

Applicant claimed for a retaining wall damaged in a storm and the FSP denied the claim. AFCA found rotted timber posts were the operative cause, so the structural defect exclusion applied and no further action was needed.

Once a prima facie storm claim was shown, the FSP proved that rot from inadequately protected timber was the proximate cause, a structural defect excluded from cover.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 496005 Determination Page 1 of 6 Case number: 496005 29 May 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) following a storm which damaged his pool, pavers and retaining wall. Initially, the FSP denied the claim but subsequently it agreed to cover the pool and surrounding pavers. The FSP continues to deny cover for the retaining wall. The FSP says the applicant has not established the wall was damaged by an insured event. Rather, the FSP says the wall was damaged because of structural defect, faulty design or faulty workmanship. The FSP also contends the damage to the retaining wall existed prior to the policy commencing. The FSP says there were separate incidents prior to the policy commencing which caused the damage to the retaining wall. As these causes are excluded from cover, the FSP submits it is entitled to deny the claim for the retaining wall. Before the recommendation, the applicant claimed $8,380 to repair the wall being 60% of the cost to repair the wall. The applicant acknowledged one of the fence posts was leaning prior to the storm. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was completely in favour of the applicant. As the FSP did not accept the recommendation, the dispute has been referred to me for determination. After the recommendation, the applicant said he would accept $13,277 to finalise the claim. 1.2 Issues and key findings Is the FSP entitled t o deny the applicant’s claim for the retaining wall? The available material establishes on the balance of probabilities the proximate cause of the damage to the wall were posts which had rotted over time because of the material used and inadequate construction. As structural defects are excluded from cover, the FSP is entitled to deny the applicant‟s claim for the retaining wall. 1.3 Determination This determination is in favour of the FSP. The FSP need take no further action in relation to the claim or the dispute in relation to the retaining wall. Case No: 496005 Determination Page 2 of 6 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. New material provided after recommendation After the recommendation was rejected, the FSP provided further material from its engineer after a further inspection and exploration. In response to the new material from the engineer, the applicant made further submissions and provided photographs. Where relevant, the new material and submissions will be referred to in this determination. 2.1 Is the FSP entitled to deny the applicant’s claim for the retaining wall? Applicant established a prima facie claim The applicant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The FSP‟s policy covers the retaining wall for any accidental loss or damage. In addition, the fence is covered for loss or damage as a result of a storm. The policy defines accidental loss or damage to mean: „damage to… (the retaining wall) … when it is caused by an unintentional act, or an unforese en and uncontrollable incident.‟ I have considered the assessors‟ reports, the various photographs provided and the material from the Bureau of Meteorology. I am satisfied there was a large storm event at the insured property in the late afternoon of 20 April 2017. I am satisfied the available material establishes on the balance of probabilities the retaining wall was damaged by an unforeseen and uncontrollable incident. I am satisfied the applicant has established a prima facie claim. Case No: 496005 Determination Page 3 of 6 FSP must prove a policy exclusion applies Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. In the circumstances of this dispute, the FSP must prove the proximate cause of the damage to the retaining wall was gradual deterioration or wear and tear or the damage occurred because of a defect in the wall, structural defects, or faulty workmanship and design. FSP’s engineer excavated next to one post before the recommendation The applicant purchased the property not long before the storm. The FSP relies on photographs in the property listing taken about two months before the storm. It is not in dispute the listing photographs show a retaining wall post was leaning out. The FSP engaged an engineer who inspected and photographed the retaining wall on 19 June 2017 some two months after the storm event. Having reviewed aerial images, the engineer concluded the wall was constructed sometime between 2010 and 2012. The engineer said the retaining wall is made out of timber sleepers spanning 10 pairs of timber posts and the wall retains about 1m of sandy backfill. At the time of inspection, the engineer said three wall posts had rotated significantly. The engineer dug next to one of the posts and found the retaining post had rotted and snapped. He also noted a crowbar slid easily through the post. The engineer said if retaining wall posts rotated during the storm, the rotation of the posts was: „….fully attributed to the long -term degradation of the timber posts as a result of being embedded directly into the soil and/or inadequately treated timber being used. Over time the timber has rotted and consequently fractured at the vulnerable location. ‟ The engineer said had the timber posts been in good condition, no damage would have occurred to the retaining wall during the storm. Applicant excavated next to four posts before the recommendation In October 2017, the applicant dug next to four random posts along the retaining wall and provided photographs of four posts which were in good condition. The applicant asserted as the engineer had only checked one post this did not establish the whole wall was compromised. He said other than that post there was no evidence the wall had failed or was failing prior to the storm. FSP’s engineer excavated 18 exploratory holes after the recommendation As the case manager accepted this submission, after the recommendation, the FSP arranged for the engineer to re-attend the premises to conduct in-depth expository works to verify the condition of the remaining wall posts. This further work was undertaken on 5 February 2018. The engineer dug exploratory holes next to every post location where there was sufficient access. He found the posts were set in a sand/cement aggregate mix at the base of the exploratory holes. Case No: 496005 Determination Page 4 of 6 The engineer inspected 10 post locations and dug 18 exploratory holes. He concluded six out of the 10 post pairs showed a loss in timber cross-sectional area because of rot. He says this is consistent with long-term exposure and contact to the ground and soil moisture and inadequately treated timber being used. The engineer‟s further inspection and exploration confirmed his earlier opinion. The applicant challenged the engineer‟s opinion. He says his opinion is tainted because he returned to the site nearly a year after the storm and therefore cannot give an opinion about the strength of the posts at the time of the storm. He says no one can provide an opinion because of factors such as the time which has passed, the worsening of the rot in this time, the movement of machinery above the wall, the backwashing of the pool, and weather conditions in the ensuing period between the storm event and the latest inspection by the engineer. A number of other arguments are made which are not necessarily determinative of the issue such as the use of the screwdriver by the engineer to demonstrate the state of the post and the failure to excavate under one of the posts. Relying on data from the U.S. Department of Agriculture, the applicant also argues no one can tell how much the rot increased since the storm. He also says the long- term degradation referred to by the engineer is actually only a short to medium term time frame in view of when the wall was built. He also submits the time the pool was back washed made a difference because it kept the area wet as did the above average rainfall in the relevant period. He points out even though three posts had rotated and other factors have occurred in the period between the storm and the engineer‟s second inspection, the wall still stands. In short, the applicant argues in view of all these factors, if the posts were “that bad”, the wall would have fully collapsed by now. Therefore, he argues as the posts continue to be strong enough to hold up the wall, and would have been even stronger at the time of the storm, then the only conclusion is the wall shifted because of the volume of water from the storm. Engineer’s further inspection and exploration confirmed his opinion The FSP‟s engineer addresses all the applicant‟s arguments in a final report in March 2018. Essentially, the engineer submits even if there has been further deterioration due to rot, this does not alter his conclusion the cause of the failure of the wall was not the storm but the wall failed due to cross-sectional area loss because of rot caused by the inadequacies in the wall construction. Damage caused over time by rot because of the wall’s structural defects I have carefully considered all the material provided. I am satisfied the FSP‟s engineer has the expertise to comment on the issues in dispute. The FSP‟s engineer inspected the wall some two months after the storm event. Although he only excavated under one post, he found it had rotted below the surface. Case No: 496005 Determination Page 5 of 6 Having returned and made further excavations some several months later, the engineer found other posts were rotted as well. The applicant argues this does not establish the state of the posts at the time the storm event. However, I am satisfied the available material establishes it is probable the posts which were rotted at the time of the second inspection were rotted at the time the storm event. This is because, in the absence of expert opinion to the contrary, I accept the expert opinion of the FSP‟s engineer about the effect of the other factors posited by the applicant. I also accept the backwashing of the pool made insufficient contribution to the state of the rot because of the limited timeframe of the backwashing. Most pertinently, I am persuaded by the fact rot was observed in one post at the initial inspection and the state of other posts was confirmed by the subsequent inspection and further exploration. Having considered the available material and the photographs provided, I am satisfied the nature of the rot was such that it would not have occurred as a result of the single storm event. Further, even if there was additional deterioration since the storm, I agree with the FSP‟s engineer that this shows the untreated timber materials used in the wall and construction methods were unsuitable. FSP entitled to rely on policy exclusion to deny the claim Case law establishes the proximate cause of the loss is the dominant or effective or operative cause of the loss. I am satisfied the available material establishes the operative cause of the damage to the retaining wall is the deterioration of the posts. I am also satisfied the available material establishes on the balance of probabilities the posts deteriorated not because of the deluge of water in the one storm event but because of rot over time caused by insufficiently moisture protected timber in soil. This is a structural defect. As any loss or damage resulting from or caused by structural defect is excluded from cover, I am satisfied the FSP is entitled to deny the claim for the retaining wall. Case No: 496005 Determination Page 6 of 6 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the recommendation and in the FSP‟s Notice of Response dated 2 October 2017. Both the policy document and the Notice have been exchanged with the applicant. Accidental damage cover We will cover your buildings or contents for any accidental loss or damage. There are also a number of incidents we will cover under specific conditions – these are listed on the following pages. Exclusions to your cover Any cover we provide is subject to the following exclusions. We will not cover any loss or damage as a result of or caused by:  […]  erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear  a defect in an item, structural defects, or faulty workmanship or design 3.3 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common sense approach is taken to determine proximate cause. 3.4 Other relevant material considered and relied on  Parties‟ submissions, emails, photographs, reports, material from Bureau of Meteorology, real estate listing, quote regarding retaining wall and all material relied on by the parties before and after the recommendation.  Correspondence between the parties.