Home / Financial Firm (Unknown - Insurer) / Determination 496005
Determination 496005
Storm damage claim for retaining wall declined
Summary
Applicant claimed for a retaining wall damaged in a storm and the FSP denied the claim. AFCA found rotted timber posts were the operative cause, so the structural defect exclusion applied and no further action was needed.
Once a prima facie storm claim was shown, the FSP proved that rot from inadequately protected timber was the proximate cause, a structural defect excluded from cover.
Issues
- Claim denial primary · not upheld“The proximate cause of the damage to the retaining wall was rot of the posts over time, which is a structural defect excluded from cover.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 496005 Determination Page 1 of 6
Case number: 496005 29 May 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) following a
storm which damaged his pool, pavers and retaining wall.
Initially, the FSP denied the claim but subsequently it agreed to cover the pool and
surrounding pavers. The FSP continues to deny cover for the retaining wall.
The FSP says the applicant has not established the wall was damaged by an insured
event. Rather, the FSP says the wall was damaged because of structural defect,
faulty design or faulty workmanship. The FSP also contends the damage to the
retaining wall existed prior to the policy commencing. The FSP says there were
separate incidents prior to the policy commencing which caused the damage to the
retaining wall. As these causes are excluded from cover, the FSP submits it is
entitled to deny the claim for the retaining wall.
Before the recommendation, the applicant claimed $8,380 to repair the wall being
60% of the cost to repair the wall. The applicant acknowledged one of the fence
posts was leaning prior to the storm.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was completely in favour of the applicant.
As the FSP did not accept the recommendation, the dispute has been referred to me
for determination. After the recommendation, the applicant said he would accept
$13,277 to finalise the claim.
1.2 Issues and key findings
Is the FSP entitled t o deny the applicant’s claim for the retaining wall?
The available material establishes on the balance of probabilities the proximate
cause of the damage to the wall were posts which had rotted over time because of
the material used and inadequate construction. As structural defects are excluded
from cover, the FSP is entitled to deny the applicant‟s claim for the retaining wall.
1.3 Determination
This determination is in favour of the FSP.
The FSP need take no further action in relation to the claim or the dispute in relation
to the retaining wall.
Case No: 496005 Determination Page 2 of 6
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
New material provided after recommendation
After the recommendation was rejected, the FSP provided further material from its
engineer after a further inspection and exploration. In response to the new material
from the engineer, the applicant made further submissions and provided
photographs.
Where relevant, the new material and submissions will be referred to in this
determination.
2.1 Is the FSP entitled to deny the applicant’s claim for the retaining
wall?
Applicant established a prima facie claim
The applicant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
The FSP‟s policy covers the retaining wall for any accidental loss or damage. In
addition, the fence is covered for loss or damage as a result of a storm.
The policy defines accidental loss or damage to mean:
„damage to… (the retaining wall) … when it is caused by an unintentional act, or an
unforese en and uncontrollable incident.‟
I have considered the assessors‟ reports, the various photographs provided and the
material from the Bureau of Meteorology. I am satisfied there was a large storm
event at the insured property in the late afternoon of 20 April 2017.
I am satisfied the available material establishes on the balance of probabilities the
retaining wall was damaged by an unforeseen and uncontrollable incident.
I am satisfied the applicant has established a prima facie claim.
Case No: 496005 Determination Page 3 of 6
FSP must prove a policy exclusion applies
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny the claim.
In the circumstances of this dispute, the FSP must prove the proximate cause of the
damage to the retaining wall was gradual deterioration or wear and tear or the
damage occurred because of a defect in the wall, structural defects, or faulty
workmanship and design.
FSP’s engineer excavated next to one post before the recommendation
The applicant purchased the property not long before the storm. The FSP relies on
photographs in the property listing taken about two months before the storm. It is not
in dispute the listing photographs show a retaining wall post was leaning out.
The FSP engaged an engineer who inspected and photographed the retaining wall
on 19 June 2017 some two months after the storm event. Having reviewed aerial
images, the engineer concluded the wall was constructed sometime between 2010
and 2012. The engineer said the retaining wall is made out of timber sleepers
spanning 10 pairs of timber posts and the wall retains about 1m of sandy backfill.
At the time of inspection, the engineer said three wall posts had rotated significantly.
The engineer dug next to one of the posts and found the retaining post had rotted
and snapped. He also noted a crowbar slid easily through the post.
The engineer said if retaining wall posts rotated during the storm, the rotation of the
posts was:
„….fully attributed to the long -term degradation of the timber posts as a result of being
embedded directly into the soil and/or inadequately treated timber being used. Over
time the timber has rotted and consequently fractured at the vulnerable location. ‟
The engineer said had the timber posts been in good condition, no damage would
have occurred to the retaining wall during the storm.
Applicant excavated next to four posts before the recommendation
In October 2017, the applicant dug next to four random posts along the retaining wall
and provided photographs of four posts which were in good condition. The applicant
asserted as the engineer had only checked one post this did not establish the whole
wall was compromised. He said other than that post there was no evidence the wall
had failed or was failing prior to the storm.
FSP’s engineer excavated 18 exploratory holes after the recommendation
As the case manager accepted this submission, after the recommendation, the FSP
arranged for the engineer to re-attend the premises to conduct in-depth expository
works to verify the condition of the remaining wall posts.
This further work was undertaken on 5 February 2018. The engineer dug exploratory
holes next to every post location where there was sufficient access. He found the
posts were set in a sand/cement aggregate mix at the base of the exploratory holes.
Case No: 496005 Determination Page 4 of 6
The engineer inspected 10 post locations and dug 18 exploratory holes. He
concluded six out of the 10 post pairs showed a loss in timber cross-sectional area
because of rot. He says this is consistent with long-term exposure and contact to the
ground and soil moisture and inadequately treated timber being used.
The engineer‟s further inspection and exploration confirmed his earlier opinion.
The applicant challenged the engineer‟s opinion. He says his opinion is tainted
because he returned to the site nearly a year after the storm and therefore cannot
give an opinion about the strength of the posts at the time of the storm. He says no
one can provide an opinion because of factors such as the time which has passed,
the worsening of the rot in this time, the movement of machinery above the wall, the
backwashing of the pool, and weather conditions in the ensuing period between the
storm event and the latest inspection by the engineer.
A number of other arguments are made which are not necessarily determinative of
the issue such as the use of the screwdriver by the engineer to demonstrate the state
of the post and the failure to excavate under one of the posts.
Relying on data from the U.S. Department of Agriculture, the applicant also argues
no one can tell how much the rot increased since the storm. He also says the long-
term degradation referred to by the engineer is actually only a short to medium term
time frame in view of when the wall was built.
He also submits the time the pool was back washed made a difference because it
kept the area wet as did the above average rainfall in the relevant period. He points
out even though three posts had rotated and other factors have occurred in the
period between the storm and the engineer‟s second inspection, the wall still stands.
In short, the applicant argues in view of all these factors, if the posts were “that bad”,
the wall would have fully collapsed by now. Therefore, he argues as the posts
continue to be strong enough to hold up the wall, and would have been even stronger
at the time of the storm, then the only conclusion is the wall shifted because of the
volume of water from the storm.
Engineer’s further inspection and exploration confirmed his opinion
The FSP‟s engineer addresses all the applicant‟s arguments in a final report in March
2018.
Essentially, the engineer submits even if there has been further deterioration due to
rot, this does not alter his conclusion the cause of the failure of the wall was not the
storm but the wall failed due to cross-sectional area loss because of rot caused by
the inadequacies in the wall construction.
Damage caused over time by rot because of the wall’s structural defects
I have carefully considered all the material provided. I am satisfied the FSP‟s
engineer has the expertise to comment on the issues in dispute. The FSP‟s engineer
inspected the wall some two months after the storm event. Although he only
excavated under one post, he found it had rotted below the surface.
Case No: 496005 Determination Page 5 of 6
Having returned and made further excavations some several months later, the
engineer found other posts were rotted as well.
The applicant argues this does not establish the state of the posts at the time the
storm event. However, I am satisfied the available material establishes it is probable
the posts which were rotted at the time of the second inspection were rotted at the
time the storm event.
This is because, in the absence of expert opinion to the contrary, I accept the expert
opinion of the FSP‟s engineer about the effect of the other factors posited by the
applicant. I also accept the backwashing of the pool made insufficient contribution to
the state of the rot because of the limited timeframe of the backwashing.
Most pertinently, I am persuaded by the fact rot was observed in one post at the
initial inspection and the state of other posts was confirmed by the subsequent
inspection and further exploration.
Having considered the available material and the photographs provided, I am
satisfied the nature of the rot was such that it would not have occurred as a result of
the single storm event.
Further, even if there was additional deterioration since the storm, I agree with the
FSP‟s engineer that this shows the untreated timber materials used in the wall and
construction methods were unsuitable.
FSP entitled to rely on policy exclusion to deny the claim
Case law establishes the proximate cause of the loss is the dominant or effective or
operative cause of the loss. I am satisfied the available material establishes the
operative cause of the damage to the retaining wall is the deterioration of the posts.
I am also satisfied the available material establishes on the balance of probabilities
the posts deteriorated not because of the deluge of water in the one storm event but
because of rot over time caused by insufficiently moisture protected timber in soil.
This is a structural defect. As any loss or damage resulting from or caused by
structural defect is excluded from cover, I am satisfied the FSP is entitled to deny the
claim for the retaining wall.
Case No: 496005 Determination Page 6 of 6
3 Supporting information
3.1 FOS Approach
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the recommendation and in the FSP‟s
Notice of Response dated 2 October 2017. Both the policy document and the Notice
have been exchanged with the applicant.
Accidental damage cover
We will cover your buildings or contents for any accidental loss or damage.
There are also a number of incidents we will cover under specific conditions – these are
listed on the following pages.
Exclusions to your cover
Any cover we provide is subject to the following exclusions.
We will not cover any loss or damage as a result of or caused by:
[…]
erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear
a defect in an item, structural defects, or faulty workmanship or design
3.3 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause
of the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.4 Other relevant material considered and relied on
Parties‟ submissions, emails, photographs, reports, material from Bureau of
Meteorology, real estate listing, quote regarding retaining wall and all material
relied on by the parties before and after the recommendation.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.