Water leak damage claim denied on ground movement, tree root and pre-inception grounds
Text of the determination
Determination
Case No: 495713 Determination Page 1 of 5
Case number: 495713 11 July 2018
1 Overview
1.1 Dispute
The applicants lodged a claim against their home building and contents policy with
the financial services provider (FSP), saying their home had suffered damage due to
a leaking water pipe.
The FSP denied the claim on the basis the damage had occurred over time and had
also resulted from soil movement and intrusion by tree roots, which are all excluded
from cover under the policy.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the applicants. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered. However, these submissions do not warrant a change in the outcome.
Was the FSP entitled to deny the claim?
The FSP was not entitled to deny the claim as the damage to the house occurred
while the applicants were insured with the FSP. However, the applicants are not
entitled to compensation for non-financial loss.
1.3 Determination
This determination is in favour of the applicants.
I agree with the case analyst ‟s reasons for the recommendation and the
recommended outcome.
The FSP is required to settle the claim in accordance with the terms of the policy. In
doing so, it is required to obtain a scope of works from an engineer and a quotation
from a registered builder for that work, which should include the normal builder‟s
margin.
The FSP is not required to pay the applicants compensation for non-financial loss.
Case No: 495713 Determination Page 2 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case analyst ‟s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 What is the first issue to be considered?
Applicants established a valid claim
The applicants bear the onus of establishing a valid claim (also called a prima facie
claim) for which the policy responds. The policy covers loss or damage due to
specified events, including the sudden and unexpected escape of liquid at the
insured address. Liquid needs to have escaped from items such as baths, sinks and
so forth, in addition to pipes and taps.
A plumber attended the applicant‟s property in December 2016 to clear a blocked
sewerage pipe. In the process, he discovered the bath waste water pipe had broken
off and was leaking water. As such, the applicants have established a valid claim for
damage due to the escape of liquid. Given the leakage was under the house, the
applicants could not be expected to have been aware of its existence.
FSP relied on expert’s report to deny claim
The FSP relied on an expert‟s report when denying the claim. C, an engineer,
provided a report (dated 14 February 2017) which looked into the cause of the
damage to the applicants‟ house and the likely time frame. C concluded the cause of
damage was differential ground movement that resulted from an escape of liquid
from a sewer pipe and bath waste pipe (both major contributing factors), along with
soil moisture changes due to proximity of trees (minor contributing factor).
C also provided a photograph of the kitchen, which was said to have been taken
around 2013 / 2014 and was sourced from a real estate agent. C said it shows the
floor was misaligned. C also said the walls had been painted and cracks repaired
around 2013 / 2014, however the soil movement continued, resulting in the hairline
cracks C saw during the site visit. This meant the losses had been occurring prior to
the policy inception in January 2014.
Losses occurred while applicants insured with FSP
C‟s conclusion the leakage from the sewer pipe and the bath waste water pipe were
the major contributors mean the tree root contribution is relegated to a minor role in
Case No: 495713 Determination Page 3 of 5
the effective cause of the damage . In this respect, the recommendation‟s allocation
of 70 per cent, together with the reasons for this are fair in all the circumstances.
C has placed reliance on the 2013 / 2014 photograph and an assumption the house
had been painted after that, with existing cracking having been covered up. There
has been no information provided in support of this comment. The photograph alone
is insufficient evidence in relation to this issue. Given its importance, C‟s comments
are tenuous and not sufficiently compelling in establishing a likely time frame as to
when the losses occurred.
The applicants‟ plumber noted in December 2016, three years after the applicants
had moved into the house, the bath waste water pipe had broken off at some time (C
said it was „disconnected‟ or „dislodged‟) and the sewer pipe was blocked (C said it
was due to tree roots).
Given there was three year‟s usage of the bath, there is a high likelihood the bath
waste water pipe broke off after policy inception (11 January 2014). Further, since
there was only a minor contribution by tree roots to the loss, the recommendation‟s
apportionment at 30 per cent is fair in all the circumstances.
Further the applicant‟s pre-purchase report prepared by BC, when inspecting the
external part of the property noted:
Water Leakage
Overall condition: unknown
Our visual inspection has not detected any water leaks.
In view of this report, on balance, I find it is further likely the broken pipe occurred
after policy commencement.
The FSP is required to:
obtain a scope of works from an engineer
obtain a quotation from a registered builder
settle the claim in accordance with the terms of the policy, at the level of 70 per
cent of the builder‟s quotation, after deducting two excesses.
Applicants not entitled to compensation for non-financial loss
The applicants also sought compensation for non-financial loss because they said
the FSP‟s staff were rude and the claims process took too long (four months). FOS
takes a conservative approach in relation to compensation for this type of loss. FOS
expects applicants to bear the normal degree of inconvenience experienced when a
problem occurs and to take the necessary steps to minimise inconvenience.
Given the nature of the claim and the issues involved, the time frame in relation to
the claims process is not excessive. The FSP was within its rights to take the steps it
did in establishing the cause(s) of the damage and when this occurred.
Further, while the applicants contended the FSP staff were rude, there is no
information in support of this assertion.
Case No: 495713 Determination Page 4 of 5
For these reasons, the applicants are not entitled to compensation for non-financial
loss.
FSP provided additional submissions
The FSP rejected the recommendation that was substantially in the applicants‟
favour. Rather than obtain input from its expert (an engineer) which had previously
provided a report (dated 14 February 2017), the FSP commented on aspects of the
recommendation.
The FSP questioned why it was accepted the water pipe under the house broke after
the applicants moved into that property (11 January 2014), because the applicants
had not provided evidence of someone damaging the water pipe. Further, no-one
has gone under the house since the applicants purchased it (including the FSP‟s
engineer), so no-one has been able to put forward a likely reason for the bath waste
pipe having broken or become dislodged.
The property had suffered movement cracking as evidence d in a builder‟s (BBS‟s)
pre- purchase report (dated 13 November 2013) and a real estate agent‟s ph otograph
of the kitchen (said to be around 2013 / 2014 and included in the engineer‟s report).
The cracking should have “substantially worsened” with the increased volume of
leaking water post policy inception.
No evidence has been provided indicating the cracking had worsened since policy
inception. This supports the FSP‟s position the loss has occurred or at a minimum,
has been occurring prior to the policy inception.
BBS is not an expert with respect to settlement cracking and a structural engineer
should have been consulted.
The FSP contends the recommendation disregarded factual and visible evidence
and, in so doing, made incorrect conclusions about when the losses occurred.
Submissions do not warrant change in outcome
Given the FSP denied the claim, it bears the onus of establishing, on the balance of
probabilities, the application of the policy exclusions / conditions upon which it has
relied. This means the FSP needed to provide compelling reasons concerning the
cause of the damage to the house. It also needed to provide compelling reasons in
support of the assertion the damage to the house had been occurring over time,
commencing prior to the policy inception (11 January 2014).
The available information does not indicate the p recise nature of the damage or the
location of this damage in the house. The reports do not satisfactorily address this
issue and the photographs are inadequate. The information only generally refers to
cracking.
Th e FSP‟s expert (C) made assumptions in relation to the time frame involved. The
„real estate agent‟ photograph is not sufficiently compelling on its own. The other
comments C made in that section of the report also need corroborating material.
Case No: 495713 Determination Page 5 of 5
There is a lack of in depth information about the nature of the damage. As such, C‟s
comments are not sufficient in establishing any damage was the result of ongoing
leakage commencing prior to 2014.
The pre-purchase inspection report did not detect any water leaks and this is prior to
the inception of the policy.
This means the FSP has not provided sufficiently convincing „factual and visible‟
evidence.
This means the FSP‟s additional submissions do not warrant a change in the
outcome.
Recommendation
Case No: 495713 Recommendation Page 1 of 9
Case number: 495713 27 February 2018
3 Overview
3.1 Dispute
The applicants lodged a claim with the financial services provider (FSP) in January
2017 for resulting damage from leak after discovering their bathtub waste pipe had
broken off.
The FSP assessed the damage and found that there was ongoing differential ground
movement which were attributable to two leaks and seasonal changes. The FSP
denied the claim because it says the damage is a result of ground movement and
had been occurring before the applicants purchased the home and insured with the
FSP.
The applicants dispute the claim denial and ask for the FSP to pay the claim because
they were unaware of any slow leak causing damage.
The applicants are also seeking compensation because of the timeframe of the claim
and the service they received.
3.2 Issues and key findings
Have the applicants established a valid claim under the policy?
The applicants have established a valid claim because:
the FSP‟s engineering report identified escape of liquid as a cause of loss
the proximate cause of the loss was escape of liquid.
Can the FSP deny or reduce its liability for the claim?
The FSP cannot deny the claim in full. However, it is fair in all the circumstances the
FSP reduce its liability by 30% because of the likely contribution to the loss by:
escape of liquid caused by blocked sewage from tree roots
ongoing differential settlement prior to the escape of liquid event.
Should the FSP pay compensation?
The FSP is not required to pay compensation because it did not unduly delay the
claim.
3.3 Recommendation
This recommendation is in favour of the applicants.
The FSP is to settle the claim by paying 70% of a quotation obtained from a
registered builder.
Case No: 495713 Recommendation Page 2 of 9
4 Reasons for recommendation
4.1 Have the applicants established a valid claim under the policy?
Applicants must show the loss resulted from escape of liquid
The applicants‟ policy provides cover for loss or damage arising from specific insured
events set out in the policy documents, subject to certain conditions and exclusions.
„Escape of liquid‟ is one of those insured event s.
It is an accepted principle of insurance law that the applicants need to show, on the
balance of probabilities, the claimed loss results from an insured event under the
policy.
Once this happens, the burden then shifts to the FSP to show, on the balance of
probabilities, that an exclusion applies or that it is otherwise entitled to de ny the
claim.
The applicants lodged a claim in January 2017, saying they engaged a plumber for
issues with the sewer pipes in December 2016. The plumber said the waste pipe for
the bath tub had broken off at some stage.
The applicants say they noticed the sloping of the floor outside the bathroom a few
months before the plumber attended (which they believe to be the time when they
also first noticed issues with the sewer pipe).
FSP‟s engineer C says the cause of damage is differential ground movement as a
result of:
escape of liquid from sewer pipes (major contributing factor)
escape of liquid from the bath waste pipe which became disconnected (major
contributing factor)
soil moisture changes due to proximity of trees (minor contributing factor).
On the available information, I am satisfied the two leaks were major contributing
factors to the damage claimed. This means the applicants have established a valid
claim.
4.2 Can the FSP deny or reduce its liability for the claim?
Information does not establish leak occurring before policy inception
The FSP maintains that even if FOS accepts that the exclusion for ground movement
does not apply, it can still deny the claim because the damage occurred before
inception of the policy and purchase of the home.
It is unknown when the bath waste pipe initially detached. The applicants‟ plumber
says it was „broken off‟ and C says it „disconnected‟ and „dislodged‟. The FSP sought
further commentary from C in relation to the timeframe and C confirmed they could
not conclusively determine when or why it detached.
Case No: 495713 Recommendation Page 3 of 9
However C believes it was before the applicants purchased the home, and most
likely because a plumber did not adequately connect the pipe since a plumber
„touched it last‟.
The FSP says the applicants have not provided any evidence for any plumbing works
carried out at the home since they owned it. The FSP is willing to reconsider its
position if this information is available.
I do not accept this for the following reasons:
the FSP has already accepted and denied the claim on three separate
exclusions
the FSP did not ask for this information during claim management
the information from C is unfounded, and by C‟s own admission, inconcl usive
the plumber says the pipe was broken which would imply the pipe was originally
fitted correctly
the plumber‟s report confirms repair of the broken pipe.
As such, I am satisfied the FSP has not adequately proven the bath waste pipe
detached before policy inception.
The FSP also relies on C‟s report which included a photograph found online from
2013/2014 showing the kitchen area of the home. C has indicated previous repairs
above the kitchen door and minor gaps between two refrigeration units. In C‟s
opinion this image proves:
the damage first occurred prior to 2013
ground movement was occurring before policy inception and home purchase.
It is difficult to understand which damage C is referring to. FOS asked the FSP to
comment on whether the previous repair mentioned by C is the same as what was
observed upon assessment. The FSP says any cracking would only support its
position that ground movement has been occurring before policy inception.
I am not persuaded the online image from 2013/2014 supports the leak was ongoing
in the manner stated by the FSP because:
previous repairs above the door does not prove a leak existed
the gap between the two refrigeration units does not prove a leak misaligned
the floor
no connection has been made between currently observed damages to those in
the image
the date of the image is arbitrary and unconfirmed
the image shows limited information about the overall condition of the home
from when it was taken.
Escape of liquid is the dominant cause
The proximate cause is not necessarily the first, last or the sole cause of the loss.
Rather, it is the effective, dominant or operative cause. Where several causes are
operating contemporaneously, if one cause would have caused the harm in any
case, and the other would not have done so in the absence of the first, the first is the
proximate cause.
Case No: 495713 Recommendation Page 4 of 9
The applicants‟ pre -purchase report identified settlement cracks in a number of areas
of the home. The cracks were deemed cosmetic rather than structurally significant
and „acceptable/fair‟. The report defines the categories of „acceptable‟ and „fair‟ and
in summary, in the inspector‟s opinion „acceptable‟ does not require remedial work
whereas „fair‟ means deteriorated and would benefit from remedial work.
C says the area which the home is located is generally composed of reactive clay
soils. There were no soil tests or geographical information to support this view. In the
absence of this information, I am less inclined to accept C‟s view. However, it is clear
there is ongoing movement at the home due to settlement cracks identified in the
pre-purchase report.
C identified „several‟ 5 to 6 metre high trees in close proximity to the northwest corner
of the home. C says the trees are not compliant with Australian standards as they are
too close to the foundation of the home and can lead to drying of clay at substantial
distances. C says applicants were made aware the ground movement would reoccur
if the home is not compliant with current standards.
C also observed:
damp soil in the sub-floor under the bathroom
water stains to the base of concrete stumps
misaligned floors in kitchen, bathroom and entry way
no damage in the bathroom
hairline cracks to entry and two bedrooms
hairline cracks showed evidence of previous repairs
misaligned door to bedroom four.
While it is evident there is more than one factor contributing to the damage, I am
satisfied the predominant cause of the damage is escape of liquid.
Exclusion for ground movement does not apply
The FSP relies on the general policy exclusion for ground movement to deny the
applicants‟ claim.
The exclusion says the FSP will not cover:
Earth movement
loss or damage or the incurring of legal liability caused by erosion, vibration, subsidence, landslip,
landslide, mudslide, collapse, shrinkage or any other earth movement.
C measured the floor levels and says the floor level survey shows:
high points were entry and kitchen areas
bathroom was lowest point
south side of kitchen was higher than north side.
C‟s report clearly says that based on the floor level surveys, the „contribution of the
trees is relatively small compared to the contribution from escape of liquid‟.
The FSP submits that all the damages are due to ground movement, however given
the above, I am not convinced this is the case.
Case No: 495713 Recommendation Page 5 of 9
I am satisfied the leaks were a major contributor to the observed ground movement.
The majority of the ground movement did not occur solely as a result of naturally
occurring changes in the moisture content of the soil. Because of this, the FSP
cannot rely on the exclusion of ground movement to decline the claim in whole.
Applicant did not know of the leak
The policy says the FSP does not cover loss or damage caused by liquid escaping
slowly over a period of time, unless it is reasonable that the insured could not have
known about the liquid escaping.
The FSP says the applicants knew about the leak because their pre-purchase report
says:
there were settlement cracks that were deemed fair and acceptable (requiring
remedial work)
settlement cracks are to be monitored and if worsening, that advice from a
structural engineer should be obtained
the subfloor access was restricted by ductwork
overall drainage condition unknown
underground storm water and sewer to be commented by licenced plumber
condition of bath unknown as not tested at time of inspection.
The applicants say:
no structural damage was identified in the pre-purchase report
there was no water damage visible
the person who inspected the property for the pre-purchase report would have a
better understanding of the condition of the home
they use the bath regularly as they have small children
they only noticed minor cracking which they believed to be relative with the age
of the home.
There is no information before me which confirms the cracking worsened and the
applicants were required to engage a structural engineer. The FSP‟s home
assessing/site visit report does not show any images of cracking.
C‟s report confirms evidence of „hairline cracking‟ and says that „some cracks
showed evidence of previous repairs‟. C fails to show all the cracks and previous
repairs and mentions „the repairs are not visible in the photographs‟. However, there
is only one close up photograph which shows hairline cracking.
The applicants provided further commentary from the inspector who says:
[…] the sub floor was dry and drainage was adequate. Whilst there was some movement cracking
noted to wall surfaces none of it was considered structural. If subsequently water has been found in
the Sub floor it would definitely be a post purchase occurrence. Stumps and Sub floor timbers were
in a relatively level alignment with no substantial subsidence.
The pre-purchase report also confirms it cannot comment on defects that may have
been concealed or the assessment or detection of defects including leaks.
Further, the bath tub waste pipe is in the sub floor, given the information in the pre -
purchase report, it is not reasonable for the applicants to have checked the sub-floor.
Case No: 495713 Recommendation Page 6 of 9
In my view, the pre-purchase report does not show the applicants knew about any
escape of liquid at the time they purchased the home. There is no further information
presented to cause me to doubt this.
Cause of sewer pipe blockage unknown
The policy says the FSP will not cover loss or damage or the incurring of legal liability
caused by the roots of trees, plants or shrubs. The FSP will also not pay for damages
caused by gradual deterioration (wear and tear).
The plumber‟s report does not comment on the reason for the blockage and the
applicant says the cause of the blockage remained unknown.
The applicant has not provided any further information regarding the cause of the
blockage.
C‟s report says the earthenware sewer pipes were blocked by tree roots, dilapidated
and leaking. While I accept the sewer pipe blockage was due to tree roots, I am not
satisfied the FSP can also rely on the exclusion for gradual deterioration/wear and
tear to exclude its liability. This is because it is unreasonable for the applicants to
have known of the gradual leak of the sewer pipes and that the pipes were
dilapidated.
FSP may reduce liability to the extent excluded event contributed to damage
C‟s further commentary attributes 33% of the current damage to the leak from the
bath waste pipe detachment. C gives an example of the cracks being ⅓ long and ⅓
wide which C has not explained further or provided any measurements to support
this.
This contradicts C‟s report which says the contribution of the proximity of the trees
being minor in comparison to the leaks as major contributors. It raises serious
concern as to why C would only attribute 33% to each factor.
I accept it would not always be possible to determine the extent of any such
contribution. However, given the uncertainty of the expert opinion presented, it is fair
in all the circumstances the apportioning of percentages should favour the applicant.
I consider the FSP be liable for 70% of the claim representing the contribution from
the bath tub leak and the sewer pipe.
This is because I would attribute:
10% to the damage caused by the trees as this would be minor
20% to the sewer pipes blocked by tree roots.
In order to bring finality to the claim and dispute, and having regard to what is fair in
all the circumstances, the FSP is to engage an engineer to prepare a scope of works
and settle 70% of a quotation from a registered builder. If the FSP chooses to cash
settle in accordance with the terms of the policy, the quotation must be actionable by
the applicant. The FSP would also be entitled to apply two excesses as per the policy
wording.
Case No: 495713 Recommendation Page 7 of 9
4.3 Should the FSP pay additional compensation?
FOS awards non-financial loss conservatively
FOS can award up to $3,000 for non-financial loss if the FSP caused the applicants
to suffer an unusual degree or extent of inconvenience, delay or interference.
FOS awards non-financial loss conservatively. This is because applicants are
expected to be moderately robust and bear the normal degree of inconvenience
experienced when a problem occurs.
Further, any amount awarded will depend on the degree suffered. For instance, the
more extreme the circumstances experienced by an applicant, the higher the amount
to be awarded.
Having reviewed the FSP‟s claim file notes, I do not consider the applicant is entitled
to an award of compensation. I have noted relevant dates in section 3.2 below.
The applicants say their experience with the FSP was difficult and some FSP
representatives were rude. They also say the claim took four months to finalise.
While I appreciate the applicants‟ dissatisfaction with the timeframe of the claim, I am
not satisfied the FSP has unduly delayed the claim. I accept the FSP was entitled to
seek further expert opinion and review the information before making a decision on
the claim.
I acknowledge the applicants are also unhappy with the service they received,
however I have not found any evidence of poor service.
I understand the IDR outcome was provided after the date which was originally
advised, however it was still provided within 45 days of making her initial complaint
which is the time allowed for an IDR.
On this basis, I remain satisfied the FSP should not pay compensation.
Case No: 495713 Recommendation Page 8 of 9
5 Supporting information
5.1 Key references
Record Key points
Product Disclosure
Statement
Page 11
Insured event We will NOT cover:
9. Sudden and unexpected
escape of liquid at the
insured address from:
fixed plumbing apparatus
...
pipes and taps
…
loss or d amage caus ed by
liquid that has escaped
slowly over a period of
time, unless it is
reasonable that you could
not have known about the
liquid escaping.
Product Disclosure
Statement
Pages 30 to 31
General Exclusions Appl ying To The Whole Policy
We will not cover:
Earth movement
x loss or damage or the inc urring of legal liability caused by erosion,
vibration, subsidence, landslip, landslide, mudslide, c ollapse,
shrinkage or any other earth movement.
…
Gradual deterioration
x loss or damage caused by rust, corrosion, rot, mould, rising damp,
mildew, gradual deterioration, wear, tear or fading.
…
Trees, shrubs or plants
x loss or damage or the inc urring of legal liability caused by the roots
of trees, plants or shrubs.
Applica nt’s pre - purchase
report
Page 15
13 November 2013
the report does not and cannot make comment upon: defects that
may have been conc ealed; the assessment or detection of defects
(including rising damp or leaks)…
Applicant’s plumber’s
report
December 2016
Blocked sewer
Attended blocked sewer and attempted to clear blockage using
high pressure sewer jetter.
Jetter was unsuccessful in clearing drain after 1 hour use at 25
meters down drainpipe
Excavation of property sewer drain in front of property
Installat ion of property 100mm PVC Inspection riser capped at
ground level.
Jetter was again used to clear blockage withing (sic) 2 meters of
the property jump up
Drain clear and flowing now.
Repair of bath waste under house that had broken off at some
stage.
Case No: 495713 Recommendation Page 9 of 9
5.2 Key date chronology
Date Key points
30 - 01 - 2017 Claim lodged with FSP
FSP arranged internal assessor to attend
02 - 02 - 2017 Internal assessor inspects damage and recommends engineer to
attend
FSP appointed engineer to comment on cause of damage
14 - 02 - 2017 engineer attends property
03 - 03 - 2017 FSP reviews engineer‟s report
23 - 03 - 2017 FSP requests applicant provide pre - purchase report
31 - 03 - 2017 FSP confirms pre - inspection report received
13 - 04 - 2017 pre - purchase report forwarded to engineer for review and
commentary
27 - 04 - 2017 FSP completes claim review
09 - 05 - 2017 FSP calls applicant to advis e of claim decline
13 - 06 - 2017 Applicant lodges disput e with FSP IDR
12 - 07 - 2017 IDR outcome provided to applicant.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.