Home / Financial Firm (Unknown - Insurer) / Determination 495463

Determination 495463

Swimming pool damage claim denied on hydrostatic pressure and faulty workmanship exclusions

FirmFinancial Firm (Unknown - Insurer)
Decided2018-05-23
ProductGeneral Insurance · Other general
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' pool was damaged after earthquakes and heavy rain and the FSP denied the claim under hydrostatic pressure and workmanship exclusions. AFCA found the FSP had not proved an exclusion applied and ordered the claim settled under the policy terms once repair costs are agreed.

The insurer bears the onus of proving an exclusion applies, and the FSP's expert evidence did not establish that the excluded cause was the proximate cause of the damage.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 495463 Determination Page 1 of 7 Case number: 495463 22 May 2018 1 Overview 1.1 Dispute The applicants lodged a claim with the financial services provider (FSP) for damage to their pool. The applicants say the damage was caused by earthquakes and rain. The FSP denied the claim because it says the applicants have not established the damage was caused by an insured event. Additionally, the FSP says the damage arose from faulty design and workmanship and/o r hydrostatic pressure which are excluded causes of damage under the policy. The applicants do not dispute there has been damage from hydrostatic pressure. However the applicants say the cause of the hydrostatic pressure was the earthquake and heavy rainfall, which the policy covers. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the applicants. As the FSP did not accept the recommendation, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the FSP entitled to deny the applicants’ claim? The applicants have established a prima facie claim because the available information establishes on the balance of probabilities the proximate cause of the claimed damage was earthquakes and rainfall. The available information does not establish there was faulty design or workmanship. While hydrostatic pressure is a policy exclusion, the available material establishes on the balance of probabilities the proximate cause of the pressure was earthquake and storm which are causes covered by the policy. 1.3 Determination This determination is in favour of the applicants. The parties are to agree an estimated repair costing and scope of works. Thereafter, the FSP is to forth with settle the applicants‟ claim in accordance with the policy terms and conditions. Case No: 495463 Determination Page 2 of 7 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. No new material provided after the recommendation The FSP rejected the recommendation but provided no new submissions or material. 2.1 Is the FSP entitled to deny the applicants’ claim? The applicants have established a prima facie claim The applicants must establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. After a series of earthquakes between August and December 2016 and a heavy rainfall event in December 2016, the applicants claim their pool was damaged. The applicants did not install the pool. It was installed in 2004/5. The applicants purchased the property in 2013. In these circumstances, the applicant had difficulty in obtaining assistance from the pool installer. The pool installer said the concern described by the applicants was not a structural issued covered by their structural warranty. In due course, the applicants arranged for a pool company (LP) to inspect the pool. LP confirmed the pool could not be repaired but the pool and the surrounding area had to be removed and replaced. LP said over time the pool shell was damaged from weather and ground movement from various seismology activities causing the bond beam and extra concrete to move and crack resulting in any water from weather to run down the spaces and apply pressure to the pool wall. Without removing the pool and digging around the pool, LP was unable to check on subsoil damage. I have considered the material provided by the applicants and in particular the photographs showing a very significant rain event in November 2013 which did not damage the pool. I have also reviewed the photographs showing the heavy rainfall events in December 2016. The applicants have also provided material showing 11 earthquakes in their location between August 2016 and December 2016. Before these events, the applicants say the pool was functional and withstood heavy rain. They particularly point to the Case No: 495463 Determination Page 3 of 7 significant rainfall event in November 2013 which did not damage the pool. However, in late 2016, the applicants noticed a crack in the skimmer box in the concrete bond. The pool was built in 2004/5. It remained functional throughout the years and despite the significant rainfall event in November 2013. I am satisfied the available material establishes it is probable the pool was damaged as contended by the applicants which contention is supported by LP. I am satisfied the applicants have established a prima facie claim. The FSP must establish an exclusion applies Once so established, the onus shifts to the FSP to prove on the balance of probabilities an exclusion applies if it seeks to deny the claim. The FSP says it is entitled to deny the claim as the damage to the pool was caused by hydrostatic pressure during heavy rain and ground saturation. It also says t he pool was incorrectly installed and it does not cover damage arising from faulty design or workmanship. The applicants agree the damage to the pool was caused by hydrostatic pressure. However, they argue the hydrostatic pressure was not the proximate ca use of the damage. They also rely on documentation from the local council which they say show the pool was properly installed. Expert material relied on by FSP In support of its position, the FSP relies on expert opinion. A fibreglass pool consultant (RW) inspected, tested and photographed the pool on 4 January 2017. He referred to the Australian Standards requirements regarding pool drainage (AS1839). He also conducted what he described as a dip test which he said showed the lower subsoil around the pool was still heavily saturated even though the last rain event was several weeks ago. RW said the pool had not been installed as per the relevant Australian Standard because of poor subsurface and subsoil drainage. He undertook measurements of the pool bond beam and the fibreglass outer flange and pool surrounds. He said the incomplete bond beam installation had contributed to the damage as it had not been able to adequately anchor the fibreglass shell to prevent the lifting and separation of the fibreglass from the concrete surround. He concluded: „…the lack of an effective concrete bond beam and the lack of adequate surface and sub soil drainage provision is the reason for the floor deflection from hydrostatic and hydrodynamic pressures present during periods of heavy rain and ground saturation. ‟ The applicants told him the damage was first noticed following earthquakes and heavy rainfall during 2016. RW says he does not believe the damage had any connection to the earthquakes. Case No: 495463 Determination Page 4 of 7 An engineer (FC) also inspected and photographed the property and the pool on 7 June 2017. The skimmer crack was now repaired and the water level in the pool was no longer reducing. The engineer reviewed the contentions made by the applicants. The engineer concluded the damage to the pool was not likely to be caused by the earthquake. He said the damage seen was not consistent with damage which occurs typically from earthquake movement. He also said the damage was most likely not due to the leaking skimmer box. As the pool had not overflowed during the storm, he said this was not a cause of the damage. The engineer posited the pool pipe system might have leaked causing expansion of the soil but this was subsequently eliminated as a caused by a leak detection test company. The engi neer agreed with the findings in RW‟s report noting RW was known to him as a reputable and knowledgeable professional within the fibreglass manufacturing and pool construction industry. FSP analysed further material provided by applicants After the applicants provided the FSP with photographs of the 2013 event, a soil report and material they obtained from the local council, RW commented further. In a further report, RW essentially reiterated his position. He did not agree the material provided from the c ouncil supported the applicants‟ position. He says the council compliance inspection would be an observation of the pool and would not assess the installation to engineering standards. As for the rain event in 2013 (which did not damage the pool) he said the noncomplying drainage and structural bond beam issues were present for the life of the pool. RW contended wet events prior to and including 2013 would have been exerting pressures on the installation during all of this time culminating in the coping finally releasing up and away from the concourse during the December 2016 weather event. The applicants provided material from the local council. The material showed plans and drawings were submitted to the council to install the swimming pool in 2004. The submitted material was to comply with relevant legislation and building codes. The pool was to be inspected at five different stages of its construction including completion of site works, pool excavation and reinforcement in position prior to placement of concrete. Detailed plans accompanied the application which showed the pool shell was manufactured to the requirements of the relevant Australian Standard and the swimming pool shell installation was to comply with the requirements of AS 1839. The plans detail the bedding material and the drainage requirements and the concrete strength required for the coping and concourse. Further material provided shows the pool installation was inspected at the time of excavation and a few months later an inspection shows the pool concourse was “OK.” Case No: 495463 Determination Page 5 of 7 When the local council provided this information to the applicants, its accompanying email noted all inspections were satisfactory. The email went on to say the inspections were all conducted by the section leader who held a senior position and was highly regarded by work colleagues, builders and engineers. Pool not designed inadequately The parties dispute the damage was caused by faulty design or workmanship. Having reviewed the material provided by the council, I do not accept the pool installation was designed inadequately. Damage not caused by poor workmanship I am also not satisfied the FSP has established the damage was caused by poor workmanship. The plans address the relevant requirements of the Australian Standards. The pool installation was inspected on a number of occasions by a senior inspector from the local council. I do not find the material from RW sufficiently compelling in this regard. I do not accept an inspection from a local council marked as satisfactory would not require compliance with the original plans. The original plans address the drainage issues and structural issues addressed by RW in his report. While noting the results of the dip test conducted by RW, the FSP has not adequately addressed the contention the subsoil can only be adequately tested after the pool is removed. FSP’s experts inadequately address the role of earthquakes The parties accept the damage to the pool was caused by hydrostatic pressure. The question which requires determi nation is the proximate cause of the hydrostatic pressure. I consider the available material from the FSP does not adequately address the role of the earthquakes. RW simply says he does not believe the damage has any connection to the earthquakes. He does not say why. The FSP‟s engineer says it is unlikely the earthquake caused the damage to the pool. He says this is because the damage he observed is not consistent with damage which occurs typically from earthquake movement. However in my opinion he does not adequately or persuasively explain this opinion. As the available material does not establish on the balance of probabilities the policy exclusions apply, the FSP is not entitled to deny the applicants‟ claim. Wayne Tank principle does not apply The FSP also relies on the Wayne Tank principle. This is an established principle of insurance law which provides that where damage is caused by two or more concurrent proximate causes (one of which is excluded and the others are not), then the insurer may rely on the excluded cause to deny the claim. I do not accept the FSP can rely on this principle to deny this claim. This is because the proximate causes were not concurrent. Rather, the proximate causes were consecutive in that the earthquake event occurred first followed by hydrostatic pressure. Case No: 495463 Determination Page 6 of 7 The FSP is not entitled to deny the claim. The available material establishes the pool cannot be repaired but the pool and surrounds must be removed and replaced. In January 2017, RW provided an estimated repair costing and scope of works. The parties are to agree an estimated repair costing and scope of works. Thereafter, the FSP is to forthwith settle the applicants‟ claim in accordance with the policy terms and conditions. Case No: 495463 Determination Page 7 of 7 3 Supporting information 3.1 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties and in the FSP‟s Notice of Response dated 26 September 2017.Both the policy document and the Notice have been exchanged with the applicants. 3.2 Record of ea rthquakes at the applicants’ location in late 2016 No. Date and time Magnitude 1 11 August 2016 at 15:44: 08 3.3 2 12 August 2016 at 02:11: 47 2.2 3 12 August 2016 at 02:15: 33 1.6 4 12 August 2016 at 17:39: 03 2.4 5 12 August 2016 at 17:45: 42 2.7 6 15 September 2016 at 23:19:44 2.3 7 16 September 2016 at 08:44:34 2.7 8 16 September 2016 at 08:47:04 3.1 9 16 September 2016 at 08:47:33 3.1 10 09 November 2026 at 03:36: 20 2.3 11 19 December 2016 at 05:34: 46 2.8 3.3 Additional information considered and relied upon  Parties‟ submissions, emails and photographs.  Parties‟ expert reports .  Material from local council .  Earthquake and rainfall data provided by the applicants.  Correspondence between the parties .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.