Home / Financial Firm (Unknown - Insurer) / Determination 495348
Determination 495348
Storm damage claim to landlord's carport declined, then reinstated on determination
Summary
The FSP initially accepted, then declined, a storm damage claim for a rented property's carport. AFCA found the FSP had not established an exclusion, ordered payment of $34,264 for repairs plus statutory interest and $750 for non-financial loss, and refused lost rent.
Once the applicant established a prima facie storm claim, the FSP had to prove an exclusion on the balance of probabilities and did not do so.
Issues
- Claim denial primary · upheld
“The FSP is not entitled to deny the applicant's claim for damage to the carport.”
- Delay secondary · upheld
“An unusual amount of time taken to make a claims decision and interference with the applicant's expectation of enjoyment or peace of mind.”
Subjects and remedies
natural disasterpay claimpay interestpay non financial loss
Text of the determination
Determination
Case No: 495348 Determination Page 1 of 8
Case number: 495348 6 June 2018
1 Overview
1.1 Dispute
The applicant holds a building and contents policy over her investment property with
the financial service provider (FSP). On 3 April 2017 the applicant lodged a claim for
damage to her carport at the property.
The FSP initially accepted the claim and instructed an engineer to provide a scope of
work to allow repairs to commence. However, the engineer said the damage was
caused by events which are excluded from cover.
The FSP subsequently declined the claim.
The applicant disputes the FSP’s decision and re quires the FSP to accept the claim
for the damaged carport and pay lost rent. The applicant also complains about the
FSP’s claims management.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the applicant.
The applicant accepted the recommendation. As it was not accepted by the FSP, the
dispute has been referred to me for determination.
1.2 Issues and key findings
Is the FSP entitled to deny the applicant’s claim for damage to the carport?
The FSP is not entitled to deny the applicant’s claim for damage to the carport as the
available material establishes on the balance of probabilities the proximate cause of
the damage was a significant storm event.
Is the applicant entitled to lost rent?
Although the carport was damaged, the available material establishes the insured
property was not unfit for living in. The FSP’s policy does not respond to the claim for
lost rent in these circumstances.
Is the applicant entitled to compensation?
The available material warrants a payment of compensation as there was an unusual
amount of time taken to make a claims decision and interference with the a pplicant’s
expectation of enjoyment or peace of mind.
Case No: 495348 Determination Page 2 of 8
1.3 Determination
This determination is substantially in favour of the applicant.
If the applicant accepts this determination, then within 14 days of acceptance, the
FSP is to pay to the applicant:
$34,264 for damage to the carport
statutory interest on $34,264 from the date of payment to the repairer by the
applicant until the date of settlement
$750 compensation.
If the applicant has undertaken the work to paint the roof tiles, the carport ceiling and
Dutch gable, then within 14 days of acceptance of this determination by the
applicant, the applicant is to provide to the FSP a paid invoice describing the work
done. Upon receipt of this invoice, the FSP is to reimburse the applicant and pay
statutory interest from the date of payment for the work until the date of settlement.
If the painting work has not been done, then within 14 days of acceptance of this
determination by the applicant, the FSP is to assess the cost of painting the roof tiles,
the carport ceiling and Dutch gable and 14 days after the assessment, pay the
assessed amount to the applicant.
Case No: 495348 Determination Page 3 of 8
2 Reasons for decision
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
Further submissions and new material provided after the recommendation
New information was provided and further submissions were made after the
recommendation. Where relevant, this new material will be referred to in the
determination.
2.1 Is the FSP entitled to deny the applicant’s claim for damage to the
carport?
The applicant has established a prima facie claim
The applicant must establish on the balance of probabilities she has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim. In the context of this claim, the applicant must establish loss caused by storm.
The applicant claims on 1 April 2017 she was working in the garden of the insured
property doing tidy up chores in preparation for a new tenant when the corner of the
carport fell down.
The insured property is rented. The applicant does not live there. She says she was
advised by builders who quoted to repair the damage that a storm had hit the area at
an earlier time and it washed out the pillar supporting the carport.
The applicant provided a quote dated 6 April 2017 from the builder SR. He found the
rear steel column/brick pier had collapsed causing the main support steel beam to
drop caused by stormwater run-off from the street onto the property which travelled
directly through the carport.
The builder who undertook repairs RB reported in the scope of works:
“ Cause of collapse appears to be due to water run off during heavy rains washing out
and undermining of the footing and pier to the rear corner of the carport .”
The applicant also relies on the opinion of the FSP’s assessor who inspected and
photographed the property on 3 May 2017. The FSP’s assessor accepted the claim.
He accepts there were severe storms at the relevant time as widely reported in the
media. He indicated the cause of the loss was:
“Water has inundated the footings of the carport causing its partial collapse”
Case No: 495348 Determination Page 4 of 8
The applicant also refers to photographs which she claims show the water/storm
washout which ran down the drive.
After the recommendation, the FSP’s engineer provided a report from the Bureau of
Meteorology from a weather station about 3kms from the insured property. The
Bureau’s records show a very significant rain event on 10 February 2017 when the
rainfall measured 95.4mm.
In the circumstances, I am satisfied the available material establishes a prima facie
claim.
The FSP must establish an exclusion applies
Once so established, the onus shifts to the FSP to prove on the balance of
probabilities an exclusion applies if it seeks to deny the claim.
The FSP relied on a report from an engineer who said the footing was not
undermined by storm water erosion because the steep slope associated with the
road would contain any stormwater run-off within the road. The engineer also said
soil disturbance or excavation caused the footing to slip into the rear section of the
property behind the colourbond fence at the property.
The FSP also refers to material provided to the FSP by the applicant including her
description of how the event occurred. The FSP says the applicant was digging out a
large plant at the rear opposite side of the fence and as she levered the plant out of
the ground, a large amount of sand came with it from behind the plant and under the
fence and then the applicant saw the carport move.
The FSP says it can rely on various policy exclusions to deny the claim because:
it did not have all relevant information when the claim was first accepted
the carport was damaged by the applicant when removing the plant
the footing was undermined by soil disturbance
the damage was caused by erosion, earth movement or subsidence
a satisfactory post/beam connection was not constructed allowing no restraint
from wind uplift pressures.
New material provided after the recommendation does not alter the outcome
After the recommendation, the FSP essentially reiterated its earlier submissions. In
addition, the FSP says the assessor relied on statements from the applicant and
does not have expertise to determine the proximate cause of damage.
The FSP also asked the engineer to provide a supplementary report. Having
reviewed the report, I note the report eliminates two of the policy exclusions relied on
by the FSP.
This is because the engineer says the post beam connection is a localised building
defect which is not relevant to causation. Further, the engineer also says he was
unaware of the plant removal.
Case No: 495348 Determination Page 5 of 8
After the recommendation, the engineer reiterates some form of soil disturbance or
excavation caused the footing to slip into the rear section of the property behind the
fence and the footing undermine was not due to scour or storm water erosion.
The FSP’s engineer’s report s are not sufficiently persuasive
Having considered all the available information, I do not find the engineer’s reports
sufficiently persuasive to establish the policy exclusions relied on by the FSP.
This is because the engineer relies on the fact of “no extensive rainfall” in the area at
the time for loss which he notes to be 1 April 2017. Even though the engineer
continues to contend the road reserve was such that any overland flows would not
enter the property in the days before 1 April 2017, he attrib utes this, not only to the
slope of the road, but to “the lack of any significant rainfall.”
The tenor of his supplementary report is that his opinion is based on his instructions.
He says the road reserve had sufficient capacity to handle the limited rai nfall which
occurred during March 2017 and that he had no instructions to investigate storm
water damage dating back to 10 February 2017.
While I acknowledge the engineer also relies on the lack of any scour damage and
other damage which would have been seen if there was a stormwater overflow, I
note the engineer did not inspect the property until 8 July 2017 some five months
after the significant rainfall event relied on by the applicant.
Contemporaneous material preferred
In the circumstances, relying on the photographs provided by the applicant and the
newspaper reports of the significant weather event on 10 February 2017, I prefer the
more contemporaneous evidence of the applicant’s builders and the FSP’s assessor
who viewed the insured property some months closer to the significant rainfall eve nt
relied on by the applicant.
The FSP’s assessor is a well -known chartered loss adjusting firm. The assessor
inspected and photographed the damage. The assessor was clear and unambiguous
in his opinion that water had inundated the footings of the carport causing the partial
collapse of the carport. The assessor was only unable to determine the scope of
works and the methodology of repair and therefore referred the claim to an engineer.
In the circumstances, I d o not accept the FSP’s assessor does not have the exp ertise
to comment on causation.
Taking all matters into account, I am not satisfied the FSP has established on the
balance of probabilities the dominant or effective or operative cause of the claimed
damage to the carport was one of the policy exclusions relied on by the FSP.
Therefore, the FSP must pay the claim.
Case No: 495348 Determination Page 6 of 8
The FSP is to pay the applicant’s claim for the damaged carport
The applicant obtained a quotation from SR to repair and rebuild the carport in the
sum of $65,450. The applicant also obtained a scope of works from RB in September
2017 to reinstate the carport in the sum of $34,264. The applicant says RB took three
weeks to complete the rebuild in October 2017.
Within 14 days of acceptance of this determination by the applicant, the FSP is to
pay to the applicant $34,264. The FSP is also to pay statutory interest on $34,264
from the date of payment to RB by the applicant until the date of settlement.
RB’s quote does not include the cost of painting the roof tiles, the carport ceiling and
Dutch gable. If the applicant has undertaken this work, then within 14 days of
acceptance of this determination by the applicant, the applicant is to provide to the
FSP a paid invoice describing the work done.
Upon receipt of this invoice, the FSP is to reimburse the applicant and pay statutory
interest from the date of payment for painting until the date of settlement.
If the painting work has not been done then, within 14 days of acceptance of this
determination by the applicant, the FSP is to assess the cost of painting the roof tiles,
the carport ceiling and Dutch gable and 14 days after the assessment, pay the
assessed amount to the applicant.
2.2 Is the applicant entitled to lost rent?
Available material does not establish a claim for lost rent
The applicant claims lost rent as she says she could not rent the house because of
the collapsed carport.
The FSP’s policy provides cover for lost rent if the premises suffer loss or damage
and are unfit for living in.
In May 2017, the FSP’s assessor said the building can be occupied now and during
repairs. Having considered the report and the photographs provided, I am not
satisfied the insured property was unfit for living in.
The available material does not establish a claim for lost rent.
2.3 Is the applicant entitled to compensation?
Compensation paid in some circumstances
The applicant complains about the FSP’s claims management, the time t aken to
resolve the claim, and the FSP’s decision to overturn the opinion of its assessor
about policy response.
She says the claims experience has been very stressful.
In its Internal Dispute Resolution (IDR) review, the FSP apologised for any offence
caused to the applicant by its staff throughout the claims process.
Case No: 495348 Determination Page 7 of 8
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the a pplicant’s expectation of
enjoyment or peace of mind.
The material provided shows some errors of fact made by the FSP in the
management of the claim. The claim was made in early April 2016. A claims decision
was made on 31 August 2017. The IDR decision was provided on 16 October 2017.
The FSP is to pay the applicant $750 compensation
In the circumstances of this dispute, I consider the FSP’s condu ct and the time taken
to make a claims decision has interfered with the applicant ’ s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
I note the apology, but I am satisfied an award of compensation is warranted. I am
satisfied it is fair in the circumstances the FSP pay to the applicant $750
compensation.
Case No: 495348 Determination Page 8 of 8
3 Supporting information
3.1 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of
the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common sense approach is taken to determine proximate cause.
3.2 Relevant policy wording
The relevant policy extracts are referred to in the recommendation, the
correspondence between the parties and in the FSP’s Internal Dispute Resolution
review 16 October 2017 and Notice of Response 29 November 2017. All documents
have been exchanged with the applicant.
3.3 Other relevant material considered and relied on
Parties’ submissions and all attachments to all submissions both before and
after the recommendation including emails, photographs, quotes, scope of
works, claim form, invoices and reports.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.