Text of the determination
Determination
Case No: 495337 Determination Page 1 of 10
Case number: 495337 10 July 2018
1 Overview
1.1 Dispute
The applicants have a home insurance policy with the financial services provider
(FSP). They lodged a claim for damage to their home after a storm on 29 December
2016.
The FSP denied the claim because it says water entered the property (and the
damage is excluded) due to poor workmanship and building defects. It also says
some of the damage in the bathroom is due to a leak in the shower.
The case analyst issued a recommendation on the issues in dispute. The FSP
rejected the recommendation. Following that, the applicants also claimed for other
personal and financial costs arising from the FSP’s handling of the dispute.
1.2 Issues and key findings
Is the FSP liable for the water damage to the property?
The FSP can deny the claim and is not liable for the damage because, on balance,
the available evidence establishes the storm was not the proximate cause. Instead:
the water damage occurred because of building defects and poor workmanship
other water damage in the bathroom has not been shown to have arisen from
the storm, but is likely to be from a leaking shower.
Both of these causes are excluded under the policy.
Is the FSP liable for the other costs?
It is fair that the FSP pays the costs of mould remediation work, since it is more likely
than not that the delay in its initial dealing with the claim allowed mould growth to
develop. The FSP is also liable to pay compensation for non-financial loss because
of the significant impact on the applicants of its handling of the matter.
1.3 Determination
This determination is substantially in favour of the FSP. The FSP is entitled to deny
the claim for water damage.
However, the FSP is to cash settle the applicants the cost to them of completing the
necessary mould remediation, as set out in section 2.2 of this determination.
The FSP is also to pay the applicants $650 compensation for non-financial loss.
Case No: 495337 Determination Page 2 of 10
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions.
I have taken into account all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
2.1 Is the FSP liable for the water damage to the property?
Applicants have established a prima facie claim
The applicants have the initial onus to establish that the loss or damage claimed is
from an insured event covered by the policy terms and conditions.
Once this is established, the onus shifts to the FSP to show, on the balance of
probabilities, the loss or damage falls within a policy exclusion or that it is otherwise
entitled to deny the claim.
It is not disputed that rain entered from the roof during a storm on 29 December
2016, and the property was found to be damaged after that event.
I am satisfied the applicants have established a prima facie claim under the policy.
Need to identify the proximate cause of the damage
It is well-established law that a proximate cause is not necessarily the first or last or
the sole cause of the loss. It is the effective, dominant or operative cause. The courts
have said that if one cause would have resulted in the harm in any case, and the
other would not have done so in the absence of the first, then the first is the
proximate cause.
There may also be circumstances where it is reasonable to conclude that there were
two causes which were equal or concurrent in their efficiency in bringing about the
damage. If one of those causes was an insured event, and the other an excluded
event, then the excluded event would prevail to defeat the claim.
FSP has shown, on balance, the water damage was from excluded causes
The applicants lodged a claim on 30 December 2016. During the course of the
investigation, the parties provided a number of expert reports. The key observations
and conclusions from those reports are outlined in section 3.2 of this determination.
I note, in particular, the January 2017 report of the FSP’s expert, LG, which identifies
building defects to the roof surface of the extension to the building, and the use of
incorrect materials. The report includes photographs and refers to relevant Australian
building standards. It shows:
flashing incorrectly installed
roof sheeting installed with inadequate cover into the guttering
Case No: 495337 Determination Page 3 of 10
no box gutter installed
gutter storm water downpipe installed off the extension leading to a reduced
pipe size.
By the time t he FSP’ s expert, HRF, attended to inspect the roof in February 2017,
those issues had been repaired, and so it could not provide a firm view on its
previous condition, although HRF did note the water had come between the tiles and
metal roof flashing. In response, the applicants say the replacement of the flashing
and fitting of a new rain head and large downpipe before HRF’s visit had been
carried out to ‘ absolutely safeguard ’ their home against any future extreme weather
events. They stressed that the fact that work was done should not be taken as an
admission that there were defects.
I accept that the applicants relied on the pre-inspection report they obtained from
SEP in June 2016, when they were buying the house, and the subsequent verbal
advice of their plumber, AW, in forming the view there were no major defects in the
property. However, the pre-inspection report is heavily qualified. It noted that in the
absence of rainfall, there was no guarantee the roof would not leak. It also
recommended engaging a qualified roof restoration contractor/roof plumber for
advice and recommendations.
Although SEP responded to a later request about whether inspectors would advise if
an extension was built in accordance with the applicable building code, the query
was not made in the context of the specific report provided for the insured property.
In its response to that general query, SEP said only that it could tell the applicant if
an extension appeared ‘ to be well built and up to standard or not ’ . I do not take that
response to mean the previous report provided would have identified building code
non-compliance, particularly when the report suggested the roof be inspected by a
qualified roof restoration contractor. That report is also clearly identified as not being
‘a certificate of compliance’.
Initial advice to the applicants from their plumber, AW, was based on the applicants’
verbal summary of their pre-purchase report, and confirmation that there had been
no water leaks from late August to some time in September. On this basis AW
formed a view the items identified did not require immediate attention, but he did not
inspect the property at that time.
After an inspection, AW reported he was of the view the roofing, guttering and
downpipes were capable of effectively dealing with local rain events. He said the
water entered the property in December 2016 due to the extraordinarily heavy rainfall
and severity of the storm. He does not give any further details about the basis on
which he formed that view.
Although it is not known for sure when the extension/renovation was built, I am
satisfied, on balance, that there were deficiencies in the roof which reasonably
represent defects/faulty workmanship. I accept the FSP’s expert report that the water
entered the property due to the defects/workmanship issues identified, rather than
the storm itself. Loss or damage caused by rain due to a design fault, structural
defect or faulty workmanship is excluded under the policy. The fact that the
applicants say they had not previously experienced any problems does not, in itself,
Case No: 495337 Determination Page 4 of 10
mean the defects or faulty workmanship were not the underlying reason for the
damage.
FSP is entitled to decline the claim for water damage
I am satisfied it is more likely than not that the storm would not have resulted in
damage if it were not for the pre-existing defects/workmanship issues with the roof.
That means those defects/workmanship issues are the proximate cause of the loss,
so the FSP is entitled to deny the claim.
Section 46 Insurance Contracts Act 1984 does not help the applicant
The applicants refer to section 46 of the Insurance Contracts Act 1984 (the Act).
They say they should be covered under the policy because they took reasonable
precautions when purchasing the property and were not aware of pre-existing
defects.
Section 46 of the Act precludes the FSP from declining the claim:
on the basis of an exclusion which operates by reference to a defect in a thing
where the defect existed before the policy was taken out
in circumstances where the insured was not aware (and a reasonable person
the circumstances could not be expected to have been aware) of the defect at
that time.
Section 46 has been considered by the courts in the case of Nelson v Hollard
Insurance Company Pty Ltd [2010] NSWSC 19. In this case, it was held that section
46 only applies to exclusions that have a temporal or time-based aspect. In other
words, section 46 only applies to assist the insured in circumstances where the
insurer relies on an exclusion which operates by reference to the time at which the
relevant defect arose – that is, where the exclusion expressly refers to the defect
having been present before the policy was taken out.
The relevant exclusion under the applicants’ policy says the FSP will not cover loss
or damage caused by rain due to a design fault, structural defect or faulty
workmanship; it makes no reference to the time of the defect occurring . That means
section 46 does not operate to assist the applicants, because the exclusions relied
upon by the FSP do not expressly refer to the defect having been present before the
policy was taken out.
Water damage in bathroom from leaking shower/shower screen
For completeness, I also note the evidence indicates that water damage identified in
the bathroom (including the swollen door arc hitrave) was not related to the storm or
roof issues, but is more likely than not from a leaking shower screen (which needed
to be re-sealed). That is a maintenance issue, for which the applicants are
responsible.
Case No: 495337 Determination Page 5 of 10
2.2 Is the FSP liable for the other costs?
Applicants have claimed other financial and personal costs
In addition to the water damage, however, the applicants have claimed for:
additional (unspecified) electrical works, and temporary accommodation for
when the flooring is repaired
personal stress and costs arising from their inability to:
o care for the female applicant’s mother and father in the home when her
mother was ill, or
o hold a commemoration at their home after her mother sadly passed
away
calling the female applicant when requested not to while her mother was ill
lengthy delays in handling their case and calls not being returned
hours spent in pursuing their claim.
However, given the FSP is not liable for the water damage to the home, it is not liable
for the additional electrical works or temporary accommodation for the period the
repairs are carried out. It is also not responsible for the applicants’ limited use of their
home as a result of the water damage in the meantime.
FOS does not award compensation for an applicant’s time spent pursuing their claim.
FSP to pay compensation for non-financial loss
I accept that the FSP calling the female applicant during a personally difficult and
distressing time, when it had been repeatedly requested not to, did cause significant
upset. I also accept som e aspects of the applicants’ claim could have been handled
in a more timely manner, and the applicants have experienced avoidable
inconvenience and concern as a result.
In the circumstances, I consider it fair that the FSP pay the applicants compensation
of $650 for non-financial loss.
FSP to cover mould remediation costs
I understand the FSP has already sent the applicants a cheque for $2,989.20 to
cover the repairs needed to the walls after holes were cut to allow mould inspection.
That is appropriate in the circumstances.
The FSP also identified that, in the early stages of the claim, delays in attendance by
the appointed restoration team may have caused or contributed to the mould issues
that were found. This is because ‘O’, who were appointed on 31 De cember 2016, did
not attend at all and were removed from the job; then ‘QR’, who were subsequently
appointed, were only able to inspect on 10 January, noting at the time that
unfortunately ‘ the damage was left unattended for over one week causing further
d amage and potential mould issues.’
There are three separate references in the FSP’s claim notes to this: the first on 16
January 2017 recommending a need to ‘review if drying had been conducted initially
when O were appointed would mould still have formed ’; then again on 18 and 30
Case No: 495337 Determination Page 6 of 10
January 2017 there are notes about the possibility that delays by O ‘may have
caused the mould damage’.
I have seen nothing in the claim notes or elsewhere which indicates whether this
query was followed up, or concluded. However, I consider it clearly raises the
likelihood that the initial delay in getting drying equipment into the property did allow
mould growth which would otherwise have been minimised, if not avoided altogether.
The FSP has said that delay was not the sole contributor to mould forming. It says
the leak to the shower screen meant there was pre-existing moisture/water damage
to the bathroom which could have generated mould in the wall cavity. However, it is
not clear on the evidence that the leak in the shower screen (which is apparently
responsible for the swollen door architrave near the front of the shower) was also
responsible for mould found in the wall behind the shower and toilet.
Given the identification of mould growth elsewhere in the house as well, I am not
satisfied the FSP has shown the mould in the bathroom was caused by factors
different to those identified in other areas of the house, or that it pre-existed the
incident giving rise to the claim.
The FSP is required to obtain an updated and current quote for the mould
remediation work identified by QR after their site inspection on 24 January 2017. The
new quote should reflect the cost to the applicants to have the necessary mould
remediation carried out, but it need not include the cost of replacement of plaster
walls, ceilings and insulation which would need replacing due to the water damage in
any case regardless of the presence of mould.
The FSP is then required to cash settle the applicant the quoted sum required to
enable them to pay for the necessary mould remediation.
If the mould remediation has already been carried out by the applicants, then the
FSP is required to pay them the costs they incurred for that work, subject to provision
of reasonable evidence of the cost and scope of work (excluding costs, as noted
above, for work which they would need to have attended to regardless of the mould).
The FSP should also pay statutory interest on any amount already paid by the
applicants, calculated from the date they paid to the date of settlement.
Case No: 495337 Determination Page 7 of 10
3 Supporting and other information
3.1 Relevant policy terms
Insured event
Storm and rainwater
Including loss or damage from:
the escape of rainwater from any water pipe, drain or gutter
[…]
We will NOT cover:
[…]
Loss or damage caused by rain, hail, wind or dust due to:
a design fault, structural defect or faulty workmanship
[…]
an opening that was not created by the storm
3.2 Expert reports
Applicant’s reports
Record Key points
Pre - Inspection report
(SEP)
dated 3 June 2016
many disclaimers
no items requiring immediate attention
roof and gutter issues in summary of minor defects
number of roof issues include recommendation to engage a
qualified roof restoration contractor for advice and
recommendations
moss build u p on tiles
hip/ridge capping mortar cracking and openings visible
valley gutter mortar cracking and openings visible
mortar capping cracking and openings visible
debris in guttering areas [ app says this was fixed ]
gutter ponding – can relate to poor fall, inadequate down
pipes, gutter or debris pile up
unable to assess the roof void on flat roof
of the visible areas the roof is in servic eable condition for the
age. Note: in the abs ence of rainfall there is no guarantee the
roof won’t leak
Plumbing: all plumbing needs to be inspected and reported
on by a plumber. It’s recommended that a licensed plumber
be consulted for further advice
inspector subsequently said (20 Jan 2017) in response to a
query about purc hasing a property that they can tell you if an
extension appears to be well built and up to standard or not.
Case No: 495337 Determination Page 8 of 10
Plumber (AW) reports (undated) September 2016 was contacted by applicant
applicant had a building report whic h drew attention to a
buildup of moss on the tiles, and to hip/ridge and valley g ully
mortar cracking
applicant advised no history of ingress of water during time
he occupied the property (from 29 August 2016 to September
2016)
applicant advised no indication of water damage to internal
walls or ceilings (pre - inspection report makes no referenc e to
water damage)
formed view items did not require immediate attention
existing roofing, guttering and downpipes adequate to deal
with rain events that could reasonably be expected in
Melbourne
inspected property on 20 January 2017 after storm o n 29
December 2016
inspected roofing, guttering and downpipes
opinion that ingress of water entirely due unanticipated and
extraordinarily heavy nature of the rainfall that occurred, not
the result of structural defects
opinion that ingress of water occurred as a result of an
overflow of water escaping from a gutter in the roof as a
direct consequence of the exceptional severity of the storm
FSP’s reports
Record Key points
QR report
inspection date 10
January 2017
Instructions - extensive water damage due to heavy rains.
Unfortunately damage left unattended for over one week
causing further damage and potential mould issues. Attempt
drying, restoration/mould remediation.
Affected rooms – rumpus room, hallway, bathroom
Elevated m oisture levels to walls and ceilings.
Bathroom door frames and door swollen.
Mould growth to timber ceiling in hallway , plaster walls in
rumpus room and hallway .
Some skirtings swollen in rumpus room and hallway.
Hardwood timber flooring (rumpus room) slightly cupped and
t imber sealer has been affected by the water.
they set up drying equipment to dry walls and ceiling plaster,
MDF skirting and door frames to prevent further mould
growth.
Recommend holes be cut in plaster walls and ceiling, and
remove a few ceiling timbers to investigate for mould growth.
LG report
inspection date 17
January 2017
scope of works cost $6,592.17 (not include timber floors or
doorframe in bat hroom)
photo page 7 – sold timber flooring deteriorated
photo page 9 – water damaged door architrave ba throom
Case No: 495337 Determination Page 9 of 10
photos page 12 - deteriorat ed valley flashing, original dwelling
meeting new
photos page 12 – no box gutter installed, flashing installed
incorrectly to water tight roof surface
photos page 14 – flashing installed incorrectly, roof sheeting
installed with not enough cover into guttering
in our opinion rain water ingress has occurred to ceiling cavity
of hallway and bedroom/rumpus due to incorrect product use
when installing extension. Building defects are present to roof
surface
roof sheets i nto gutters are not sufficient as per AS/NZS
3500.3 plumbing and drainage
gutter storm water downpipe installed off extension leads to a
reduced sized pipe and is defect as per AS/NZS 3500. 3
solid timber flooring in bedroom/rumpus rooms displays signs
of l ong term wear and tear
bathroom architrave adjacent with shower cubicle displays
signs of water damage and may be due to leaking shower
recess. In our opinion this damage has been present for
some time, perhaps months
damage may be due to water ingress but roof surface of
dwelling has not been installed to code AS/NZS3500.3
plumbing and drainage and incorrect product use has been
implemented to attempt to watertight the extension internal
building surfaces.
Subsequent LG report
dated 18 October 2017
corr ugated iron roofing has not been flashed appropriately,
the product used is not rigid and cannot be mechanically fixed
without tearing the product. That particular aluminium flashing
should not be used in a roofing application to flash roof
surfaces or roo f surfaces to external cladding to aid in making
the roof surface wat er tight, which is non - compliant
also identified the installation of corrugated roof sheets to the
back section is also non - compliant as it encroached into back
guttering approximately 10 mm not the required 50mm as per
AS/NZS Plumbing and Drainage 2003
non - compliant solid roof flue which does not meet the
relevant code AS/NZS 2918 (VBA Tec hnical solutions). As
the installed flue is within 3 metres of a wall it should protrude
in its curren t position no less than 600mm from the highest
point of the encroaching wall, finish 600mm or more above
the adjac ent wall apex
the back section renovation may have been constructed
approximately 10 – 15 years prior, however we believe that it
is plausible that the roof surface to this area has been
installed approximately 2 years or less.
OLS report
inspected 4 February
2017
attended site to investigate bathroom and report on the cause
of damage to the property [ not just the bathroom ]
lot of damage to the property including holes in wall cavities
and swollen skirting boards
spray test to shower screen failed
Case No: 495337 Determination Page 10 of 10
small leak from shower screen due to cracks in sealant but
this is not the cause of the damage obs erved [in house, not
just the bathroom]`
recommen d re - s ealing shower screen.
HRF report
inspected 16 February
2017
new metal flashing had been installed over the metal and
under the tiled roof, flashing around walls have been replaced
and new rain head and large down pipe fitted
terrac otta roof had no s pecific breakages and not the direct
cause of the leak
water has come between the tiles and metal roof flashing
appears with the new replac ements the original materials had
deteriorated due to wear and tear and possibly down pipe
and rain heads needed to be replaced, which has been
carried out.