Home / Financial Firm (Unknown - Insurer) / Determination 495325

Determination 495325

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$37,270
Non-financial loss—
Amount claimed$100,000
SourceAFCA PDF

Summary

Homeowners claimed about $100,000 for mould-damaged contents after a 1999 hail storm. AFCA ordered the insurer to replace or cash settle the carpet, curtains and other specified items, pay $10,000 for discarded bedding and clothing and $2,600 for reclamation, and reimburse ventilation and report costs on proof, but declined non-financial loss compensation.

The insurer's own specialist's 2015 inspection and credibility findings made it fair to replace or cash settle certain items, despite weak proof of loss for many others.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 495325 Determination Page 1 of 13 Case number: 495325 27 June 2018 1 Overview 1.1 Dispute The applicants hold a home buildings and a home contents insurance policy with the financial services provider (FSP). They lodged a claim in April 1999 for damage to their home caused during a hail storm. As a result, the roof was repaired and the ceilings in the main bedroom, lounge dining room and hallway were painted. Subsequently, the applicants further claimed the FSP was required to replace the carpet, curtains, some furniture and some other contents which they say were mould damaged because of the water and hail damage caused in the storm event and because of the FSP’s delay in managing the claim. The FSP says the applicants have failed to provide the requisite proofs of loss required by the policy. The FSP is only willing to offer the applicants $24,670 to replace the carpet and curtains. The applicants rejected the offer. The applicants seek $50,000 to replace the carpet, furniture and furnishings and $50,000 to replace other contents such as clothing, shoes and handbags. The case manager provided the parties with a recommendation o n the issues in dispute. The recommendation was in favour of the FSP. As a recommendation was not accepted by the applicants, the dispute has been referred to me for determination. 1.2 Issues and key findings Is the FSP’s offer of $24,670 for the claimed conte nts items fair? The offer made is not fair as material from the FSP’s specialist and the applicants’ environmental specialist establish certain contents items were damaged by mould. While the proofs provided by the applicants in relation to many items claimed may be less than adequate, in view of the detailed discussion and inspection by the FSP’s specialist in 2015 and his findings about the credibility of the applicants, it is fair in the circumstances certain other listed items are replaced or cash settled by the FSP. Are the applicants entitled to compensation? The available material establishes the applicants genuinely required expert assistance. Upon provision by the applicants of satisfactory proof of the cost of the Case No: 495325 Determination Page 2 of 13 environmental specialist report dated 7 March 2018, the FSP is to reimburse the applicants for the cost of the report. 1.3 Determination This determination is substantially in favour of the applicants. If the applicants accept this determination, and upon the FSP being advised of acceptance, the dispute is to be settled promptly in accordance with the process outlined in the determination under the heading “mechanism for fair resolution of the dispute.” Namely, within 14 days of acceptance, the FSP is to assess and then replace or cash settle the items listed in the determination in the said heading. Further, within 14 days of acceptance, the FSP is to cash settle the applicants:  $24,670 to replace the curtains and carpet  $10,000 to replace discarded bedding and clothing  $2,600 for indoor environmental reclamation. In addition, upon provision by the applicants of satisfactory proof of the cost of air conditioning, ceiling vents in the bedrooms, more subfloor ventilation and a whirly bird on the roof, the FSP is to forthwith reimburse the applicants for these costs. Finally, upon provision by the applicants of satisfactory proof of the cost of the environmental specialist report dated 7 March 2018, the FSP is to forthwith reimburse the applicants for the cost of the report. Case No: 495325 Determination Page 3 of 13 2 Reasons for decision I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. New material provided after a recommendation by the applicants After the recommendation was rejected, the applicants made further submissions in which they essentially reiterated their position. In addition, they say a new report from an environmental specialist supports their contention the major contributing factor to the development of mould is the absence of remediation by the FSP After the recommendation, the applicants provided a new report by an environmental specialist which will be referred to where relevant in the determination. In response, the FSP said the applicants had not raised any new issues or concerns which needed to be addressed and provided no new material or submissions. 2.1 Is the FSP’s offer of $24,670 for the claimed contents items fair? Applicants say $24,670 is insufficient as it does not cover all items It is not in dispute the insured property was damaged b y storm in April 1999. The available material shows the repair of the roof did take longer than usual. The parties agree this was because there were not enough tradesmen to deal with the extensive damage caused by the storm. The FSP’s file notes show the r oofer was paid in November 1999 and the painter paid in February 2000. Subsequently, the applicants claimed mould damage to contents which they say had been ongoing since the storm. The applicants bear the onus to establish on the balance of probabilities the claimed loss and that the claimed damage to the contents was caused by mould from the storm event in April 1999 or otherwise caused by the FSP’s conduct. The applicants say the offer of $24,670 is insufficient as it does not cover all items claimed. The applicants say they have proved their damage as:  numerous FSP representatives have inspected and confirmed the damage  all but the bed was seen by the previous assessors  photographs provided show there is mould damage not only as claimed to carpets, skirting boards, curtains, blankets, mattresses and lounge but also to bedrooms 2 and 3  invoices for the original curtains were provided  due to the accretion of time, they have lost or disposed of records Case No: 495325 Determination Page 4 of 13  the process was delayed not only because of the ma le applicant’s illness but also because the FSP rejected their quotes  furniture and other items badly affected by mould (for example, wardrobe, curtains, bedheads) were disposed of to mitigate the risk of mould spreading. The applicants also criticise the painting work which they say contributed to the mould damage. After the roof was repaired, the applicants say the FSP rejected its quote but engaged its own painter to paint the ceilings without replacing the ceilings. The applicants submit the painter dried out the ceilings poorly before painting them. Shortly thereafter, the paint started to delaminate. The FSP inspected and arranged repainting but the ceilings continued to delaminate. The applicants rely on an ex tract from a report from the FSP’s consultants who examined the painting in 2006. The applicants contend the work was to be delayed until the ceilings were dry and it was only in in 2014 the FSP permitted further painting. The applicants say the prolonged processing of the claim by the FSP, including dealing with numerous claims consultants, caused or exacerbated the mould growth. The applicants also submit the FSP gave contradictory evidence to them about necessary proofs. To mitigate damage, the applicants say they moved and/or disposed of items. They also say they were advised by the FSP’s consultants to dismantle and dispose of some items. The applicants submit as they saw no reason to keep proof of ownership of items approved for disposal, they also disposed of receipts, quotes and invoices. FSP says there is insufficient evidence of ownership and proof of loss The FSP says:  because of the extent of damage caused by the storm event, there was limited availability of trades and customers were encouraged to source their own repairers which caused delay  the applicants engaged their own roofer and painter who completed repairs in late 1999/early 2000  after issues raised in 2006, the FSP arranged for an assessor and independent builder to inspect and report  as a result, rectification work was identified and arrangements made for the ceilings to be repainted  the assessor identified the affected mould items as being the curtains in the master bedroom, lounge/dining room and carpet in these two rooms and the hallway  as for the other items claimed, they were not sighted nor adequate proof provided. The available material shows after the applicants complained about the quality of the paintwork to the ceilings there was a hiatus in the claims management because of the male applicant’s health. Case No: 495325 Determination Page 5 of 13 When the claim was revived in 2014, the issues with the paintwork were dealt with. Because of the claim for mould damage, the FSP arranged an inspection by its technical specialist who provided a report. The FSP submits many of the items now claimed were not discussed with the technical specialist nor is there sufficient evidence of the items or the extent of damage. In August 2016, FSP offered $8,000 for the carpet and $7,388.17 for curtains. In December 2016, the offer was increased to $24,670 being $13,650 for carpet and $11,000 for the curtains in the master bedroom and lounge/ dining room. The offer was in full and final settlement of the dispute. As for the other contents items, the FSP required a further specialist inspection to obtain a current assessment of the damage and to establish the extent of the loss. The applicants declined saying there is nothing left to inspect except the curtains, carpet, the queen bed and the lounge. Photographs were provided but did not take the issues in dispute further. The FSP reiterated its requirement for an inspection by a building consultant and mould specialist. As for the other contents items, the FSP says it cannot meet the claim because:  the applicants have not established the items were damaged as many items are now discarded  the applicants have not established the condition the other items were in when they were discarded  the applicants have not established the claimed damage for some items is directly related to the 1999 event  the applicants have not proved ownership or sufficient proofs in relation to some items  damaged items in bedroom 2 and 3 were not considered as these rooms were not affected by the 1999 storm event. The FSP acknowledges because of the storm event, the applicants have a valid claim to make for some damage to certain contents items caused subsequently by mould. The FSP acknowledges the applicants’ quotes but says this is not evidence the applicants owned the items or they were damaged as claimed. F SP’s policy contains conditions regarding cooperation and proof of loss The FSP’s policy provides cover for loss and damage caused by storm. When making a claim, the FSP’s policy also contain certain conditions namely:  an insured is to provide purchase receipts or other proof of ownership.  an insured must cooperate with the FSP. Applicants provided invoices, photographs and a report extract from the FSP’s builder Due to the age of the dispute, many of the applicants’ documents and FSP’s documents are no longer available. Case No: 495325 Determination Page 6 of 13 The applicants’ photographs taken at various times show mould damage to contents and parts of the home, as well as paint delamination. The applicants also refer to an extract from a report from the FSP’s building consultant (IT) after the claim was made in 2006. The FSP’s material does not provide this report but its file notes show IT inspected the damage on 9 March 2006. IT inspected the ceiling in the lounge/dining, bathroom and main bedroom and inspected the roof. Heavy mould growth was noted in the main bedroom and the bathroom and in the timber on the roof frame. Flaking paint was noted in the lounge dining area. Relevantly, the FSP’s notes refer to excessive moist air in the roof void but there were no broken tiles or indicators of water entry. The FSP’s file notes conclude the paint issues are due to inappropriate preparation to the ceilings when the original repairs were done. The extract from the building report relied on by the applicants supports the applicants’ contentio n the flaking paint was because of inadequate preparation and attention to retained moisture content in the ceilings. Relevantly, the report said mould growth is a factor consistent with poorly prepared surfaces prior to painting. The FSP has not responded to the extract relied on by the applicants. FSP relies on several consultant reports Because of the complaints about the peeling paint, in December 2007 and January 2008, the FSP arranged for two consultants (IT and a paint specialist) to inspect the pr emises to ascertain why the paint was peeling. The FSP’s experts agreed there was wide spread paint adhesion failure to the ceilings in the lounge/dining area and front bedroom. The experts concluded the recurring paint failure was because of widespread a dhesion failure of the acrylic base coat. IT’s earlier report, relied on by the applicants, was not referred to. The FSP assessed the claim and offered a cash settlement to repair the ceilings in the main bedroom, lounge/dining and hallway and offered $1,000 for alternate accommodation. Although the applicants contend otherwise, the available material shows there was no progress on the claim between 2009 and 2014. The applicants say this is because of the male applicant’s ill health. Once the claim was revived, the painting was done. FSP’s specialist reviewed mould damage in December 2015 The available material shows in November 2015, the applicants provided a list of items which have been disposed of due to mould damage. In response, the FSP arranged for its technical assessor to attend and review the mould damage claim with the applicants on 3 December 2015. Case No: 495325 Determination Page 7 of 13 Relevantly the FSP’s specialist reported: Taking into account the contact, the years the claim is been ongoing for and the co mplex nature of the claim, the (female applicant’s) versions of events is to be viewed as reliable and credible. The specialist report included the following relevant recommendations and comments:  the FSP was to accept a quote for review and cash settleme nt of damage to external pointing  he accepted the carpet had deteriorated and the FSP was to accept a quote for review and cash settlement  the specialist engaged builders who inspected the roof and the subfloor area. The builders found no evidence of elevated levels of moisture to the plaster ceilings and no evidence of elevated moisture levels to the subfloor area soil.  the painting completed in early 2015 have been completed to a high standard  the specialist listed items which the applicants said were disposed of due to mould and water damage. The list included:  bedroom: curtains, robe unit, bedside tables  hallway: joinery unit to hallway  dining/lounge: curtains, computer desk. The specialist also notes: These (items) were discussed and confirmed at the time of my attendance Applicants’ environmental specialist reviewed mould damage in March 2018 After the recommendation, the applicants provided a report from an environmental specialist who inspected the home on 6 March 2018 and found low to mid-level mould contamination in isolated areas. The specialist said moisture readings were within acceptable levels. At isolated areas, the specialist found low to mid-level mould contamination. He said the current indoor environment may pose a risk of health to the occupants. The specialist’s list of visible contamination is set out in supporting section 3 of this determination. He also noticed a light mould odour throughout the home. The specialist provided a remedy which he said would provide a safe a nd healthy living environment. The remedy is also set out in supporting section 3 of this determination. Mechanism for fair resolution of the dispute The FSP acknowledges because of the original storm event, the applicants had a valid claim for some subsequent mould damage to certain contents items. The FSP accepts its liability for the damage to the curtains and carpet but does not accept it is liable for the other items in view of the material provided by the applicants. I acknowledge the policy terms which deal with cooperation and the provision by an insured of purchase receipts or other proof of ownership. In this regard, I accept the applicants have not established adequate proof of loss for many items. Case No: 495325 Determination Page 8 of 13 However, in view of the many attendances b y the FSP and the extensive inspection by the FSP’s specialist in 2015, I do not accept the applicants have not cooperated and that the FSP is not able to decide about the extent of the applicants’ loss. Inadequate proof may have been provided by the applicants in relation to many items claimed but in view of the detailed discussion and inspection by the FSP’s specialist in 2015, I accept his comments about the credibility of the applicants and I accept his findings. Because of this, I am satisfied it is fair in the circumstances the FSP replace or cash settle the applicants in relation to the items identified by its specialist in 2015 at the time of the extensive inspection with the applicants. The items include the carpet and curtains and:  bedroom: robe unit, bedside tables  hallway: joinery unit to hallway  dining/lounge: computer desk. However, I also note the specialist specifically said the items he listed were discussed and confirmed at the time of his attendance. For this reason, I am not satisfied the FSP is obliged to pay for other claimed items, save for the items referred to below. I accept the FSP is liable to replace or cash settle the items listed by the applicants’ specialist in the inspection which took place in March 2018. In addition to items identified by the FSP’s specialist in 2015, the items include:  Venetian blinds in bedroom 2 and 3  Mattresses in bedroom 1 and 3  Purchase of a dehumidifier. Should the applicants accept this determination, then within fourteen days acceptance, the FSP is to assess and then replace or cash settle the items listed above. In all the circumstances of this long-running claim and dispute, I accept it was not unreasonable for the applicants to mitigate damage and dispose of certain household items. Particularly, I accept it was not unreasonable in the circumstances to dispose of bedding and clothing. I note the material provided by the applicants from the retailer HN. In view of the limited material provided and the long-running nature of this dispute, I consider it is fair in the circumstances that an allowance of $10,000 be made for the bedding and clothing disposed of. Further, in view of the uncontested environmental specialist’s opinion, I am satisfied it is fair in the circumstances the FSP also pay to the applicants $2,600. This is the amount of the quotation provided by the specialist in relation to indoor environmental reclamation ($2,024) plus an allowance made for contingencies if the physical decontamination takes longer than the estimated 5 hours. The applicants claim they acted on the advice of FSP and installed air conditioning, ceiling vents in the bedrooms, more subfloor ventilation around the house and a Case No: 495325 Determination Page 9 of 13 whirly bird on the roof. They claim $10,000 reimbursement. No proof of this expenditure has been provided. The FSP has not specifically responded to this claim. The environmental specialist confirms ducted air-conditioning is installed. I accept such measures would have mitigated the mould damage. In the circumstances I accept it is fair the FSP reimburse the applicants this expenditure upon provision by the applicants of satisfactory proof of the expenditure. As for the cash settlement in relation to the carpet and curtains, I have considered all the material provided by the parties obtained in 2015 and 2016 about the carpet and curtains and the correspondence between the parties about these items. Based on invoices provided and quotations obtained, the FSP offered $24,670 to replace the curtains and carpet. Taking all matters into account, including the earlier lesser offers made by the FSP and the reasons for those offers, I am satisfied the offer to cash settle the claim for the curtains and carpet in the sum of $24,670 is fair in the circumstances. 2.2 Are the applicants entitled to compensation? Compensation paid only in some circumstances The applicants complain about the FSP’s claims management and the amount of time taken to process the claim. FSP says the applicants should accept some responsibility for the delays. FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. FOS may decide an FSP should compensate an applicant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the a pplicant’s expectation of enjoyment or peace of mind. The material provided shows the FSP was reasonably responsive to the applicants’ issues and arranged for several inspections and assessments during the life of the claim. There was a hiatus between 2009 and 2014. The applicants say this was due to the male applicant’s ill -health. Once the claim was revived, the house was repainted. Further, because of the list of items provided by the applicants concerning mould damaged items, the FSP arranged for its technical specialist to inspect and assess the loss in December 2015. Negotiations ensued resulting in the final offer made on 9 December 2016. FOS takes a conservative approach to compensation for non-financial loss. In the circumstances of this dispute, I consider the FSP’s claims management was not untimely. I am not satisfied an award of compensation for non-financial loss is warranted. Case No: 495325 Determination Page 10 of 13 FSP to pay for the cost of the environmental specialist report FOS’s Terms of Reference also make provision for applicants’ costs in pursuing a dispute. FOS may decide the FSP contribute to professional costs incurred by the applicant during the dispute. Unless exceptional circumstances apply, FOS will not require the FSP to contribute more than $3,000 to this cost. The applicants engaged an environmental specialist to inspect the claimed damage and provide a report dated 7 March 2018. In the circumstances of this dispute, I accept the applicants genuinely required expert assistance. I am satisfied it is fair in the circumstances the FSP pay for the cost of the report. Upon provision by the applicants of satisfactory proof of the cost of the report, the FSP is to reimburse the applicants for the cost of the report. Case No: 495325 Determination Page 11 of 13 3 Supporting information 3.1 FOS Approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties and in the FSP’s Notice of Response dated 22 September 2017. Both the policy document and the Notice have been exchanged with the applicants. 3.3 Extract from applicants’ environmental specialist report Visible contamination  Mould contamination on curtains in bedrooms, dining and lounge room  Mould staining/discolouration on skirting boards in dining, lounge room and bedrooms  Mould contamination on bedside tables and bookcase in front main bedroom  Mould staining/discolouration on mattress in front main bedroom and bedroom 3  Mould contamination on guitar case and drawers of built-in wardrobe in bedroom 2  Mould contamination on built-in wardrobe in bedroom 3  Mould contamination on lower side of doors and door jambs of all bedrooms  Mould contamination on strings of venetian blinds in bedroom 2 and bedroom 3  Mould staining/discolouration on lounge fabric which covers the legs  Carpet discoloration at isolated areas throughout Mould odour  Light mould odour notice throughout at time of inspection Remedy 1. Replace carpet, venetian blinds and curtains (third party provider) 2. Replace mattress in bedroom 1 and bedroom 3 (third party provider) 3. Lysis Silber sterilisation treatment internal (airborne and surface mould remediation) 4. Physical decontamination of affected structure and furniture 5. HEPA filtration during reclamation process 6. Improve internal fresh air intake/circulation and lower internal humidity levels a. Utilise exhaust fans at least 30 minutes after shower b. Open all external and internal doors and windows fully to ventilate premises at least 1~ 2 hours a day Case No: 495325 Determination Page 12 of 13 Case No: 495325 Determination Page 13 of 13 7. Purchase and utilise dehumidifier (third party provider) a. Utilise dehumidifiers overnight in winter use and/or when internal humidity exceeds 60% - close external doors and windows, open internal bedroom doors b. Utilise dehumidifier in room for 3~5 hours once a week while all wardrobe and drawers open – close door and windows Quotation for direct works in relation to reclamation - total estimate including GST $2,024. 3.4 Other relevant material considered and relied on  Parties’ submissions, emails, photographs, invoices and quotations.  FSP’s claim file notes and reports.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.