Home / Financial Firm (Unknown - Insurer) / Determination 494922

Determination 494922

Cracking and movement damage to bathroom and bedrooms after leaking pipe; FSP withdrew cash settlement offer and declined claim

FirmFinancial Firm (Unknown - Insurer)
Decided2018-09-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$5,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Home owners attributed extensive cracking to a leaking bathroom pipe after the FSP first offered a $19,590.63 cash settlement and then declined the claim entirely. AFCA found the bulk of the damage excluded but ordered the FSP to contribute $5,000 towards repairs because the leak may have worsened damage and the FSP changed its position.

Where the proximate cause of damage is an excluded building movement, the insurer may decline the bulk of the claim, but it remains liable for any independent additional damage caused by an insured event.

Issues

Subjects and remedies

home or building damagepay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 494922 Determination Page 1 of 8 Case number: 494922 23 July 2018 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy with the financial services provider (FSP) for cracking and movement damage to their home. The applicants consider the damage was caused by a leaking pipe in the bathroom. After assessing the damage, the FSP accepted liability for the damage in the immediate vicinity of the water leak and offered to cash settle the applicants for $19,590.63 for the cost of the relevant repairs. However, the applicants rejected the offer because they wanted the FSP to arrange the repairs. After obtaining further information from its building consultant, the FSP withdrew its original offer and declined the claim in its entirety. The FSP says it is not liable for the cracking and movement damage because the damage was not caused by the leaking pipe, but by naturally occurring building movement over an extended period of time (which is excluded from cover under the policy). The applicants dispute the FSP’s decision and seek cover for the costs of repairing all of the damage to the bathroom and adjacent rooms . 1.2 Issue and key findings Is the FSP liable for the damage to the property? The available information establishes that the bulk of the damage was caused by ongoing building movement (and not by the leaking pipe in the bathroom). Damage caused in this manner is excluded from cover under the policy. However, the FSP’s consultant has confirmed th at the leaking pipe may have exacerbated the existing damage in the immediate vicinity of the leak . Further, the applicants have suffered loss as a result of the FSP’s change of position during the course of the claim. In these circumstances, it is fair that the FSP contribute the amount of $5,000 towards the cost of the repairs. Case No: 494922 Determination Page 2 of 8 1.3 Determination This determination is substantially in favour of the FSP. The FSP is required to pay the applicants the amount of $5,000 as a contribution towards the cost of the repairs. The FSP is not required to take any other action. Case No: 494922 Determination Page 3 of 8 2 Reasons for determination 2.1 Is the FSP liable for the damage to the property? Policy provides cover for insured events subject to exclusions The applicants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the applicants are able to establish a prima facie claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The applicants’ policy provides cover for damage caused by the events listed in the policy, subject to the conditions and exclusions set out in the policy. The insured events include the accidental escape of liquid from a fixed pipe. However, the policy contains general exclusions for damage caused by:  wear and tear or gradual deterioration  earth or soil movement (other than earthquake)  settling, expansion, shrinkage or vibration. FSP’s must show damage was caused by excluded factors The contractors who inspected the applicants’ property have confirmed there is extensive cracking and movement damage to the bathroom, adjacent middle bedroom and front bedroom. The photographs included in the reports provided show large cracks in the walls of these rooms and the slate floor of the bathroom. There are also movement gaps between the ceilings and cornices, as well as a large gap along the external side wall where the main building meets the lean-to. The applicants have advised that termite activity has been identified in the front bedroom. The applicants consider the damage to the bathroom and bedrooms was caused by a leak in the copper pipe which leads to the bathroom vanity. The leaking pipe was discovered and repaired in September 2015 and the applicants lodged their claim shortly thereafter. It is clear from the information provided that there is significant damage to the walls and floor in areas within the immediate vicinity of the leaking pipe. On this basis, I am satisfied the applicants have established a valid (or prima facie ) claim under the policy. Accordingly, the FSP is required to show that, on the balance of probabilities, the damage was caused by factors which are excluded under the policy. The FSP disputes that the cracking and movement damage was caused by water leaking from the burst pipe (or by any other event insured against under the policy). Case No: 494922 Determination Page 4 of 8 The FSP says the damage occurred over an extended period of time due to naturally occurring building movement. In these circumstances, it is necessary to identify the proximate cause of the damage (that is, the real, effective or dominant cause). Initial cash settlement offer was based on scope of works prepared by SE The building consultant (SE) appointed by the FSP to determine the cause of the damage to the bathroom and surrounding areas concluded it had occurred due to general building movement over an extended period of time. Such movement generally occurs due to changes in the moisture content of the foundation soils. SE noted that the property was susceptible to this kind of damage due to its age (approximately 115 years old) and manner of construction (limestone walls with mud mortar and an absence of control joints). In his report, SE advised that there was evidence of extensive and widespread cracking and movement damage throughout the property, including in areas which were relatively remote from the water leak. SE considered that the leak from the copper pipe was unlikely to have contributed to the damage to any significant extent. He noted that:  the location of the pipe (in the bathroom wall at a point approximately 30 centimetres above the floor) meant that the leak was likely to have been discovered shortly after it commenced  at the time of his inspection in late November 2015, the stonework around the pipe appeared relatively dry, indicating that the leak was not significant. However, SE acknowledged that he was unable to rule out the possibility that the leaking water had affected the soils under the bathroom, exacerbating the existing cracking and movement damage in this area. Accordingly, SE prepared a scope of works for the repair of the cracking damage to the bathroom and the adjacent (middle) bedroom. Based on the SE’s report, the FSP’s loss adjuster (CL) recommended that the claim be accepted (although he noted that some items might be excluded or limited). The FSP’s initial offer to cash settle the applicants for $19,590.63 was based on a quotation provided by its builder (CO) for the repairs set out in SE’s scope of works. The cash settlement offer was made after CO advised he was unable to warrant the repairs due to the extent of pre-existing movement damage to the property. After the applicants rejected the cash settlement offer, the FSP reviewed SE’s report and asked him to clarify the extent to which he considered the leaking pipe may have contributed to the damage observed. In his response, SE emphasised that the bulk of the damage had been caused by ongoing building movement at the property. He estimated that the contribution from the leaking pipe would have been in the order of 10%. Case No: 494922 Determination Page 5 of 8 Based on SE’s response, the FSP now says it is not liable for any of the damage to the property because the overwhelming bulk of the damage was caused by factors which are excluded from cover under the policy. Further, the FSP seeks to rely on the Wayne Tank principle. This is an established principle of insurance law which provides that, where damage is caused by two or more concurrent proximate causes (one of which is excluded and the others are not), then the insurer may rely on the excluded cause to deny the claim. Consultants have provided differing opinions about cause of damage As outlined above, the FSP’s building consultant (SE) concluded that the bulk of the damage had been caused by ongoing building movement, with the leaking pipe making only a slight contribution. The applicants dispute the findings in SE’s report. While they acknowledge that the property has been subject to some building movement over its lifetime, the applicants say that the significant cracking damage is confined to areas near the leaking pipe. They say there is minimal damage (a few, minor cracks only) to other parts of the property. The applicants have provided a report from their engineer (HE) which states that the cracks in the areas near the bathroom were caused by swelling of the foundations due to the wetting of the soil. HE advised that:  his surveys had identified a significant rise in the elevation of the bathroom floor near the vanity and swelling along the wall in this section  at the time of his inspection in April 2017, the colour of the soil in the middle bedroom sub-floor was darker in the area adjacent to the bathroom. HE said this demonstrated that the soil in this area had a higher moisture content than the sub-soil further away from the bathroom, and  the cracking damage to other areas of the house was slight (cracks of less than 1 millimetre), compared to the major cracking identified in the bathroom area. On this basis, the applicants say that all of the cracking and movement damage to the bathroom, middle bedroom and front bedroom has been caused by the leaking pipe. Bulk of damage was not caused by leaking pipe Having carefully reviewed the available information, I am satisfied that the bulk of the cracking and movement to the bathroom and adjacent areas was caused by general building movement over an extended period of time (and not by the leaking pipe). The reports and photographs provided establish that the property has been subject to significant movement over a number of years. The applicants have provided photographs of other areas of the property which they say do not show cracking damage of the type evident in the bathroom and bedrooms. Case No: 494922 Determination Page 6 of 8 However, the areas shown in the photographs provided by the applicants (such as the front and rear hallway) have been the subject of previous repairs in recent years. These photographs clearly show areas where significant cracks have been filled. Further, the extent of the damage (as shown in the numerous photographs provided) is not consistent with it having been caused by a leak from the copper pipe to the vanity basin. In this regard, I note that:  the pipe was located in the wall of the bathroom (rather than in the sub -floor itself) and the leak occurred at a point approximately 30 centimetres above the floor  th e applicants’ water bills for the two years leading up to the leak do not show any material increase in water usage during this time (as would be expected had the leak resulted in the discharge of significant volumes of water)  while the applicants’ enginee r (HE) reported that the soil near the bathroom appeared to have a higher moisture content than in other areas, his inspection occurred over 18 months after the leaking pipe had been discovered and repaired. In these circumstances, it is unlikely that the leaking pipe was the source of the increased moisture in this area, and  the cracking and movement damage is not localised to the area in the immediate vicinity of the leaking pipe but extends to the front bedroom, which is relatively remote from the source of the leak. Given the nature and location of the leak, it is unlikely the effects would extend to this area. FSP is required to contribute to the cost of repairs For the reasons outlined above, I am satisfied that the FSP is not liable for the bulk of the cracking and movement damage, on the basis that this damage was not caused by the leaking pipe. I have given careful consideration to the fact that the FSP altered its position during the course of the claim. However, I am satisfied that the FSP’s original position was based on a misunderstanding of SE’s findings, whi ch remained consistent throughout the course of the claim. As noted above, SE acknowledged that the leaking pipe may have exacerbated the cracking and movement damage in the immediate vicinity of the vanity. Accordingly, while the bulk of the damage was caused by ongoing building movement, it is possible that the leaking pipe caused some additional damage (independently of the pre-existing damage). The Wayne Tank principle does not preclude liability on the part of the FSP in these circumstances. Further, I consider that the applicants have suffered stress and inconvenience as a result of the FSP’s change of position which has contributed to the delay in them undertaking the necessary repairs and incurring additional costs. The FSP’s builders (CO and HP) provided quotations of $20,297.57 and $36,052.83 respectively for the repairs to the bathroom and middle bedroom, while the applicants have provided quotations totalling approximately $60,000 for similar repairs. Case No: 494922 Determination Page 7 of 8 Having regard to the factors outlined above, I consider it is fair in the circumstances that the FSP pay the applicants an amount of $5,000 towards the cost of the repairs. In determining this amount, I have taken into account the passage of time. Accordingly, the FSP is not required to pay interest. Case No: 494922 Determination Page 8 of 8 3 Supporting information 3.1 FOS approach to this dispute This dispute was the subject of a recommendation issued on behalf of the Financial Ombudsman Service (FOS) Australia on 19 March 2018. The recommendation was rejected by the applicants. This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly refere nced in this determination).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.