Text of the determination
Determination
Case No: 494680 Determination Page 1 of 3
Case number: 494680 22 June 2018
1 Overview
1.1 Dispute
The applicant lodged a home building claim for water damage he says caused his
ceiling to sag. The financial service provider (FSP) declined the claim because it says
the policy covers damage from listed events only, and:
the applicant did not show a storm or rain event caused the damage
the proximate cause of damage is a gradual deterioration of ceiling glue
the policy excludes damage caused by gradual deterioration.
The applicant did not agree. He wants the FSP to pay the claim.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Is the FSP entitled to decline the claim?
The applicant has not established that the damage arose from an insured event.
Instead, the evidence shows, on balance, the proximate cause of damage is gradual
deterioration, which is excluded under the policy.
That means the FSP is entitled to decline the claim.
1.3 Determination
This determination is in favour of the FSP.
I agree with the case manager‟s reasons for the recommendation and the
recommended outcome.
The FSP is not required to take any further action.
Case No: 494680 Determination Page 2 of 3
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been
provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the dispute, the issues to be determined, any applicable paragraphs of
the Terms of Reference and any relevant law.
I acknowledge the applicant feels that both the FSP‟s decision to de cline the claim,
and the recommendation, are based (at least in some respects) on certain
inaccuracies and assumptions. That includes reference to apparent previous „repairs‟
to the property, the mistaken identification of paint drops as mould, the efficacy or
otherwise of sarking in the roof, and the qualifications of the respective experts. I
would like to assure him I have taken all his comments and concerns into account in
reaching my decision.
2.2 Is the FSP entitled to decline the claim?
The policy rel evantly covers loss or damage caused by „storm, flood, rainwater or
wind‟. I consider the applicant has shown, on balance, he has a prima facie claim.
However, following the investigation, I am not satisfied the detailed evidence
sufficiently supports the conclusion that the proximate cause of the damage was a
storm event. Instead, I consider it more likely than not that the damage arose from
gradual deterioration (including allowing for the general effects of weather and
atmospheric changes over time).
References were made in the various experts‟ reports to some areas („isolated
patches‟) of water staining, and the possibility of water entering the roof cavity during
storms; but there was no evidence of specific roof damage or issues which might
clearly point to water entry from a specific storm event.
DF made the distinction between „moisture staining‟ and „water damage‟ , in
concluding that it was a build-up of moisture in the atmosphere within the roof space
which was likely the most significant contri buting factor to the „sagging‟ of the
plasterboard ceiling sheets. He went on to reiterate that this sagging damage had
been occurring over some years, and was not the result of a single storm event.
The distinction was also made between the „dropping‟ of the ceiling and „sagging‟. DF
explained that the latter was „a common aged creep deflection of plasterboard
ceilings installed below tiled roofs constructed without under- tile sarking‟ (as was the
case with the applicant‟s roof).
Case No: 494680 Determination Page 3 of 3
While I acknowledge the applicant‟s own detailed submissions and the reports of his
professional expert, I am satisfied, on balance, that the FSP has shown that it is
entitled to rely on the exclusion for „gradual deterioration‟ to decline the claim.
I also acknowledge the upset and concern this dispute will understandably have
caused the applicant. However, on the available evidence, I cannot be satisfied the
FSP has acted in a „discriminatory‟ or otherwise unreasonable manner in its handling
of the matter.
Recommendation
Case No: 494680 Recommendation Page 1 of 7
Case number: 494680 14 March 2018
3 Overview
3.1 Dispute
The applicant lodged a home building claim for water damage he says caused his
ceiling to sag. The financial service provider (FSP) declined the claim because it says
the policy covers damage from listed events and:
the applicant did not show a storm or rain event caused the damage
the proximate cause of damage is a gradual deterioration of ceiling glue
the policy excludes damage caused by gradual deterioration.
The applicant is dissatisfied with this decision. He seeks the FSP accept the claim
and his quote for repairs ($32,840).
3.2 Issues and key findings
Is the FSP entitled to decline the claim?
The FSP is entitled to decline the claim because it has established the proximate
cause of damage is gradual deterioration, which is excluded by the policy conditions.
Specificall y, the FSP‟s engineer reported the proximate cause was failure of the glue
joining ceiling plasterboards to roof timbers. He concluded glue failure occurred over
time, from humidity and moisture. The engineer‟s reports also sufficiently refuted the
applica nt‟s own, and his experts, observations and conclusions.
As the policy excludes damage as a result of gradual deterioration, the FSP is
therefore entitled to decline the claim.
3.3 Recommendation
This recommendation is in favour of the FSP.
No action is required of the FSP.
Case No 494680 Recommendation Page 2 of 7
4 Reasons for recommendation
4.1 Is the FSP entitled to decline the claim?
On balance, applicant established a valid claim
The applicant is initially required to show his building was damaged by a risk insured
against under the policy. This is known as a prima facie (valid) claim.
If the applicant establishes a valid claim, the onus then shifts to the FSP to
demonstrate, on balance:
the policy excludes the damage, or
it is otherwise entitled to deny the claim.
In this dispute, the FSP‟s policy covers loss or damage as a result of insured (listed)
events that include storm, rainwater and wind.
The applicant claimed in June 20 17 for water damage „causing some ceiling panels
in my home to sag‟. He provided a repair quote for $32,840 (plus GST) and considers
the damage caused by storms in June 2016 and in January and March 2017.
On balance, I accept the applicant established a valid claim, as the:
policy covers storm damage
parties‟ experts agree the ceiling damage is „sagging‟
location experienced storms categorised as catastrophic (by the Insurance
Council of Australia) during June 2016 and March 2017.
Given this, it falls to the FSP to demonstrate it is entitled to decline the claim.
Onus on FSP to establish policy exclusion applies
The FSP argues it can decline the claim based on policy exclusions. It says gradual
deterioration caused the ceiling to sag, which the policy expressly excludes. In
support of its position, the FSP provided reports by an assessor and an engineer.
The applicant disagrees and says the cause was water that entered the roof during
storm events. In support, he provided a builder‟s reports (with quote) an d an
engineer‟s report. The applicant also gave this Service detailed submissions
regarding the property‟s use, maintenance, condition and building code compliance.
Given the parties dispute an exclusion about cause of damage applies, the proximate
cause of damage must first be ascertained.
Proximate cause of damage
In order to determine whether the applicant‟s claim falls within an insured event, it is
necessary to determine the proximate cause of the loss. What is the proximate cause
of the loss is the question of fact depending upon the circumstances of each case.
It is well established that a proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss.
Case No 494680 Recommendation Page 3 of 7
If there are several causes operating contemporaneously, then each must be
examined for the qualities of predominance and efficiency as the active efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Experts disagree on proximate cause of ceiling sag
The applicant‟s builder (KC) provided two reports. He says that:
ceiling sag was caused by water, probably entering the roof space in storm/rain
he disagrees with the FSP‟s engineer‟s conclusions, because he observed
water staining on plasterboard sheets in the roof space.
The applicant provided a letter from JB, providing JB‟s opi nion on water entry noted
in KC‟s photographs. The applicant‟s engineer‟s (WJ‟s) report also noted the water
marks. JB concludes the damage „appears to have been from water ingress‟ that:
may have come through cracked tiles & pointing, but also under tiles in extreme weather events.
The FSP‟s engineer (DF) provided a report, concluding the:
roof or ceiling paint/plasterboard lacks damage usually seen with water ingress
instead, glue joining roof timbers and ceiling plasterboards weakened over time
this caused overall ceiling sag and plasterboard joint cracks
the minor water stains observed were likely from moisture and condensation,
which was also the cause of the glue gradually weakening.
The FSP also provided its assessor‟s (GL) report with annotated pho tographs, which
GL said indicated prior ceiling repairs. GL also said KC told him the ceiling has been
sagging for some years.
FSP’s established proximate cause was gradual glue failure from humidity
I have carefully reviewed all reports submitted by parties in support of their positions.
In the circumstances, I find DF most persuasive. While I accept WJ is also an
engineer, DF‟s reports:
contain comprehensive reasoning explaining how and why DF reached his
conclusion, plus relevant photographs
include photographs with detailed annotations convincingly supporting the
report‟s explanations.
successfully refute the conclusions formed by WJ (as well as those of KC and
the applicant).
I note WJ‟s comments about 12 tiles being replaced a year before claim lodge ment.
However, on balance, I give these comments little weight. This is because all the
other (and more contemporaneous) materials provided by both parties consistently
confirm the roof was in good condition. Significantly these, including the applicant‟ s
own submissions and claim lodgement materials, contain no mention of any roof
damage.
Case No 494680 Recommendation Page 4 of 7
Furthermore, the letter by JB does not confirm JB‟s profession or qualifications and is
not based on site attendance. In any case, I do not consider its contents refute DF‟s
observations or conclusions, but rather support them.
For all the above reasons, I accept the conclusions contained in DF‟s reports.
On this basis, I also accept the proximate cause of damage was humidity and
moisture causing gradual adhesion failure. Relevantly, failure over time of the glue
joining the roof space‟s timber joints with ceiling plasterboards.
The FSP has therefore established, on balance, the proximate cause was not a
storm, rain or wind event.
FSP’s policy excludes damage caused by gradual deterioration
All insurance policies provide cover for loss or damage subject to various conditions
and exclusions. These are outlined in the policy‟s product disclosure statement
(PDS).
In this dispute, the FSP says it is entitled to decline the claim based on a policy
exclusion excluding cover for damage „caused by … gradual deterioration‟.
The applicant disagrees the exclusion applies on several bases, including because
damaged areas are not corroded or rusted. While I empathise with the applica nt‟s
disappointment regarding the damage to his ceilings, I do not consider these
arguments assist his position.
Accordingly, I accept the FSP is entitled to decline the claim based on a policy
exclusion, given:
the FSP‟s policy excludes damage caused by g radual deterioration
as stated above, I accept the proximate cause of damage was deterioration of
ceiling adhesions (caused over time by humidity and moisture).
Case No 494680 Recommendation Page 5 of 7
5 Supporting information
5.1 Policy
General exclusions
Exclusions to your cover
Any cover we provide is subject to the following exclusions.
We will not cover any loss or damage as a result of, or caused by:
- erosion, rust, corrosion, gradual deterioration, depreciation, wear or tear.
5.2 Expert reports
Record Key points
Applicant’s expert (KC )
Builder
Report
28 - 06 - 2017
u pon completing some maintenance work … I observed … the
ceiling sheets were letting go from the roof structure , which I
brought to the attention of the home owner
[upon] inspection with a straight edge on the underside of the
ceiling and visual inspection in the roof cavity, it became clear the
problem was throughout the home
caused by water wit hin the roof cavity at some point most likely
forced into the roof cavi ty during a storm or large rain / wind event,
unbeknown to the property owner
moisture has been absorbed by the plasterboard sheets and
caused them to fail/sag
repair quote for $32, 840
FSP’s expert (GL )
Assessor
Property assessment report
10 - 07 - 2017
plast erboard ceiling are showing signs of delaminating from timber
ceiling frames throughout the rooms
lounge plasterboard ceiling has been re - screwed as screws have
not been plastered over
KC stated that he believed that during storm activity storm water
withi n the ceiling cavity has caused the delaminating to happen
I asked KC as he was a friend how long had these ceilings been
water damaged, KC stated maybe up to and longer than 5 years
(gradual det erioration)
KC
Builder
Report
13 - 07 - 2017
ceilings of this property have been affected by water during a
significant weat her event
completely disagree with … [GL‟s opinion] damage was wear and
tear not storm related
upon a roof cavity inspection … multiple areas of wat er staining on
the back of gyprock sheets was observed … [and] on timber
members
mechanic al (fixings) and adhesive (glue) fixings of the gy prock
sheets have let go … a clear indication that the int egrity of the
gyprock sheet has been compromised by the water … puts more
pressure on the fixing points as the sheet is heavier in weight …
and weak er in strength as the water is absorbed in the sheet
Case No 494680 Recommendation Page 6 of 7
making it softer and more pliable
FSP’s expert (JB )
Letter
17 - 07 - 2017
I … note the wat er entry to specified areas throughout … impact of
any water ent ry to th is ceiling would have been exaggerated due to
the moisture being retained by the insulation
FSP’s expert (DF )
Engineer
Report
23 - 07 - 2017
observed no evidenc e of water damage to the plasterboard linings
or water damage to the ceiling paint normally indica ted by
"bubbling"
tiled roof on the home is weatherproof but not waterproof as
evidenced by the holes or gaps bet ween individual concrete roof
tiles
the majority of roof tile Manufacturers recommend the installation
of sarking under roof tiles for … reduct ion of condensation damage
in the roof space ... reduction in heat in the roof space
no evidence of broken roof tiles, water staining on roof tiles or
water staining on timber battens or on timber roof framing that
indicated any evidence of rain water ent r y into the roof space
no evidence of water staining on the roof valley gutter framing that
indicated any evidence of gutter overflow or prolonged rain water
entry into the roof space
no evidence of roof damage, rainwater ingress or water damage in
the roof spac e
isolated patches of moisture staining … are unlikely to be the result
of rain water entry into the roof space
this "staining" on the paper surface of the plasterboard is most
likely the result of circa 20 years of moisture & condensation in the
roof space from high humidity or from wind - blown moisture due to
the failure to install under - tile sarking
evidence of adhesion failure between the daubs of plasterboard
glue & the underside of the bottom chord of the timber truss … is
the most likely cause of the "sagging deflection" in the ceiling
plasterboard
the ceiling plasterboard has not ”dropped” since "dropping" would
indicate a sudden movement … some of the ceiling plasterboard
has "sagged" which is a common aged creep deflect ion of
plasterboard ceilings installed below tiled roofs constructed without
under - tile sarking as discussed
the "sagging" in the plasterboard ceilings has most likely been
gradually o ccurring over the past 20 years
DF
Engineer
Report
29 - 11 - 2017
typical moisture staining (as distinct from water damage)
[observed] … is very likely to be the result of condensation and the
build - up of moisture in the atmosphere of the roof space over the
last 20 years resulting in “plasterboard sagging”
stains on the ceiling plasterboard sheet … are likely the result of
the droplets from condensation not the ingress of rain water which
would normally cause visible damage to the paper reinforcement of
the plasterboard lining
build - up of moisture in the atmosphere withi n the roof space of the
Home is very likely the most significant contributing factor causing
the “sagging” in the ceiling plasterboard sheets, however it remains
Case No 494680 Recommendation Page 7 of 7
my opinion that this “sagging damage” has been gradually
occurring over the past 20 years and is not the result of water
damage from a single storm event
renovation or repair works which includes re - fixing of plasterboard
sheets and installation of control joints as [observed] would not
normally be considered “painting preparation”
the [applicant] is confusing water damage with moisture damage
from condensation from build - up of moisture in the atmosphere of
the roof spac e over the last 20 years or so which has resulted in
“plasterboard sagging”
Applicant’s expert (WJ )
E ngineer
R eport
13 - 2 2 - 2017
p l a sterboard ceilings throughout r esidence has noticeable sag
plasterboard ceilings are direct fixed to t russ
numerous water marks on plasterboard in ceiling
works (listed below) were complet ed approximately 12 months ago
… r eplace 12 x broken tiles
d amage to ceiling appears to have been from wat er ingress.
w ater may have come through cracked tiles & pointing but also
under tiles in extreme weather events ;
c eiling d amage is due to water ingress through existing concrete
tile roof
5.3 Applicant’s further submissions
Conduct of parties’ experts
The applicant provided detailed submissions stating he experienced discrimination in
this claim from the FSP‟s:
engineer‟s (DF‟s) conduct during the site attendance
failure to provide specifically requested information.
I have closely considered all available materials.
While I consider home building damage to be a stressful experience, particularly with
a claim decline, I do not accept the applicant‟s arguments. This is because the terms
and conditions of the policy outline parties‟ mutual obligations. I am not satisfied the
FSP‟s (or its experts‟) actions either:
incorrectly assessed or handled the claim under the policy
discriminated against the applicant (or related parties).
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.